101 wind turbines with 254.9 MW of gross capacity were in operation in Grafschaft Bentheim (Niedersachsen) as of 2026-11-05, with a further 76 units (503.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Grafschaft Bentheim (Niedersachsen), and how large are they, as of 2026-11-05?
- 101 wind turbines with 254.9 MW of gross capacity were in operation in Grafschaft Bentheim (Niedersachsen) as of 2026-11-05, with a further 76 units (503.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Grafschaft Bentheim?
- 101 wind turbines with 254.9 MW of gross capacity were in operation in Grafschaft Bentheim as of 2026-11-05, with a further 76 units (503.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Grafschaft Bentheim in 2021?
- 1 wind turbines with 0.03 MW went into operation in Grafschaft Bentheim in 2021; the strongest year of the last two decades was 2018 with 33.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Grafschaft Bentheim?
- IWB Windpark Itterbeck-Wielen Betriebsgesellschaft operates 14 wind turbines with 98.0 MW in Grafschaft Bentheim, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Grafschaft Bentheim?
- ENERCON GmbH leads with 95 wind turbines and 337.0 MW in Grafschaft Bentheim (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Grafschaft Bentheim?
- The largest registered wind turbine in Grafschaft Bentheim has 7.20 MW of gross capacity and is operated by Windpark Nordkamp GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Grafschaft Bentheim distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.03 MW | 1 | 0 |
| 30 to 100 kW | 1 | 0.08 MW | 1 | 0 |
| over 100 kW | 181 | 768.6 MW | 99 | 76 |
How much wind power capacity was commissioned in Grafschaft Bentheim each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 13 | 64.3 MW |
| 2021 | 1 | 0.03 MW |
| 2020 | 1 | 3.00 MW |
| 2018 | 11 | 33.0 MW |
| 2017 | 6 | 19.9 MW |
| 2015 | 4 | 11.3 MW |
| 2014 | 5 | 13.8 MW |
| 2013 | 3 | 9.51 MW |
| 2012 | 4 | 8.20 MW |
| 2011 | 5 | 11.5 MW |
| 2007 | 1 | 2.00 MW |
| 2006 | 2 | 4.00 MW |
How many wind turbines in Grafschaft Bentheim are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 76 | 503.8 MW |
| in operation | 101 | 254.9 MW |
| permanently decommissioned | 6 | 10.0 MW |
Which wind turbines are registered in Grafschaft Bentheim?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Nordkamp GmbH & Co. KG |
| WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Nordkamp GmbH & Co. KG |
| WP Bad Bentheim Repower - WEA2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SK Wind GmbH & Co. KG |
| WP Bad Bentheim Repower - WEA3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SK Wind GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Nordkamp GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Nordkamp GmbH & Co. KG |
| WP Bad Bentheim Repower - WEA1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SK Wind GmbH & Co. KG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Nordkamp GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Nordkamp GmbH & Co. KG |
| Windpark Samern WEA 6 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Samern GmbH & Co. KG |
| Emlichheim - Volzel 4 | 7.00 MW | Nordex SE | planned | planned 2028 | Prowind GmbH |
| WEA 1 Itterbeck | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Bimolten I GmbH |
| WEA 3 Wielen | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| WEA 4 Wielen | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| WEA 2 Wielen | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| WEA 8 Itterbeck | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| WEA 6 Itterbeck | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| Windpark Samern WEA 3 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Samern GmbH & Co. KG |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerenergie Bimolten I GmbH & Co. KG |
| WEA 3 Itterbeck | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| Emlichheim - Volzel 3 | 7.00 MW | Nordex SE | planned | planned 2028 | Prowind GmbH |
| Windpark Samern WEA 1 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Samern GmbH & Co. KG |
| Windpark Samern WEA 8 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Samern GmbH & Co. KG |
| Windpark Samern WEA 9 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Samern GmbH & Co. KG |
| WEA 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | Sieringhoeker Windenergie GmbH |
| Windpark Samern WEA 4 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Samern GmbH & Co. KG |
| WEA 5 Wielen | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| Windpark Samern WEA 5 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Samern GmbH & Co. KG |
| WEA 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | Sieringhoeker Windenergie GmbH |
| Windpark Samern WEA 2 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Samern GmbH & Co. KG |
| Windpark Autobahnkreuz WEA-2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Stadtwerke Schüttorf - Emsbüren GmbH |
| Emlichheim - Volzel 2 | 7.00 MW | Nordex SE | planned | planned 2028 | Prowind GmbH |
| WEA 1 Wielen | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| Windpark Autobahnkreuz WEA-1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Stadtwerke Schüttorf - Emsbüren GmbH |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Bimolten I GmbH |
| WEA 7 Itterbeck | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| WEA 2 Itterbeck | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| WEA 5 Itterbeck | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| Emlichheim - Volzel 1 | 7.00 MW | Nordex SE | planned | planned 2028 | Prowind GmbH |
| WEA 5 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Bimolten I GmbH |
| WEA 6 Wielen | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| Windpark Samern WEA 7 | 7.00 MW | Nordex SE | planned | planned 2029 | Windpark Samern GmbH & Co. KG |
| WEA 4 Itterbeck | 7.00 MW | Nordex SE | planned | planned 2028 | IWB Windpark Itterbeck-Wielen Betriebsgesellschaft |
| WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerenergie Bimolten I GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Wielener Naturstrom GmbH & Co. KG |
| WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Wielener Naturstrom GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Wielener Naturstrom GmbH & Co. KG |
| ABO Energy WP Bentheim-Süd WEA 6 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy Windpark 33 GmbH & Co. KG |
| ABO Energy WP Bentheim-Süd WEA 2 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy Windpark 33 GmbH & Co. KG |
| ABO Energy WP Bentheim-Süd WEA 7 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy Windpark 33 GmbH & Co. KG |
| ABO Energy WP Bentheim-Süd WEA 5 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | ABO Energy Windpark 33 GmbH & Co. KG |
| ABO Energy WP Bentheim-Süd WEA 4 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy Windpark 33 GmbH & Co. KG |
| ABO Energy WP Bentheim-Süd WEA 3 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy Windpark 33 GmbH & Co. KG |
| ABO Energy WP Bentheim-Süd WEA 1 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy Windpark 33 GmbH & Co. KG |
| Bad Bentheim - Erweiterung & Repowering WEA 4 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Prowind GmbH |
| Bad Bentheim - Erweiterung & Repowering WEA 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Prowind GmbH |
| Bad Bentheim - Erweiterung & Repowering WEA 5 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Prowind GmbH |
| WEA 02 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 03 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 08 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 07 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 10 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 09 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 06 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 04 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 05 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 01 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 3 | 5.56 MW | ENERCON GmbH | in operation | 2026-05-12 | Bürgerwind Georgsdorf GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | in operation | 2026-01-30 | Windpark Georgsdorf-Neuenhaus GmbH & Co. KG |
| WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 4 | 5.56 MW | ENERCON GmbH | in operation | 2026-02-20 | Windpark Georgsdorf GmbH & Co. KG |
| WEA 6 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 6 | 5.56 MW | ENERCON GmbH | in operation | 2026-05-12 | Bürgerwind Georgsdorf GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 7 | 5.56 MW | ENERCON GmbH | in operation | 2026-02-27 | Agrowea WP Georgsdorf GmbH & Co. KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | in operation | 2026-03-19 | Agrowea WP Georgsdorf GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2026-02-27 | Agrowea WP Georgsdorf GmbH & Co. KG |
| WEA 016 | 4.26 MW | ENERCON GmbH | in operation | 2026-07-20 | BVT Windpark Emlichheim 2 GmbH & Co. KG |
| WEA 015 | 4.26 MW | ENERCON GmbH | in operation | 2026-07-20 | BVT Windpark Emlichheim 2 GmbH & Co. KG |
| WEA 7 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 013 | 4.26 MW | ENERCON GmbH | in operation | 2026-07-22 | BVT Windpark Emlichheim 2 GmbH & Co. KG |
| WEA 019 | 4.20 MW | ENERCON GmbH | in operation | 2026-07-27 | BVT Windpark Emlichheim 2 GmbH & Co. KG |
| WEA 8 | 4.20 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 018 | 4.20 MW | ENERCON GmbH | in operation | 2026-07-28 | BVT Windpark Emlichheim 2 GmbH & Co. KG |
| WEA 017 | 4.20 MW | ENERCON GmbH | in operation | 2026-07-27 | BVT Windpark Emlichheim 2 GmbH & Co. KG |
| V217451 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-06-29 | Dritte Bürgerwind GmbH |
| V217449 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-06-28 | Dritte Bürgerwind GmbH |
| V217450 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-06-28 | Bürgerwindpark Bad Bentheim-Waldseite GmbH & Co. KG |
| V217448 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-06-28 | Bürgerwindpark Bad Bentheim-Waldseite GmbH & Co. KG |
| WEA1 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2013-04-26 | Windpark Quendorf Drievorden GmbH & Co. KG |
| WEA2 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2013-04-26 | Windpark Quendorf Drievorden GmbH & Co. KG |
| WEA3 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2013-04-26 | Windpark Quendorf Drievorden GmbH & Co. KG |
| WP-Wilsum-608 | 3.05 MW | ENERCON GmbH | in operation | 2017-03-31 | Windpark Wilsum GmbH & Co. KG |
| WP-Wilsum-609 | 3.05 MW | ENERCON GmbH | in operation | 2017-02-24 | Windpark Wilsum GmbH & Co. KG |
| WEA 7 (1010820) | 3.05 MW | ENERCON GmbH | in operation | 2014-12-23 | Bürgerwindpark Esche III GmbH & Co. KG |
| WEA 6 (1010819) | 3.05 MW | ENERCON GmbH | in operation | 2014-12-08 | Bürgerwindpark Esche III GmbH & Co. KG |
| WEA 10 (1010821) | 3.05 MW | ENERCON GmbH | in operation | 2014-11-26 | A & W Windenergie GmbH & Co. KG |
| WEA006 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-13 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA 12 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-29 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA 2 (1150187) | 3.00 MW | ENERCON GmbH | in operation | 2015-12-18 | Agrowea Windpark Achterberg/Westenberg GmbH & Co. KG |
| WEA005 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-13 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA 07 | 3.00 MW | ENERCON GmbH | in operation | 2018-08-10 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA 09 | 3.00 MW | ENERCON GmbH | in operation | 2018-07-19 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA003 | 3.00 MW | ENERCON GmbH | in operation | 2020-04-17 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA001 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-20 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA 10 | 3.00 MW | ENERCON GmbH | in operation | 2018-07-09 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA 3 (1150188) | 3.00 MW | ENERCON GmbH | in operation | 2015-12-31 | Bürgerwindpark Achterberg-Westenberg GmbH & Co. KG |
| WEA 11 | 3.00 MW | ENERCON GmbH | in operation | 2018-08-24 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA 1 (1150186) | 3.00 MW | ENERCON GmbH | in operation | 2015-12-30 | Windpark Achterberg/Westenberg GmbH & Co. KG |
| WEA002 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-25 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA 08 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-07 | BVT Windpark Emlichheim GmbH & Co. KG |
| WEA004 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-25 | BVT Windpark Emlichheim GmbH & Co. KG |
| Gö-Ha-77 | 2.35 MW | ENERCON GmbH | in operation | 2015-10-15 | Windpark Gölenkamp-Haftenkamp GmbH & Co. KG |
| Gö-Ha-45 | 2.30 MW | ENERCON GmbH | in operation | 2011-05-16 | Windpark Gölenkamp-Haftenkamp GmbH & Co. KG |
| Gö-Ha-47 | 2.30 MW | ENERCON GmbH | in operation | 2011-05-11 | Windpark Gölenkamp-Haftenkamp GmbH & Co. KG |
| Gö-Ha-48 | 2.30 MW | ENERCON GmbH | in operation | 2011-04-28 | Windpark Gölenkamp-Haftenkamp GmbH & Co. KG |
| WEA 9 (826029) | 2.30 MW | ENERCON GmbH | in operation | 2014-11-28 | Bürgerwindpark Esche III GmbH & Co. KG |
| Gö-Ha-49 | 2.30 MW | ENERCON GmbH | in operation | 2011-04-14 | Windpark Gölenkamp-Haftenkamp GmbH & Co. KG |
| WEA 8 (826028) | 2.30 MW | ENERCON GmbH | in operation | 2014-12-11 | A & W Windenergie GmbH & Co. KG |
| Gö-Ha-46 | 2.30 MW | ENERCON GmbH | in operation | 2011-05-20 | Windpark Gölenkamp-Haftenkamp GmbH & Co. KG |
| WEA2-92273 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-11-06 | Eurowind Laar B.V. & Co. KG |
| WEA4-92275 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-11-06 | Eurowind Laar B.V. & Co. KG |
| WEA3-92274 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-11-06 | Eurowind Laar B.V. & Co. KG |
| WEA1-92272 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-11-06 | Eurowind Laar B.V. & Co. KG |
| WEA 3 (701364) | 2.00 MW | ENERCON GmbH | in operation | 2003-09-11 | A & W Windenergie GmbH & Co. KG |
| WEA 5 (82083) | 2.00 MW | ENERCON GmbH | in operation | 2007-02-12 | Windpark Esche II GmbH & Co. KG |
| WEA 1 (701362) | 2.00 MW | ENERCON GmbH | in operation | 2003-09-23 | Windpark Esche GmbH & Co. KG |
| 82004 | 2.00 MW | ENERCON GmbH | in operation | 2006-06-28 | Alterric Windpark GmbH & Co. Bimolten II KG |
| WEA 4 (701365) | 2.00 MW | ENERCON GmbH | in operation | 2003-09-09 | Windpark Esche GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2001-12-21 | private individual |
| WEA 2 (701363) | 2.00 MW | ENERCON GmbH | in operation | 2003-09-24 | Windpark Esche GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2001-12-21 | private individual |
| 82003 | 2.00 MW | ENERCON GmbH | in operation | 2006-06-14 | Alterric Windpark GmbH & Co. Bimolten II KG |
| WEA 14 (70746) | 1.80 MW | ENERCON GmbH | in operation | 2002-09-10 | BW Bürgerwindpark Bimolten GmbH & Co. KG |
| WEA 5 (70737) | 1.80 MW | ENERCON GmbH | in operation | 2002-08-09 | Windpark Bimolten GmbH & Co. KG |
| Gö-Wi-53 | 1.80 MW | ENERCON GmbH | in operation | 2001-08-24 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| Gö-Wi-48 | 1.80 MW | ENERCON GmbH | in operation | 2001-06-29 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| WEA 7 (70739) | 1.80 MW | ENERCON GmbH | in operation | 2002-07-10 | A & W Windenergie GmbH & Co. KG |
| WEA 12 (70744) | 1.80 MW | ENERCON GmbH | in operation | 2002-09-03 | BW Bürgerwindpark Bimolten GmbH & Co. KG |
| Gö-Wi-44 | 1.80 MW | ENERCON GmbH | in operation | 2001-06-29 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| WEA 10 (70742) | 1.80 MW | ENERCON GmbH | in operation | 2002-08-21 | BW Bürgerwindpark Bimolten GmbH & Co. KG |
| WEA 8 (70740) | 1.80 MW | ENERCON GmbH | in operation | 2002-07-23 | Windpark Bimolten GmbH & Co. KG |
| WEA 6 (70738) | 1.80 MW | ENERCON GmbH | in operation | 2002-07-31 | Windpark Bimolten GmbH & Co. KG |
| Gö-Wi-50 | 1.80 MW | ENERCON GmbH | in operation | 2001-08-16 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| Gö-Wi-49 | 1.80 MW | ENERCON GmbH | in operation | 2001-06-29 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| WEA 3 (70735) | 1.80 MW | ENERCON GmbH | in operation | 2002-08-02 | Windpark Bimolten GmbH & Co. KG |
| WEA 11 (70743) | 1.80 MW | ENERCON GmbH | in operation | 2002-08-28 | BW Bürgerwindpark Bimolten GmbH & Co. KG |
| WEA 2 (70734) | 1.80 MW | ENERCON GmbH | in operation | 2002-08-13 | Windpark Bimolten GmbH & Co. KG |
| WEA 9 (70741) | 1.80 MW | ENERCON GmbH | in operation | 2002-07-16 | BW Bürgerwindpark Bimolten GmbH & Co. KG |
| Gö-Wi-47 | 1.80 MW | ENERCON GmbH | in operation | 2001-06-29 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| Gö-Wi-51 | 1.80 MW | ENERCON GmbH | in operation | 2001-07-03 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| WEA 4 (70736) | 1.80 MW | ENERCON GmbH | in operation | 2002-07-30 | Windpark Bimolten GmbH & Co. KG |
| Gö-Wi-52 | 1.80 MW | ENERCON GmbH | in operation | 2001-07-19 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| WEA 1 (70733) | 1.80 MW | ENERCON GmbH | in operation | 2002-08-15 | Windpark Bimolten GmbH & Co. KG |
| WEA 13 (70745) | 1.80 MW | ENERCON GmbH | in operation | 2002-09-06 | BW Bürgerwindpark Bimolten GmbH & Co. KG |
| Gö-Wi-45 | 1.80 MW | ENERCON GmbH | in operation | 2001-06-29 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| Gö-Wi-46 | 1.80 MW | ENERCON GmbH | in operation | 2001-06-29 | Windpark Gölenkamp-Wilsum GmbH & Co. KG |
| WEA Wietmarschen 5 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-14 | WP Wietmarschen-Ohne GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | Tacke GmbH & Co. KG | permanently decommissioned | 2000-10-17 | private individual |
| WEA Bad Bentheim 15560426 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-09-06 | SK Wind GmbH & Co. KG |
| WEA Bad Bentheim 15560425 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-09-12 | SK Wind GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | Tacke GmbH & Co. KG | permanently decommissioned | 2000-09-14 | private individual |
| WEA Bad Bentheim 15560427 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-09-12 | SK Wind GmbH & Co. KG |
| WEA Ohne 5 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-13 | WP Wietmarschen-Ohne GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | Tacke GmbH & Co. KG | permanently decommissioned | 2000-10-30 | private individual |
| unit operated by a private individual | 1.50 MW | Tacke GmbH & Co. KG | permanently decommissioned | 2000-09-20 | private individual |
| WEA Wietmarschen 4 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-14 | WP Wietmarschen-Ohne GmbH & Co. KG |
| WEA Ohne 4 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-13 | WP Wietmarschen-Ohne GmbH & Co. KG |
| WEA Ohne 6 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-13 | WP Wietmarschen-Ohne GmbH & Co. KG |
| WEA Ohne 7 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-19 | WP Wietmarschen-Ohne GmbH & Co. KG |
| WEA Ohne 1 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-13 | WP Wietmarschen-Ohne GmbH & Co. KG |
| WEA Ohne 2 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-13 | WP Wietmarschen-Ohne GmbH & Co. KG |
| WEA Wietmarschen 3 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-14 | WP Wietmarschen-Ohne GmbH & Co. KG |
| WEA Wietmarschen 1 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-14 | WP Wietmarschen-Ohne GmbH & Co. KG |
| WEA Ohne 3 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-13 | WP Wietmarschen-Ohne GmbH & Co. KG |
| WEA Wietmarschen 2 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-14 | WP Wietmarschen-Ohne GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-01-10 | private individual |
| Butz GbR | 0.08 MW | Tacke GmbH & Co. KG | in operation | 1994-11-11 | Butz GbR |
| unit operated by a private individual | 0.03 MW | Lely Aircon B.V. Niederlassung Leer | in operation | 2021-12-23 | private individual |
Which organisations operate the most wind power capacity in Grafschaft Bentheim?
| Operator | Units | Capacity |
|---|---|---|
| IWB Windpark Itterbeck-Wielen Betriebsgesellschaft | 14 | 98.0 MW |
| Windpark Samern GmbH & Co. KG | 9 | 63.0 MW |
| Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH | 10 | 60.0 MW |
| Prowind GmbH | 7 | 46.6 MW |
| ABO Energy Windpark 33 GmbH & Co. KG | 7 | 46.2 MW |
| Windpark Nordkamp GmbH & Co. KG | 6 | 43.2 MW |
| Agrowea GmbH & Co. KG | 8 | 41.8 MW |
| BVT Windpark Emlichheim GmbH & Co. KG | 12 | 36.0 MW |
| SK Wind GmbH & Co. KG | 6 | 26.1 MW |
| BVT Windpark Emlichheim 2 GmbH & Co. KG | 6 | 25.4 MW |
Which manufacturer accounts for the most wind power capacity in Grafschaft Bentheim?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 95 | 337.0 MW |
| Nordex SE | 27 | 189.0 MW |
| Vestas Deutschland GmbH | 18 | 101.2 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 7 | 46.2 MW |
| Nordex Germany GmbH | 5 | 34.4 MW |
| GE Wind Energy GmbH | 15 | 22.5 MW |
| Senvion Deutschland GmbH | 7 | 17.7 MW |
| Nordex Energy GmbH | 2 | 14.0 MW |
| Tacke GmbH & Co. KG | 6 | 6.68 MW |
| Lely Aircon B.V. Niederlassung Leer | 1 | 0.03 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Grafschaft Bentheim (Niedersachsen), and how larg can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.