Germany · renewables
Wind power in Hildesheim
86 wind turbines with 184.0 MW of gross capacity were in operation in Hildesheim (Niedersachsen) as of 2026-11-05, with a further 28 units (190.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Hildesheim (Niedersachsen), and how large are they, as of 2026-11-05?
- 86 wind turbines with 184.0 MW of gross capacity were in operation in Hildesheim (Niedersachsen) as of 2026-11-05, with a further 28 units (190.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Hildesheim?
- 86 wind turbines with 184.0 MW of gross capacity were in operation in Hildesheim as of 2026-11-05, with a further 28 units (190.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Hildesheim in 2025?
- 8 wind turbines with 47.6 MW went into operation in Hildesheim in 2025; the strongest year of the last two decades was 2025 with 47.6 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Hildesheim?
- Windpark Klein Escherde GmbH&Co. KG operates 7 wind turbines with 50.4 MW in Hildesheim, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Hildesheim?
- Vestas Deutschland GmbH leads with 33 wind turbines and 211.8 MW in Hildesheim (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Hildesheim?
- The largest registered wind turbine in Hildesheim has 7.20 MW of gross capacity and is operated by Windpark Klein Escherde GmbH&Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Hildesheim distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 118 | 376.8 MW | 85 | 28 |
How much wind power capacity was commissioned in Hildesheim each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 8 | 47.6 MW |
| 2023 | 2 | 4.00 MW |
| 2022 | 2 | 6.90 MW |
| 2020 | 1 | 4.80 MW |
| 2019 | 3 | 10.8 MW |
| 2017 | 7 | 22.2 MW |
| 2014 | 3 | 8.65 MW |
How many wind turbines in Hildesheim are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 28 | 190.1 MW |
| in operation | 86 | 184.0 MW |
| permanently decommissioned | 5 | 2.75 MW |
Which wind turbines are registered in Hildesheim?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Windpark Klein Escherde 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Klein Escherde GmbH&Co. KG |
| Windpark Klein Escherde 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Klein Escherde GmbH&Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Schulenburg REP GmbH & Co. KG |
| Windpark Klein Escherde 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Klein Escherde GmbH&Co. KG |
| Windpark Klein Escherde 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Klein Escherde GmbH&Co. KG |
| WEA AFW 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Aasumer Feld GmbH & Co. KG |
| WEA GRO 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Gronau Leine GmbH & Co. KG |
| WEA GRO 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Gronau Leine GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Schulenburg REP GmbH & Co. KG |
| Bockenem WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SAB Projektentwicklung GmbH & Co. KG |
| Bockenem WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SAB Projektentwicklung GmbH & Co. KG |
| WEA AFW 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Aasumer Feld GmbH & Co. KG |
| Windpark Klein Escherde 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Klein Escherde GmbH&Co. KG |
| Windpark Klein Escherde 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Klein Escherde GmbH&Co. KG |
| WEA GRO 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Gronau Leine GmbH & Co. KG |
| WEA AFW 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Aasumer Feld GmbH & Co. KG |
| Bockenem WEA 9 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SAB Projektentwicklung GmbH & Co. KG |
| WEA AFW 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Aasumer Feld GmbH & Co. KG |
| WEA AFW 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Aasumer Feld GmbH & Co. KG |
| WEA GRO 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Gronau Leine GmbH & Co. KG |
| Windpark Klein Escherde 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Klein Escherde GmbH&Co. KG |
| Windpark Bockenem WEA 3 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-01-23 | Windpark Bockenem GmbH & Co. Betriebs-KG |
| Windpark Bockenem WEA 4 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-01-21 | Windpark Bockenem GmbH & Co. Betriebs-KG |
| Windpark Bockenem WEA 5 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-01-24 | Windpark Bockenem GmbH & Co. Betriebs-KG |
| Windpark Bockenem WEA 2 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-02-13 | Windpark Bockenem GmbH & Co. Betriebs-KG |
| Windpark Bockenem WEA 1 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-02-13 | Windpark Bockenem GmbH & Co. Betriebs-KG |
| Windpark Bockenem WEA 6 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-01-22 | Windpark Bockenem GmbH & Co. Betriebs-KG |
| Windpark Bockenem WEA 7 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-02-19 | Windpark Bockenem GmbH & Co. Betriebs-KG |
| ABO Energy WP Almstedt-Breinum II WEA 1 | 5.56 MW | – | planned | planned 2027 | ABO Energy WP Almstedt-Breinum GmbH & Co. KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Bockenem Repowering I GmbH & Co. KG |
| ABO Energy WP Almstedt-Breinum II WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Almstedt-Breinum GmbH & Co. KG |
| ABO Energy WP Almstedt-Breinum II WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Almstedt-Breinum GmbH & Co. KG |
| Windpark Esbeck WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | SAB Projektentwicklung GmbH & Co. KG |
| Windpark Esbeck WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | SAB Projektentwicklung GmbH & Co. KG |
| Windpark Esbeck WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | SAB Projektentwicklung GmbH & Co. KG |
| WEA 3 | 4.80 MW | Nordex SE | in operation | 2020-03-04 | innoVent WP Schellerten |
| WEA 1 | 4.20 MW | ENERCON GmbH | in operation | 2017-12-20 | VERBUND Windpark Oedelum GmbH |
| Koppelberg WKA 3 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2025-05-21 | Windenergie Koppelberg GmbH & Co. KG |
| Oedelum WEA 2 | 4.00 MW | ENERCON GmbH | in operation | 2023-10-05 | Windpark Oedelum GmbH & Co. KG. |
| WEA 2 | 3.60 MW | Nordex Energy GmbH | in operation | 2019-06-19 | innoVent WP Harsum |
| WEA 4 | 3.60 MW | Nordex Energy GmbH | in operation | 2019-07-02 | innoVent WP Schellerten |
| WEA 1 | 3.60 MW | Nordex Energy GmbH | in operation | 2019-06-25 | Grundeigentümer Windenergieanlagen Sostedter Feld |
| WP Adensen WEA 2 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2022-10-06 | PNE WIND Park XXIX GmbH & Co.KG |
| WP Adensen WEA 1 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2022-10-10 | Windpark Adensen GmbH & Co. KG |
| Windenergie Koppelberg GmbH & Co. KG | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-11-14 | Windenergie Koppelberg GmbH & Co. KG |
| Windenergie Koppelberg GmbH & Co. KG | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-11-06 | Windenergie Koppelberg GmbH & Co. KG |
| E 1150656-01 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-28 | Windpark Bockenem Repowering I GmbH & Co. KG |
| Bürgerwindrad Evensen | 3.00 MW | ENERCON GmbH | in operation | 2017-06-28 | BWR Evensen GmbH & Co. KG |
| 1150659 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-20 | Windkraft Eyershausen GmbH & Co.KG |
| E 1150792-02 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-20 | Windpark Bockenem Repowering I GmbH & Co. KG |
| E 1150793-04 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-21 | Windpark Bockenem Repowering I GmbH & Co. KG |
| E 1150657-03 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-31 | Windpark Bockenem Repowering I GmbH & Co. KG |
| WIN0006 | 2.50 MW | VENSYS Energy AG | in operation | 2014-07-24 | Windenergie Leinetal GmbH & Co KG |
| AN 2000-251-03 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-12-21 | Schulenburg GmbH & Co. KG |
| AN 2000-250-06 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-12-21 | Schulenburg GmbH & Co. KG |
| WP Clauen WEA 2 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2002-09-25 | LWP Clauen GmbH & Co. KG |
| WP Clauen WEA 1 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2002-09-19 | Wind Power GmbH & Co. Windpark Engelrod KG |
| 701107_Oedelum | 1.80 MW | ENERCON GmbH | in operation | 2003-03-14 | RWE Wind Onshore & PV Deutschland GmbH |
| 701106_Oedelum | 1.80 MW | ENERCON GmbH | in operation | 2003-03-13 | RWE Wind Onshore & PV Deutschland GmbH |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | in operation | 2003-07-10 | private individual |
| Neuhof WEA 4 | 1.80 MW | ENERCON GmbH | in operation | 2003-07-10 | HGE UG & Co. KG |
| Neuhof WEA 3 | 1.80 MW | ENERCON GmbH | in operation | 2003-07-10 | B & H eGbR |
| Neuhof WEA 1 | 1.80 MW | ENERCON GmbH | in operation | 2003-07-10 | Friends and Family Windpark 2 GbR |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | in operation | 2003-07-10 | private individual |
| Hasede WEA 1 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-11-30 | Windwärts Davendis GmbH & Co. Projekt Hasede KG |
| Meerberg WEA 2 | 1.50 MW | ENERCON GmbH | in operation | 2000-09-06 | Windwärts Meerberg GmbH & Co. Betreiber KG |
| Hasede WEA 2 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-11-30 | Windwärts Davendis GmbH & Co. Projekt Hasede KG |
| GE 15500844-01 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-10-09 | EBV Windpark Almstedt-Breinum GmbH & Co. Betriebs- KG |
| Hasede WEA 4 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-12-05 | Windwärts Davendis GmbH & Co. Projekt Hasede KG |
| 1. Nettlinger Windkraft KG | 1.50 MW | REpower Systems SE | in operation | 2004-11-23 | Erste Nettlinger Windkraft KG |
| Wind Feld | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-09-04 | Windkraft Bavenstedt GbR |
| GE 15500842-03 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-10-10 | EBV Windpark Almstedt-Breinum GmbH & Co. Betriebs- KG |
| GE-15520544 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-10-15 | Windpark Holle-Sillium |
| GE-15520547 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-09-25 | Windpark Holle-Sillium |
| GE 15500841-05 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-09-25 | EBV Windpark Almstedt-Breinum GmbH & Co. Betriebs- KG |
| GE 1,5 MW | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-08-13 | Windkraft G &P GmbH &Co KG |
| GE 15500843-02 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-10-10 | EBV Windpark Almstedt-Breinum GmbH & Co. Betriebs- KG |
| WEA 70002 | 1.50 MW | ENERCON GmbH | in operation | 2000-06-07 | Windkraft Nettlingen GbR Vornkahl-Bültemann |
| GE 15500840-04 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-09-24 | EBV Windpark Almstedt-Breinum GmbH & Co. Betriebs- KG |
| GE-15520546 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-10-01 | Windpark Holle-Sillium |
| WEA 3 Schliekum | 1.50 MW | Tacke GmbH & Co. KG | in operation | 1999-10-15 | Windwärts Schliekum GmbH & Co. KG |
| Meerberg WEA 5 | 1.50 MW | ENERCON GmbH | in operation | 2000-09-13 | Windwärts Meerberg GmbH & Co. Betreiber KG |
| WEA 1 Schliekum | 1.50 MW | Tacke GmbH & Co. KG | in operation | 1999-07-29 | Windwärts Schliekum GmbH & Co. KG |
| GE-15520549 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-09-23 | Windpark Holle-Sillium |
| GE-15520548 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-09-24 | Windpark Holle-Sillium |
| Hasede WEA 3 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-12-03 | Windwärts Davendis GmbH & Co. Projekt Hasede KG |
| WEA 2 Schliekum | 1.50 MW | Tacke GmbH & Co. KG | in operation | 1999-10-13 | Windwärts Schliekum GmbH & Co. KG |
| Meerberg WEA 4 | 1.50 MW | ENERCON GmbH | in operation | 2000-09-15 | Windwärts Meerberg GmbH & Co. Betreiber KG |
| WEA 70001 | 1.50 MW | ENERCON GmbH | in operation | 2000-06-01 | Windkraft Nettlingen GbR Vornkahl-Bültemann |
| Meerberg WEA 1 | 1.50 MW | ENERCON GmbH | in operation | 2000-09-08 | Windwärts Meerberg GmbH & Co. Betreiber KG |
| GE-15520543 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-10-16 | Windpark Holle-Sillium |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-10-02 | private individual |
| GE-15520545 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-10-01 | Windpark Holle-Sillium |
| GE-15520542 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-10-14 | Windpark Holle-Sillium |
| Meerberg WEA 6 | 1.50 MW | ENERCON GmbH | in operation | 2000-09-12 | Windwärts Meerberg GmbH & Co. Betreiber KG |
| Meerberg WEA 3 | 1.50 MW | ENERCON GmbH | in operation | 2000-09-15 | Windwärts Meerberg GmbH & Co. Betreiber KG |
| VENTUS | 1.30 MW | AN Windenergie GmbH | in operation | 2000-10-18 | Ventus GbR |
| HERMES | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 2002-11-11 | Hermes GbR |
| NX-9060 | 1.00 MW | Nordex Energy GmbH | in operation | 1997-12-12 | Wind at Work GmbH & Co. Betriebsgesellschaft Buke KG |
| NX-9059 | 1.00 MW | Nordex Energy GmbH | in operation | 1997-12-10 | Wind at Work GmbH & Co. Betriebsgesellschaft Buke KG |
| G 8397 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2005-12-22 | MOSELA Mobiliengesellschaft mbH & Co. KG |
| G 8396 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2005-12-30 | MOSELA Mobiliengesellschaft mbH & Co. KG |
| WEA 44278 | 0.60 MW | ENERCON GmbH | in operation | 2000-05-31 | Windkraft Nettlingen GbR Vornkahl-Bültemann |
| WEA 2 | 0.60 MW | ENERCON GmbH | in operation | 2002-01-15 | ECV Energy-Concept GmbH & Co. Windkraft Duingen II KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2001-12-21 | private individual |
| WEA 1 | 0.60 MW | ENERCON GmbH | in operation | 2002-01-15 | ECV Energy-Concept GmbH & Co. Windkraft Thüster Berg I KG |
| WEA 2 | 0.60 MW | ENERCON GmbH | in operation | 1999-12-02 | Windenergie Algermissen GmbH |
| unit operated by a private individual | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1998-12-29 | private individual |
| WEA 1 | 0.60 MW | ENERCON GmbH | in operation | 1999-12-02 | Windenergie Algermissen GmbH |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1999-08-11 | private individual |
| unit operated by a private individual | 0.45 MW | AN Windenergie GmbH | in operation | 1994-11-10 | private individual |
| unit operated by a private individual | 0.45 MW | – | permanently decommissioned | 1994-11-10 | private individual |
| unit operated by a private individual | 0.30 MW | AN Windenergie GmbH | in operation | 1996-10-10 | private individual |
| Nordex 187 | 0.25 MW | Nordex Energy GmbH | in operation | 1994-10-20 | CaSi-Systems Windenergie GmbH |
| Nordex 188 | 0.25 MW | Nordex Energy GmbH | in operation | 1994-10-20 | CaSi-Systems Windenergie GmbH |
| unit operated by a private individual | 0.15 MW | AN Windenergie GmbH | permanently decommissioned | 1993-10-29 | private individual |
| unit operated by a private individual | 0.15 MW | Nordex SE | permanently decommissioned | 1993-09-15 | private individual |
| Nordex 095 | 0.15 MW | Nordex SE | in operation | 1993-09-15 | CaSi-Systems Windenergie GmbH |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2023-01-12 | private individual |
Which organisations operate the most wind power capacity in Hildesheim?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Klein Escherde GmbH&Co. KG | 7 | 50.4 MW |
| Windpark Bockenem GmbH & Co. Betriebs-KG | 7 | 43.4 MW |
| SAB Projektentwicklung GmbH & Co. KG | 6 | 38.3 MW |
| Windpark Aasumer Feld GmbH & Co. KG | 5 | 36.0 MW |
| Windpark Gronau Leine GmbH & Co. KG | 4 | 28.8 MW |
| Windpark Bockenem Repowering I GmbH & Co. KG | 5 | 17.6 MW |
| ABO Energy WP Almstedt-Breinum GmbH & Co. KG | 3 | 16.7 MW |
| Windpark Schulenburg REP GmbH & Co. KG | 2 | 14.4 MW |
| Windpark Holle-Sillium | 8 | 12.0 MW |
| Windenergie Koppelberg GmbH & Co. KG | 3 | 10.3 MW |
Which manufacturer accounts for the most wind power capacity in Hildesheim?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 33 | 211.8 MW |
| ENERCON GmbH | 36 | 88.3 MW |
| GE Wind Energy GmbH | 16 | 24.0 MW |
| Nordex Energy GmbH | 7 | 13.3 MW |
| Siemens Wind Power GmbH & Co. KG | 4 | 8.00 MW |
| Südwind Borsig Energy GmbH | 4 | 6.00 MW |
| Nordex SE | 3 | 5.10 MW |
| Tacke GmbH & Co. KG | 3 | 4.50 MW |
| VENSYS Energy AG | 1 | 2.50 MW |
| AN Windenergie GmbH | 4 | 2.20 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Hildesheim (Niedersachsen), and how large are the can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.