Wind power in Goslar

34 wind turbines with 116.8 MW of gross capacity were in operation in Goslar (Niedersachsen) as of 2026-11-05, with a further 4 units (24.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/wind/niedersachsen/goslar

Questions this page answers

How many wind turbines are registered in Goslar (Niedersachsen), and how large are they, as of 2026-11-05?
34 wind turbines with 116.8 MW of gross capacity were in operation in Goslar (Niedersachsen) as of 2026-11-05, with a further 4 units (24.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many wind turbines are in operation in Goslar?
34 wind turbines with 116.8 MW of gross capacity were in operation in Goslar as of 2026-11-05, with a further 4 units (24.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity was commissioned in Goslar in 2025?
10 wind turbines with 52.2 MW went into operation in Goslar in 2025; the strongest year of the last two decades was 2025 with 52.2 MW (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most wind power capacity in Goslar?
Haarwald Wind GmbH & Co. KG operates 6 wind turbines with 34.8 MW in Goslar, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which manufacturer has the most wind power capacity in Goslar?
Vestas Deutschland GmbH leads with 29 wind turbines and 134.4 MW in Goslar (Bundesnetzagentur, Marktstammdatenregister).
What is the largest wind turbine in Goslar?
The largest registered wind turbine in Goslar has 6.20 MW of gross capacity and is operated by Heiwista Konzept GmbH & Co. Am Appelhorn KG, commissioned 2026-02-10 (Bundesnetzagentur, Marktstammdatenregister).

How are the wind turbines in Goslar distributed by size class?

Size classUnitsCapacityIn operationPlanned
up to 30 kW40.02 MW30
30 to 100 kW10.07 MW10
over 100 kW36143.7 MW304

How much wind power capacity was commissioned in Goslar each year?

Commissioning yearUnitsCapacity added
2026418.0 MW
20251052.2 MW
2023725.2 MW
201813.00 MW
201710.01 MW
201212.00 MW
201125.00 MW

How many wind turbines in Goslar are in operation, planned or decommissioned?

StatusUnitsCapacity
in operation34116.8 MW
planned424.0 MW
permanently decommissioned33.00 MW

Which wind turbines are registered in Goslar?

UnitCapacityManufacturerStatusCommissionedOperator
WEA OHA V106.20 MWVestas Deutschland GmbHin operation2026-02-10Heiwista Konzept GmbH & Co. Am Appelhorn KG
WEA OHA V026.20 MWVestas Deutschland GmbHin operation2025-12-04Sinnost GmbH & Co. Wind1 KG
WEA OHA V096.20 MWVestas Deutschland GmbHin operation2025-12-17Haarwald Wind GmbH & Co. KG
WEA OHA V016.20 MWVestas Deutschland GmbHin operation2026-01-16Heiwista Konzept GmbH & Co. Mitarbeiter Terrawatt KG
WEA OHA V066.20 MWVestas Deutschland GmbHin operation2025-11-22Haarwald Wind GmbH & Co. KG
WEA 46.00 MWVestas Deutschland GmbHplannedplanned 2028Windpark Lochtum GmbH
Lochtum WEA 016.00 MWVestas Deutschland GmbHplannedplanned 2029JUWI GmbH
WEA 26.00 MWVestas Deutschland GmbHplannedplanned 2028Windpark Lochtum GmbH
Lochtum WEA 036.00 MWVestas Deutschland GmbHplannedplanned 2029JUWI GmbH
WEA OHA V085.60 MWVestas Deutschland GmbHin operation2025-12-04Haarwald Wind GmbH & Co. KG
WEA OHA V075.60 MWVestas Deutschland GmbHin operation2026-02-07Haarwald Wind GmbH & Co. KG
WEA OHA V045.60 MWVestas Deutschland GmbHin operation2025-12-22Haarwald Wind GmbH & Co. KG
WEA OHA V115.60 MWVestas Deutschland GmbHin operation2025-11-22Heiwista Konzept GmbH & Co. Am Appelhorn KG
WEA OHA V055.60 MWVestas Deutschland GmbHin operation2025-12-06Haarwald Wind GmbH & Co. KG
WEA OHA V035.60 MWVestas Deutschland GmbHin operation2025-12-29Nelse Management GmbH & Co. Nordharz KG
WEA OHA V125.60 MWVestas Deutschland GmbHin operation2025-11-12SamKa GmbH & Co. KG
V 247255-064.20 MWVestas Deutschland GmbHin operation2023-10-16Windpark Bornhausen GmbH & Co. KG
V 247251-044.20 MWVestas Deutschland GmbHin operation2023-10-18Windpark Bornhausen GmbH & Co. KG
V 247254-054.20 MWVestas Deutschland GmbHin operation2023-10-18Windpark Bornhausen GmbH & Co. KG
V 247252-024.20 MWVestas Deutschland GmbHin operation2023-12-21Windpark Bornhausen GmbH & Co. KG
V 247250-014.20 MWVestas Deutschland GmbHin operation2023-11-17Windpark Bornhausen GmbH & Co. KG
V 247253-034.20 MWVestas Deutschland GmbHin operation2023-12-21Windpark Bornhausen GmbH & Co. KG
446413.00 MWVestas Deutschland GmbHin operation2011-12-16Volkswind Immenrode GmbH
SOWIWAS - MajAeo GmbH & Co.KG3.00 MWENERCON GmbHin operation2018-03-31SOWIWAS - MajAeo GmbH & Co.KG
196452.00 MWVestas Deutschland GmbHin operation2004-09-07Volkswind GmbH
WEA Harlingerode2.00 MWVestas Deutschland GmbHin operation2001-12-21NewWind Beta GmbH & Co. KG
163212.00 MWVestas Deutschland GmbHin operation2002-10-30Volkswind GmbH
WEA Remlingen2.00 MWVestas Deutschland GmbHin operation2001-12-21NewWind Beta GmbH & Co. KG
446242.00 MWVestas Deutschland GmbHin operation2011-12-23Volkswind Immenrode GmbH
446232.00 MWVestas Deutschland GmbHin operation2012-01-26Volkswind Immenrode GmbH
SOWIWAS GmbH & Co. Windkonzept 2000 KG1.80 MWENERCON GmbHin operation2001-09-07SO WI WAS - Sonne Wind und Wasser GmbH & Co. Windkonzept 2000 KG
unit operated by a private individual1.50 MWGE Wind Energy GmbHpermanently decommissioned2001-12-13private individual
unit operated by a private individual1.50 MWGE Wind Energy GmbHpermanently decommissioned2001-12-14private individual
SOWIWAS GmbH & Co. Windkonzept Bad Harzburg KG0.50 MWENERCON GmbHin operation1995-10-25SO WI WAS- Sonne Wind und Wasser GmbH & Co. Windkonzept Bad Harzburg KG
SOWIWAS GmbH & Co. Windkonzept Bad Harzburg KG0.50 MWENERCON GmbHin operation1995-10-24SO WI WAS- Sonne Wind und Wasser GmbH & Co. Windkonzept Bad Harzburg KG
SOWIWAS GmbH & Co. Windkonzept Bad Harzburg KG0.50 MWENERCON GmbHin operation1995-10-25SO WI WAS- Sonne Wind und Wasser GmbH & Co. Windkonzept Bad Harzburg KG
unit operated by a private individual0.07 MWLagerwey GmbHin operation1991-06-04private individual
unit operated by a private individual0.01 MWPSW-Energiesysteme GmbHin operation2026-01-21private individual
unit operated by a private individual0.01 MWBRAUN Windturbinen GmbHin operation2017-01-13private individual
unit operated by a private individual0.00 MWSkyWind GmbHpermanently decommissioned2025-09-01private individual
unit operated by a private individual0.00 MWSonstigein operation2023-07-10private individual

Which organisations operate the most wind power capacity in Goslar?

OperatorUnitsCapacity
Haarwald Wind GmbH & Co. KG634.8 MW
Windpark Bornhausen GmbH & Co. KG625.2 MW
Windpark Lochtum GmbH212.0 MW
JUWI GmbH212.0 MW
Heiwista Konzept GmbH & Co. Am Appelhorn KG211.8 MW
Volkswind Immenrode GmbH37.00 MW
Heiwista Konzept GmbH & Co. Mitarbeiter Terrawatt KG16.20 MW
Sinnost GmbH & Co. Wind1 KG16.20 MW
Nelse Management GmbH & Co. Nordharz KG15.60 MW
SamKa GmbH & Co. KG15.60 MW

Which manufacturer accounts for the most wind power capacity in Goslar?

ManufacturerUnitsCapacity
Vestas Deutschland GmbH29134.4 MW
ENERCON GmbH56.30 MW
GE Wind Energy GmbH23.00 MW
Lagerwey GmbH10.07 MW
PSW-Energiesysteme GmbH10.01 MW
BRAUN Windturbinen GmbH10.01 MW
SkyWind GmbH10.00 MW
Sonstige10.00 MW

Wind power in Niedersachsen · Wind power in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many wind turbines are registered in Goslar (Niedersachsen), and how large are they, a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.