Germany · renewables
Wind power in Emsland
527 wind turbines with 1.43 GW of gross capacity were in operation in Emsland (Niedersachsen) as of 2026-11-05, with a further 259 units (1.75 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Emsland (Niedersachsen), and how large are they, as of 2026-11-05?
- 527 wind turbines with 1.43 GW of gross capacity were in operation in Emsland (Niedersachsen) as of 2026-11-05, with a further 259 units (1.75 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Emsland?
- 527 wind turbines with 1.43 GW of gross capacity were in operation in Emsland as of 2026-11-05, with a further 259 units (1.75 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Emsland in 2025?
- 23 wind turbines with 128.3 MW went into operation in Emsland in 2025; the strongest year of the last two decades was 2018 with 239.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Emsland?
- Marka Taler GmbH & Co. KG operates 47 wind turbines with 323.3 MW in Emsland, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Emsland?
- ENERCON GmbH leads with 715 wind turbines and 2.69 GW in Emsland (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Emsland?
- The largest registered wind turbine in Emsland has 7.80 MW of gross capacity and is operated by Prowind GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Emsland distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 9 | 0.10 MW | 9 | 0 |
| 30 to 100 kW | 18 | 1.42 MW | 13 | 0 |
| over 100 kW | 859 | 3.34 GW | 505 | 259 |
How much wind power capacity was commissioned in Emsland each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 21 | 135.6 MW |
| 2025 | 23 | 128.3 MW |
| 2024 | 20 | 103.1 MW |
| 2023 | 5 | 22.1 MW |
| 2021 | 16 | 67.2 MW |
| 2020 | 6 | 21.0 MW |
| 2019 | 2 | 7.20 MW |
| 2018 | 61 | 239.8 MW |
| 2017 | 52 | 172.7 MW |
| 2016 | 29 | 80.6 MW |
| 2015 | 4 | 8.41 MW |
| 2014 | 5 | 15.0 MW |
| 2013 | 3 | 4.67 MW |
| 2012 | 7 | 19.1 MW |
| 2011 | 45 | 103.2 MW |
| 2010 | 20 | 40.7 MW |
| 2009 | 2 | 4.00 MW |
| 2008 | 7 | 14.9 MW |
| 2007 | 8 | 16.0 MW |
How many wind turbines in Emsland are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 259 | 1.75 GW |
| in operation | 527 | 1.43 GW |
| permanently decommissioned | 99 | 163.7 MW |
| temporarily shut down | 1 | 0.20 MW |
Which wind turbines are registered in Emsland?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Sögel Erweiterung 3 | 7.80 MW | VENSYS Energy AG | planned | planned 2027 | Prowind GmbH |
| Sögel Erweiterung 2 | 7.80 MW | VENSYS Energy AG | planned | planned 2027 | Prowind GmbH |
| Freren Bardel Erweiterung 1 | 7.80 MW | VENSYS Energy AG | planned | planned 2027 | Prowind GmbH |
| Sögel Erweiterung 1 | 7.80 MW | VENSYS Energy AG | planned | planned 2027 | Prowind GmbH |
| Freren Bardel Erweiterung 2 | 7.80 MW | VENSYS Energy AG | planned | planned 2027 | Prowind GmbH |
| MEP01 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-02-26 | ENOVA Windpark Meppen Repowering GmbH & Co. KG |
| MEP08 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-02-26 | ENOVA Windpark Meppen Repowering GmbH & Co. KG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-07-30 | Windpark Haselünne-Schleper GmbH & Co. KG |
| MEP09 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-02-16 | ENOVA Windpark Meppen Repowering GmbH & Co. KG |
| MEP04 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-29 | ENOVA Windpark Meppen Repowering GmbH & Co. KG |
| MEP05 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-04-11 | ENOVA Windpark Meppen Repowering GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-06-18 | Windpark Haselünne-Schleper GmbH & Co. KG |
| MEP07 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-04-02 | ENOVA Windpark Meppen Repowering GmbH & Co. KG |
| MEP03 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-12 | ENOVA Windpark Meppen Repowering GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-06-29 | Windenergie Sautmannshausen GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-07-17 | Windpark Haselünne-Schleper GmbH & Co. KG |
| MEP02 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-02-12 | ENOVA Windpark Meppen Repowering GmbH & Co. KG |
| MEP06 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-29 | ENOVA Windpark Meppen Repowering GmbH & Co. KG |
| WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA 12 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WP-Hilkenbrook-WEA-02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Hilkenbrook Goosenmoor GmbH & Co. KG |
| WEA 7 Mammoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| Windpark Emsbüren - WEA-1 | 7.00 MW | Nordex SE | planned | planned 2028 | Stadtwerke Schüttorf - Emsbüren GmbH |
| WEA 04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Fehndorf 4 GmbH & Co. KG |
| WEA 17 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA 04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | EF Bürgerwindpark Herßum GmbH & Co. KG |
| WEA Papenburg 20 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| TW8.2 WEA15 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WP Herzlake-Bookhof WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bookhofer Feldwind GmbH & Co. KG |
| WEA 06 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Windmühlenberg GbR |
| WT08-3 WEA13 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Andervenne/Handrup GmbH & Co. KG |
| WEA 13 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA02 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Raiffeisen Lünne Projektentwicklung GmbH |
| WEA 4 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 8 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Andervenne/Handrup GmbH & Co. KG |
| WEA 12 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Andervenne/Handrup GmbH & Co. KG |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WEA 6 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Andervenne/Handrup GmbH & Co. KG |
| WEA Papenburg 06 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA Papenburg 08 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA 10 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA 5 Mundersum | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WEA 11 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| TW8.2 WEA18 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 4 Mundersum | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WEA 5 Mammoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 05 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 15 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| TW8.2 WEA34 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 1 Mundersum | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WEA Papenburg 04 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| TW8.2 WEA25 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 7 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| TW8.2 WEA21 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA 007 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Spahnharrenstätte Betriebs GmbH & Co. KG |
| WEA Papenburg 14 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WP Herzlake-Bookhof WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bookhofer Feldwind GmbH & Co. KG |
| TW8.2 WEA07 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 005 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Spahnharrenstätte Betriebs GmbH & Co. KG |
| WT X-3 WEA02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 2 Mundersum | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WEA Papenburg 15 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | EF Bürgerwindpark Herßum GmbH & Co. KG |
| WP-Hilkenbrook-WEA-06 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Hilkenbrook Goosenmoor GmbH & Co. KG |
| WT X-1 WEA01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA Lähden Rep. 5 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Pieper Öko-Strom Verwaltungsgesellschaft mbH |
| TW8.2 WEA29 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 05 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA R03 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Agrowea GmbH & Co. KG |
| TW8.2 WEA02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WT08-3 WEA10 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Fehndorf 4 GmbH & Co. KG |
| WEA 8 Mammoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| TW8.2 WEA20 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 4 Mammoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2025 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WT X-3 WEA03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | EF Bürgerwindpark Herßum GmbH & Co. KG |
| TW8.2 WEA31 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA R02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 06 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | EF Bürgerwindpark Herßum GmbH & Co. KG |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WT08-2 WEA16 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA Papenburg 02 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA 05 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | EF Bürgerwindpark Herßum GmbH & Co. KG |
| WT08-2 WEA17 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA Papenburg 18 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| TW8.2 WEA30 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WP-Hilkenbrook-WEA-03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Hilkenbrook Goosenmoor GmbH & Co. KG |
| WT08-3 WEA06 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WT08-1 WEA22 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 14 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA 6 Mammoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WT11 WEA02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | GA Projekt GmbH & Co. KG |
| WT11 WEA03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| TW8.2 WEA05 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 5 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| Windpark Emsbüren - WEA-3 | 7.00 MW | Nordex SE | planned | planned 2028 | Stadtwerke Schüttorf - Emsbüren GmbH |
| WEA 16 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA Lähden Rep. 1 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Pieper Öko-Strom Verwaltungsgesellschaft mbH |
| WEA 2 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 11 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 3 Glümmel Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA R06 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA Papenburg 05 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | EF Bürgerwindpark Herßum GmbH & Co. KG |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Windmühlenberg GbR |
| TW8.2 WEA24 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 10 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| TW8.2 WEA12 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 13 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WP-Hilkenbrook-WEA-04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Hilkenbrook Goosenmoor GmbH & Co. KG |
| WT08-2 WEA09 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 11 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA 6 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| TW8.2 WEA14 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| TW8.2 WEA33 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| TW8.2 WEA23 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Andervenne/Handrup GmbH & Co. KG |
| WEA 4 Glümmel Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 9 Mammoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA R04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | GA Projekt GmbH & Co. KG |
| WP Herzlake-Bookhof WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bookhofer Feldwind GmbH & Co. KG |
| TW8.2 WEA08 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 9 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Andervenne/Handrup GmbH & Co. KG |
| Windpark Emsbüren - WEA-4 | 7.00 MW | Nordex SE | planned | planned 2028 | Stadtwerke Schüttorf - Emsbüren GmbH |
| WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WEA 2 Glümmel Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA Papenburg 10 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WP Herzlake-Bookhof WEA 5 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bookhofer Feldwind GmbH & Co. KG |
| WEA 07 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Fehndorf 3 GmbH & Co. KG |
| WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA 7 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Andervenne/Handrup GmbH & Co. KG |
| WEA Papenburg 01 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| TW8.2 WEA36 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 6 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Andervenne/Handrup GmbH & Co. KG |
| WEA 8 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| TW8.2 WEA32 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA R05 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| TW8.2 WEA03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Windmühlenberg GbR |
| WEA 3 Mammoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 3 Mundersum | 7.00 MW | ENERCON GmbH | planned | planned 2028 | SWL Wind GmbH |
| WEA 08 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| TW8.2 WEA26 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 11 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA 006 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Spahnharrenstätte Betriebs GmbH & Co. KG |
| WT8-4 WEA01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA Papenburg 13 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| TW8.2 WEA11 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WP-Hilkenbrook-WEA-05 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Hilkenbrook Goosenmoor GmbH & Co. KG |
| WEA Papenburg 16 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| TW8.2 WEA19 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA01 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Raiffeisen Lünne Projektentwicklung GmbH |
| WEA 5 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Windmühlenberg GbR |
| WEA 001 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Spahnharrenstätte Betriebs GmbH & Co. KG |
| WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Windmühlenberg GbR |
| WEA R01 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Agrowea GmbH & Co. KG |
| TW8.2 WEA04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 2 Mammoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA Papenburg 11 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA 1 Glümmel Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| TW8.2 WEA35 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 12 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Fehndorf 3 GmbH & Co. KG |
| WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA 04 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA 008 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Spahnharrenstätte Betriebs GmbH & Co. KG |
| TW8.2 WEA28 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA Papenburg 03 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA 9 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 09 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA 3 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA 08 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA 10 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA Papenburg 07 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA 1 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WP Herzlake-Bookhof WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bookhofer Feldwind GmbH & Co. KG |
| WEA Papenburg 12 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA 07 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WEA 1 Mammoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| WEA Papenburg 09 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WP-Hilkenbrook-WEA-01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Hilkenbrook Goosenmoor GmbH & Co. KG |
| WEA 09 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA 004 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Spahnharrenstätte Betriebs GmbH & Co. KG |
| WEA Papenburg 17 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| WEA R08 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA Papenburg 19 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Papenburg GmbH & Co. KG Umweltgerechte Energie |
| TW8.2 WEA27 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA R02 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Agrowea GmbH & Co. KG |
| WEA 14 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | wpd Windpark Engelbertswald GmbH & Co. KG |
| WT11 WEA01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 05 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA 5 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Andervenne/Handrup GmbH & Co. KG |
| Windpark Emsbüren - WEA-2 | 7.00 MW | Nordex SE | planned | planned 2028 | Stadtwerke Schüttorf - Emsbüren GmbH |
| WEA 06 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG |
| WEA R07 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA 5 Hassmoor Erweiterung | 7.00 MW | ENERCON GmbH | planned | planned 2027 | RBI-Raiffeisen Bauträger- u. Immobilien GmbH |
| WEA03 | 6.90 MW | ENERCON GmbH | planned | planned 2028 | Raiffeisen Lünne Projektentwicklung GmbH |
| WEA01 | 6.90 MW | ENERCON GmbH | planned | planned 2028 | Raiffeisen Lünne Projektentwicklung GmbH |
| WEA02 | 6.90 MW | ENERCON GmbH | planned | planned 2028 | Raiffeisen Lünne Projektentwicklung GmbH |
| WEA01 | 6.90 MW | ENERCON GmbH | planned | planned 2028 | Raiffeisen Lünne Projektentwicklung GmbH |
| WEA02 | 6.90 MW | ENERCON GmbH | planned | planned 2028 | Raiffeisen Lünne Projektentwicklung GmbH |
| WEA03 | 6.90 MW | ENERCON GmbH | planned | planned 2028 | Raiffeisen Lünne Projektentwicklung GmbH |
| WEA 01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | VB-EF Windpark Bergmoor GmbH & Co. KG |
| WEA 6 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Breddenberg GmbH & Co. KG |
| WEA 6 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Neubörger III GmbH & Co. KG |
| WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Neubörger III GmbH & Co. KG |
| WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Neubörger III GmbH & Co. KG |
| WEA 02 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | VB-EF Windpark Bergmoor GmbH & Co. KG |
| WEA 04 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | VB-EF Windpark Bergmoor GmbH & Co. KG |
| WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Breddenberg GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Breddenberg GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Neubörger III GmbH & Co. KG |
| WEA 7 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Neubörger III GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Neubörger III GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Neubörger III GmbH & Co. KG |
| WEA 05 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | VB-EF Windpark Bergmoor GmbH & Co. KG |
| WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Breddenberg GmbH & Co. KG |
| WEA 03 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | VB-EF Windpark Bergmoor GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Breddenberg GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WP Breddenberg GmbH & Co. KG |
| WEA 05N | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-12-31 | Windpark Rhede GmbH & Co. KG |
| WEA 02N | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-10-02 | Windpark Rhede GmbH & Co. KG |
| WEA 01N | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-10-09 | Windpark Rhede GmbH & Co. KG |
| WEA 03N | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-12-13 | Windpark Rhede GmbH & Co. KG |
| WEA 04N | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-12-23 | Windpark Rhede GmbH & Co. KG |
| WT VII-1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA06 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerenergiegesellschaft Listrup-Süd GmbH & Co. KG |
| WEA 06 | 6.00 MW | ENERCON GmbH | in operation | 2025-11-19 | Energiepark Mammoor GmbH & Co. KG |
| WEA 07 | 6.00 MW | ENERCON GmbH | in operation | 2026-05-13 | Energiepark Mammoor GmbH & Co. KG |
| WEA 08 | 6.00 MW | ENERCON GmbH | in operation | 2025-11-19 | Energiepark Mammoor GmbH & Co. KG |
| WEA04 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerenergiegesellschaft Heitel-Ost GmbH & Co. KG |
| WEA05 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerenergiegesellschaft Heitel-Ost GmbH & Co. KG |
| Windtaler VI GmbH & Co. KG | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-09-11 | Windtaler VI GmbH & Co.KG |
| WT VII-2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 02 | 6.00 MW | ENERCON GmbH | in operation | 2026-05-13 | Energiepark Mammoor GmbH & Co. KG |
| WEA 05 | 6.00 MW | ENERCON GmbH | in operation | 2026-05-13 | Energiepark Mammoor GmbH & Co. KG |
| WEA04 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerenergiegesellschaft Listrup-Süd GmbH & Co. KG |
| WEA05 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerenergiegesellschaft Listrup-Süd GmbH & Co. KG |
| WEA 04 | 6.00 MW | ENERCON GmbH | in operation | 2026-05-16 | Energiepark Mammoor GmbH & Co. KG |
| Repowering WEA | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Lotter Ökostrom Planungs GmbH |
| WEA 03 | 6.00 MW | ENERCON GmbH | in operation | 2026-05-13 | Energiepark Mammoor GmbH & Co. KG |
| WEA 10 | 6.00 MW | ENERCON GmbH | in operation | 2025-11-19 | Energiepark Mammoor GmbH & Co. KG |
| WEA 01 | 6.00 MW | ENERCON GmbH | in operation | 2026-05-13 | Energiepark Mammoor GmbH & Co. KG |
| Repowering Lagerfeld | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Ökowindpark Lagerfeld GmbH |
| WEA06 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerenergiegesellschaft Heitel-Ost GmbH & Co. KG |
| WT VII-3 WEA01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA 09 | 6.00 MW | ENERCON GmbH | in operation | 2026-05-15 | Energiepark Mammoor GmbH & Co. KG |
| WEA 12N | 5.70 MW | Nordex SE | in operation | 2025-07-10 | Windpark Neudersum GmbH & Co. KG |
| WEA 03N | 5.70 MW | Nordex Energy GmbH | in operation | 2023-08-04 | Windpark Neudersum GmbH & Co. KG |
| WEA 10N | 5.70 MW | Nordex SE | in operation | 2025-07-24 | Windpark Neudersum GmbH & Co. KG |
| WEA 09N | 5.70 MW | Nordex SE | in operation | 2025-07-09 | Windpark Neudersum GmbH & Co. KG |
| WEA 04N | 5.70 MW | Nordex Energy GmbH | in operation | 2023-10-17 | Windpark Neudersum GmbH & Co. KG |
| WP Börger Ohe 3 | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | Marka Taler GmbH & Co. KG |
| WEA 08N | 5.70 MW | Nordex SE | in operation | 2025-08-07 | Windpark Neudersum GmbH & Co. KG |
| WKA 1 - WP Lengerich Repowering | 5.70 MW | Nordex SE | in operation | 2024-03-27 | RWE Lengerich Windparkbetriebsgesellschaft mbh |
| WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2025-07-31 | Windpark Groß Berßen Süd I GmbH & Co. KG |
| WEA 03 | 5.56 MW | ENERCON GmbH | in operation | 2025-02-27 | Repowering Windpark Listrup GmbH & Co. KG |
| RBB01 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-02 | Energiepark Börger-Breddenberg GmbH & Co. KG |
| WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| Repowering WEA | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Ökowindpark Hinrichs GmbH |
| WP Borsum WEA 5 Enercon E160 | 5.56 MW | ENERCON GmbH | in operation | 2025-03-12 | Windpark Borsum GmbH & Co. KG |
| WEA R03 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WEA Lähden Rep. 2 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Pieper Öko-Strom Verwaltungsgesellschaft mbH |
| WP Borsum WEA 3 Enercon E160 | 5.56 MW | ENERCON GmbH | in operation | 2024-08-22 | Windpark Borsum GmbH & Co. KG |
| WP Borsum WEA 8 Enercon E160 | 5.56 MW | ENERCON GmbH | in operation | 2024-11-21 | Windpark Borsum GmbH & Co. KG |
| WP Borsum WEA 1 Enercon E160 | 5.56 MW | ENERCON GmbH | in operation | 2025-03-27 | Windpark Borsum GmbH & Co. KG |
| WEA R03 | 5.56 MW | ENERCON GmbH | in operation | 2025-02-04 | Repowering Windpark Lünne GmbH & Co. KG |
| WT X-2 WEA04 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Marka Taler GmbH & Co. KG |
| WEA R01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Agrowea GmbH & Co. KG |
| WP Borsum WEA 4 Enercon E160 | 5.56 MW | ENERCON GmbH | in operation | 2024-11-19 | Windpark Borsum GmbH & Co. KG |
| WEA R05 | 5.56 MW | ENERCON GmbH | in operation | 2025-02-20 | Repowering Windpark Lünne GmbH & Co. KG |
| WEA R01 | 5.56 MW | ENERCON GmbH | in operation | 2024-12-23 | Repowering Windpark Lünne GmbH & Co. KG |
| WEA 02 | 5.56 MW | ENERCON GmbH | in operation | 2024-12-23 | Repowering Windpark Listrup GmbH & Co. KG |
| WEA R06 | 5.56 MW | ENERCON GmbH | in operation | 2025-02-27 | Repowering Windpark Lünne GmbH & Co. KG |
| WEA 01 | 5.56 MW | ENERCON GmbH | in operation | 2024-12-20 | Repowering Windpark Listrup GmbH & Co. KG |
| WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energiepark Langen GmbH & Co. KG |
| WP Borsum WEA 2 Enercon E160 | 5.56 MW | ENERCON GmbH | in operation | 2024-12-04 | Windpark Borsum GmbH & Co. KG |
| WP Borsum WEA 7 Enercon E160 | 5.56 MW | ENERCON GmbH | in operation | 2024-08-20 | Windpark Borsum GmbH & Co. KG |
| WP Borsum WEA 9 Enercon E160 | 5.56 MW | ENERCON GmbH | in operation | 2024-12-17 | Windpark Borsum GmbH & Co. KG |
| WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | WP Herzog Planungs-GmbH |
| WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Raiffeisenwindpark Ems-Vechte Verwaltungs- und Beteiligungs-GmbH |
| RBB03 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-17 | ENOVA Windpark Börger-Breddenberg Repowering GmbH & Co. KG |
| WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energiepark Langen GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Loherfeld Wind GmbH |
| RBB04 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-24 | ENOVA Windpark Börger-Breddenberg Repowering GmbH & Co. KG |
| WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | WP Herzog Planungs-GmbH |
| RBB02 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-11 | Energiepark Börger-Breddenberg GmbH & Co. KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Emsland?
| Operator | Units | Capacity |
|---|---|---|
| Marka Taler GmbH & Co. KG | 47 | 323.3 MW |
| RBI-Raiffeisen Bauträger- u. Immobilien GmbH | 25 | 175.0 MW |
| UGE Papenburg GmbH & Co. KG Umweltgerechte Energie | 20 | 140.0 MW |
| wpd Windpark Engelbertswald GmbH & Co. KG | 14 | 98.0 MW |
| SWL Wind GmbH | 22 | 96.8 MW |
| BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG | 13 | 91.0 MW |
| Energiepark Hümmling GmbH & Co. KG | 23 | 89.9 MW |
| Agrowea GmbH & Co. KG | 11 | 74.1 MW |
| Windpark Rhede GmbH & Co. KG | 21 | 67.5 MW |
| Windpark Andervenne/Handrup GmbH & Co. KG | 10 | 67.3 MW |
Which manufacturer accounts for the most wind power capacity in Emsland?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 715 | 2.69 GW |
| Nordex Germany GmbH | 33 | 228.4 MW |
| Vestas Deutschland GmbH | 28 | 164.9 MW |
| Nordex Energy GmbH | 16 | 68.0 MW |
| Nordex SE | 10 | 58.9 MW |
| VENSYS Energy AG | 5 | 39.0 MW |
| Tacke GmbH & Co. KG | 32 | 31.0 MW |
| GE Wind Energy GmbH | 12 | 20.1 MW |
| Gamesa Corporación Tecnológica S.A. | 5 | 10.0 MW |
| Nordtank Energy Group | 5 | 7.50 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Emsland (Niedersachsen), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.