Germany · renewables
Wind power in Nienburg (Weser)
213 wind turbines with 448.7 MW of gross capacity were in operation in Nienburg (Weser) (Niedersachsen) as of 2026-11-05, with a further 63 units (357.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Nienburg (Weser) (Niedersachsen), and how large are they, as of 2026-11-05?
- 213 wind turbines with 448.7 MW of gross capacity were in operation in Nienburg (Weser) (Niedersachsen) as of 2026-11-05, with a further 63 units (357.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Nienburg (Weser)?
- 213 wind turbines with 448.7 MW of gross capacity were in operation in Nienburg (Weser) as of 2026-11-05, with a further 63 units (357.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Nienburg (Weser) in 2025?
- 7 wind turbines with 36.8 MW went into operation in Nienburg (Weser) in 2025; the strongest year of the last two decades was 2021 with 56.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Nienburg (Weser)?
- Westwind Projektierungs GmbH & Co. KG operates 17 wind turbines with 102.0 MW in Nienburg (Weser), the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Nienburg (Weser)?
- ENERCON GmbH leads with 206 wind turbines and 609.7 MW in Nienburg (Weser) (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Nienburg (Weser)?
- The largest registered wind turbine in Nienburg (Weser) has 7.58 MW of gross capacity and is operated by Windpark GmbH & Co. Diepenau KG, commissioned 2014-06-07 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Nienburg (Weser) distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 7 | 0.05 MW | 7 | 0 |
| over 100 kW | 313 | 866.3 MW | 206 | 63 |
How much wind power capacity was commissioned in Nienburg (Weser) each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 6 | 24.2 MW |
| 2025 | 7 | 36.8 MW |
| 2024 | 11 | 42.4 MW |
| 2023 | 8 | 20.7 MW |
| 2022 | 9 | 33.5 MW |
| 2021 | 14 | 56.0 MW |
| 2020 | 1 | 3.00 MW |
| 2017 | 11 | 33.6 MW |
| 2016 | 5 | 17.2 MW |
| 2014 | 6 | 19.2 MW |
| 2013 | 5 | 7.71 MW |
| 2012 | 4 | 14.5 MW |
| 2010 | 6 | 10.3 MW |
| 2009 | 13 | 15.2 MW |
| 2008 | 1 | 2.00 MW |
| 2007 | 2 | 2.85 MW |
| 2006 | 8 | 7.45 MW |
How many wind turbines in Nienburg (Weser) are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 213 | 448.7 MW |
| planned | 63 | 357.1 MW |
| permanently decommissioned | 44 | 60.5 MW |
Which wind turbines are registered in Nienburg (Weser)?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| 1260084 | 7.58 MW | ENERCON GmbH | in operation | 2014-06-07 | Windpark GmbH & Co. Diepenau KG |
| 1260034 | 7.58 MW | ENERCON GmbH | in operation | 2012-08-03 | Windpark GmbH & Co. Diepenau II KG |
| Landesbergen WEA 4 | 7.00 MW | Nordex SE | planned | planned 2028 | Windpark GmbH & Co. Weserbrise KG |
| Landesbergen WEA 2 | 7.00 MW | Nordex SE | planned | planned 2028 | Windpark GmbH & Co. Weserbrise KG |
| Landesbergen WEA 1 | 7.00 MW | Nordex SE | planned | planned 2028 | Windpark GmbH & Co. Weserbrise KG |
| Landesbergen WEA 3 | 7.00 MW | Nordex SE | planned | planned 2028 | Windpark GmbH & Co. Weserbrise KG |
| WP Hoyerhagen II WEA 01 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WEA1_SEB-I_ 251058 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-10-16 | NeXtWind Sebbenhausen-Schweringen GmbH |
| WP Hustedt II WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 4 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 12 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 8 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 14 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| SEB II WEA05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | NeXtWind Sebbenhausen-Schweringen GmbH |
| WEA3_SEB-I_ 251060 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-10-16 | NeXtWind Sebbenhausen-Schweringen GmbH |
| WP Hoyerhagen II WEA 02 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| SEB III WEA06 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | NeXtWind Sebbenhausen-Schweringen GmbH |
| WP Eitzendorf - WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WEA2_SEB-I_ 251059 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-09-24 | NeXtWind Sebbenhausen-Schweringen GmbH |
| WP Eitzendorf - WEA 9 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 6 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 10 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 5 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 13 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Eitzendorf - WEA 11 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WEA4_SEB-I_251061 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-09-24 | NeXtWind Sebbenhausen-Schweringen GmbH |
| WP Eitzendorf - WEA 7 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WEA 03 - N149/5.X | 5.70 MW | Nordex SE | planned | planned 2027 | NeXtWind Harrienstedt GmbH |
| WEA 01 - WP Liebenau/Binnen | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Trave Erneuerbare Energien GmbH & Co. KG |
| CAL-Rep WEA 03 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 01 - N149/5.X | 5.70 MW | Nordex SE | planned | planned 2027 | NeXtWind Harrienstedt GmbH |
| CAL-Rep WEA 02 | 5.70 MW | Nordex Energy GmbH | in operation | 2026-10-08 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 05 - N149/5.X | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | NeXtWind Harrienstedt GmbH |
| WEA 04 - N149/5.X | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | NeXtWind Harrienstedt GmbH |
| CAL-Rep WEA 01 | 5.70 MW | Nordex Energy GmbH | in operation | 2026-10-29 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 02 - N149/5.X | 5.70 MW | Nordex SE | planned | planned 2027 | NeXtWind Harrienstedt GmbH |
| WEA 02 - WP Liebenau/Binnen | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Trave Erneuerbare Energien GmbH & Co. KG |
| WEA 06 - N149/5.X | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | NeXtWind Harrienstedt GmbH |
| Voigtei-Deblinghausen WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| WEA 01 Hämelhausen-Erweiterung | 5.56 MW | ENERCON GmbH | in operation | 2022-08-24 | Windpark GE-Rainmoor GmbH & Co. KG |
| WEA 6 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Navaris GmbH |
| Voigtei-Deblinghausen WEA 6 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| WEA 02 Hämelhausen-Erweiterung | 5.56 MW | ENERCON GmbH | in operation | 2022-05-23 | SM-Wind GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Navaris GmbH |
| Voigtei-Deblinghausen WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| WEA 8 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| Estorf-WEA-1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Estorf GmbH & Co. KG |
| WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| WEA 9 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| WEA 7 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Navaris GmbH |
| Voigtei-Deblinghausen WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Navaris GmbH |
| WEA 03 Hämelhausen-Erweiterung | 5.56 MW | ENERCON GmbH | in operation | 2022-06-24 | 1. SES Wind-Betriebs GmbH & Co. KG |
| WEA 6 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| Voigtei-Deblinghausen WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| Voigtei-Deblinghausen WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Navaris GmbH |
| WEA 7 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Navaris GmbH |
| WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Navaris GmbH |
| WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| Voigtei-Deblinghausen WEA 7 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| WEA 03 - WP Liebenau/Binnen | 4.80 MW | Nordex Germany GmbH | planned | planned 2028 | Trave Erneuerbare Energien GmbH & Co. KG |
| E-138 WEA02 | 4.26 MW | ENERCON GmbH | in operation | 2025-08-22 | Agroenergy GmbH |
| 1390035 | 4.26 MW | ENERCON GmbH | in operation | 2025-01-10 | Vierte Windenergie Wellie GmbH & Co. KG |
| WEA 1 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | MKB-Windenergie GmbH & Co. Liebenauer Heide KG |
| Leese-Loccum WEA1 | 4.26 MW | ENERCON GmbH | in operation | 2026-07-14 | wpd Windpark Leese-Loccum GmbH & Co. KG |
| WP Lohhof WEA 2 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Dietmar Harting Windkraft GmbH |
| 1390036 | 4.26 MW | ENERCON GmbH | in operation | 2024-12-18 | Alterric Windpark GmbH & Co. Frische Brise I KG |
| WEA 2 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | MKB-Windenergie GmbH & Co. Liebenauer Heide KG |
| WP Hämelhausen WEA 4 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | M+S Wind GmbH & Co KG |
| 1390033 | 4.26 MW | ENERCON GmbH | in operation | 2024-12-23 | Dritte Windenergie Wellie GmbH & Co. KG |
| 1390030 | 4.26 MW | ENERCON GmbH | in operation | 2024-12-19 | Alterric Windpark GmbH & Co. Frische Brise I KG |
| 1390029 | 4.26 MW | ENERCON GmbH | in operation | 2024-12-23 | Erste Windenergie Wellie GmbH & Co KG |
| Leese-Loccum WEA3 | 4.26 MW | ENERCON GmbH | in operation | 2026-07-07 | WinLocKG |
| 1390034 | 4.26 MW | ENERCON GmbH | in operation | 2024-12-19 | Alterric Windpark GmbH & Co. Frische Brise I KG |
| WP Lohhof WEA03 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Dietmar Harting Windkraft GmbH |
| E-138 WEA01 | 4.26 MW | ENERCON GmbH | in operation | 2025-08-21 | Agroenergy GmbH |
| Leese-Loccum WEA2 | 4.26 MW | ENERCON GmbH | in operation | 2026-07-15 | wpd Windpark Leese-Loccum GmbH & Co. KG |
| WP Lohhof WEA 1 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Dietmar Harting Windkraft GmbH |
| 1390032 | 4.26 MW | ENERCON GmbH | in operation | 2024-12-20 | Alterric Windpark GmbH & Co. Frische Brise I KG |
| 1390031 | 4.26 MW | ENERCON GmbH | in operation | 2024-12-23 | Zweite Windenergie Wellie GmbH & Co. KG |
| 1160136 | 4.20 MW | ENERCON GmbH | in operation | 2024-07-29 | Höfen Projekt GmbH & Co. KG |
| HÖFE - WEA 3 | 4.20 MW | ENERCON GmbH | in operation | 2022-11-23 | Windpark Höfen GmbH & Co. KG |
| unit operated by a private individual | 4.20 MW | ENERCON GmbH | in operation | 2022-12-30 | private individual |
| 1160134 | 4.20 MW | ENERCON GmbH | in operation | 2024-06-21 | Windenergie Baukeloh GmbH & Co. KG |
| 1160135 | 4.20 MW | ENERCON GmbH | in operation | 2024-07-08 | Höfen Projekt GmbH & Co. KG |
| HÖFE - WEA 4 | 4.20 MW | ENERCON GmbH | in operation | 2022-11-17 | Windpark Höfen GmbH & Co. KG |
| HÖFE - WEA 5 | 4.20 MW | ENERCON GmbH | in operation | 2022-12-07 | Windpark Höfen GmbH & Co. KG |
| WP Bruchhagen WEA 3 | 4.00 MW | ENERCON GmbH | in operation | 2021-03-05 | 93. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 5 | 4.00 MW | ENERCON GmbH | in operation | 2021-04-15 | 100. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 7 | 4.00 MW | ENERCON GmbH | in operation | 2021-06-03 | 167. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 14 | 4.00 MW | ENERCON GmbH | in operation | 2021-02-26 | 168. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 10 | 4.00 MW | ENERCON GmbH | in operation | 2021-01-27 | 98. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 8 | 4.00 MW | ENERCON GmbH | in operation | 2021-05-14 | 97. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 9 | 4.00 MW | ENERCON GmbH | in operation | 2021-05-06 | 97. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 6 | 4.00 MW | ENERCON GmbH | in operation | 2021-05-11 | 95. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 4 | 4.00 MW | ENERCON GmbH | in operation | 2021-03-24 | 94. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 12 | 4.00 MW | ENERCON GmbH | in operation | 2021-03-15 | 95. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 2 | 4.00 MW | ENERCON GmbH | in operation | 2021-06-18 | 92. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 11 | 4.00 MW | ENERCON GmbH | in operation | 2021-04-23 | 99. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 13 | 4.00 MW | ENERCON GmbH | in operation | 2021-03-30 | 101. WestWind Windpark GmbH & Co. KG |
| WP Bruchhagen WEA 1 | 4.00 MW | ENERCON GmbH | in operation | 2021-08-10 | 92. WestWind Windpark GmbH & Co. KG |
| V 245195-01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-08-08 | Windpark Oyle-Bühren GmbH & Co. KG |
| V 245200-06 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-06-29 | Windpark Oyle-Bühren GmbH & Co. KG |
| WEA02-208849 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-08 | Windpark Hämelheide GmbH & Co. KG |
| WEA03-208850 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-23 | Windpark Hämelheide GmbH & Co. KG |
| V 245199-02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-06-30 | Windpark Oyle-Bühren GmbH & Co. KG |
| WEA01-208848 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-16 | Windpark Hämelhausen GmbH & Co.KG |
| WP Oyle-Bühren WEA 4 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-06-30 | Windwerk Bühren GmbH & Co KG |
| V 245198-05 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-06-30 | Windpark Oyle-Bühren GmbH & Co. KG |
| WEA04-208851 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-29 | Windpark Hämelhausen GmbH & Co.KG |
| V 245196-03 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-07-01 | Windpark Oyle-Bühren GmbH & Co. KG |
| WEA05-208852 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-17 | Windpark Hämelhausen GmbH & Co.KG |
| WEA 12 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-07-28 | Windstrom Wienbergen GmbH & Co.KG |
| V217446 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-07-19 | Sechzehnte Bürgerwindpark GmbH & Co. KG |
| WP Hoyerhagen WEA 5 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-13 | 134. WestWind Windpark GmbH & Co. KG |
| WP Hoyerhagen WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-20 | 131. WestWind Windpark GmbH & Co. KG |
| WP Hoyerhagen WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2017-08-31 | 132. WestWind Windpark GmbH & Co. KG |
| WP Hoyerhagen WEA 9 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-09 | 138. WestWind Windpark GmbH & Co. KG |
| WP Hoyerhagen WEA 8 | 3.00 MW | ENERCON GmbH | in operation | 2017-05-31 | 137. WestWind Windpark GmbH & Co. KG |
| 1150032 | 3.00 MW | ENERCON GmbH | in operation | 2014-11-14 | Windpark GmbH & Co. Diepenau KG |
| 1151194 | 3.00 MW | ENERCON GmbH | in operation | 2020-08-28 | Windenergie Loccum GmbH & Co. KG |
| WP Hoyerhagen WEA 6 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-26 | 140. WestWind Windpark GmbH & Co. KG |
| WP Hoyerhagen WEA 4 | 3.00 MW | ENERCON GmbH | in operation | 2017-08-08 | 133. WestWind Windpark GmbH & Co. KG |
| WP Hoyerhagen WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-05 | 130. WestWind Windpark GmbH & Co. KG |
| WP Hoyerhagen WEA 7 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-16 | 136. WestWind Windpark GmbH & Co. KG |
| E82 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-16 | Schlamann Kalksandsteinwerk GmbH |
| WP Loccum WEA 2 | 2.30 MW | ENERCON GmbH | in operation | 2014-11-07 | 110. WestWind Windpark GmbH & Co. KG |
| 33 WEA Landesbergen I | 2.30 MW | ENERCON GmbH | in operation | 2012-08-01 | VR-Bank in Nordhessen Westthüringen eG |
| 33 WEA Landesbergen II | 2.30 MW | ENERCON GmbH | in operation | 2012-08-17 | VR-Bank in Nordhessen Westthüringen eG |
| WEA 09 - 824886 | 2.30 MW | ENERCON GmbH | in operation | 2013-04-29 | 3. Stadtwerke Bielefeld Wind GmbH & Co. KG |
| 783584 | 2.30 MW | ENERCON GmbH | in operation | 2012-03-14 | Windpark GmbH & Co. Landesbergen Süd KG |
| WEA 10 - 824887 | 2.30 MW | ENERCON GmbH | in operation | 2013-04-29 | 4. Stadtwerke Bielefeld Wind GmbH & Co. KG |
| WP Loccum WEA 1 | 2.30 MW | ENERCON GmbH | in operation | 2014-11-20 | 109. WestWind Windpark GmbH & Co. KG |
| WEA 08 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-30 | 68. Westwind Wind Farm GmbH & Co KG |
| WKA Schweringen 1 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-09-26 | Windkraft Schweringen GmbH |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-06-04 | private individual |
| WP Mensinghausen WEA 4 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-22 | 48. WestWind Windpark GmbH & Co KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-06-04 | private individual |
| WEA 1 | 2.00 MW | ENERCON GmbH | in operation | 2008-03-10 | WGW-GmbH |
| WP Mensinghausen WEA 6 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-24 | 51. WestWind Windpark GmbH & Co KG |
| WEA 01 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-31 | 49. Westwind Windpark GmbH & Co KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2005-07-19 | private individual |
| WP Mensinghausen WEA 5 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-23 | 50. WestWind Windpark GmbH & Co KG |
| WEA 02 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-30 | 66. Westwind Windpark GmbH & Co KG |
| WKA Schweringen 2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-09-24 | Windkraft Schweringen GmbH |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2005-07-21 | private individual |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-11-12 | private individual |
| WP Mensinghausen WEA 3 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-10 | 47. WestWind Windpark GmbH & Co. KG |
| V18407 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-06-24 | Wind Partner 23 Hilgermissen ApS & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2005-07-29 | private individual |
| WEA 07 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-22 | 67. Westwind Wind Farm GmbH & Co KG |
| Wienbergen E-66 | 2.00 MW | ENERCON GmbH | in operation | 2004-03-01 | Zweite Bürgerwindpark GmbH & Co. KG, |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2005-07-23 | private individual |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-06-09 | private individual |
| 78807 | 2.00 MW | ENERCON GmbH | in operation | 2006-07-06 | Windpark GmbH & Co. Weserbrise KG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-07-07 | private individual |
| WP Oyle WEA 4 | 2.00 MW | ENERCON GmbH | in operation | 2007-02-02 | 7. WestWind Windpark GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2003-11-27 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-09-27 | private individual |
| 70713_Eystrup_A | 1.80 MW | ENERCON GmbH | in operation | 2003-01-30 | RWE Wind Onshore & PV Deutschland GmbH |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-12-23 | private individual |
| 701388 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-30 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| E70712 Nienburg | 1.80 MW | ENERCON GmbH | in operation | 2002-06-27 | SR Wind GmbH & Co. KG |
| 701385 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-17 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| 70714_Eystrup_A | 1.80 MW | ENERCON GmbH | in operation | 2003-01-29 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Oyle WEA 1 | 1.80 MW | ENERCON GmbH | in operation | 2002-11-28 | 7. WestWind Windpark GmbH & Co. KG |
| 70717_Eystrup_A | 1.80 MW | ENERCON GmbH | in operation | 2003-02-04 | RWE Wind Onshore & PV Deutschland GmbH |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-10-17 | private individual |
| 70710_Eystrup_B | 1.80 MW | ENERCON GmbH | in operation | 2002-06-27 | RWE Wind Onshore & PV Deutschland GmbH |
| 70823 | 1.80 MW | ENERCON GmbH | in operation | 2002-12-20 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| 70825 | 1.80 MW | ENERCON GmbH | in operation | 2002-12-23 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| 701392 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-30 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| WP Oyle WEA 2 | 1.80 MW | ENERCON GmbH | in operation | 2002-12-02 | 7. WestWind Windpark GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-10-14 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-12-21 | private individual |
| 701386 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-28 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| 701391 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-14 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| WP Oyle WEA 3 | 1.80 MW | ENERCON GmbH | in operation | 2002-12-05 | 7. WestWind Windpark GmbH & Co. KG |
| 701389 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-31 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| 701384 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-28 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-10-13 | private individual |
| 70711_Eystrup_B | 1.80 MW | ENERCON GmbH | in operation | 2002-06-26 | RWE Wind Onshore & PV Deutschland GmbH |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-12-30 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2005-01-27 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-09-10 | private individual |
| 701390 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-14 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-12-19 | private individual |
| 701387 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-28 | Alterric Windpark GmbH & Co. Deblinghausen KG |
| 70824 | 1.80 MW | ENERCON GmbH | in operation | 2002-10-16 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-10-20 | private individual |
| 70520 | 1.50 MW | REpower Systems SE | in operation | 2005-11-11 | QE Haßbergen GmbH |
| 70463 | 1.50 MW | REpower Systems SE | in operation | 2004-12-09 | NeXtWind Harrienstedt GmbH |
| NM82 / 18971-70816 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2004-07-12 | NeXtWind Harrienstedt GmbH |
| NM82 / 18972-70813 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2004-07-12 | NeXtWind Harrienstedt GmbH |
| GE15431379 | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-04-21 | Windpark Hilgermissen GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | NEG Micon Deutschland GmbH | permanently decommissioned | 2004-07-12 | private individual |
| unit operated by a private individual | 1.50 MW | NEG Micon Deutschland GmbH | permanently decommissioned | 2004-07-12 | private individual |
| 701455 | 1.50 MW | ENERCON GmbH | in operation | 2003-12-02 | Alterric Windpark GmbH & Co. Frische Brise I KG |
| unit operated by a private individual | 1.50 MW | General Electric Deutschland Holding GmbH | permanently decommissioned | 2002-11-27 | private individual |
| 70519 | 1.50 MW | REpower Systems SE | in operation | 2005-11-11 | QE Haßbergen GmbH |
| unit operated by a private individual | 1.50 MW | General Electric Deutschland Holding GmbH | permanently decommissioned | 2002-11-27 | private individual |
| unit operated by a private individual | 1.50 MW | NEG Micon Deutschland GmbH | permanently decommissioned | 2004-07-12 | private individual |
| 70521 | 1.50 MW | REpower Systems SE | in operation | 2005-11-15 | QE Haßbergen GmbH |
| 70518 | 1.50 MW | REpower Systems SE | in operation | 2005-11-09 | QE Haßbergen GmbH |
| 701454 | 1.50 MW | ENERCON GmbH | in operation | 2003-12-02 | Alterric Windpark GmbH & Co. Frische Brise I KG |
| Windkraftanlage Marklohe 3 | 1.50 MW | Fuhrländer AG | in operation | 2010-02-05 | Windwandler GmbH & Co. KG |
| 701453 | 1.50 MW | ENERCON GmbH | in operation | 2003-11-28 | Alterric Windpark GmbH & Co. Frische Brise I KG |
| GE15431378 | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-04-26 | Windpark Hilgermissen GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | General Electric Deutschland Holding GmbH | permanently decommissioned | 2002-11-28 | private individual |
| unit operated by a private individual | 1.50 MW | General Electric Deutschland Holding GmbH | permanently decommissioned | 2004-01-22 | private individual |
| 70517 | 1.50 MW | REpower Systems SE | in operation | 2005-11-03 | QE Haßbergen GmbH |
| WEA Rohrsen | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-20 | Naturstrom Rohrsen GmbH & Co KG |
| WKA004 - WEA Haustedt | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-07-13 | Hanse Windkraft GmbH |
| WKA001 - Frestorf | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2000-12-28 | Hanse Windkraft GmbH |
| V67155 Wietzen | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-20 | TiLeTo Ecostrom GmbH |
| WEA Frestorf West | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2003-09-18 | 27. WestWind Windpark GmbH & Co. KG |
| WKA002 - Stolzenau 01 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-06-21 | Hanse Windkraft GmbH |
| V67139 Wietzen | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-21 | TiLeTo Ecostrom GmbH |
| WKA007 - Stolzenau 02 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-06-14 | Hanse Windkraft GmbH |
| V67141 Wietzen | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-21 | TiLeTo Ecostrom GmbH |
| V 20357-01 | 0.85 MW | Sonstige | in operation | 2005-12-28 | Windpark Hassel GmbH & Co. KG |
| WP Wendenborstel 14 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2004-11-19 | ecoJoule construct GmbH |
| unit operated by a private individual | 0.85 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-12-30 | private individual |
| V 25962-06 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2006-12-30 | Windpark Liebenau GmbH & Co. KG Renditefonds |
| MKB-Windenergie V16298 | 0.85 MW | Sonstige | in operation | 2002-12-12 | MKB-Windenergie GmbH & Co. Liebenauer Heide KG |
| WP Wendenborstel MLK | 0.85 MW | Vestas Deutschland GmbH | in operation | 2004-11-19 | MLK Beteiligungs-GmbH |
| WP Wendenborstel | 0.85 MW | Vestas Deutschland GmbH | in operation | 2004-11-23 | ecoJoule construct GmbH |
| unit operated by a private individual | 0.85 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-12-30 | private individual |
| MKB-Windenergie V16322 | 0.85 MW | Sonstige | in operation | 2002-12-12 | MKB-Windenergie GmbH & Co. Liebenauer Heide KG |
| unit operated by a private individual | 0.85 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-12-28 | private individual |
| unit operated by a private individual | 0.85 MW | Vestas Deutschland GmbH | in operation | 2004-11-17 | private individual |
| V 25963-07 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2007-02-02 | Windpark Liebenau GmbH & Co. KG Renditefonds |
| V 20359-03 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2005-12-23 | Windpark Hassel GmbH & Co. KG |
| unit operated by a private individual | 0.85 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-12-22 | private individual |
| V 20358-02 | 0.85 MW | Sonstige | in operation | 2005-12-28 | Windpark Hassel GmbH & Co. KG |
| WP Wendenborstel IQ | 0.85 MW | Vestas Deutschland GmbH | in operation | 2004-11-20 | ecoJoule construct GmbH |
| unit operated by a private individual | 0.85 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-12-23 | private individual |
| V 20360-04 | 0.85 MW | Sonstige | in operation | 2005-12-29 | Windpark Hassel GmbH & Co. KG |
| WP Wendenborstel | 0.85 MW | Vestas Deutschland GmbH | in operation | 2004-11-18 | ecoJoule construct GmbH |
| 481807 | 0.80 MW | ENERCON GmbH | in operation | 2009-12-11 | Windpark GmbH & Co. Weserbrise KG |
| 481808 | 0.80 MW | ENERCON GmbH | in operation | 2009-12-11 | Windpark GmbH & Co. Weserbrise KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2006-12-06 | private individual |
| 48192 | 0.80 MW | ENERCON GmbH | in operation | 2005-09-30 | Windpark GmbH & Co. Weserbrise KG |
| WEA 53839 | 0.80 MW | ENERCON GmbH | in operation | 2009-12-18 | HERO GbR |
| 48188 | 0.80 MW | ENERCON GmbH | in operation | 2005-09-29 | Windpark GmbH & Co. Weserbrise KG |
| 48494 | 0.80 MW | ENERCON GmbH | in operation | 2006-01-18 | Windconcept Marklohe OHG |
| 48191 | 0.80 MW | ENERCON GmbH | in operation | 2005-09-29 | Windpark GmbH & Co. Weserbrise KG |
| 53992 | 0.80 MW | ENERCON GmbH | in operation | 2009-11-13 | Alterric Windpark GmbH & Co. Frische Brise I KG |
| 48185 | 0.80 MW | ENERCON GmbH | in operation | 2005-10-07 | Windpark GmbH & Co. Weserbrise KG |
| 48184 | 0.80 MW | ENERCON GmbH | in operation | 2005-09-29 | Windpark GmbH & Co. Weserbrise KG |
| 481806 | 0.80 MW | ENERCON GmbH | in operation | 2009-12-10 | Windpark GmbH & Co. Weserbrise KG |
| E 53945-02 | 0.80 MW | ENERCON GmbH | in operation | 2009-12-31 | Windpark Eystrup-Hassel GmbH & Co. KG |
| WKA Marklohe II | 0.80 MW | ENERCON GmbH | in operation | 2013-12-13 | WKA Marklohe II GmbH & Co. KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2010-09-14 | private individual |
| 48189 | 0.80 MW | ENERCON GmbH | in operation | 2005-10-11 | Windpark GmbH & Co. Weserbrise KG |
| 53991 | 0.80 MW | ENERCON GmbH | in operation | 2009-11-06 | Alterric Windpark GmbH & Co. Frische Brise I KG |
| E 53944-01 | 0.80 MW | ENERCON GmbH | in operation | 2009-12-31 | Windpark Eystrup-Hassel GmbH & Co. KG |
| 48187 | 0.80 MW | ENERCON GmbH | in operation | 2005-10-12 | Windpark GmbH & Co. Weserbrise KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2006-01-22 | private individual |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2006-01-21 | private individual |
| 48190 | 0.80 MW | ENERCON GmbH | in operation | 2005-10-06 | Windpark GmbH & Co. Weserbrise KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2006-01-21 | private individual |
| E53 | 0.80 MW | ENERCON GmbH | in operation | 2009-10-20 | Schlamann Kalksandsteinwerk GmbH |
| 48186 | 0.80 MW | ENERCON GmbH | in operation | 2005-09-29 | Windpark GmbH & Co. Weserbrise KG |
| unit operated by a private individual | 0.60 MW | DeWind GmbH | permanently decommissioned | 1999-02-01 | private individual |
| WP Lemke WEA 4 | 0.60 MW | ENERCON GmbH | in operation | 1999-08-19 | WestWind Windpark GmbH & Co. Lemker Geest KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2004-10-25 | private individual |
| WEA 3 | 0.60 MW | ENERCON GmbH | in operation | 1999-11-26 | Steyerberger Verteiler GbR |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-03-28 | private individual |
| WP Lemke WEA 2 | 0.60 MW | ENERCON GmbH | in operation | 1999-08-20 | WestWind Windpark GmbH & Co. Lemke I KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 1999-08-18 | private individual |
| unit operated by a private individual | 0.60 MW | DeWind GmbH | permanently decommissioned | 1999-02-01 | private individual |
| WP Lemke WEA 3 | 0.60 MW | ENERCON GmbH | in operation | 1999-08-19 | WestWind Windpark GmbH & Co. Lemker Geest KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 1999-11-26 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-01-28 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 1999-11-26 | private individual |
| unit operated by a private individual | 0.60 MW | DeWind GmbH | permanently decommissioned | 1999-02-01 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2001-06-01 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 1999-11-26 | private individual |
| unit operated by a private individual | 0.60 MW | – | in operation | 2002-02-28 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2006-01-24 | private individual |
| 2-A72634/42 | 0.50 MW | ENERCON GmbH | in operation | 1998-10-10 | Dietmar Harting Windkraft GmbH |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1998-07-02 | private individual |
| 40820 | 0.50 MW | ENERCON GmbH | in operation | 1997-02-28 | HKWHB - Windenergie GmbH & Co. KG |
| Minna 63283 | 0.50 MW | NEG Micon Deutschland GmbH | in operation | 1997-11-25 | Windpark Steimbke GmbH & Co. KG |
| Heinrich 63284 | 0.50 MW | NEG Micon Deutschland GmbH | in operation | 1997-11-25 | Windpark Steimbke GmbH & Co. KG |
| Windkraftanlage E 40 Lohof | 0.50 MW | ENERCON GmbH | in operation | 1998-04-15 | Dietmar Harting Windkraft GmbH |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1998-07-02 | private individual |
| 4-A72633/41 | 0.50 MW | ENERCON GmbH | in operation | 1998-10-10 | Dietmar Harting Windkraft GmbH |
| 1737700010 | 0.50 MW | ENERCON GmbH | in operation | 1998-10-10 | Dietmar Harting Windkraft GmbH |
| 3-A72631/44 | 0.50 MW | ENERCON GmbH | in operation | 1998-10-10 | Dietmar Harting Windkraft GmbH |
| 40818 | 0.50 MW | ENERCON GmbH | in operation | 1997-02-27 | HKWHB - Windenergie GmbH & Co. KG |
| 40819 | 0.50 MW | ENERCON GmbH | in operation | 1997-02-27 | HKWHB - Windenergie GmbH & Co. KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Nienburg (Weser)?
| Operator | Units | Capacity |
|---|---|---|
| Westwind Projektierungs GmbH & Co. KG | 17 | 102.0 MW |
| Alterric Windpark GmbH & Co. Deblinghausen KG | 16 | 55.1 MW |
| Schierloh-Engineering GmbH | 9 | 50.0 MW |
| Windpark GmbH & Co. Weserbrise KG | 17 | 39.6 MW |
| Navaris GmbH | 7 | 38.9 MW |
| NeXtWind Harrienstedt GmbH | 9 | 38.7 MW |
| NeXtWind Sebbenhausen-Schweringen GmbH | 6 | 36.0 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 8 | 26.1 MW |
| Alterric Windpark GmbH & Co. Frische Brise I KG | 9 | 23.1 MW |
| Windpark Oyle-Bühren GmbH & Co. KG | 5 | 17.2 MW |
Which manufacturer accounts for the most wind power capacity in Nienburg (Weser)?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 206 | 609.7 MW |
| Vestas Deutschland GmbH | 44 | 114.5 MW |
| Nordex SE | 11 | 46.0 MW |
| Nordex Energy GmbH | 8 | 34.5 MW |
| Nordex Germany GmbH | 3 | 16.2 MW |
| NEG Micon Deutschland GmbH | 16 | 15.2 MW |
| REpower Systems SE | 6 | 9.00 MW |
| General Electric Deutschland Holding GmbH | 4 | 6.00 MW |
| GE Wind Energy GmbH | 3 | 4.50 MW |
| Sonstige | 6 | 4.26 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Nienburg (Weser) (Niedersachsen), and how large a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.