Germany · renewables
Wind power in Gifhorn
107 wind turbines with 319.7 MW of gross capacity were in operation in Gifhorn (Niedersachsen) as of 2026-11-05, with a further 53 units (314.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Gifhorn (Niedersachsen), and how large are they, as of 2026-11-05?
- 107 wind turbines with 319.7 MW of gross capacity were in operation in Gifhorn (Niedersachsen) as of 2026-11-05, with a further 53 units (314.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Gifhorn?
- 107 wind turbines with 319.7 MW of gross capacity were in operation in Gifhorn as of 2026-11-05, with a further 53 units (314.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Gifhorn in 2025?
- 18 wind turbines with 67.2 MW went into operation in Gifhorn in 2025; the strongest year of the last two decades was 2025 with 67.2 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Gifhorn?
- ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG operates 10 wind turbines with 68.0 MW in Gifhorn, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Gifhorn?
- Vestas Deutschland GmbH leads with 69 wind turbines and 239.2 MW in Gifhorn (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Gifhorn?
- The largest registered wind turbine in Gifhorn has 7.20 MW of gross capacity and is operated by wpd Windenergieanlage Suderwittingen GmbH & Co. KG, commissioned 2026-09-24 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Gifhorn distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.00 MW | 2 | 0 |
| over 100 kW | 170 | 654.1 MW | 105 | 53 |
How much wind power capacity was commissioned in Gifhorn each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 7.20 MW |
| 2025 | 18 | 67.2 MW |
| 2024 | 5 | 28.5 MW |
| 2023 | 6 | 25.2 MW |
| 2022 | 9 | 32.4 MW |
| 2021 | 13 | 46.6 MW |
| 2015 | 3 | 7.05 MW |
| 2014 | 5 | 14.2 MW |
| 2013 | 8 | 16.0 MW |
| 2012 | 2 | 4.10 MW |
| 2011 | 3 | 6.90 MW |
| 2009 | 10 | 20.0 MW |
| 2007 | 8 | 20.0 MW |
How many wind turbines in Gifhorn are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 107 | 319.7 MW |
| planned | 53 | 314.5 MW |
| permanently decommissioned | 12 | 19.9 MW |
Which wind turbines are registered in Gifhorn?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Suderwittingen-WEA-1 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-09-24 | wpd Windenergieanlage Suderwittingen GmbH & Co. KG |
| RET-VOR-B WEA 03 | 7.00 MW | Nordex SE | planned | planned 2027 | RWE Wind Onshore & PV Deutschland GmbH |
| RET-VOR-B WEA 01 | 7.00 MW | Nordex SE | planned | planned 2027 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Wahrenholz/Wesendorf: WEA 02 | 7.00 MW | Nordex SE | planned | planned 2027 | RheinEnergie AG |
| WP Wahrenholz/Wesendorf: WEA 01 | 7.00 MW | Nordex SE | planned | planned 2027 | RheinEnergie AG |
| RET-VOR-B WEA 02 | 7.00 MW | Nordex SE | planned | planned 2027 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Boldecker Land WEA 6 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| WP Boldecker Land WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| WP Boldecker Land WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| WP Boldecker Land WEA 9 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| WP Boldecker Land WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| WP Boldecker Land WEA 8 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| WP Boldecker Land WEA 7 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| WP Boldecker Land WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| WP Boldecker Land WEA 10 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| WP Boldecker Land WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG |
| Kreutzberg WEA 2 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Kreutzberg zweite GmbH |
| Kreutzberg WEA 1 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Kreutzberg GmbH & Co. erste KG |
| Kreutzberg WEA 3 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Kreutzberg GmbH & Co. dritte KG |
| Kreutzberg WEA 4 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Kreutzberg GmbH & Co. vierte KG |
| Kreutzberg WEA 5 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Kreutzberg GmbH & Co. fünfte KG |
| WP Müden (Aller) WEA 09 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WP Müden (Aller) WEA 08 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WP Müden (Aller) WEA 04 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WP Müden (Aller) WEA 05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WeBo Repo 3 | 6.00 MW | – | planned | planned 2027 | K/S Hydrovind XI |
| WP Müden (Aller) WEA 11 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WeBo Repo 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | K/S Hydrovind XI |
| WeBo Repo 6 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | K/S Hydrovind XI |
| WP Müden (Aller) WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WeBo Repo 4 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | K/S Hydrovind XI |
| WP Müden (Aller) WEA 06 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WP Müden (Aller) WEA 07 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WeBo Repo 5 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | K/S Hydrovind XI |
| WP Müden (Aller) WEA 10 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WeBo Repo 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | K/S Hydrovind XI |
| WP Müden (Aller) WEA 03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WP Müden (Aller) WEA 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Müden/Aller GmbH |
| WEA 01 | 5.70 MW | Nordex SE | planned | planned 2027 | wpd Windpark Vorhop GmbH & Co. KG |
| WEA 02 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-09-03 | Windpark Hankensbüttel GmbH |
| WEA 05 | 5.70 MW | Nordex SE | planned | planned 2027 | wpd Windpark Vorhop GmbH & Co. KG |
| WEA 01 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-09-05 | Windpark Hankensbüttel GmbH |
| WEA 2 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-09-03 | ENOVA Windpark Jembke Betriebs GmbH & Co. KG |
| WEA 05 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-09-05 | Windpark Hankensbüttel GmbH |
| WEA 06 | 5.70 MW | Nordex SE | planned | planned 2027 | wpd Windpark Vorhop GmbH & Co. KG |
| WEA Suderwittingen 01 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-08-12 | UGE Suderwittingen GmbH & Co. KG Umweltgerechte Energie |
| WEA 02 | 5.70 MW | Nordex SE | planned | planned 2027 | wpd Windpark Vorhop GmbH & Co. KG |
| WEA 04 | 5.70 MW | Nordex SE | planned | planned 2027 | wpd Windpark Vorhop GmbH & Co. KG |
| WEA 03 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-09-11 | Windpark Hankensbüttel GmbH |
| WEA 04 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-09-05 | Windpark Hankensbüttel GmbH |
| WEA 3 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-09-04 | ENOVA Windpark Jembke Betriebs GmbH & Co. KG |
| WEA 03 | 5.70 MW | Nordex SE | planned | planned 2027 | wpd Windpark Vorhop GmbH & Co. KG |
| WP Lüben WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Gifhorn 1 GmbH & Co. KG |
| WP Lüben WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Gifhorn 1 GmbH & Co. KG |
| WEA 2 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2025 | Energiekontor AG |
| WEA 1 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2025 | Energiekontor AG |
| WP Lüben WEA 02 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windpark Lüben GmbH & Co. KG |
| WP Lüben WEA 01 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windpark Lüben GmbH & Co. KG |
| WP Lüben WEA 03 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windpark Lüben GmbH & Co. KG |
| WP Lüben WEA 04 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windpark Lüben GmbH & Co. KG |
| WP Lüben WEA 05 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windpark Lüben GmbH & Co. KG |
| V 243417-05 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-06-06 | Windpark Ehra-Lessien GmbH & Co. KG |
| V 243418-06 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-06-20 | Windpark Ehra-Lessien GmbH & Co. KG |
| Teschendorf WEA 01 | 4.20 MW | ENERCON GmbH | in operation | 2025-09-08 | Windpark Teschendorf GmbH & Co. KG |
| Teschendorf WEA 04 | 4.20 MW | ENERCON GmbH | in operation | 2025-09-11 | Windpark Teschendorf GmbH & Co. KG |
| Teschendorf WEA 03 | 4.20 MW | ENERCON GmbH | in operation | 2025-09-10 | Windpark Teschendorf GmbH & Co. KG |
| Teschendorf WEA 02 | 4.20 MW | ENERCON GmbH | in operation | 2025-09-16 | Windpark Teschendorf GmbH & Co. KG |
| V 243413-01 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-04-13 | Windpark Ehra-Lessien GmbH & Co. KG |
| V 243414-02 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-05-11 | Windpark Ehra-Lessien GmbH & Co. KG |
| WP Ehra-Lessien WEA 4 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-05-26 | Bürgerenergie Ehra-Lessien eG |
| V 243415-03 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-07-04 | Windpark Ehra-Lessien GmbH & Co. KG |
| Teschendorf WEA 05 | 4.20 MW | ENERCON GmbH | in operation | 2025-10-10 | Windpark Teschendorf GmbH & Co. KG |
| WEA1 | 3.90 MW | Nordex Energy GmbH | in operation | 2025-10-09 | ENOVA Windpark Jembke Betriebs GmbH & Co. KG |
| WP Bokel WEA 03 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2025-03-31 | Energy Invest Mittelhessen 1 Windpark Bokel GmbH & Co. KG |
| WP Groß Oesingen WEA 08 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-10-28 | PNE WIND Park XXVII GmbH & Co.KG |
| WP Groß Oesingen WEA 04 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-12-15 | PNE WIND Park XXVII GmbH & Co.KG |
| WP Bokel WEA 01 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2025-04-04 | Energy Invest Mittelhessen 1 Windpark Bokel GmbH & Co. KG |
| WP Groß Oesingen WEA 09 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-10-25 | PNE WIND Park XXVII GmbH & Co.KG |
| WP Bokel WEA 04 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2025-04-04 | Energy Invest Mittelhessen 1 Windpark Bokel GmbH & Co. KG |
| WP Zahrenholz WEA 5 | 3.60 MW | Nordex SE | in operation | 2021-12-17 | WKN Windpark Zahrenholz GmbH & Co. KG |
| WP Boitzenhagen WEA 1 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-10-29 | PNE WIND Park XVII GmbH & Co.KG |
| WP Zahrenholz WEA 4 | 3.60 MW | Nordex SE | in operation | 2021-12-16 | WKN Windpark Zahrenholz GmbH & Co. KG |
| WP Zahrenholz WEA 6 | 3.60 MW | Nordex SE | in operation | 2021-12-29 | WKN Windpark Zahrenholz GmbH & Co. KG |
| WP Groß Oesingen WEA 06 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-11-09 | PNE WIND Park XXVII GmbH & Co.KG |
| WP Boitzenhagen WEA 2 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-11-04 | PNE WIND Park XVII GmbH & Co.KG |
| WP Boitzenhagen WEA 4 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-09-30 | PNE WIND Park XVII GmbH & Co.KG |
| WP Groß Oesingen WEA 07 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-11-03 | PNE WIND Park XXVII GmbH & Co.KG |
| WP Zahrenholz WEA 1 | 3.60 MW | Nordex SE | in operation | 2021-12-29 | WKN Windpark Zahrenholz GmbH & Co. KG |
| WP Bokel WEA 02 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2025-03-31 | Energy Invest Mittelhessen 1 Windpark Bokel GmbH & Co. KG |
| WP Groß Oesingen WEA 01 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-12-29 | PNE WIND Park XXVII GmbH & Co.KG |
| WP Zahrenholz WEA 3 | 3.60 MW | Nordex SE | in operation | 2021-11-18 | WKN Windpark Zahrenholz GmbH & Co. KG |
| WP Groß Oesingen WEA 02 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-12-06 | PNE WIND Park XXVII GmbH & Co.KG |
| WP Bokel WEA 05 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2025-04-11 | Energy Invest Mittelhessen 1 Windpark Bokel GmbH & Co. KG |
| WP Groß Oesingen WEA 03 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-11-17 | PNE WIND Park XXVII GmbH & Co.KG |
| WP Bokel WEA 07 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2025-03-31 | Energy Invest Mittelhessen 1 Windpark Bokel GmbH & Co. KG |
| WP Zahrenholz WEA 2 | 3.60 MW | Nordex SE | in operation | 2021-12-02 | WKN Windpark Zahrenholz GmbH & Co. KG |
| WP Groß Oesingen WEA 05 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-11-03 | PNE WIND Park XXVII GmbH & Co.KG |
| WP Boitzenhagen WEA 6 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-10-22 | PNE WIND Park XVII GmbH & Co.KG |
| WP Boitzenhagen WEA 3 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-10-27 | PNE WIND Park XVII GmbH & Co.KG |
| WP Boitzenhagen WEA 5 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-10-22 | PNE WIND Park XVII GmbH & Co.KG |
| WP Bokel WEA 06 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2025-03-31 | Energy Invest Mittelhessen 1 Windpark Bokel GmbH & Co. KG |
| WP Boitzenhagen WEA 7 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-10-22 | PNE WIND Park XVII GmbH & Co.KG |
| WeBo II - 13 | 2.85 MW | GE Wind Energy GmbH | in operation | 2014-03-08 | Hydrovind VII |
| WeBo II - 10 | 2.85 MW | GE Wind Energy GmbH | in operation | 2014-03-20 | Hydrovind VII |
| WeBo II - 9 | 2.85 MW | GE Wind Energy GmbH | in operation | 2014-03-26 | Hydrovind VII |
| WeBo II - 11 | 2.85 MW | GE Wind Energy GmbH | in operation | 2014-03-17 | Hydrovind VII |
| WeBo II - 12 | 2.85 MW | GE Wind Energy GmbH | in operation | 2014-03-10 | Hydrovind VII |
| WeBo I - 3 | 2.50 MW | Fuhrländer AG | in operation | 2007-12-13 | Hydrovind VI |
| WeBo I - 6 | 2.50 MW | Fuhrländer AG | in operation | 2007-12-03 | Hydrovind VI |
| WeBo I - 1 | 2.50 MW | Fuhrländer AG | in operation | 2007-12-12 | Hydrovind VI |
| WeBo I - 2 | 2.50 MW | Fuhrländer AG | in operation | 2007-12-10 | Hydrovind VI |
| WeBo I - 7 | 2.50 MW | Fuhrländer AG | in operation | 2007-04-25 | Hydrovind VI |
| WeBo I - 4 | 2.50 MW | Fuhrländer AG | in operation | 2007-12-03 | Hydrovind VI |
| WeBo I - 8 | 2.50 MW | Fuhrländer AG | in operation | 2007-02-15 | Hydrovind VI |
| WeBo I - 5 | 2.50 MW | Fuhrländer AG | in operation | 2007-12-07 | Hydrovind VI |
| Böckelse E-920857 | 2.35 MW | ENERCON GmbH | in operation | 2015-12-01 | Windpark Böckelse GmbH & Co. KG |
| Böckelse E-920856 | 2.35 MW | ENERCON GmbH | in operation | 2015-11-19 | Windpark Böckelse GmbH & Co. KG |
| Böckelse E-920855 | 2.35 MW | ENERCON GmbH | in operation | 2015-12-01 | Windpark Böckelse GmbH & Co. KG |
| Am Wasserkamp WEA 1 | 2.30 MW | ENERCON GmbH | in operation | 2011-06-30 | Windpark am Wasserkamp GmbH & Co. Betriebs-KG |
| Am Wasserkamp WEA 3 | 2.30 MW | ENERCON GmbH | in operation | 2011-08-04 | Windpark am Wasserkamp GmbH & Co. Betriebs-KG |
| Am Wasserkamp WEA 2 | 2.30 MW | ENERCON GmbH | in operation | 2011-06-30 | Windpark am Wasserkamp GmbH & Co. Betriebs-KG |
| 91984 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-08-17 | ORBIS GmbH & Co. Energie- und Umwelttechnik 32. KG |
| 91399 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-08-15 | ORBIS GmbH & Co. Energie- und Umwelttechnik 32. KG |
| 30741 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-03 | LERAK Mobiliengesellschaft mbH & Co. KG |
| WP Boldecker Land | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-02-14 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| WP Boldecker Land | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-02-11 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| 701636_Zicherie | 2.00 MW | ENERCON GmbH | in operation | 2003-12-18 | RWE Wind Onshore & PV Deutschland GmbH |
| 30737 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-22 | LERAK Mobiliengesellschaft mbH & Co. KG |
| 30743 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-06 | LERAK Mobiliengesellschaft mbH & Co. KG |
| 30742 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-11 | LERAK Mobiliengesellschaft mbH & Co. KG |
| WP Boldecker Land | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-02-28 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| 701635_Zicherie | 2.00 MW | ENERCON GmbH | in operation | 2003-12-18 | RWE Wind Onshore & PV Deutschland GmbH |
| 30736 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-14 | LERAK Mobiliengesellschaft mbH & Co. KG |
| 30735 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-16 | LERAK Mobiliengesellschaft mbH & Co. KG |
| 30739 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-09 | LERAK Mobiliengesellschaft mbH & Co. KG |
| WP Boldecker Land | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-01-30 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| 201155 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-06-03 | LERAK Mobiliengesellschaft mbH & Co. KG |
| 30740 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-12 | LERAK Mobiliengesellschaft mbH & Co. KG |
| WP Boldecker Land | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-02-20 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| 201158 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-06-14 | LERAK Mobiliengesellschaft mbH & Co. KG |
| 30738 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-12 | LERAK Mobiliengesellschaft mbH & Co. KG |
| V-201894 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-19 | PROKON Regenerative Energien eG |
| WP Boldecker Land | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-02-17 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| V-201896 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-20 | PROKON Regenerative Energien eG |
| V17137 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-05-22 | Momentum Energy Germany GmbH & Co.KG |
| 201157 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-06-14 | LERAK Mobiliengesellschaft mbH & Co. KG |
| WP Boldecker Land WEA 17136 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-05-22 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| 201156 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-06-13 | LERAK Mobiliengesellschaft mbH & Co. KG |
| 701637_Zicherie | 2.00 MW | ENERCON GmbH | in operation | 2003-12-22 | RWE Wind Onshore & PV Deutschland GmbH |
| V-201893 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-20 | PROKON Regenerative Energien eG |
| WP Boldecker Land | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-03-07 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| V-201895 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-20 | PROKON Regenerative Energien eG |
| WP Boldecker Land | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-02-27 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| WP Boldecker Land WEA 17135 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-05-14 | ENOVA Windpark Boldecker Land GmbH & Co. KG |
| 30734 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-02 | LERAK Mobiliengesellschaft mbH & Co. KG |
| 701226_Rethen | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2003-05-27 | RWE Wind Onshore & PV Deutschland GmbH |
| 701225_Rethen | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2003-06-05 | RWE Wind Onshore & PV Deutschland GmbH |
| 701224_Rethen | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2003-05-22 | RWE Wind Onshore & PV Deutschland GmbH |
| unit operated by a private individual | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2001-12-12 | private individual |
| unit operated by a private individual | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2001-12-05 | private individual |
| unit operated by a private individual | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2001-12-04 | private individual |
| unit operated by a private individual | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2001-12-11 | private individual |
| unit operated by a private individual | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2001-12-06 | private individual |
| WEA 1 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-10-16 | ecoJoule construct GmbH |
| WEA03 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-10-31 | ecoJoule construct GmbH |
| WEA 2 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-10-17 | ecoJoule construct GmbH |
| Obernholz_1 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 2000-03-01 | Obernholz Windkraft GmbH |
| Obernholz_2 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 2002-08-01 | Obernholz Alternativenergie Betriebsführungs GmbH & Co. KG |
| Windkraft Tülau | 0.50 MW | ENERCON GmbH | in operation | 1996-06-01 | FoxWind - WEA Service |
| unit operated by a private individual | 0.40 MW | MyWind | planned | planned 2026 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2025-06-04 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2025-04-01 | private individual |
Which organisations operate the most wind power capacity in Gifhorn?
| Operator | Units | Capacity |
|---|---|---|
| ENOVA Windpark Boldecker Land Betriebs GmbH & Co. KG | 10 | 68.0 MW |
| Windpark Müden/Aller GmbH | 11 | 66.0 MW |
| K/S Hydrovind XI | 6 | 36.0 MW |
| wpd Windpark Vorhop GmbH & Co. KG | 6 | 34.2 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 9 | 32.4 MW |
| PNE WIND Park XXVII GmbH & Co.KG | 9 | 32.4 MW |
| Windpark Hankensbüttel GmbH | 5 | 28.5 MW |
| LERAK Mobiliengesellschaft mbH & Co. KG | 14 | 28.0 MW |
| Energy Invest Mittelhessen 1 Windpark Bokel GmbH & Co. KG | 7 | 25.2 MW |
| PNE WIND Park XVII GmbH & Co.KG | 7 | 25.1 MW |
Which manufacturer accounts for the most wind power capacity in Gifhorn?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 69 | 239.2 MW |
| ENERCON GmbH | 30 | 110.8 MW |
| Nordex Germany GmbH | 16 | 102.2 MW |
| Nordex SE | 17 | 90.8 MW |
| Nordex Energy GmbH | 17 | 54.2 MW |
| GE Wind Energy GmbH | 7 | 25.2 MW |
| Fuhrländer AG | 8 | 20.0 MW |
| Senvion Deutschland GmbH | 2 | 4.10 MW |
| Tacke GmbH & Co. KG | 2 | 1.20 MW |
| MyWind | 1 | 0.40 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Gifhorn (Niedersachsen), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.