Germany · renewables
Wind power in Leer
116 wind turbines with 229.4 MW of gross capacity were in operation in Leer (Niedersachsen) as of 2026-11-05, with a further 47 units (312.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Leer (Niedersachsen), and how large are they, as of 2026-11-05?
- 116 wind turbines with 229.4 MW of gross capacity were in operation in Leer (Niedersachsen) as of 2026-11-05, with a further 47 units (312.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Leer?
- 116 wind turbines with 229.4 MW of gross capacity were in operation in Leer as of 2026-11-05, with a further 47 units (312.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Leer in 2025?
- 1 wind turbines with 0.01 MW went into operation in Leer in 2025; the strongest year of the last two decades was 2016 with 47.1 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Leer?
- ENOVA Power GmbH operates 10 wind turbines with 70.0 MW in Leer, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Leer?
- ENERCON GmbH leads with 107 wind turbines and 296.2 MW in Leer (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Leer?
- The largest registered wind turbine in Leer has 7.20 MW of gross capacity and is operated by ENERTRAG SE, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Leer distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 11 | 0.20 MW | 11 | 0 |
| 30 to 100 kW | 3 | 0.26 MW | 1 | 0 |
| over 100 kW | 151 | 541.8 MW | 104 | 47 |
How much wind power capacity was commissioned in Leer each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 0.00 MW |
| 2025 | 1 | 0.01 MW |
| 2022 | 3 | 6.58 MW |
| 2018 | 6 | 23.4 MW |
| 2017 | 11 | 23.8 MW |
| 2016 | 17 | 47.1 MW |
| 2015 | 1 | 3.05 MW |
| 2014 | 1 | 0.03 MW |
| 2013 | 7 | 16.1 MW |
| 2012 | 8 | 15.3 MW |
| 2008 | 1 | 0.10 MW |
| 2006 | 9 | 20.7 MW |
How many wind turbines in Leer are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 47 | 312.7 MW |
| in operation | 116 | 229.4 MW |
| temporarily shut down | 2 | 0.16 MW |
Which wind turbines are registered in Leer?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| H3 Heester 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | ENERTRAG SE |
| H5 Heester 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | ENERTRAG SE |
| H2 Heester 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | ENERTRAG SE |
| H4 Heester 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | ENERTRAG SE |
| H1 Heester 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | ENERTRAG SE |
| WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | NEN Projekt GmbH & Co. KG |
| B-IP WEA 08 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | ENOVA Power GmbH |
| WP Spols - WEA 5 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Bühren-Spols GmbH & Co. KG |
| B-IP WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | ENOVA Power GmbH |
| WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| WP Spols - WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Bühren-Spols GmbH & Co. KG |
| WP Spols - WEA 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Bühren-Spols GmbH & Co. KG |
| WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | NEN Projekt GmbH & Co. KG |
| B-IP WEA 04 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | ENOVA Power GmbH |
| WP Großsander - WEA 4 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Bühren-Großsander GmbH & Co. KG |
| WEA 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| WEA 4 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| WEA 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| WEA 4 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| WP Großsander - WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Bühren-Großsander GmbH & Co. KG |
| WP Hollriede - WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Hollriede GmbH & Co. KG |
| WEA 3 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| B-IP WEA 05 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | ENOVA Power GmbH |
| WP Spols - WEA 4 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Bühren-Spols GmbH & Co. KG |
| FIR III | 7.00 MW | Nordex SE | planned | planned 2027 | ENOVA Power GmbH |
| B-IP WEA 07 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | ENOVA Power GmbH |
| B-IP WEA 06 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | ENOVA Power GmbH |
| WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | NEN Projekt GmbH & Co. KG |
| WEA 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| WP Großsander - WEA 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Bühren-Großsander GmbH & Co. KG |
| B-IP WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | ENOVA Power GmbH |
| B-IP WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | ENOVA Power GmbH |
| WP Großsander - WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Bühren-Großsander GmbH & Co. KG |
| FIR II | 7.00 MW | Nordex SE | planned | planned 2027 | ENOVA Power GmbH |
| WP Hollriede - WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Hollriede GmbH & Co. KG |
| WP Spols - WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Bühren-Spols GmbH & Co. KG |
| UPL03 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | ENOVA Windpark Uplengen I GmbH & Co. KG |
| UPL01 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | ENOVA Windpark Uplengen I GmbH & Co. KG |
| UPL02 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | ENOVA Windpark Uplengen I GmbH & Co. KG |
| WEA 6 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windpark Fehnland Repowering GmbH & Co. KG |
| WEA 7 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windpark Fehnland Repowering GmbH & Co. KG |
| WEA 8 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windpark Fehnland Repowering GmbH & Co. KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windpark Fehnland Repowering GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windpark Südgeorgsfehn GmbH & Co. KG |
| WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windpark Südgeorgsfehn GmbH & Co. KG |
| WEA 9 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windpark Fehnland Repowering GmbH & Co. KG |
| WEA 6 | 4.20 MW | ENERCON GmbH | in operation | 2018-06-05 | innoVent WP Detern |
| WEA 4 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-26 | Windpark Detern Süd |
| WEA 5 | 4.20 MW | ENERCON GmbH | in operation | 2018-06-22 | Bürgerwindpark Detern |
| WEA 2 | 4.20 MW | ENERCON GmbH | in operation | 2018-05-18 | innoVent WP Detern |
| WEA 3 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-19 | innoVent WP Detern |
| WEA 2 DII | 4.20 MW | ENERCON GmbH | in operation | 2022-12-08 | innoVent WP Detern II |
| WEA 3 SE301043 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-05-23 | Windpark Charlottenpolder GmbH&Co.KG |
| WEA 1 SE301045 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-06-01 | Windpark Charlottenpolder GmbH&Co.KG |
| WEA 2 SE301044 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-05-26 | Windpark Charlottenpolder GmbH&Co.KG |
| WEA 4 SE301042 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-05-04 | Windpark Charlottenpolder GmbH&Co.KG |
| WEA 6 SE301040 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-04-20 | Windpark Charlottenpolder GmbH&Co.KG |
| WEA 5 SE301041 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-04-27 | Windpark Charlottenpolder GmbH&Co.KG |
| 1011101 | 3.05 MW | ENERCON GmbH | in operation | 2016-06-10 | Erste Windpark Weener Betreiber GmbH & Co. Dwarstief KG |
| 1011099 | 3.05 MW | ENERCON GmbH | in operation | 2016-05-20 | Erste Windpark Weener GmbH & Co. KG |
| WP Hohegaste WEA 6 (1011473) | 3.05 MW | ENERCON GmbH | in operation | 2017-12-15 | Windenergiepark Hohegaste GmbH & Co KG |
| WEA02 - 1010073 | 3.05 MW | ENERCON GmbH | in operation | 2012-12-10 | SOHOWI GmbH & Co. KG |
| 1011095 | 3.05 MW | ENERCON GmbH | in operation | 2016-03-24 | Zweite Windpark Weener GmbH & Co. KG |
| WEA 4 | 3.05 MW | ENERCON GmbH | in operation | 2012-12-04 | Windpark Holtgaste GmbH & Co. KG |
| 1011097 | 3.05 MW | ENERCON GmbH | in operation | 2016-04-13 | Zweite Windpark Weener GmbH & Co. KG |
| WEA 5 | 3.05 MW | ENERCON GmbH | in operation | 2012-11-29 | Windpark Holtgaste GmbH & Co. KG |
| WP Hohegaste WEA 4 (1011472) | 3.05 MW | ENERCON GmbH | in operation | 2017-11-17 | Windenergiepark Hohegaste GmbH & Co KG |
| 1011096 | 3.05 MW | ENERCON GmbH | in operation | 2016-03-30 | Zweite Windpark Weener GmbH & Co. KG |
| WP Hohegaste WEA 2 (1011470) | 3.05 MW | ENERCON GmbH | in operation | 2017-11-17 | Windenergiepark Hohegaste GmbH & Co KG |
| WP Hohegaste WEA 3 (1011471) | 3.05 MW | ENERCON GmbH | in operation | 2017-12-08 | Windenergiepark Hohegaste GmbH & Co KG |
| WEA 3 | 3.05 MW | ENERCON GmbH | in operation | 2012-12-19 | Windpark Holtgaste GmbH & Co. KG |
| 1011098 | 3.05 MW | ENERCON GmbH | in operation | 2016-05-09 | Erste Windpark Weener GmbH & Co. KG |
| 1011100 | 3.05 MW | ENERCON GmbH | in operation | 2016-06-27 | Erste Windpark Weener Betreiber GmbH & Co. Dwarstief KG |
| WEA 1 | 3.05 MW | ENERCON GmbH | in operation | 2012-12-14 | Windpark Holtgaste GmbH & Co. KG |
| Windanlage Weener | 3.05 MW | ENERCON GmbH | in operation | 2015-12-02 | Klingele Windkraft GmbH |
| WEA 01 | 2.35 MW | ENERCON GmbH | in operation | 2018-01-30 | ENOVA WEA Sanden GmbH & Co. KG |
| 920744 | 2.35 MW | ENERCON GmbH | in operation | 2016-03-17 | GEP nord GmbH & Co. KG |
| WEA 1 DII | 2.35 MW | ENERCON GmbH | in operation | 2022-11-03 | innoVent WP Detern II |
| 920743 | 2.35 MW | ENERCON GmbH | in operation | 2016-03-18 | Dritte Windpark Weener GmbH & Co. KG |
| WEA 01 | 2.30 MW | ENERCON GmbH | in operation | 2006-11-23 | ENOVA Windpark Bunde GmbH & Co. KG |
| WEA 2 (Windpark Westoverledingen) | 2.30 MW | ENERCON GmbH | in operation | 2013-11-14 | IFE Windpark Westoverledingen GmbH & Co. Betriebs-KG |
| WEA 01 | 2.30 MW | ENERCON GmbH | in operation | 2006-12-12 | Bunder Windloopers GmbH & Co. KG |
| WEA 02 | 2.30 MW | ENERCON GmbH | in operation | 2006-12-06 | Windenergie Bunderhee GmbH & Co. KG |
| WEA 02 | 2.30 MW | ENERCON GmbH | in operation | 2006-11-15 | ENOVA Windpark Bunde GmbH & Co. KG |
| WEA 4 (Windpark Westoverledingen) | 2.30 MW | ENERCON GmbH | in operation | 2013-12-30 | IFE Windpark Westoverledingen GmbH & Co. Betriebs-KG |
| WEA 5 (Windpark Westoverledingen) | 2.30 MW | ENERCON GmbH | in operation | 2013-11-28 | IFE Windpark Westoverledingen GmbH & Co. Betriebs-KG |
| WEA 01 | 2.30 MW | ENERCON GmbH | in operation | 2006-11-30 | ENOVA WKA Bunderhee GmbH & Co. KG |
| WEA 5 (Windpark Burlage) | 2.30 MW | ENERCON GmbH | in operation | 2017-09-06 | IFE Windpark Burlage GmbH |
| WEA 3 (Windpark Westoverledingen) | 2.30 MW | ENERCON GmbH | in operation | 2013-11-14 | IFE Windpark Westoverledingen GmbH & Co. Betriebs-KG |
| WEA 2 (Windpark Burlage) | 2.30 MW | ENERCON GmbH | in operation | 2017-08-30 | IFE Windpark Burlage GmbH |
| WEA 03 | 2.30 MW | ENERCON GmbH | in operation | 2006-11-30 | Windenergie Bunderhee GmbH & Co. KG |
| WEA 6 (Windpark Westoverledingen) | 2.30 MW | ENERCON GmbH | in operation | 2013-12-11 | IFE Windpark Westoverledingen GmbH & Co. Betriebs-KG |
| WEA 4 (Windpark Burlage) | 2.30 MW | ENERCON GmbH | in operation | 2017-09-25 | IFE Windpark Burlage GmbH |
| WEA 7 (Windpark Westoverledingen) | 2.30 MW | ENERCON GmbH | in operation | 2013-12-13 | IFE Windpark Westoverledingen GmbH & Co. Betriebs-KG |
| WEA 01 | 2.30 MW | ENERCON GmbH | in operation | 2006-12-14 | Hammricher Wind GmbH & Co. KG |
| WEA 01 | 2.30 MW | ENERCON GmbH | in operation | 2006-11-17 | Heester Wind GmbH & Co. KG |
| WEA 3 (Windpark Burlage) | 2.30 MW | ENERCON GmbH | in operation | 2017-09-28 | IFE Windpark Burlage GmbH |
| WEA 01 | 2.30 MW | ENERCON GmbH | in operation | 2006-12-08 | Windenergie Bunderhee GmbH & Co. KG |
| WEA 1 (Windpark Westoverledingen) | 2.30 MW | ENERCON GmbH | in operation | 2013-11-13 | IFE Windpark Westoverledingen GmbH & Co. Betriebs-KG |
| WEA 1 (Windpark Burlage) | 2.30 MW | ENERCON GmbH | in operation | 2017-07-30 | IFE Windpark Burlage GmbH |
| WEA 01 | 2.00 MW | ENERCON GmbH | in operation | 2003-10-23 | Windkraft van Lessen GbR |
| WEA 01 | 2.00 MW | ENERCON GmbH | in operation | 2004-06-30 | ENOVA WKA Ettingschloot Neermoor GmbH & Co. KG |
| Oncken-Steen WEA01 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-17 | Oncken-Steen UG |
| WEA03 - 70329 | 1.80 MW | ENERCON GmbH | in operation | 2001-06-22 | Windpark Moorgut Ostrhauderfehn GmbH & Co. KG |
| Enercon | 1.80 MW | ENERCON GmbH | in operation | 2003-11-25 | ENOVA Windpark Firrel GmbH & Co. KG |
| Enercon | 1.80 MW | ENERCON GmbH | in operation | 2003-11-20 | ENOVA Windpark Firrel GmbH & Co. KG |
| WKA Westeretting | 1.80 MW | ENERCON GmbH | in operation | 2003-03-19 | ENOVA WKA Westeretting Neermoor GmbH & Co. KG |
| Enercon | 1.80 MW | ENERCON GmbH | in operation | 2003-11-12 | ENOVA Windpark Firrel GmbH & Co. KG |
| Filsum FS 1 | 1.80 MW | ENERCON GmbH | in operation | 2002-07-01 | Prokon Nord Energiesysteme GmbH & Co. Westwind KG |
| WEA02 - 70327 | 1.80 MW | ENERCON GmbH | in operation | 2001-06-22 | Windpark Moorgut Ostrhauderfehn GmbH & Co. KG |
| Enercon | 1.80 MW | ENERCON GmbH | in operation | 2003-11-28 | ENOVA Windpark Firrel GmbH & Co. KG |
| Enercon | 1.80 MW | ENERCON GmbH | in operation | 2003-11-26 | ENOVA Windpark Firrel GmbH & Co. KG |
| WEA01 - 70328 | 1.80 MW | ENERCON GmbH | in operation | 2001-06-27 | Windpark Moorgut Ostrhauderfehn GmbH & Co. KG |
| Filsum FS 3 | 1.80 MW | ENERCON GmbH | in operation | 2002-07-01 | Prokon Nord Energiesysteme GmbH & Co. Westwind KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | in operation | 2001-04-09 | private individual |
| Windkraftanlage E66 Windkraft GmbH | 1.80 MW | ENERCON GmbH | in operation | 2002-04-26 | Windkraft GmbH |
| Moormerland_Fairwind007 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-17 | Windpark Memgaste GmbH & Co. KG |
| Filsum FS 4 | 1.80 MW | ENERCON GmbH | in operation | 2002-07-01 | Prokon Nord Energiesysteme GmbH & Co. Westwind KG |
| Filsum FS 2 | 1.80 MW | ENERCON GmbH | in operation | 2002-07-01 | Prokon Nord Energiesysteme GmbH & Co. Westwind KG |
| K5 Klostermoor 5 | 1.50 MW | ENERCON GmbH | in operation | 1999-07-01 | ENERTRAG Windfeld Klostermoor GmbH & Co. KG |
| K3 Klostermoor 3 | 1.50 MW | ENERCON GmbH | in operation | 1999-08-13 | ENERTRAG Windfeld Klostermoor GmbH & Co. KG |
| K8 Klostermoor 8 | 1.50 MW | ENERCON GmbH | in operation | 1999-07-01 | ENERTRAG Windfeld Klostermoor GmbH & Co. KG |
| K4 Klostermoor 4 | 1.50 MW | ENERCON GmbH | in operation | 1999-07-01 | ENERTRAG Windfeld Klostermoor GmbH & Co. KG |
| N6 Nordweener 6 | 1.50 MW | ENERCON GmbH | in operation | 1998-12-01 | ENERTRAG Windfeld Weenermoor GmbH & Co. KG |
| N9 Nordweener 9 | 1.50 MW | ENERCON GmbH | in operation | 1999-01-01 | ENERTRAG Windfeld Weenermoor GmbH & Co. KG |
| K2 Klostermoor 2 | 1.50 MW | ENERCON GmbH | in operation | 1999-08-10 | ENERTRAG Windfeld Klostermoor GmbH & Co. KG |
| Südweener S5 | 1.50 MW | ENERCON GmbH | in operation | 2002-10-01 | Prokon Nord Energiesysteme GmbH & Co. WKA auf der Baute KG |
| K7 Klostermoor 7 | 1.50 MW | ENERCON GmbH | in operation | 1999-07-01 | ENERTRAG Windfeld Klostermoor GmbH & Co. KG |
| N5 Nordweener 5 | 1.50 MW | ENERCON GmbH | in operation | 1998-12-03 | ENERTRAG Windfeld Weenermoor GmbH & Co. KG |
| N7 Nordweener 7 | 1.50 MW | ENERCON GmbH | in operation | 1998-11-27 | WJD Windenergie St. Georgiwold GmbH & Co. KG |
| N1 Nordweener 1 | 1.50 MW | ENERCON GmbH | in operation | 1998-12-12 | HDJ Energieerzeugung GmbH & Co. KG |
| S3 Südweener 3 | 1.50 MW | ENERCON GmbH | in operation | 1999-02-19 | WM Windstrom GmbH & Co. Weenermoor KG |
| S1 Südweener 1 | 1.50 MW | ENERCON GmbH | in operation | 1999-02-01 | ENERTRAG Windfeld Weenermoor GmbH & Co. KG |
| N4 Nordweener 4 | 1.50 MW | ENERCON GmbH | in operation | 1999-01-01 | ENERTRAG Windfeld Weenermoor GmbH & Co. KG |
| N8 Nordweener 8 | 1.50 MW | ENERCON GmbH | in operation | 1998-12-01 | ENERTRAG Windfeld Weenermoor GmbH & Co. KG |
| N3 Nordweener 3 | 1.50 MW | ENERCON GmbH | in operation | 1998-12-01 | ENERTRAG Windfeld Weenermoor GmbH & Co. KG |
| S4 Südweener 4 | 1.50 MW | ENERCON GmbH | in operation | 1999-02-19 | WM Windstrom GmbH & Co. Weenermoor KG |
| K1 Klostermoor 1 | 1.50 MW | – | in operation | 1999-07-01 | ENERTRAG Windfeld Klostermoor GmbH & Co. KG |
| S2 Südweener 2 | 1.50 MW | ENERCON GmbH | in operation | 1998-11-17 | ENERTRAG Windfeld Weenermoor GmbH & Co. KG |
| K6 Klostermoor 6 | 1.50 MW | ENERCON GmbH | in operation | 1999-06-01 | ENERTRAG Windfeld Klostermoor GmbH & Co. KG |
| Klostermoor2 | 1.00 MW | AN Windenergie GmbH | in operation | 1999-07-01 | Windpark Klostermoor GmbH & Co. Betriebs-KG |
| unit operated by a private individual | 1.00 MW | Sonstige | planned | planned 2025 | private individual |
| Klostermoor5 | 1.00 MW | AN Windenergie GmbH | in operation | 1999-07-01 | Windpark Klostermoor GmbH & Co. Betriebs-KG |
| Klostermoor6 | 1.00 MW | AN Windenergie GmbH | in operation | 1999-07-01 | Windpark Klostermoor GmbH & Co. Betriebs-KG |
| Klostermoor3 | 1.00 MW | Sonstige | in operation | 1999-06-30 | Windpark Klostermoor GmbH & Co. Betriebs-KG |
| Klostermoor4 | 1.00 MW | AN Windenergie GmbH | in operation | 1999-07-01 | Windpark Klostermoor GmbH & Co. Betriebs-KG |
| Klostermoor1 | 1.00 MW | AN Windenergie GmbH | in operation | 1999-07-01 | Windpark Klostermoor GmbH & Co. Betriebs-KG |
| ENERCON E-53 | 0.80 MW | ENERCON GmbH | in operation | 2016-09-28 | Wasserversorgungsverband Moormerland-Uplengen-Hesel-Jümme |
| WEA-2 | 0.50 MW | ENERCON GmbH | in operation | 1995-04-20 | Windlicht Energieerzeugungs-Betriebs-OHG |
| WEA-1 | 0.50 MW | ENERCON GmbH | in operation | 1995-04-20 | Windlicht Energieerzeugungs-Betriebs-OHG |
| WEA Hatzum | 0.23 MW | Vestas Deutschland GmbH | in operation | 1996-06-18 | Wübbena Energie GbR |
| unit operated by a private individual | 0.10 MW | Fuhrländer AG | in operation | 2008-12-19 | private individual |
| WKA Baubetriebshof Ihrhove | 0.08 MW | ENERCON GmbH | temporarily shut down | 1992-07-15 | Gemeinde Westoverledingen - Betrieb von Windkraftanlagen und erneuerbare Energien |
| WKA Klärwerk Steenfelde | 0.08 MW | ENERCON GmbH | temporarily shut down | 1990-10-15 | Gemeinde Westoverledingen - Betrieb von Windkraftanlagen und erneuerbare Energien |
| unit operated by a private individual | 0.03 MW | Lely Aircon B.V. Niederlassung Leer | in operation | 2017-08-07 | private individual |
| unit operated by a private individual | 0.03 MW | Lely Aircon B.V. Niederlassung Leer | in operation | 2017-08-07 | private individual |
| unit operated by a private individual | 0.03 MW | Lely Aircon B.V. Niederlassung Leer | in operation | 2014-01-30 | private individual |
| KWEA 4 LagerHaus 30 kW | 0.03 MW | Sonstige | in operation | 2016-12-15 | Sparkasse LeerWittmund |
| unit operated by a private individual | 0.03 MW | Lely Aircon B.V. Niederlassung Leer | in operation | 2022-01-14 | private individual |
| Kleinwind1 | 0.01 MW | E.A.Z. Wind GmbH | in operation | 2025-08-07 | Steenblock GbR |
| unit operated by a private individual | 0.01 MW | Lely Aircon B.V. Niederlassung Leer | in operation | 2005-10-10 | private individual |
| KWEA 1 LagerHaus 10 kW | 0.01 MW | Sonstige | in operation | 2012-02-01 | Sparkasse LeerWittmund |
| KWEA 3 LagerHaus 10 kW | 0.01 MW | Sonstige | in operation | 2012-02-01 | Sparkasse LeerWittmund |
| KWEA 2 LagerHaus 10 kW | 0.01 MW | Sonstige | in operation | 2012-02-01 | Sparkasse LeerWittmund |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2026-10-20 | private individual |
Which organisations operate the most wind power capacity in Leer?
| Operator | Units | Capacity |
|---|---|---|
| ENOVA Power GmbH | 10 | 70.0 MW |
| NEN Projekt GmbH & Co. KG | 10 | 70.0 MW |
| ENERTRAG SE | 5 | 36.0 MW |
| Windpark Bühren-Spols GmbH & Co. KG | 5 | 35.0 MW |
| Windpark Bühren-Großsander GmbH & Co. KG | 4 | 28.0 MW |
| Windpark Fehnland Repowering GmbH & Co. KG | 5 | 27.8 MW |
| Windpark Charlottenpolder GmbH&Co.KG | 6 | 20.2 MW |
| ENOVA Windpark Uplengen I GmbH & Co. KG | 3 | 19.8 MW |
| IFE Windpark Westoverledingen GmbH & Co. Betriebs-KG | 7 | 16.1 MW |
| Windpark Hollriede GmbH & Co. KG | 2 | 14.0 MW |
Which manufacturer accounts for the most wind power capacity in Leer?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 107 | 296.2 MW |
| Nordex Germany GmbH | 17 | 119.0 MW |
| Vestas Deutschland GmbH | 6 | 36.2 MW |
| Nordex Energy GmbH | 4 | 28.0 MW |
| Senvion Deutschland GmbH | 6 | 20.2 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 3 | 19.8 MW |
| Nordex SE | 2 | 14.0 MW |
| AN Windenergie GmbH | 5 | 5.00 MW |
| Sonstige | 6 | 2.06 MW |
| Lely Aircon B.V. Niederlassung Leer | 5 | 0.13 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Leer (Niedersachsen), and how large are they, as can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.