Germany · renewables
Wind power in Diepholz
411 wind turbines with 1.04 GW of gross capacity were in operation in Diepholz (Niedersachsen) as of 2026-11-05, with a further 155 units (950.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Diepholz (Niedersachsen), and how large are they, as of 2026-11-05?
- 411 wind turbines with 1.04 GW of gross capacity were in operation in Diepholz (Niedersachsen) as of 2026-11-05, with a further 155 units (950.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Diepholz?
- 411 wind turbines with 1.04 GW of gross capacity were in operation in Diepholz as of 2026-11-05, with a further 155 units (950.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Diepholz in 2025?
- 17 wind turbines with 87.9 MW went into operation in Diepholz in 2025; the strongest year of the last two decades was 2016 with 103.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Diepholz?
- Westwind Projektierungs GmbH & Co. KG operates 31 wind turbines with 188.4 MW in Diepholz, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Diepholz?
- ENERCON GmbH leads with 472 wind turbines and 1.61 GW in Diepholz (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Diepholz?
- The largest registered wind turbine in Diepholz has 7.20 MW of gross capacity and is operated by Energiepark Donstorf WP DO I GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Diepholz distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 6 | 0.03 MW | 6 | 0 |
| 30 to 100 kW | 6 | 0.42 MW | 1 | 0 |
| over 100 kW | 624 | 2.10 GW | 404 | 155 |
How much wind power capacity was commissioned in Diepholz each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 22 | 117.3 MW |
| 2025 | 17 | 87.9 MW |
| 2024 | 11 | 58.0 MW |
| 2023 | 14 | 72.3 MW |
| 2022 | 3 | 8.40 MW |
| 2021 | 8 | 37.1 MW |
| 2018 | 5 | 11.8 MW |
| 2017 | 27 | 65.8 MW |
| 2016 | 36 | 103.0 MW |
| 2015 | 1 | 0.80 MW |
| 2014 | 10 | 24.3 MW |
| 2013 | 10 | 22.0 MW |
| 2012 | 9 | 23.4 MW |
| 2011 | 9 | 20.7 MW |
| 2010 | 15 | 30.8 MW |
| 2009 | 21 | 42.6 MW |
| 2008 | 12 | 24.9 MW |
| 2007 | 14 | 28.0 MW |
| 2006 | 19 | 38.0 MW |
How many wind turbines in Diepholz are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 411 | 1.04 GW |
| planned | 155 | 950.3 MW |
| permanently decommissioned | 70 | 103.4 MW |
Which wind turbines are registered in Diepholz?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Donstorf WP DO I GmbH & Co. KG |
| Repowering Windpark Okel WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Okeler Bruch Repowering GmbH & Co. KG |
| Repowering Windpark Okel WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Okeler Bruch Repowering GmbH & Co. KG |
| WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Donstorf WP DO I GmbH & Co. KG |
| Repowering Windpark Okel WEA 9 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Okeler Bruch Repowering GmbH & Co. KG |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Donstorf WP DO I GmbH & Co. KG |
| Repowering Windpark Okel WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Okeler Bruch Repowering GmbH & Co. KG |
| Repowering Windpark Okel WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Okeler Bruch Repowering GmbH & Co. KG |
| Repowering Windpark Okel WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Okeler Bruch Repowering GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Danau Wind |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Danau Wind |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Donstorf WP DO I GmbH & Co. KG |
| Repowering Windpark Okel WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Okeler Bruch Repowering GmbH & Co. KG |
| Repowering Windpark Okel WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Okeler Bruch Repowering GmbH & Co. KG |
| WP Altenmarhorst WEA 13 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WEA 003 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | EEB Planung GmbH |
| Drebber WEA01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| Drebber WEA11 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| WEA 005 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | EEB Planung GmbH |
| WP Altenmarhorst WEA 05 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| GÖT WEA6 | 7.00 MW | – | planned | planned 2027 | Windpark Gödestorf GmbH & Co. KG |
| WP Altenmarhorst WEA 18 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WP Altenmarhorst WEA 06 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WP Altenmarhorst WEA 16 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WP Altenmarhorst WEA 10 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Drebber WEA10 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| WP Altenmarhorst WEA 08 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WP Altenmarhorst WEA 15 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Drebber WEA02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| WP Altenmarhorst WEA 19 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Drebber WEA05 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| GÖT WEA5 | 7.00 MW | – | planned | planned 2027 | Windpark Gödestorf GmbH & Co. KG |
| WEA2_KIR_E175 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | NeXtWind Windpark Beteiligung 22 GmbH & Co. KG |
| WP Feine Stuhr WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| Drebber WEA14 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| Drebber WEA12 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| WP Aldorf - WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WPB GmbH & Co.KG |
| WEA1_KIR_ E175 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | NeXtWind Windpark Beteiligung 22 GmbH & Co. KG |
| WP Altenmarhorst WEA 14 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WP Altenmarhorst WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WP Altenmarhorst WEA 04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| unit operated by a private individual | 7.00 MW | ENERCON GmbH | planned | planned 2028 | private individual |
| GÖT WEA7 | 7.00 MW | – | planned | planned 2027 | wpd Windpark Gödestorf-Wachendorf GmbH & Co. KG |
| WEA 001 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | EEB Planung GmbH |
| unit operated by a private individual | 7.00 MW | – | planned | planned 2028 | private individual |
| WEA 002 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | EEB Planung GmbH |
| Drebber WEA04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| Drebber WEA08 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| GÖT WEA3 | 7.00 MW | – | planned | planned 2027 | wpd Windpark Gödestorf-Wachendorf GmbH & Co. KG |
| WP Wachendorf WEA 06 | 7.00 MW | ENERCON GmbH | in operation | 2025-05-14 | 8. SES-Wind Betriebs GmbH & Co. KG |
| WEA 006 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | EEB Planung GmbH |
| WP Altenmarhorst WEA 12 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WP Altenmarhorst WEA 09 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Drebber WEA07 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| WP Altenmarhorst WEA 17 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WEA3_KIR_E175 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | NeXtWind Windpark Beteiligung 22 GmbH & Co. KG |
| WP Altenmarhorst WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Drebber WEA09 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| GÖT WEA4 | 7.00 MW | – | planned | planned 2027 | Windpark Gödestorf GmbH & Co. KG |
| WP Aldorf - WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WPB GmbH & Co.KG |
| WP Altenmarhorst WEA 07 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Drebber WEA03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| WP Altenmarhorst WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Drebber WEA06 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| WP Altenmarhorst WEA 11 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Drebber WEA13 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Drebber Bürgerwindpark GmbH & Co. KG |
| GÖT WEA2 | 7.00 MW | – | planned | planned 2027 | Windpark Gödestorf GmbH & Co. KG |
| WEA Aasbruch 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA01 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Windpark Kleine Marsch GmbH & Co. KG |
| WP Wachendorf WEA 3 | 6.00 MW | ENERCON GmbH | in operation | 2026-06-18 | WP GE Wachendorf GmbH & Co. KG |
| WP Mäkel WEA 04 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WP Mäkel WEA 05 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WEA02 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Kleine Marsch GmbH & Co. KG |
| Scholen 2 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | LuV Windenergie GmbH & Co. WP Schwaförden KG |
| WP Hustedt WEA 01 | 6.00 MW | ENERCON GmbH | in operation | 2025-12-13 | 220. WestWind Windpark GmbH & Co. KG |
| Scholen 1 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | LuV Windenergie GmbH & Co. WP Schwaförden KG |
| WEA 04 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiequelle GmbH |
| WEA 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiequelle GmbH |
| WEA 05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiequelle GmbH |
| WP Mäkel WEA 03 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WP Mäkel WEA 02 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Mühlenhorster WIND GmbH & Co. KG |
| Cantrup 1 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | LuV Windenergie GmbH & Co. WP Schwaförden KG |
| WP Wachendorf WEA 01 WPD | 6.00 MW | ENERCON GmbH | planned | planned 2027 | wpd Windpark Gödestorf-Wachendorf GmbH & Co. KG |
| WEA 03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiequelle GmbH |
| WP Kuppendorf WEA 1 | 6.00 MW | ENERCON GmbH | in operation | 2025-03-14 | 226. WestWind Windpark GmbH & Co. KG |
| WP Wachendorf WEA 1 | 6.00 MW | ENERCON GmbH | in operation | 2026-07-03 | WP GE Wachendorf GmbH & Co. KG |
| WP Wachendorf WEA 2 | 6.00 MW | ENERCON GmbH | in operation | 2026-06-17 | 6. SES Wind-Betriebs GmbH & Co. KG |
| WP Wachendorf WEA 4 | 6.00 MW | ENERCON GmbH | in operation | 2026-07-10 | 7. SES Wind-Betriebs GmbH & Co. KG |
| WP Markonah WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| WP Wachendorf WEA 5 | 6.00 MW | ENERCON GmbH | in operation | 2026-07-10 | 6. SES Wind-Betriebs GmbH & Co. KG |
| WEA 06 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiequelle GmbH |
| Cantrup 2 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | LuV Windenergie GmbH & Co. WP Schwaförden KG |
| WP Mäkel WEA 01 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiequelle GmbH |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Mühlenhorster WIND GmbH & Co. KG |
| WEA 01 | 5.70 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lembruch GmbH & Co. KG |
| WP Diepholzer Bruch, WEA 04 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-10-13 | Windpark Diepholzer Bruch ANW WEA GmbH & Co. KG II |
| WEA 04 | 5.70 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lembruch GmbH & Co. KG |
| GÖT WEA1 | 5.70 MW | – | planned | planned 2027 | Windpark Gödestorf GmbH & Co. KG |
| WP Diepholzer Bruch, WEA 03 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-10-21 | wpd Windpark Diepholzer Bruch GmbH & Co. KG |
| WP Diepholzer Bruch, WEA 01 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-10-14 | wpd Windpark Diepholzer Bruch GmbH & Co. KG |
| GÖT WEA9 | 5.70 MW | – | planned | planned 2027 | wpd Windpark Gödestorf-Wachendorf GmbH & Co. KG |
| WEA 03 | 5.70 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lembruch GmbH & Co. KG |
| WP Diepholzer Bruch, WEA 02 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-10-19 | Windpark Diepholzer Bruch ET WEA GmbH & Co. KG I |
| WEA 02 | 5.70 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Lembruch GmbH & Co. KG |
| WEA 01 - WP Wesenstedt | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Wesenstedt GmbH & Co. KG |
| GÖT WEA8 | 5.70 MW | – | planned | planned 2027 | Windpark Gödestorf GmbH & Co. KG |
| WP Martfeld II WEA 05 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Westwind Projektierungs GmbH & Co. KG |
| WP Diepholzer Bruch WEA 02 | 5.56 MW | ENERCON GmbH | in operation | 2025-11-20 | 202. WestWind Windpark |
| WP Wagenfeld-Süd WEA 5 | 5.56 MW | ENERCON GmbH | in operation | 2026-07-31 | WEI - Wagenfelder Energie Infrastrukturg. mbH & CO. KG |
| WP Wagenfeld-Süd WEA 4 | 5.56 MW | ENERCON GmbH | in operation | 2026-07-31 | WEI - Wagenfelder Energie Infrastrukturg. mbH & CO. KG |
| WP Albringhausen II Repowering WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2023-07-24 | 170. WestWind Windpark GmbH & Co. KG |
| WP Lemförde WEA 06 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| Repowering Lehmkuhl | 5.56 MW | ENERCON GmbH | planned | planned 2028 | ELBA Consult GmbH |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Neue Weide Repowering GmbH & Co. KG |
| WP Erw. FHH - WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Erweiterung Friedeholzheide GmbH & Co. KG |
| WP Scharrendorf Repowering - WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Süstedt WEA 06 | 5.56 MW | ENERCON GmbH | in operation | 2023-12-28 | Bürger-Energie-Syke eG |
| WP Süstedt WEA 08 | 5.56 MW | ENERCON GmbH | in operation | 2024-02-14 | WP GE Süstedt GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Martfeld Repowering GmbH & Co. KG |
| WP Süstedt WEA 02 | 5.56 MW | ENERCON GmbH | in operation | 2024-03-11 | 2. SES Wind-Betriebs GmbH & Co. KG |
| WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Abbenhausen GmbH & Co. KG |
| WP Diepholzer Bruch WEA 05 | 5.56 MW | ENERCON GmbH | in operation | 2025-11-27 | Windpark Diepholz Repowering II |
| WP Süstedt WEA 04 | 5.56 MW | ENERCON GmbH | in operation | 2025-03-07 | WP GE Süstedt II GmbH & Co. KG |
| WP Dörpel WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WP Süstedt WEA 13 | 5.56 MW | ENERCON GmbH | in operation | 2024-11-13 | 5.SES Wind-Betriebs GmbH & Co. KG |
| WP Lemförde WEA 10 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Diepholzer Bruch WEA09 | 5.56 MW | ENERCON GmbH | in operation | 2025-12-19 | Windpark Diepholz Repowering III |
| WP Süstedt WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2024-12-20 | RC-Wind Süstedt I GmbH |
| WP Erw. FHH - WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Erweiterung Friedeholzheide GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Neue Weide Repowering GmbH & Co. KG |
| WP Albringhausen II Repowering WEA 8 | 5.56 MW | ENERCON GmbH | in operation | 2023-03-13 | 177. WestWind Windpark GmbH & Co. KG |
| WP Lemförde WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Süstedt WEA 05 | 5.56 MW | ENERCON GmbH | in operation | 2025-03-07 | WP GE Süstedt II GmbH & Co. KG |
| WP Aasbruch WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WP Albringhausen II Repowering WEA 4 | 5.56 MW | ENERCON GmbH | in operation | 2023-02-20 | 173. WestWind Windpark GmbH & Co. KG |
| WP Erw. FHH - WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Erweiterung Friedeholzheide GmbH & Co. KG |
| WP Wagenfeld-Süd WEA 6 | 5.56 MW | ENERCON GmbH | in operation | 2026-07-31 | WEI - Wagenfelder Energie Infrastrukturg. mbH & CO. KG |
| WP Scharrendorf Repowering - WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Albringhausen II Repowering WEA 2 | 5.56 MW | ENERCON GmbH | in operation | 2023-04-18 | 171. WestWind Windpark GmbH & Co. KG |
| WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Abbenhausen GmbH & Co. KG |
| WP Wachendorf WEA 02 WPD | 5.56 MW | ENERCON GmbH | planned | planned 2027 | wpd Windpark Gödestorf-Wachendorf GmbH & Co. KG |
| WP Diepholzer Bruch WEA06 | 5.56 MW | ENERCON GmbH | in operation | 2025-11-27 | Windpark Diepholz Repowering III |
| WP Süstedt WEA 10 | 5.56 MW | ENERCON GmbH | in operation | 2024-12-31 | WP Bürger Süstedt GmbH & Co. KG |
| WEA Mecklinge | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk Wind GmbH & Co. WP Mecklingen KG |
| WP Lemförde WEA 08 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Süstedt WEA 12 | 5.56 MW | ENERCON GmbH | in operation | 2024-03-13 | WP GE Süstedt GmbH & Co. KG |
| WP Wagenfeld-Süd WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2026-07-31 | WEI - Wagenfelder Energie Infrastrukturg. mbH & CO. KG |
| WP Scharrendorf Repowering - WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Westwind Projektierungs GmbH & Co. KG |
| WP Lemförde WEA 05 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Wagenfeld-Süd WEA 2 | 5.56 MW | ENERCON GmbH | in operation | 2026-07-31 | WEI - Wagenfelder Energie Infrastrukturg. mbH & CO. KG |
| WP Martfeld II WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Westwind Projektierungs GmbH & Co. KG |
| WP Wagenfeld-Süd WEA 3 | 5.56 MW | ENERCON GmbH | in operation | 2026-07-31 | WEI - Wagenfelder Energie Infrastrukturg. mbH & CO. KG |
| WP Lemförde WEA 09 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Martfeld II WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Westwind Projektierungs GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Abbenhausen GmbH & Co. KG |
| WP Martfeld II WEA 06 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Westwind Projektierungs GmbH & Co. KG |
| WP Albringhausen II Repowering WEA 7 | 5.56 MW | ENERCON GmbH | in operation | 2023-03-21 | 176. WestWind Windpark GmbH & Co. KG |
| WP Albringhausen II Repowering WEA 9 | 5.56 MW | ENERCON GmbH | in operation | 2023-03-15 | 179. WestWind Windpark GmbH & Co. KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Abbenhausen GmbH & Co. KG |
| WP Süstedt WEA 14 | 5.56 MW | ENERCON GmbH | in operation | 2024-11-22 | 5.SES Wind-Betriebs GmbH & Co. KG |
| WP Martfeld II WEA 04 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Westwind Projektierungs GmbH & Co. KG |
| WP Albringhausen II Repowering WEA 3 | 5.56 MW | ENERCON GmbH | in operation | 2023-04-25 | 172. WestWind Windpark GmbH & Co. KG |
| WP Diepholzer Bruch WEA08 | 5.56 MW | ENERCON GmbH | in operation | 2025-11-27 | Windpark Diepholz Repowering III |
| WP Lemförde WEA 04 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Albringhausen II Repowering WEA 6 | 5.56 MW | ENERCON GmbH | in operation | 2023-01-23 | 175. WestWind Windpark GmbH & Co. KG |
| WP Süstedt WEA 09 | 5.56 MW | ENERCON GmbH | in operation | 2024-01-25 | WP GE Süstedt GmbH & Co. KG |
| WP Diepholzer Bruch WEA 04 | 5.56 MW | ENERCON GmbH | in operation | 2025-11-19 | Windpark Diepholz Repowering I |
| WP Albringhausen II Repowering WEA 5 | 5.56 MW | ENERCON GmbH | in operation | 2023-02-14 | 174. WestWind Windpark GmbH & Co. KG |
| WP Dörpel WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Abbenhausen GmbH & Co. KG |
| WP Süstedt WEA 03 | 5.56 MW | ENERCON GmbH | in operation | 2024-03-08 | 3. SES Wind-Betriebs GmbH & Co. KG |
| 32 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Casa Projekt GmbH |
| WP Süstedt WEA 07 | 5.56 MW | ENERCON GmbH | in operation | 2023-12-22 | 4. SES Wind-Betriebs GmbH & Co. KG |
| WP Lemförde WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Albringhausen II Repowering WEA 10 | 5.56 MW | ENERCON GmbH | in operation | 2023-04-19 | 178. WestWind Windpark GmbH & Co. KG |
| WP Aasbruch WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WP Erw. FHH - WEA 04 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Erweiterung Friedeholzheide GmbH & Co. KG |
| WP Dörpel WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WP Lemförde WEA 11 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Lemförde WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Martfeld II WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Westwind Projektierungs GmbH & Co. KG |
| 31 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Casa Projekt GmbH |
| WP Aasbruch WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WP Süstedt WEA 11 | 5.56 MW | ENERCON GmbH | in operation | 2023-12-12 | WP GE Süstedt GmbH & Co. KG |
| WP Lemförde WEA 07 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH |
| WP Wagenfeld-Süd WEA 7 | 5.56 MW | ENERCON GmbH | in operation | 2026-07-31 | WEI - Wagenfelder Energie Infrastrukturg. mbH & CO. KG |
| WP Diepholzer Bruch WEA07 | 5.56 MW | ENERCON GmbH | in operation | 2025-12-02 | Windpark Diepholz Repowering III |
| WP Süstedt WEA 15 | 5.56 MW | ENERCON GmbH | in operation | 2024-11-28 | WP GE Süstedt II GmbH & Co. KG |
| WP Diepholzer Bruch WEA 03 | 5.56 MW | ENERCON GmbH | in operation | 2025-11-24 | 206. WestWind Windpark |
| WP Albringhausen WEA 1 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-02-08 | 111. WestWind Windpark GmbH & Co. KG |
| WP Albringhausen WEA 7 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-03-12 | 151. WestWind Windpark GmbH & Co. KG |
| WP Albringhausen WEA 5 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-03-31 | 116. WestWind Windpark GmbH & Co. KG |
| WP Albringhausen WEA 2 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-02-23 | 122. WestWind Windpark GmbH & Co. KG |
| WP Albringhausen WEA 4 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-03-08 | 115. WestWind Windpark GmbH & Co. KG |
| WP Albringhausen WEA 6 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-03-29 | 149. WestWind Windpark GmbH & Co. KG |
| WP Albringhausen WEA 3 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-01-28 | 112. WestWind Windpark GmbH & Co. KG |
| WEA St. Hülfer Bruch 01 | 4.80 MW | Nordex Germany GmbH | in operation | 2025-10-23 | UGE Sankt Hülfer Bruch GmbH & Co. KG Umweltgerechte Energie |
| WP Markonah WEA 2 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| WEA Groß-Ringmar | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Schierloh-Engineering GmbH |
| WP Holzhausen WEA 03 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| 28 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Sommerdamm GmbH & Co. KG |
| 30 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Casa Projekt GmbH |
| WP Barver Süd WEA 01 | 4.26 MW | ENERCON GmbH | in operation | 2026-09-04 | Landvolk GmbH & Co. Windpark Barver Alpha KG |
| WP Barver Süd WEA 04 | 4.26 MW | ENERCON GmbH | in operation | 2026-09-04 | Landvolk GmbH & Co. Windpark Barver Bürger KG |
| WP Holzhausen WEA 04 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WP Süstedt WEA 17 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WEA 3 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Mühlenhorster WIND GmbH & Co. KG |
| WP Holzhausen WEA 02 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| 29 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Casa Projekt GmbH |
| WEA 02 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | BHT Windpark GmbH & Co. II. HEWI KG |
| WP Diepholzer Bruch WEA 01 | 4.26 MW | ENERCON GmbH | in operation | 2025-11-20 | 208. WestWind Windpark |
| WP Schobrink WEA 02 | 4.26 MW | ENERCON GmbH | in operation | 2026-05-28 | 316. WestWind Windpark GmbH & Co. KG |
| WP Schobrink WEA 01 | 4.26 MW | ENERCON GmbH | in operation | 2026-05-29 | 315. WestWind Windpark GmbH & Co. KG |
| WP Süstedt WEA 16 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WEA 01 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | BHT Windpark GmbH & Co. II. HEWI KG |
| WP Holzhausen WEA 01 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Schierloh-Engineering GmbH |
| WP Barver Süd WEA 03 | 4.26 MW | ENERCON GmbH | in operation | 2026-09-04 | Landvolk GmbH & Co. Windpark Barver Beta KG |
| WP Barver Süd WEA 02 | 4.26 MW | ENERCON GmbH | in operation | 2026-09-17 | Landvolk GmbH & Co. Windpark Barver Alpha KG |
| WEA 2 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Natur-Energie GmbH & Co. Wehrbleck I KG |
| WEA005 | 4.20 MW | ENERCON GmbH | in operation | 2022-11-04 | BHT Windpark GmbH & Co. HEWI KG |
| 1160246 | 4.20 MW | ENERCON GmbH | in operation | 2025-02-10 | WEA Aasbruch III GmbH & Co. KG |
| WEA 1 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Volkswind GmbH & Co. Wehrbleck KG |
| WEA006 | 4.20 MW | ENERCON GmbH | in operation | 2022-12-22 | BHT Windpark GmbH & Co. HEWI KG |
| WEA Binghausen | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-10-12 | Meyer Erneuerbare Energien GmbH |
| WEA V117 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-08-14 | Abfall Wirtschaftsgesellschft mbH |
| 207383 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-11-16 | WEA Aasbruch I GmbH & Co. KG |
| 207382 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-11-09 | enercity Windpark Barnstorf GmbH & Co. KG |
| 207384 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-11-25 | WEA Aasbruch I GmbH & Co. KG |
| ENERCON E101 | 3.05 MW | ENERCON GmbH | in operation | 2017-06-27 | RoWi Energy GmbH |
| Windpark III | 3.05 MW | ENERCON GmbH | in operation | 2013-12-20 | Dickel Netz GbR |
| Windpark II | 3.05 MW | ENERCON GmbH | in operation | 2014-03-04 | Dickel Netz GbR |
| WEA 1150249 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-02 | Kirchmeyer Verwaltungs- und Beteiligungs GmbH |
| LV GmbH & Co. Windpark Wetscher Bruch KG I | 3.00 MW | ENERCON GmbH | in operation | 2012-07-31 | LV GmbH & Co. Windpark Wetscher Bruch KG I |
| 1150245 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-02 | Energiepark Bassum GmbH & Co. KG |
| WEA 1150246 | 3.00 MW | ENERCON GmbH | in operation | 2016-08-25 | Windpark Ströen GmbH & Co.KG |
| WP Borwede WEA 4 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-27 | 124. WestWind Windpark GmbH & Co. KG |
| WP Sulinger Bruch WEA 4 | 3.00 MW | ENERCON GmbH | in operation | 2016-07-20 | 86. WestWind Windpark GmbH & Co. KG |
| WP Sulinger Bruch WEA 5 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-21 | 87. WestWind Windpark GmbH & Co. KG |
| WP Sulinger Bruch WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-24 | 85. WestWind Windpark GmbH & Co. KG |
| WEA 1150244 | 3.00 MW | ENERCON GmbH | in operation | 2016-07-08 | Windpark Friedeholzheide GmbH & Co. KG |
| LV GmbH & Co. Windpark Wetscher Bruch KG II | 3.00 MW | ENERCON GmbH | in operation | 2012-11-06 | LV GmbH & Co. Windpark Wetscher Bruch KG II |
| LV GmbH & Co. Windpark Wetscher Bruch KG III | 3.00 MW | ENERCON GmbH | in operation | 2012-10-18 | LV GmbH & Co. Windpark Wetscher Bruch KG III |
| LV GmbH & Co. Windpark Wetscher Bruch KG IV | 3.00 MW | ENERCON GmbH | in operation | 2012-09-28 | LV GmbH & Co. Windpark Wetscher Bruch KG IV |
| WP Natenstedt WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-19 | Seyffart Windenergie GmbH & Co. KG |
| WP Borwede WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-28 | 118. WestWind Windpark GmbH & Co. KG |
| WP Borwede WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2017-08-15 | 120. WestWind Windpark GmbH & Co. KG |
| WEA 1150247 | 3.00 MW | ENERCON GmbH | in operation | 2016-08-04 | Uwe Wehrenberg Beteiligungs- und Betriebs GmbH |
| WEA 1150240 | 3.00 MW | ENERCON GmbH | in operation | 2016-07-28 | Altanleger GmbH & Co. KG |
| WEA 1150248 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-29 | Claus Windenergie GmbH & Co.KG |
| LV GmbH & Co. Windpark Wetscher Bruch KG V | 3.00 MW | ENERCON GmbH | in operation | 2012-09-07 | LV GmbH & Co. Windpark Wetscher Bruch KG V |
| WP Rüssen WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2016-12-28 | 147. WestWind Windpark GmbH & Co. KG |
| 1150243 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-09 | Energiepark Bassum GmbH & Co. KG |
| WP Sulinger Bruch WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2016-05-18 | 83. WestWind Windpark GmbH & Co. KG |
| WP Borwede WEA 6 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-13 | WKA Borwede Zwei GmbH & Co. KG |
| WP Borwede WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-13 | 119. WestWind Windpark GmbH & Co. KG |
| WP Borwede WEA 5 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-07 | WKA Borwede Eins GmbH & Co.KG |
| WP Natenstedt | 3.00 MW | ENERCON GmbH | in operation | 2016-08-26 | CCR Windenergie Duveneck GmbH & Co. KG |
| LV GmbH & Co. Windpark Wetscher Bruch KG VI | 3.00 MW | ENERCON GmbH | in operation | 2012-11-20 | LV GmbH & Co. Windpark Wetscher Bruch KG VI |
| WEA 1150238 | 3.00 MW | ENERCON GmbH | in operation | 2016-08-18 | Windpark Ströen GmbH & Co.KG |
| WP Rüssen WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-20 | 146. WestWind Windpark GmbH & Co. KG |
| WP Sulinger Bruch WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-10 | 84. WestWind Windpark GmbH & Co. KG |
| WEA 1150242 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-15 | HG Börde Wind GmbH & Co. KG |
| WEA 1150237 | 3.00 MW | ENERCON GmbH | in operation | 2017-05-16 | Windpark Bassum A GmbH & Co KG |
| WEA 1150250 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-02 | Windpark Friedeholzheide GmbH & Co. KG |
| WP Natenstedt WEA 4 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-09 | Sohle Energie GmbH & Co. KG |
| WEA 1150241 | 3.00 MW | ENERCON GmbH | in operation | 2016-08-18 | HG Börde Wind GmbH & Co. KG |
| WP Borwede WEA 7 | 3.00 MW | ENERCON GmbH | in operation | 2017-05-23 | Hespe & Ehlers Wind GmbH & Co.KG |
| WEA 1150239 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-05 | Windpark Ströen GmbH & Co.KG |
| WEA Maasen III | 2.50 MW | VENSYS Energy AG | in operation | 2014-09-19 | 108. WestWind Windpark GmbH & Co. KG |
| WP Barver WEA 2 | 2.50 MW | VENSYS Energy AG | in operation | 2017-03-30 | 17. WestWind Windpark GmbH & CO. KG |
| Schwarme | 2.50 MW | VENSYS Energy AG | in operation | 2017-06-27 | Kiel GmbH & Co KG |
| ID 34 | 2.50 MW | VENSYS Energy AG | in operation | 2010-08-05 | VENSYS Windpark Wagenfeld Betriebsgesellschaft mbH & Co. KG |
| Aue Wind GmbH&CO.KG | 2.50 MW | VENSYS Energy AG | in operation | 2014-12-16 | Aue Wind GmbH&CO.KG |
| WEA 4-921541 | 2.35 MW | ENERCON GmbH | in operation | 2018-12-14 | Windpark Düste zwei UG (haftungsbeschränkt) & Co. KG |
| WEA 13-921538 | 2.35 MW | ENERCON GmbH | in operation | 2018-11-26 | Windpark Düste zwei UG (haftungsbeschränkt) & Co. KG |
| 920896 | 2.35 MW | ENERCON GmbH | in operation | 2016-03-23 | WEA Aasbruch II GmbH & Co. KG |
| Windanlage | 2.35 MW | ENERCON GmbH | in operation | 2017-07-18 | Windpark Düste UG (haftungsbeschränkt) & Co. KG |
| WEA 921128 | 2.35 MW | ENERCON GmbH | in operation | 2017-01-24 | Claus Windenergie GmbH & Co.KG |
| WEA 7-921540 | 2.35 MW | ENERCON GmbH | in operation | 2018-12-21 | Windpark Düste zwei UG (haftungsbeschränkt) & Co. KG |
| Siedecamp | 2.35 MW | ENERCON GmbH | in operation | 2014-07-31 | Siedecamp GmbH & Co. KG |
| Windanlage | 2.35 MW | ENERCON GmbH | in operation | 2017-07-29 | Windpark Düste UG (haftungsbeschränkt) & Co. KG |
| Barnstorf WEA 920380 | 2.35 MW | ENERCON GmbH | in operation | 2014-12-12 | WPA VI GmbH & Co. KG |
| WEA 921127 | 2.35 MW | ENERCON GmbH | in operation | 2017-01-20 | Claus Windenergie GmbH & Co.KG |
| WEA Drentwede | 2.35 MW | ENERCON GmbH | in operation | 2024-03-14 | WEA Drentwede GmbH & Co. KG |
| 920895 | 2.35 MW | ENERCON GmbH | in operation | 2016-03-31 | WEA Aasbruch IV GmbH & Co. KG |
| Barnstorf WEA 920379 | 2.35 MW | ENERCON GmbH | in operation | 2014-12-12 | WPA V GmbH & Co. KG |
| Windanlage | 2.35 MW | ENERCON GmbH | in operation | 2017-06-30 | Windpark Düste UG (haftungsbeschränkt) & Co. KG |
| Windanlage | 2.35 MW | ENERCON GmbH | in operation | 2017-09-13 | Windpark Düste UG (haftungsbeschränkt) & Co. KG |
| E 921256-01 | 2.35 MW | ENERCON GmbH | in operation | 2017-05-24 | Windpark Natenstedt GmbH & Co. KG |
| Windanlage | 2.35 MW | ENERCON GmbH | in operation | 2017-06-28 | Windpark Düste UG (haftungsbeschränkt) & Co. KG |
| 920894 | 2.35 MW | ENERCON GmbH | in operation | 2016-03-30 | WEA Aasbruch III GmbH & Co. KG |
| WEA 10-921542 | 2.35 MW | ENERCON GmbH | in operation | 2018-12-19 | Windpark Düste zwei UG (haftungsbeschränkt) & Co. KG |
| WEA 6-921539 | 2.35 MW | ENERCON GmbH | in operation | 2018-12-07 | Windpark Düste zwei UG (haftungsbeschränkt) & Co. KG |
| 920897 | 2.35 MW | ENERCON GmbH | in operation | 2016-03-21 | WEA Aasbruch II GmbH & Co. KG |
| Schierholz1 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-23 | SüdWestStromWindpark Donstorf |
| Barnstorf WEA 826041 | 2.30 MW | ENERCON GmbH | in operation | 2014-07-31 | WPA VIII GmbH & Co. KG |
| unit operated by a private individual | 2.30 MW | GE Wind Energy GmbH | permanently decommissioned | 2006-01-26 | private individual |
| WP Sieden WEA 2 | 2.30 MW | ENERCON GmbH | in operation | 2008-10-22 | 42. WestWind Windpark GmbH & Co KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Diepholz?
| Operator | Units | Capacity |
|---|---|---|
| Westwind Projektierungs GmbH & Co. KG | 31 | 188.4 MW |
| Schierloh-Engineering GmbH | 21 | 110.4 MW |
| Drebber Bürgerwindpark GmbH & Co. KG | 14 | 98.0 MW |
| Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH | 11 | 61.2 MW |
| Windpark Okeler Bruch Repowering GmbH & Co. KG | 8 | 57.6 MW |
| Windpark Gödestorf GmbH & Co. KG | 6 | 39.4 MW |
| WEI - Wagenfelder Energie Infrastrukturg. mbH & CO. KG | 7 | 38.9 MW |
| Energiequelle GmbH | 6 | 36.0 MW |
| EEB Planung GmbH | 5 | 35.0 MW |
| LuV Windenergie GmbH & Co. WP Schwaförden KG | 8 | 32.0 MW |
Which manufacturer accounts for the most wind power capacity in Diepholz?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 472 | 1.61 GW |
| Vestas Deutschland GmbH | 71 | 246.1 MW |
| Nordex Germany GmbH | 11 | 62.9 MW |
| GE Wind Energy GmbH | 12 | 48.6 MW |
| Enron Wind GmbH | 16 | 24.0 MW |
| VENSYS Energy AG | 5 | 12.5 MW |
| Siemens Wind Power GmbH & Co. KG | 7 | 7.95 MW |
| Nordex Energy GmbH | 8 | 5.50 MW |
| Senvion Deutschland GmbH | 2 | 4.10 MW |
| AN Windanlagen GmbH | 2 | 2.60 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Diepholz (Niedersachsen), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.