35 wind turbines with 46.9 MW of gross capacity were in operation in Holzminden (Niedersachsen) as of 2026-11-05, with a further 33 units (216.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Holzminden (Niedersachsen), and how large are they, as of 2026-11-05?
- 35 wind turbines with 46.9 MW of gross capacity were in operation in Holzminden (Niedersachsen) as of 2026-11-05, with a further 33 units (216.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Holzminden?
- 35 wind turbines with 46.9 MW of gross capacity were in operation in Holzminden as of 2026-11-05, with a further 33 units (216.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Holzminden in 2017?
- 3 wind turbines with 6.90 MW went into operation in Holzminden in 2017; the strongest year of the last two decades was 2017 with 6.90 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Holzminden?
- EnBW OnshoreInvest GmbH & Co. KG operates 10 wind turbines with 62.2 MW in Holzminden, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Holzminden?
- Nordex Germany GmbH leads with 29 wind turbines and 190.0 MW in Holzminden (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Holzminden?
- The largest registered wind turbine in Holzminden has 7.00 MW of gross capacity and is operated by VERUM Heyen R 2020 GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Holzminden distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| over 100 kW | 71 | 268.3 MW | 35 | 33 |
How much wind power capacity was commissioned in Holzminden each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2017 | 3 | 6.90 MW |
| 2016 | 1 | 0.80 MW |
| 2015 | 1 | 0.80 MW |
| 2013 | 1 | 0.80 MW |
How many wind turbines in Holzminden are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 33 | 216.8 MW |
| in operation | 35 | 46.9 MW |
| permanently decommissioned | 3 | 4.60 MW |
Which wind turbines are registered in Holzminden?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WP Heyen V WEA 16 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | VERUM Heyen R 2020 GmbH & Co. KG |
| WP Heyen V WEA 17 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | VERUM Heyen R 2020 GmbH & Co. KG |
| WEA 02 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Kölker Berg GmbH & Co. KG |
| Windpark Heyen IV WEA 14 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | VERUM Heyen R 2020 GmbH & Co. KG |
| WEA 01 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Kölker Berg GmbH & Co. KG |
| WP Heyen V.1 WEA 18 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | VERUM Heyen R 2020 GmbH & Co. KG |
| WP Nordsolling WEA 3 | 6.80 MW | – | planned | planned 2028 | Max Bögl Wind AG |
| WP Nordsolling WEA 6 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Max Bögl Wind AG |
| WEA 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG |
| WEA 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG |
| WEA 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG |
| WEA 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG |
| WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG |
| WEA 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG |
| WP Nordsolling WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Max Bögl Wind AG |
| WP Nordsolling WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Max Bögl Wind AG |
| WP Nordsolling WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Max Bögl Wind AG |
| WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG |
| WEA 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG |
| WP Nordsolling WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Max Bögl Wind AG |
| WP Lauenförde WEA1 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Derental WEA2 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Lauenförde WEA2 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Lauenförde WEA4 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Lauenförde WEA5 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Derental WEA3 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Derental WEA4 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Lauenförde WEA3 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Derental WEA1 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Lauenförde WEA6 | 6.22 MW | Nordex Germany GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| ERG Windpark Heyen GmbH & Co. KG | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | ERG Windpark Heyen GmbH & Co. KG |
| WP Heyen V WEA 15 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | VERUM Heyen R 2020 GmbH & Co. KG |
| WP Heyen V.2 WEA 19 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | VERUM Heyen R 2020 GmbH & Co. KG |
| Heyen II WEA I | 3.05 MW | ENERCON GmbH | in operation | 2017-02-16 | VERUM 101 Infrastuktur GmbH |
| Heyen II WEA 2 | 3.05 MW | ENERCON GmbH | in operation | 2017-04-28 | VERUM 101 Infrastuktur GmbH |
| WKA 3 (6394) | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2004-12-01 | Equitix Innova (Lower Saxony) GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Gamesa Corporación Tecnológica S.A. | permanently decommissioned | 2004-09-09 | private individual |
| WKA 1 (6395) | 2.00 MW | Gamesa Corporación Tecnológica S.A. | permanently decommissioned | 2004-11-16 | Equitix Innova (Lower Saxony) GmbH & Co. KG |
| 701424_Halle | 1.80 MW | ENERCON GmbH | in operation | 2003-11-04 | RWE Wind Onshore & PV Deutschland GmbH |
| 701427_Halle | 1.80 MW | ENERCON GmbH | in operation | 2004-04-28 | RWE Wind Onshore & PV Deutschland GmbH |
| Heyen E-701431 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-11 | VERUM Heyen Infrastrukturgesellschaft mbH |
| Heyen E-701433 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-12 | VERUM Heyen Infrastrukturgesellschaft mbH |
| 701434_Halle | 1.80 MW | ENERCON GmbH | in operation | 2003-11-06 | RWE Wind Onshore & PV Deutschland GmbH |
| Heyen E-701430 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-11 | VERUM Heyen Infrastrukturgesellschaft mbH |
| Heyen E-701429 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-05 | VERUM Heyen Infrastrukturgesellschaft mbH |
| Heyen E-701428 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-05 | VERUM Heyen Infrastrukturgesellschaft mbH |
| 701425_Halle | 1.80 MW | ENERCON GmbH | in operation | 2003-11-03 | RWE Wind Onshore & PV Deutschland GmbH |
| Heyen E-701432 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-17 | VERUM Heyen Infrastrukturgesellschaft mbH |
| 701426_Halle | 1.80 MW | ENERCON GmbH | in operation | 2003-11-12 | RWE Wind Onshore & PV Deutschland GmbH |
| 70262 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2003-07-16 | Windpark Deensen GmbH & Co. KG |
| 70280 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2003-07-11 | Windpark Deensen GmbH & Co. KG |
| Lichtenhagen IV | 1.25 MW | DeWind GmbH | in operation | 2002-05-08 | Lichtenhagen Infrastruktur Gbr |
| Kölker Berg WEA 2 | 1.00 MW | DeWind GmbH | in operation | 2001-12-21 | Aufwind Gesellschaft zur Nutzung regenerativer Energien mbH |
| Kölker Berg WEA 1 | 1.00 MW | DeWind GmbH | in operation | 2001-12-21 | Aufwind Gesellschaft zur Nutzung regenerativer Energien mbH |
| WEA Vahlbruch 15443 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-08-01 | SK Wind GmbH & Co. KG |
| Kölker Berg WEA 3 | 1.00 MW | DeWind GmbH | in operation | 2001-12-21 | Aufwind Gesellschaft zur Nutzung regenerativer Energien mbH |
| WEA Vahlbruch 15437 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-08-01 | SK Wind GmbH & Co. KG |
| WEA Vahlbruch 15439 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-08-01 | SK Wind GmbH & Co. KG |
| Kölker Berg WEA 4 | 1.00 MW | DeWind GmbH | in operation | 2001-12-21 | Aufwind Gesellschaft zur Nutzung regenerativer Energien mbH |
| Lichtenhagen V | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-10-22 | Lichtenhagen Infrastruktur Gbr |
| Fürstenau 8 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2005-01-11 | Maka Service GmbH |
| Fürstenau 5 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2004-12-30 | Maka Service GmbH |
| Lichtenhagen VII | 0.80 MW | ENERCON GmbH | in operation | 2016-09-27 | Anröchter Windkraft GmbH & Co. Windpark Lichtenhagen KG |
| Lichtenhagen VIII | 0.80 MW | ENERCON GmbH | in operation | 2017-05-31 | Anröchter Windkraft GmbH & Co. Windpark Lichtenhagen KG |
| Lichtenhagen VI | 0.80 MW | ENERCON GmbH | in operation | 2015-07-22 | Anröchter Windkraft GmbH & Co. Windpark Lichtenhagen KG |
| WEA Otteinsteiner Hochfläche | 0.80 MW | ENERCON GmbH | in operation | 2013-05-18 | Kettenbach Regenerative Energien KG |
| Lichtenhagen I | 0.60 MW | DeWind GmbH | in operation | 2002-02-27 | Lichtenhagen Infrastruktur Gbr |
| Lichtenhagen III | 0.60 MW | DeWind GmbH | permanently decommissioned | 2002-02-27 | Lichtenhagen Infrastruktur Gbr |
| Lichtenhagen II | 0.60 MW | DeWind GmbH | in operation | 2003-01-02 | Lichtenhagen Infrastruktur Gbr |
| 41196 | 0.50 MW | ENERCON GmbH | in operation | 1998-03-30 | Windkraft Ottenstein GbRmbH |
| unit operated by a private individual | 0.25 MW | Sonstige | in operation | 1995-10-06 | private individual |
Which organisations operate the most wind power capacity in Holzminden?
| Operator | Units | Capacity |
|---|---|---|
| EnBW OnshoreInvest GmbH & Co. KG | 10 | 62.2 MW |
| wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG | 8 | 54.4 MW |
| Max Bögl Wind AG | 6 | 40.8 MW |
| VERUM Heyen R 2020 GmbH & Co. KG | 6 | 39.4 MW |
| Windpark Kölker Berg GmbH & Co. KG | 2 | 14.0 MW |
| VERUM Heyen Infrastrukturgesellschaft mbH | 6 | 10.8 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 5 | 9.00 MW |
| VERUM 101 Infrastuktur GmbH | 2 | 6.10 MW |
| ERG Windpark Heyen GmbH & Co. KG | 1 | 6.00 MW |
| Equitix Innova (Lower Saxony) GmbH & Co. KG | 2 | 4.00 MW |
Which manufacturer accounts for the most wind power capacity in Holzminden?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Germany GmbH | 29 | 190.0 MW |
| ENERCON GmbH | 18 | 29.6 MW |
| Nordex Energy GmbH | 2 | 14.0 MW |
| Gamesa Corporación Tecnológica S.A. | 5 | 7.70 MW |
| DeWind GmbH | 8 | 7.05 MW |
| Vestas Deutschland GmbH | 1 | 6.00 MW |
| NEG Micon Deutschland GmbH | 4 | 3.90 MW |
| Senvion Deutschland GmbH | 2 | 3.00 MW |
| Sonstige | 1 | 0.25 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Holzminden (Niedersachsen), and how large are the can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.