Germany · renewables
Wind power in Lüneburg
111 wind turbines with 260.7 MW of gross capacity were in operation in Lüneburg (Niedersachsen) as of 2026-11-05, with a further 41 units (272.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Lüneburg (Niedersachsen), and how large are they, as of 2026-11-05?
- 111 wind turbines with 260.7 MW of gross capacity were in operation in Lüneburg (Niedersachsen) as of 2026-11-05, with a further 41 units (272.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Lüneburg?
- 111 wind turbines with 260.7 MW of gross capacity were in operation in Lüneburg as of 2026-11-05, with a further 41 units (272.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Lüneburg in 2024?
- 1 wind turbines with 4.20 MW went into operation in Lüneburg in 2024; the strongest year of the last two decades was 2017 with 122.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Lüneburg?
- Windpark Lemgrabe GmbH & Co. KG operates 10 wind turbines with 68.0 MW in Lüneburg, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Lüneburg?
- Nordex SE leads with 18 wind turbines and 121.1 MW in Lüneburg (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Lüneburg?
- The largest registered wind turbine in Lüneburg has 7.20 MW of gross capacity and is operated by Bürgerwindpark Häcklingen-Melbeck Betriebsgesellschaft mbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Lüneburg distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 0 | 1 |
| over 100 kW | 157 | 542.3 MW | 111 | 40 |
How much wind power capacity was commissioned in Lüneburg each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2024 | 1 | 4.20 MW |
| 2023 | 4 | 21.0 MW |
| 2018 | 2 | 5.60 MW |
| 2017 | 43 | 122.5 MW |
| 2013 | 1 | 2.00 MW |
| 2007 | 3 | 6.00 MW |
| 2006 | 1 | 1.50 MW |
How many wind turbines in Lüneburg are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 41 | 272.0 MW |
| in operation | 111 | 260.7 MW |
| permanently decommissioned | 6 | 9.60 MW |
Which wind turbines are registered in Lüneburg?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| HMZ-1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindpark Häcklingen-Melbeck Betriebsgesellschaft mbH & Co. KG |
| WEA 2 BETZ | 7.00 MW | ENERCON GmbH | planned | planned 2029 | BayWa r.e. Energieprojekte GmbH |
| WEA 5 BETZ | 7.00 MW | ENERCON GmbH | planned | planned 2029 | BayWa r.e. Energieprojekte GmbH |
| 03 | 7.00 MW | Nordex SE | planned | planned 2027 | Windpark Süttorf Repowering GmbH & Co. KG |
| 01 | 7.00 MW | Nordex SE | planned | planned 2027 | wpd Windpark Süttorf Erweiterung GmbH & Co. KG |
| WEA 4 BETZ | 7.00 MW | ENERCON GmbH | planned | planned 2029 | BayWa r.e. Energieprojekte GmbH |
| 02 | 7.00 MW | Nordex SE | planned | planned 2027 | wpd Windpark Süttorf Erweiterung GmbH & Co. KG |
| 04 | 7.00 MW | Nordex SE | planned | planned 2027 | Windpark Süttorf Repowering GmbH & Co. KG |
| WEA 1 BETZ | 7.00 MW | ENERCON GmbH | planned | planned 2029 | BayWa r.e. Energieprojekte GmbH |
| WEA 3 BETZ | 7.00 MW | ENERCON GmbH | planned | planned 2029 | BayWa r.e. Energieprojekte GmbH |
| WP Breetzer Berge - WEA 1 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Breetzer Berge GmbH & Co. KG |
| WP Breetzer Berge - WEA 5 | 6.80 MW | Nordex SE | planned | planned 2029 | Windpark Breetzer Berge GmbH & Co. KG |
| WEA 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| Oerzen Repowering - WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Landwind Planung GmbH & Co. KG |
| WEA 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| WEA 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| Oerzen Repowering - WEA 5 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | Landwind Planung GmbH & Co. KG |
| Oerzen Repowering - WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Landwind Planung GmbH & Co. KG |
| WEA 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| BWP Kirchgellersen WEA06 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindpark Kirchgellersen GmbH & Co. KG |
| BWP Kirchgellersen WEA04 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindpark Kirchgellersen GmbH & Co. KG |
| BWP Kirchgellersen WEA07 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindpark Kirchgellersen GmbH & Co. KG |
| WP Breetzer Berge - WEA 4 | 6.80 MW | Nordex SE | planned | planned 2029 | Windpark Breetzer Berge GmbH & Co. KG |
| WP Breetzer Berge - WEA 6 | 6.80 MW | Nordex SE | planned | planned 2029 | Windpark Breetzer Berge GmbH & Co. KG |
| WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| Oerzen Repowering - WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Landwind Planung GmbH & Co. KG |
| BWP Kirchgellersen WEA01 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindpark Kirchgellersen GmbH & Co. KG |
| WEA 11 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| WP Breetzer Berge - WEA 2 | 6.80 MW | Nordex SE | planned | planned 2029 | Windpark Breetzer Berge GmbH & Co. KG |
| WEA 10 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| BWP Kirchgellersen WEA03 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindpark Kirchgellersen GmbH & Co. KG |
| WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| WEA 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| WEA 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lemgrabe GmbH & Co. KG |
| BWP Kirchgellersen WEA05 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindpark Kirchgellersen GmbH & Co. KG |
| Oerzen Repowering - WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Landwind Planung GmbH & Co. KG |
| BWP Kirchgellersen WEA02 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindpark Kirchgellersen GmbH & Co. KG |
| WP Breetzer Berge - WEA 3 | 6.80 MW | Nordex SE | planned | planned 2029 | Windpark Breetzer Berge GmbH & Co. KG |
| Boltersen V150-5,6 WEA 1 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | WEA Boltersen GmbH & Co. KG |
| Wendhausen V-150-5,6 WEA02 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Ostheide Repowering GmbH & Co. KG |
| WP Thomasburg - WEA 1 | 5.50 MW | ENERCON GmbH | in operation | 2023-04-12 | EWS Windpark Thomasburg GmbH & Co. KG |
| WP Thomasburg - WEA 2 | 5.50 MW | ENERCON GmbH | in operation | 2023-05-09 | EWS Windpark Thomasburg GmbH & Co. KG |
| WP Thomasburg - WEA 3 | 5.50 MW | ENERCON GmbH | in operation | 2023-03-17 | EWS Windpark Thomasburg GmbH & Co. KG |
| Südergellersen II | 4.50 MW | Nordex SE | in operation | 2023-01-27 | Südergellersen Landwind GmbH & Co.KG |
| Am Wind Mühle 5 GmbH & Co KG | 4.20 MW | ENERCON GmbH | in operation | 2024-03-07 | Am Wind Mühle 5 GmbH & Co KG |
| Heidewind GmbH & Co. KG | 3.30 MW | Nordex Energy GmbH | in operation | 2017-12-22 | Heidewind GmbH & Co.KG |
| REB - Energieerzeugungsgesellschaft mbH & Co. KG | 3.30 MW | Nordex Energy GmbH | in operation | 2017-12-19 | REB Energieerzeugungsgesellschaft mbH & Co KG |
| Heidewind GmbH & Co. KG | 3.30 MW | Nordex Energy GmbH | in operation | 2018-01-23 | Heidewind GmbH & Co.KG |
| Tellmer 4 | 3.05 MW | ENERCON GmbH | in operation | 2017-05-26 | Windpark Tellmer GmbH & Co . KG |
| Tellmer 3 | 3.05 MW | ENERCON GmbH | in operation | 2017-05-16 | Windpark Tellmer GmbH & Co . KG |
| Tellmer 2 | 3.05 MW | ENERCON GmbH | in operation | 2017-04-28 | Windpark Tellmer GmbH & Co . KG |
| Tellmer 1 | 3.05 MW | ENERCON GmbH | in operation | 2017-04-28 | Windpark Tellmer GmbH & Co . KG |
| WEA 4 (Etzen Flur 2 28/1) | 3.00 MW | ENERCON GmbH | in operation | 2017-09-27 | Bürgerwindpark Etzen GmbH & Co. KG |
| WEA 1 (Etzen 2:28/1) | 3.00 MW | ENERCON GmbH | in operation | 2017-09-08 | Bürgerwindpark Etzen GmbH & Co. KG |
| WEA 2 (Etzen 2:28/1) | 3.00 MW | ENERCON GmbH | in operation | 2017-11-03 | Bürgerwindpark Etzen GmbH & Co. KG |
| WEA 3 (Amelinghausen 1,322) | 3.00 MW | ENERCON GmbH | in operation | 2017-12-28 | Bürgerwindpark Etzen GmbH & Co. KG |
| Wetzen1 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-05-27 | Windpark Wetzen GmbH & Co. KG |
| EH-6 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-07-11 | Bürgerwindpark Ehlbeck Betreibergesellschaft mbH & Co. KG |
| HM-4 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-07-14 | Bürgerwindpark Häcklingen-Melbeck Betriebsgesellschaft mbH & Co. KG |
| EH-4 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-06-29 | Bürgerwindpark Ehlbeck Betreibergesellschaft mbH & Co. KG |
| BA-1 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-09-26 | Bürgerwindpark Bardowick Betreibergesellschaft mbH & Co. KG |
| BA-3 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-09-01 | Bürgerwindpark Bardowick Betreibergesellschaft mbH & Co. KG |
| BA-8 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-09-11 | Bürgerwindpark Bardowick Betreibergesellschaft mbH & Co. KG |
| WH-6 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-05-12 | Bürgerwindpark Wendhausen Betreibergesellschaft mbH & Co. KG |
| WH-1 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-04-29 | Bürgerwindpark Wendhausen Betreibergesellschaft mbH & Co. KG |
| WH-4 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-05-17 | Bürgerwindpark Wendhausen Betreibergesellschaft mbH & Co. KG |
| BA-5 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-09-25 | Bürgerwindpark Bardowick Betreibergesellschaft mbH & Co. KG |
| WH-5 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-04-24 | Bürgerwindpark Wendhausen Betreibergesellschaft mbH & Co. KG |
| EH-5 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-07-12 | Bürgerwindpark Ehlbeck Betreibergesellschaft mbH & Co. KG |
| EH-7 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-07-24 | Bürgerwindpark Ehlbeck Betreibergesellschaft mbH & Co. KG |
| BA-4 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-09-05 | Bürgerwindpark Bardowick Betreibergesellschaft mbH & Co. KG |
| Wetzen5 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-05-31 | Windpark Wetzen GmbH & Co. KG |
| EH-2 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-06-29 | Bürgerwindpark Ehlbeck Betreibergesellschaft mbH & Co. KG |
| Wetzen4 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-06-10 | Bürger-Windpark Amelinghausen eG |
| EH-1 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-06-29 | Bürgerwindpark Ehlbeck Betreibergesellschaft mbH & Co. KG |
| HM-2 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-06-28 | Bürgerwindpark Häcklingen-Melbeck Betriebsgesellschaft mbH & Co. KG |
| WH-3 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-04-27 | Bürgerwindpark Wendhausen Betreibergesellschaft mbH & Co. KG |
| HM-1 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-06-29 | Bürgerwindpark Häcklingen-Melbeck Betriebsgesellschaft mbH & Co. KG |
| WEA 7 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-06-22 | WEB Energieerzeugungsgesellschaft mbH & Co KG |
| EH-3 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-06-30 | Bürgerwindpark Ehlbeck Betreibergesellschaft mbH & Co. KG |
| Wetzen2 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-05-20 | Windpark Wetzen GmbH & Co. KG |
| BA-6 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-08-31 | Bürgerwindpark Bardowick Betreibergesellschaft mbH & Co. KG |
| WH-2 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-05-26 | Bürgerwindpark Wendhausen Betreibergesellschaft mbH & Co. KG |
| Wetzen3 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-05-19 | Windpark Wetzen GmbH & Co. KG |
| HM-3 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-07-12 | Bürgerwindpark Häcklingen-Melbeck Betriebsgesellschaft mbH & Co. KG |
| Wetzen6 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-06-15 | Windpark Wetzen GmbH & Co. KG |
| HM-5 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-07-21 | Bürgerwindpark Häcklingen-Melbeck Betriebsgesellschaft mbH & Co. KG |
| BA-7 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-09-29 | Bürgerwindpark Bardowick Betreibergesellschaft mbH & Co. KG |
| BA-2 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2017-09-27 | Bürgerwindpark Bardowick Betreibergesellschaft mbH & Co. KG |
| WEA2 | 2.30 MW | ENERCON GmbH | in operation | 2018-03-26 | Manzke Besitz GmbH & Co. KG |
| V 16781-07 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-01-28 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 16777-02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-14 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 17011-16 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-01-27 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| 781789_Breetze | 2.00 MW | ENERCON GmbH | in operation | 2007-12-21 | RWE Wind Onshore & PV Deutschland GmbH |
| 781788_Breetze | 2.00 MW | ENERCON GmbH | in operation | 2007-12-06 | RWE Wind Onshore & PV Deutschland GmbH |
| 781790_Breetze | 2.00 MW | ENERCON GmbH | in operation | 2007-12-13 | RWE Wind Onshore & PV Deutschland GmbH |
| V 16779-05 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-20 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| WEA 2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-07-20 | UWM Verteiler GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-07-13 | private individual |
| V 16784-10 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-27 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 17012-18 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-01-22 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 17010-17 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-01-13 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| WEA 4 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-07-20 | UWM Verteiler GmbH & Co. KG |
| V 16780-06 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-21 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| WEA 1 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-07-20 | UWM Verteiler GmbH & Co. KG |
| V 16788-12 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-11 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 16786-11 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-05 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 16778-04 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-20 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 16782-03 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-21 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 16785-09 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-03 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| WEA 5 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-07-20 | UWM Verteiler GmbH & Co. KG |
| WEA 3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-07-20 | UWM Verteiler GmbH & Co. KG |
| V 16790-14 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-01-29 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 16787-13 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-01-15 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-07-13 | private individual |
| V 16789-15 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-02-05 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| V 16776-01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-14 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-08-28 | private individual |
| V 16783-08 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-27 | Windpark Dahlenburg GmbH & Co. KG Renditefonds |
| WEA 6 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-07-20 | UWM Verteiler GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-07-01 | private individual |
| 701741 | 1.80 MW | ENERCON GmbH | in operation | 2004-03-16 | Windpark GmbH & Co. Barnstedt KG |
| 701739 | 1.80 MW | ENERCON GmbH | in operation | 2004-03-15 | Windpark GmbH & Co. Barnstedt KG |
| Melbeck 701627 | 1.80 MW | ENERCON GmbH | in operation | 2003-12-22 | Reprojekt Plan und Invest GmbH & Co. KG |
| Melbeck701628 | 1.80 MW | ENERCON GmbH | in operation | 2003-12-18 | Reprojekt Plan und Invest GmbH & Co. KG |
| Embsen WKA 4 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-28 | Energiehandel Lünen GmbH |
| Melbeck 701630 | 1.80 MW | ENERCON GmbH | in operation | 2003-12-29 | Reprojekt Plan und Invest GmbH & Co. KG |
| Embsen WKA 2 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-29 | Energiehandel Lünen GmbH |
| Embsen WKA 1 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-30 | Energiehandel Lünen GmbH |
| 701738 | 1.80 MW | ENERCON GmbH | in operation | 2004-03-12 | Windpark GmbH & Co. Barnstedt KG |
| Embsen WKA 3 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-21 | Energiehandel Lünen GmbH |
| Melbeck 701629 | 1.80 MW | ENERCON GmbH | in operation | 2003-12-17 | Reprojekt Plan und Invest GmbH & Co. KG |
| 701740 | 1.80 MW | ENERCON GmbH | in operation | 2004-03-16 | Windpark GmbH & Co. Barnstedt KG |
| S 70234-03 (Artlenburg) | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-12-23 | Windpark Lüneburg Nr. 38 GmbH & Co.KG |
| S 70237-05 (Artlenburg) | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-12-30 | Windpark Lüneburg Nr. 38 GmbH & Co.KG |
| NM72-1500KW - # 66220 | 1.50 MW | NEG Micon Deutschland GmbH | permanently decommissioned | 2001-11-29 | Kröger Management GmbH & Co. Windenergie KG |
| NM 67340-02 (Ostheide) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2002-11-27 | Windpark Lüneburg Nr. 38 GmbH & Co.KG |
| EREM European Renewable Energy Management GmbH & Co. 4. German Wind KG | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-09-01 | BAE-Energieerzeugungsgesellschaft mbH & Co. KG |
| S 70229-01 (Artlenburg) | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-12-29 | Windpark Lüneburg Nr. 38 GmbH & Co.KG |
| NM 67339-04 (Ostheide) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-04 | Windpark Lüneburg Nr. 38 GmbH & Co.KG |
| EREM European Renewable Energy Management GmbH & Co. 4. German Wind KG | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-09-01 | BAE-Energieerzeugungsgesellschaft mbH & Co. KG |
| Barendorf WEA 23296 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-12-31 | ENOVA Windpark Barendorf GmbH & Co. KG |
| Boitze | 1.50 MW | Fuhrländer AG | in operation | 2006-02-09 | Wiese Wind GmbH & Co. KG |
| NM 67341-03 (Ostheide) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-03 | Windpark Lüneburg Nr. 38 GmbH & Co.KG |
| Barendorf WEA 23295 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-12-31 | ENOVA Windpark Barendorf GmbH & Co. KG |
| NM72-1500KW - # 66222 | 1.50 MW | NEG Micon Deutschland GmbH | permanently decommissioned | 2001-11-29 | Kröger Management GmbH & Co. Windenergie KG |
| NM 67357-01 (Ostheide) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-05 | Windpark Lüneburg Nr. 38 GmbH & Co.KG |
| S 70236-02 (Artlenburg) | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-12-28 | Windpark Lüneburg Nr. 38 GmbH & Co.KG |
| Barendorf WEA 3 23297 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-12-30 | ENOVA Windpark Barendorf GmbH & Co. KG |
| WEA 6 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2003-04-09 | BAE-Energieerzeugungsgesellschaft mbH & Co. KG |
| WEA 1 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-11-29 | BAE-Energieerzeugungsgesellschaft mbH & Co. KG |
| S 70235-04 (Artlenburg) | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-12-29 | Windpark Lüneburg Nr. 38 GmbH & Co.KG |
| Barendorf WEA 4 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-12-30 | ENOVA Windpark Barendorf GmbH & Co. KG |
| Wotan 2 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-09-03 | Wotan Wind GmbH & Co KG II |
| Wotan 1 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-06-09 | Harmstorf Wind GmbH & Co KG |
| Bardowick | 0.80 MW | ENERCON GmbH | in operation | 2005-11-23 | MB Energy |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-02-20 | private individual |
| unit operated by a private individual | 0.00 MW | – | planned | planned 2023 | private individual |
Which organisations operate the most wind power capacity in Lüneburg?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Lemgrabe GmbH & Co. KG | 10 | 68.0 MW |
| Bürgerwindpark Kirchgellersen GmbH & Co. KG | 7 | 47.6 MW |
| Windpark Breetzer Berge GmbH & Co. KG | 6 | 41.0 MW |
| Windpark Dahlenburg GmbH & Co. KG Renditefonds | 18 | 36.0 MW |
| BayWa r.e. Energieprojekte GmbH | 5 | 35.0 MW |
| Landwind Planung GmbH & Co. KG | 5 | 34.0 MW |
| Bürgerwindpark Bardowick Betreibergesellschaft mbH & Co. KG | 8 | 22.2 MW |
| Bürgerwindpark Häcklingen-Melbeck Betriebsgesellschaft mbH & Co. KG | 6 | 21.1 MW |
| Bürgerwindpark Ehlbeck Betreibergesellschaft mbH & Co. KG | 7 | 19.5 MW |
| Bürgerwindpark Wendhausen Betreibergesellschaft mbH & Co. KG | 6 | 16.7 MW |
Which manufacturer accounts for the most wind power capacity in Lüneburg?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex SE | 18 | 121.1 MW |
| ENERCON GmbH | 35 | 111.2 MW |
| Nordex Germany GmbH | 14 | 95.2 MW |
| General Electric Deutschland Holding GmbH | 28 | 77.8 MW |
| Vestas Deutschland GmbH | 31 | 74.4 MW |
| NEG Micon Deutschland GmbH | 16 | 23.0 MW |
| Nordex Energy GmbH | 4 | 16.7 MW |
| GE Wind Energy GmbH | 5 | 13.9 MW |
| Senvion Deutschland GmbH | 5 | 7.50 MW |
| Fuhrländer AG | 1 | 1.50 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Lüneburg (Niedersachsen), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.