Wind power in Cuxhaven
526 wind turbines with 809.8 MW of gross capacity were in operation in Cuxhaven (Niedersachsen) as of 2026-11-05, with a further 38 units (206.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Cuxhaven (Niedersachsen), and how large are they, as of 2026-11-05?
- 526 wind turbines with 809.8 MW of gross capacity were in operation in Cuxhaven (Niedersachsen) as of 2026-11-05, with a further 38 units (206.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Cuxhaven?
- 526 wind turbines with 809.8 MW of gross capacity were in operation in Cuxhaven as of 2026-11-05, with a further 38 units (206.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Cuxhaven in 2025?
- 3 wind turbines with 4.83 MW went into operation in Cuxhaven in 2025; the strongest year of the last two decades was 2016 with 93.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Cuxhaven?
- NeXtWind Windpark Beteiligung 28 GmbH & Co. KG operates 16 wind turbines with 64.0 MW in Cuxhaven, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Cuxhaven?
- ENERCON GmbH leads with 283 wind turbines and 485.1 MW in Cuxhaven (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Cuxhaven?
- The largest registered wind turbine in Cuxhaven has 6.60 MW of gross capacity and is operated by Energiekontor AG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Cuxhaven distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 18 | 0.24 MW | 18 | 0 |
| over 100 kW | 565 | 1.03 GW | 508 | 38 |
How much wind power capacity was commissioned in Cuxhaven each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 3 | 4.83 MW |
| 2023 | 6 | 11.5 MW |
| 2022 | 6 | 9.18 MW |
| 2021 | 8 | 12.2 MW |
| 2019 | 2 | 7.20 MW |
| 2018 | 14 | 38.7 MW |
| 2017 | 20 | 62.7 MW |
| 2016 | 30 | 93.0 MW |
| 2015 | 34 | 84.2 MW |
| 2014 | 25 | 64.0 MW |
| 2013 | 7 | 20.2 MW |
| 2012 | 20 | 46.0 MW |
| 2010 | 5 | 10.2 MW |
| 2009 | 25 | 49.5 MW |
| 2008 | 4 | 1.32 MW |
| 2007 | 31 | 53.2 MW |
| 2006 | 20 | 37.8 MW |
How many wind turbines in Cuxhaven are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 526 | 809.8 MW |
| planned | 38 | 206.0 MW |
| permanently decommissioned | 19 | 14.5 MW |
Which wind turbines are registered in Cuxhaven?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 8 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | Energiekontor AG |
| WEA 6 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | Energiekontor AG |
| WEA 5 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | Energiekontor AG |
| WEA 3 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | Energiekontor AG |
| WEA 02 | 6.20 MW | – | planned | planned 2028 | Friesen Elektra VII GmbH & Co. KG |
| WEA 01 | 6.20 MW | – | planned | planned 2028 | Friesen Elektra VII GmbH & Co. KG |
| WEA 05 | 6.20 MW | – | planned | planned 2028 | Friesen Elektra VII GmbH & Co. KG |
| WEA 04 | 6.20 MW | – | planned | planned 2028 | Friesen Elektra VII GmbH & Co. KG |
| WEA 03 | 6.20 MW | – | planned | planned 2028 | Friesen Elektra VII GmbH & Co. KG |
| WP Neuenwalde Anlage 5 (600112) | 6.15 MW | Senvion Deutschland GmbH | in operation | 2014-12-18 | Alterric Deutschland GmbH |
| WEA07_E175_LAM1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| WEA05_E175_LAM1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| WEA06_E175_LAM1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| WP Neuenwalde Anlage 1 (112012) | 6.00 MW | ENERCON GmbH | in operation | 2007-12-21 | Alterric Deutschland GmbH |
| WEA04_E175_LAM1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| WP Neuenwalde Anlage 2 (1260083) | 6.00 MW | ENERCON GmbH | in operation | 2005-12-29 | Alterric Deutschland GmbH |
| WEA08_E175_LAM1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| WEA02_E175_LAM1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| WEA09_E175_LAM1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| WEA03_E175_LAM1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| WEA4 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | BayWa r.e. Energieprojekte GmbH |
| WEA5 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | BayWa r.e. Energieprojekte GmbH |
| WEA3 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | BayWa r.e. Energieprojekte GmbH |
| WEA1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | BayWa r.e. Energieprojekte GmbH |
| WEA6 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | BayWa r.e. Energieprojekte GmbH |
| WEA7 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | BayWa r.e. Energieprojekte GmbH |
| WEA2 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | BayWa r.e. Energieprojekte GmbH |
| WP Neuenwalde Anlage 4 (120005) | 5.08 MW | Senvion Deutschland GmbH | in operation | 2006-12-22 | Alterric Deutschland GmbH |
| WP Neuenwalde Anlage 3 (120004) | 5.08 MW | Senvion Deutschland GmbH | in operation | 2006-12-20 | Alterric Deutschland GmbH |
| WP Neuenkirchen WEA 3 | 4.80 MW | Nordex Energy GmbH | planned | planned 2028 | NeuenkirchenWind GmbH & Co. KG |
| Neuenkirchen Repowering WEA1 | 4.80 MW | Nordex Germany GmbH | in operation | 2025-02-17 | NeuenkirchenWind GmbH & Co. KG |
| WP Neuenkirchen WEA 2 | 4.80 MW | Nordex Germany GmbH | planned | planned 2027 | NeuenkirchenWind GmbH & Co. KG |
| DEB RE 01 | 4.50 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2016-12-21 | Energiepark Debstedt GmbH & Co. RE WP DE KG |
| DEB RE 04 | 4.50 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2016-12-17 | Energiepark Debstedt GmbH & Co. RE WP DE KG |
| DEB RE 03 | 4.50 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2018-11-01 | Energiepark Debstedt GmbH & Co. RE WP DE KG |
| DEB RE 02 | 4.50 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2016-12-22 | Energiepark Debstedt GmbH & Co. RE WP DE KG |
| WEA08_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA10_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA02_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA11_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA06_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA05_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA09_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA03_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA07_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA01_E138_BEL_ I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA04_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| WEA12_E138_BEL_I | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Belum Repowering GmbH & Co. KG |
| Windpark Neuenwalde WEA 02 | 3.60 MW | Nordex Energy GmbH | in operation | 2019-12-02 | PNE WIND Park XVI GmbH & Co. KG |
| Windpark Neuenwalde | 3.60 MW | Nordex Energy GmbH | in operation | 2019-12-02 | PNE WIND Park XVI GmbH & Co. KG |
| WP Altenbruch II WEA 03 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2009-03-26 | Altenbruch II Wind |
| WP Altenbruch II WEA 05 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2009-02-27 | Altenbruch II Wind |
| WP Altenbruch II WEA 01 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2009-02-23 | Altenbruch II Wind |
| WEA 12 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-22 | PNE WIND Park Kührstedt-Alfstedt A |
| Senvion 3.4M114 NES | 3.40 MW | Senvion Deutschland GmbH | in operation | 2018-02-02 | Windkraft Hadler OHG |
| Senvion 3.4M114 NES | 3.40 MW | Senvion Deutschland GmbH | in operation | 2018-01-29 | Windkraft Hadler OHG |
| WEA 09 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-19 | PNE WIND Park Kührstedt-Alfstedt A |
| WEA 06 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-23 | PNE WIND Park Kührstedt-Alfstedt A |
| WEA 08 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-22 | PNE WIND Park Kührstedt-Alfstedt A |
| WEA 07 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-19 | PNE WIND Park Kührstedt-Alfstedt A |
| WEA 11 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-23 | PNE WIND Park Kührstedt-Alfstedt A |
| WEA 10 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-20 | PNE WIND Park Kührstedt-Alfstedt A |
| WEA 05 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-07 | PNE WIND Park Kührstedt-Alfstedt A |
| 300195 | 3.37 MW | PowerWind GmbH | in operation | 2013-11-13 | WINDPOOL Wittgeeste GmbH & Co. KG |
| 300479 | 3.37 MW | REpower Systems SE | in operation | 2013-12-10 | WINDPOOL Wittgeeste GmbH & Co. KG |
| 300476 | 3.37 MW | REpower Systems SE | in operation | 2013-11-06 | WINDPOOL Wittgeeste GmbH & Co. KG |
| ODIS 02 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2017-12-21 | Energiepark Odisheim GmbH & Co. WP ODI KG |
| ODIS 01 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2017-12-11 | Energiepark Odisheim GmbH & Co. WP ODI KG |
| 300194 | 3.37 MW | REpower Systems SE | in operation | 2013-11-21 | WINDPOOL Wittgeeste GmbH & Co. KG |
| 300477 | 3.37 MW | REpower Systems SE | in operation | 2013-11-07 | WINDPOOL Wittgeeste GmbH & Co. KG |
| 300478 | 3.37 MW | REpower Systems SE | in operation | 2013-12-03 | WINDPOOL Wittgeeste GmbH & Co. KG |
| ODIS 03 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2017-12-29 | Energiepark Odisheim GmbH & Co. WP ODI KG |
| WEA 02 | 3.20 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-12-02 | PNE WIND Park Kührstedt-Alfstedt GmbH |
| WEA 03 | 3.20 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-12-02 | PNE WIND Park Kührstedt-Alfstedt GmbH |
| WEA 13 | 3.20 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-12-02 | PNE WIND Park Kührstedt-Alfstedt GmbH |
| WEA 04 | 3.20 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-12-04 | PNE WIND Park Kührstedt-Alfstedt GmbH |
| WEA 01 | 3.20 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-12-01 | PNE WIND Park Kührstedt-Alfstedt GmbH |
| WP Altenbruch Rep. WEA 6 | 3.15 MW | Nordex Energy GmbH | in operation | 2016-11-03 | Altenbruch Wind Repowering GmbH |
| WP Altenbruch Rep. WEA 1 | 3.15 MW | Nordex Energy GmbH | in operation | 2017-05-30 | Altenbruch Wind Repowering GmbH |
| WP Altenbruch Rep. WEA 4 | 3.15 MW | Nordex Energy GmbH | in operation | 2016-12-15 | Altenbruch Wind Repowering GmbH |
| WP Altenbruch Rep. WEA 3 | 3.15 MW | Nordex Energy GmbH | in operation | 2016-11-29 | Altenbruch Wind Repowering GmbH |
| WP Altenbruch Rep. WEA 2 | 3.15 MW | Nordex Energy GmbH | in operation | 2017-05-23 | Altenbruch Wind Repowering GmbH |
| WP Altenbruch Rep. WEA 5 | 3.15 MW | Nordex Energy GmbH | in operation | 2016-11-10 | Altenbruch Wind Repowering GmbH |
| 1011492 | 3.05 MW | ENERCON GmbH | in operation | 2021-11-21 | Windpark Infrastruktur Oberndorf Intern GmbH & Co. KG |
| WP Köhlen WEA 11 (1011306) | 3.05 MW | ENERCON GmbH | in operation | 2016-09-05 | Alterric Windpark Köhlen GmbH & Co. KG |
| 1011490 | 3.05 MW | ENERCON GmbH | in operation | 2021-11-08 | Windpark Infrastruktur Oberndorf Intern GmbH & Co. KG |
| FLÖ 06 | 3.05 MW | ENERCON GmbH | in operation | 2014-06-23 | Infrastrukturgemeinschaft Flögeln GbR |
| FLÖ 05 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-02 | Infrastrukturgemeinschaft Flögeln GbR |
| WP Köhlen WEA 9 (1011304) | 3.05 MW | ENERCON GmbH | in operation | 2016-09-10 | Alterric Windpark Köhlen GmbH & Co. KG |
| WP Köhlen WEA 6 (1011301) | 3.05 MW | ENERCON GmbH | in operation | 2016-08-10 | Alterric Windpark Köhlen GmbH & Co. KG |
| WP Köhlen WEA 5 | 3.05 MW | ENERCON GmbH | in operation | 2016-08-22 | Köhlen Wind GmbH |
| WP Köhlen WEA 12 (1011307) | 3.05 MW | ENERCON GmbH | in operation | 2016-08-10 | Alterric Windpark Köhlen GmbH & Co. KG |
| FLÖ 04 | 3.05 MW | ENERCON GmbH | in operation | 2014-08-04 | Infrastrukturgemeinschaft Flögeln GbR |
| WP Köhlen WEA 2 | 3.05 MW | ENERCON GmbH | in operation | 2016-09-22 | Köhlen Wind GmbH |
| WEA 2 / 1011497 | 3.05 MW | ENERCON GmbH | in operation | 2021-08-20 | GREE Geversdorf GmbH & Co. KG |
| 01WEA1011115 | 3.05 MW | ENERCON GmbH | in operation | 2016-02-04 | Windpark Oldendorf GmbH & Co. KG |
| WEA 5 / 1011500 | 3.05 MW | ENERCON GmbH | in operation | 2021-08-20 | GREE Geversdorf GmbH & Co. KG |
| WP Köhlen WEA 13 (1011308) | 3.05 MW | ENERCON GmbH | in operation | 2016-08-03 | Alterric Windpark Köhlen GmbH & Co. KG |
| FLÖ MEY 03 | 3.05 MW | ENERCON GmbH | in operation | 2014-06-17 | Infrastrukturgemeinschaft Flögeln GbR |
| WP Köhlen WEA 1 | 3.05 MW | ENERCON GmbH | in operation | 2016-09-12 | Köhlen Wind GmbH |
| FLÖ MEY 01 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-28 | Infrastrukturgemeinschaft Flögeln GbR |
| Windpark Moosmoor, WEA 04 | 3.05 MW | ENERCON GmbH | in operation | 2015-11-27 | IWE Gmbh & Co. Windpark Moosmoor KG |
| 1011489 | 3.05 MW | ENERCON GmbH | in operation | 2022-10-21 | Windpark Infrastruktur Oberndorf Intern GmbH & Co. KG |
| 1011491 | 3.05 MW | ENERCON GmbH | in operation | 2022-09-09 | Windpark Infrastruktur Oberndorf Intern GmbH & Co. KG |
| Windpark Moosmoor, WEA 03 | 3.05 MW | ENERCON GmbH | in operation | 2015-12-16 | IWE Gmbh & Co. Windpark Moosmoor KG |
| WP Köhlen WEA 19 | 3.05 MW | ENERCON GmbH | in operation | 2016-09-20 | Köhlen Wind GmbH |
| FLÖ MEY 02 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-15 | Infrastrukturgemeinschaft Flögeln GbR |
| WP Köhlen WEA 15 (1011310) | 3.05 MW | ENERCON GmbH | in operation | 2016-07-15 | Alterric Windpark Köhlen GmbH & Co. KG |
| Windpark Moosmoor, WEA 02 | 3.05 MW | ENERCON GmbH | in operation | 2015-12-21 | IWE Gmbh & Co. Windpark Moosmoor KG |
| WP Köhlen WEA 14 | 3.05 MW | ENERCON GmbH | in operation | 2016-07-05 | Köhlen Wind GmbH |
| 1011493 | 3.05 MW | ENERCON GmbH | in operation | 2022-02-23 | Windpark Infrastruktur Oberndorf Intern GmbH & Co. KG |
| WP Lohkamp WEA 14 | 3.05 MW | ENERCON GmbH | in operation | 2017-12-21 | CEE Windpark Lohkamp GmbH & Co. KG |
| WP Köhlen WEA 3 | 3.05 MW | ENERCON GmbH | in operation | 2016-09-03 | Köhlen Wind GmbH |
| WEA 4 / 1011499 | 3.05 MW | ENERCON GmbH | in operation | 2018-12-13 | GREE Geversdorf GmbH & Co. KG |
| Windpark Moosmoor, WEA 01 | 3.05 MW | ENERCON GmbH | in operation | 2015-12-29 | IWE Gmbh & Co. Windpark Moosmoor KG |
| WP Köhlen WEA 18 | 3.05 MW | ENERCON GmbH | in operation | 2016-06-07 | Köhlen Wind GmbH |
| WP Köhlen WEA 8 (1011303) | 3.05 MW | ENERCON GmbH | in operation | 2016-06-20 | Alterric Windpark Köhlen GmbH & Co. KG |
| WP Köhlen WEA 10 (1011305) | 3.05 MW | ENERCON GmbH | in operation | 2016-08-05 | Alterric Windpark Köhlen GmbH & Co. KG |
| WEA 3 / 1011498 | 3.05 MW | ENERCON GmbH | in operation | 2018-12-19 | GREE Geversdorf GmbH & Co. KG |
| WEA 1 / 1011496 | 3.05 MW | ENERCON GmbH | in operation | 2018-12-13 | GREE Geversdorf GmbH & Co. KG |
| WP Köhlen WEA 4 (1011299) | 3.05 MW | ENERCON GmbH | in operation | 2016-09-16 | Alterric Windpark Köhlen GmbH & Co. KG |
| NX 85059-01 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-12-08 | GNT Altenbruch GmbH & Co. KG |
| WP Neuenwalde Anlage 7 (1150044) | 3.00 MW | ENERCON GmbH | in operation | 2015-01-29 | Alterric Deutschland GmbH |
| WP Altenbruch II WEA 04 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2009-05-07 | Altenbruch II Wind |
| WP Altenbruch II WEA 02 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2009-05-05 | Altenbruch II Wind |
| WP Lohkamp WEA 16 | 3.00 MW | ENERCON GmbH | in operation | 2018-02-28 | CEE Windpark Lohkamp GmbH & Co. KG |
| WP Altenbruch-Ost WEA 8 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-12-01 | Windpark Altenbruch-Ost GmbH & Co.KG |
| WP Altenbruch II WEA 06 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2009-05-08 | Altenbruch II Wind |
| WP Altenbruch-Ost WEA 10 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-12-08 | Windpark Altenbruch-Ost GmbH & Co.KG |
| WP Lohkamp WEA 17 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-29 | CEE Windpark Lohkamp GmbH & Co. KG |
| WP Lohkamp WEA 15 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-15 | CEE Windpark Lohkamp GmbH & Co. KG |
| WP Altenbruch-Ost WEA 9 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-12-15 | Windpark Altenbruch-Ost GmbH & Co.KG |
| WP Altenbruch-Ost WEA 11 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-12-15 | Windpark Altenbruch-Ost GmbH & Co.KG |
| WP Neuenwalde Anlage 6 (1150040) | 3.00 MW | ENERCON GmbH | in operation | 2015-03-05 | Alterric Deutschland GmbH |
| APP 3 - GE 28150124 | 2.85 MW | GE Renewable Germany GmbH | in operation | 2015-12-17 | CHORUS Wind Appeln GmbH & Co. KG |
| APP 4 - GE 28150125 | 2.85 MW | GE Renewable Germany GmbH | in operation | 2015-12-10 | CHORUS Wind Appeln GmbH & Co. KG |
| APP 1 -GE 28150122 | 2.85 MW | GE Renewable Germany GmbH | in operation | 2015-12-23 | CHORUS Wind Appeln GmbH & Co. KG |
| APP 2 -GE 28150123 | 2.85 MW | GE Renewable Germany GmbH | in operation | 2015-12-22 | CHORUS Wind Appeln GmbH & Co. KG |
| Windpark Uthlede WEA 03 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-11-29 | FP Lux Wind GmbH & Co. Uthlede KG |
| Windpark Uthlede WEA 10 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-12-03 | FP Lux Wind GmbH & Co. Uthlede KG |
| LUN 11 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-09-28 | Energiepark Lunestedt GmbH & Co. WP LUN KG |
| HEE 06 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-10-15 | Energiepark Lunestedt GmbH & Co. WP HEE KG |
| Windpark Uthlede WEA 07 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-10-31 | FP Lux Wind GmbH & Co. Uthlede KG |
| HEE 03 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-11-06 | Energiepark Lunestedt GmbH & Co. WP HEE KG |
| Windpark Uthlede WEA 08 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-11-27 | FP Lux Wind GmbH & Co. Uthlede KG |
| Windpark Uthlede WEA 09 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-11-10 | FP Lux Wind GmbH & Co. Uthlede KG |
| LUN 10 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-09-22 | Energiepark Lunestedt GmbH & Co. WP LUN KG |
| LUN 13 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-09-12 | Energiepark Lunestedt GmbH & Co. WP LUN KG |
| Windpark Uthlede WEA 12 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-11-19 | FP Lux Wind GmbH & Co. Uthlede KG |
| Windpark Uthlede WEA 04 | 2.75 MW | – | in operation | 2014-12-10 | FP Lux Wind GmbH & Co. Uthlede KG |
| Windpark Uthlede WEA 02 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-12-13 | FP Lux Wind GmbH & Co. Uthlede KG |
| LUN 12 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-09-15 | Energiepark Lunestedt GmbH & Co. WP LUN KG |
| Windpark Uthlede WEA 11 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-11-11 | FP Lux Wind GmbH & Co. Uthlede KG |
| LUN 08 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-11-14 | Energiepark Lunestedt GmbH & Co. WP LUN KG |
| HEE 04 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-11-02 | Energiepark Lunestedt GmbH & Co. WP HEE KG |
| HEE 07 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-12-01 | Energiepark Lunestedt GmbH & Co. WP HEE KG |
| LUN 09 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-11-26 | Energiepark Lunestedt GmbH & Co. WP LUN KG |
| HEE 05 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-12-04 | Energiepark Lunestedt GmbH & Co. WP HEE KG |
| Windpark Uthlede WEA 05 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-10-25 | FP Lux Wind GmbH & Co. Uthlede KG |
| Windpark Uthlede WEA 06 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-11-24 | FP Lux Wind GmbH & Co. Uthlede KG |
| Windpark Uthlede WEA 01 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-12-13 | FP Lux Wind GmbH & Co. Uthlede KG |
| HEE 02 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-10-16 | Energiepark Lunestedt GmbH & Co. WP HEE KG |
| HEE 01 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-11-02 | Energiepark Lunestedt GmbH & Co. WP HEE KG |
| LUN 14 | 2.75 MW | General Electric Deutschland Holding GmbH | in operation | 2015-09-09 | Energiepark Lunestedt GmbH & Co. WP LUN KG |
| Bürgerwind | 2.35 MW | ENERCON GmbH | in operation | 2018-03-28 | Bürgerwindpark Kehdingbruch GmbH &Co.KG |
| HOL 20 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-06 | SOWIREG ENERGIE GmbH & Co. WKA Holßel KG |
| Bürgerwind | 2.30 MW | ENERCON GmbH | in operation | 2018-03-16 | Bürgerwindpark Kehdingbruch GmbH &Co.KG |
| HOL 17 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-19 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| Bürgerwind | 2.30 MW | ENERCON GmbH | in operation | 2018-03-29 | Bürgerwindpark Kehdingbruch GmbH &Co.KG |
| HOL 18 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-13 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 06 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-31 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| Bürgerwind | 2.30 MW | ENERCON GmbH | in operation | 2018-03-29 | Bürgerwindpark Kehdingbruch GmbH &Co.KG |
| HOL 04 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-29 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 03 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-31 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 07 | 2.30 MW | ENERCON GmbH | in operation | 2012-09-07 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| Do13 | 2.30 MW | ENERCON GmbH | in operation | 2015-04-16 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH & Co. Dorum KG |
| HOL 13 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-17 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 16 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-16 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| Osterbruch Rep., WEA 03 | 2.30 MW | ENERCON GmbH | in operation | 2023-08-14 | Windpark Osterbruch GmbH & Co. Betriebs KG |
| Sdi09 | 2.30 MW | ENERCON GmbH | in operation | 2015-03-27 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| HOL 14 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-26 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| Osterbruch Rep., WEA 04 | 2.30 MW | ENERCON GmbH | in operation | 2023-08-10 | Windpark Osterbruch GmbH & Co. Betriebs KG |
| Sdi08 | 2.30 MW | ENERCON GmbH | in operation | 2015-03-26 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| Osterbruch Rep., WEA 02 | 2.30 MW | ENERCON GmbH | in operation | 2023-08-09 | Windpark Osterbruch GmbH & Co. Betriebs KG |
| Do11 | 2.30 MW | ENERCON GmbH | in operation | 2015-04-20 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH & Co. Dorum KG |
| HOL 09 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-23 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 01 | 2.30 MW | ENERCON GmbH | in operation | 2012-09-06 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 11 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-15 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| BW14 | 2.30 MW | ENERCON GmbH | in operation | 2015-04-23 | BürgerWind Dorum eG |
| DoII12 | 2.30 MW | ENERCON GmbH | in operation | 2015-05-07 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH & Co. Dorum II KG |
| HOL 05 | 2.30 MW | ENERCON GmbH | in operation | 2012-09-06 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 02 | 2.30 MW | ENERCON GmbH | in operation | 2012-09-05 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| Sdi10 | 2.30 MW | ENERCON GmbH | in operation | 2015-04-10 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| HOL 19 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-12 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| Osterbruch Rep., WEA 01 | 2.30 MW | ENERCON GmbH | in operation | 2023-08-08 | Windpark Osterbruch GmbH & Co. Betriebs KG |
| Osterbruch Rep., WEA 05 | 2.30 MW | ENERCON GmbH | in operation | 2023-08-10 | Windpark Osterbruch GmbH & Co. Betriebs KG |
| HOL 12 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-31 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 10 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-27 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 15 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-20 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| HOL 08 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-20 | Energiekontor Windkraft GmbH & Co. WP HOL KG |
| Windkarftwerk Wremen WEA 2 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2010-06-21 | Windkraftwerk Wremen |
| Windkraftwerk Wremen WEA 1 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2010-06-24 | Windkraftwerk Wremen |
| Windkraftwerk Wremen WEA 5 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2010-06-17 | Windkraftwerk Wremen |
| Windkraftwerk Wremen WEA 3 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2010-06-25 | Windkraftwerk Wremen |
| Windkraftwerk Wremen WEA 4 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2010-06-11 | Windkraftwerk Wremen |
| 781514 | 2.00 MW | ENERCON GmbH | in operation | 2007-10-11 | REG Regenerative Energien Standortentwicklung GmbH & Co. Beverstedt KG |
| WEA Mittelstenahe 781037 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-06 | Windpark Mittelstenahe GmbH & Co. Betriebs-KG |
| Sellstedt_WEA_4 | 2.00 MW | ENERCON GmbH | in operation | 2005-11-02 | Energiequelle Umwelt Management EUM GmbH & Co. Sellstedt KG |
| 9398 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2007-02-28 | HT Aiwanger GmbH & Co. KG |
| WEA Nückel 781221 | 2.00 MW | ENERCON GmbH | in operation | 2007-02-23 | Windpark Nückel GmbH & Co. KG |
| WEA Mittelstenahe 781041 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-29 | Windpark Mittelstenahe GmbH & Co. Betriebs-KG |
| 782132 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-23 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| 78131 | 2.00 MW | ENERCON GmbH | in operation | 2006-07-06 | REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG |
| 78132 | 2.00 MW | ENERCON GmbH | in operation | 2006-06-29 | REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG |
| 782127 | 2.00 MW | ENERCON GmbH | in operation | 2009-02-19 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| WEA Mittelstenahe 781040 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-14 | Windpark Mittelstenahe GmbH & Co. Betriebs-KG |
| WEA Nückel 781220 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-30 | Windpark Nückel GmbH & Co. KG |
| Windpark Bülkau WEA02 | 2.00 MW | VENTIS WIND SERVICE S.L | in operation | 2009-12-18 | Hamburger Energiewerke GmbH |
| 781512 | 2.00 MW | ENERCON GmbH | in operation | 2007-10-18 | REG Regenerative Energien Standortentwicklung GmbH & Co. Beverstedt KG |
| WP Altenbruch II WEA 07 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-16 | Altenbruch II Wind |
| 781519 | 2.00 MW | ENERCON GmbH | in operation | 2007-10-15 | REG Regenerative Energien Standortentwicklung GmbH & Co. Beverstedt KG |
| 781515 | 2.00 MW | ENERCON GmbH | in operation | 2007-10-10 | REG Regenerative Energien Standortentwicklung GmbH & Co. Beverstedt KG |
| 9396 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2007-03-02 | HT Aiwanger GmbH & Co. KG |
| 702454 | 2.00 MW | ENERCON GmbH | in operation | 2005-06-28 | REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG |
| 702456 | 2.00 MW | ENERCON GmbH | in operation | 2005-06-30 | REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG |
| AN 2000-347-07 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2004-03-11 | Belumer Energiegesellschaft mbH |
| 782125 | 2.00 MW | ENERCON GmbH | in operation | 2009-03-16 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| 781520 | 2.00 MW | ENERCON GmbH | in operation | 2007-10-19 | REG Regenerative Energien Standortentwicklung GmbH & Co. Beverstedt KG |
| 781518 | 2.00 MW | ENERCON GmbH | in operation | 2007-10-17 | REG Regenerative Energien Standortentwicklung GmbH & Co. Beverstedt KG |
| 782124 | 2.00 MW | ENERCON GmbH | in operation | 2009-04-03 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| 702455 | 2.00 MW | ENERCON GmbH | in operation | 2005-07-07 | REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG |
| 782134 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-07 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| 78130 | 2.00 MW | ENERCON GmbH | in operation | 2006-06-29 | REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG |
| AN 2000-366-06 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2004-03-19 | Belumer Energiegesellschaft mbH |
| 9395 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2007-04-26 | HT Aiwanger GmbH & Co. KG |
| Windpark Bülkau WEA01 | 2.00 MW | – | in operation | 2009-12-18 | Hamburger Energiewerke GmbH |
| AN 2000-363-04 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2004-03-19 | Belumer Energiegesellschaft mbH |
| Sellstedt_WEA_3 | 2.00 MW | ENERCON GmbH | in operation | 2005-11-07 | Energiequelle Umwelt Management EUM GmbH & Co. Sellstedt KG |
| 9399 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2007-02-15 | HT Aiwanger GmbH & Co. KG |
| 782128 | 2.00 MW | ENERCON GmbH | in operation | 2009-03-06 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| 702453 | 2.00 MW | ENERCON GmbH | in operation | 2005-06-28 | REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG |
| WP Altenbruch II WEA 09 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-16 | Altenbruch II Wind |
| 78134 | 2.00 MW | ENERCON GmbH | in operation | 2006-06-22 | REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG |
| 782133 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-14 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| AN 2000-358-03 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2004-03-12 | WPD Windpark Belum GmbH & Co. KG |
| WEA Mittelstenahe 781039 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-15 | Windpark Mittelstenahe GmbH & Co. Betriebs-KG |
| 781516 | 2.00 MW | ENERCON GmbH | in operation | 2007-10-15 | REG Regenerative Energien Standortentwicklung GmbH & Co. Beverstedt KG |
| AN 2000-341-01 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2004-03-17 | WPD Windpark Belum GmbH & Co. KG |
| 781517 | 2.00 MW | ENERCON GmbH | in operation | 2007-10-11 | REG Regenerative Energien Standortentwicklung GmbH & Co. Beverstedt KG |
| 782126 | 2.00 MW | ENERCON GmbH | in operation | 2009-03-05 | NeXtWind Windpark Beteiligung 28 GmbH & Co. KG |
| E 70 Lox | 2.00 MW | ENERCON GmbH | in operation | 2007-02-21 | Windpark Sellstedt GmbH & Co. Betriebs KG |
| WEA Mittelstenahe 781036 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-22 | Windpark Mittelstenahe GmbH & Co. Betriebs-KG |
| 78133 | 2.00 MW | ENERCON GmbH | in operation | 2006-07-11 | REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG |
| Sellstedt_WEA_2 | 2.00 MW | ENERCON GmbH | in operation | 2005-10-26 | Energiequelle Umwelt Management EUM GmbH & Co. Sellstedt KG |
| AN 2000-367-02 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2004-03-18 | Belumer Energiegesellschaft mbH |
| 781513 | 2.00 MW | ENERCON GmbH | in operation | 2007-10-16 | REG Regenerative Energien Standortentwicklung GmbH & Co. Beverstedt KG |
| Windpark Bülkau WEA03 | 2.00 MW | VENTIS WIND SERVICE S.L | in operation | 2009-12-18 | Hamburger Energiewerke GmbH |
| WP Altenbruch II WEA 08 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-22 | Altenbruch II Wind |
| Sellstedt_WEA_1 | 2.00 MW | ENERCON GmbH | in operation | 2005-11-10 | Energiequelle Umwelt Management EUM GmbH & Co. Sellstedt KG |
| 9397 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2007-02-23 | HT Aiwanger GmbH & Co. KG |
| AN 2000-357-09 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2004-03-16 | Belumer Energiegesellschaft mbH |
| AN 2000-350-05 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2004-03-10 | Belumer Energiegesellschaft mbH |
| 1500327 | 1.50 MW | GE Wind Energy GmbH | in operation | 2000-12-21 | FWE Windpark Wittstedt GmbH & Co. KG |
| 537 | 1.50 MW | Fuhrländer AG | in operation | 2007-11-14 | QE Bramstedt GmbH |
| 533 | 1.50 MW | Fuhrländer AG | in operation | 2007-10-26 | QE Bramstedt GmbH |
| 538 | 1.50 MW | Fuhrländer AG | in operation | 2007-12-06 | QE Bramstedt GmbH |
| Sdi07 | 1.50 MW | ENERCON GmbH | in operation | 2001-01-01 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| Sdi01 | 1.50 MW | ENERCON GmbH | in operation | 2001-04-06 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| 1500328 | 1.50 MW | GE Wind Energy GmbH | in operation | 2000-12-22 | FWE Windpark Wittstedt GmbH & Co. KG |
| 536 | 1.50 MW | Fuhrländer AG | in operation | 2007-11-30 | QE Bramstedt GmbH |
| Sdi04 | 1.50 MW | ENERCON GmbH | in operation | 2001-01-01 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| Bürgerwind | 1.50 MW | ENERCON GmbH | in operation | 1999-11-10 | Bürgerwindpark Kehdingbruch GmbH &Co.KG |
| Bürgerwind | 1.50 MW | ENERCON GmbH | in operation | 1999-11-10 | Bürgerwindpark Kehdingbruch GmbH &Co.KG |
| Sdi05 | 1.50 MW | ENERCON GmbH | in operation | 2001-01-01 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| Sdi02 | 1.50 MW | ENERCON GmbH | in operation | 2001-01-01 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| Sdi06 | 1.50 MW | ENERCON GmbH | in operation | 2001-01-01 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| Sdi03 | 1.50 MW | ENERCON GmbH | in operation | 2001-03-16 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH&Co. Sachsendingen KG |
| 534 | 1.50 MW | Fuhrländer AG | in operation | 2007-10-23 | QE Bramstedt GmbH |
| 535 | 1.50 MW | Fuhrländer AG | in operation | 2007-11-16 | QE Bramstedt GmbH |
| KRE 03 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| STO 05 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-06-16 | Energiekontor Umwelt GmbH & Co. WP STO KG |
| KREII 12 | 1.30 MW | Nordex Energy GmbH | in operation | 2014-01-01 | Energiekontor Windstrom GmbH & Co. ÜWP KRE II KG |
| STO 01 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-05-31 | Energiekontor Umwelt GmbH & Co. WP STO KG |
| KRE 02 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| KRE 09 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| STO 04 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-06-22 | Energiekontor Umwelt GmbH & Co. WP STO KG |
| KRE 01 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| STO 06 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-06-26 | Energiekontor Umwelt GmbH & Co. WP STO KG |
| KREII 16 | 1.30 MW | Nordex Energy GmbH | in operation | 2014-01-01 | Energiekontor Windstrom GmbH & Co. ÜWP KRE II KG |
| KREII 13 | 1.30 MW | Nordex Energy GmbH | in operation | 2014-01-01 | Energiekontor Windstrom GmbH & Co. ÜWP KRE II KG |
| STO 02 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-06-28 | Energiekontor Umwelt GmbH & Co. WP STO KG |
| KRE 05 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| STO 03 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-06-30 | Energiekontor Umwelt GmbH & Co. WP STO KG |
| KRE 08 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| KREII 15 | 1.30 MW | Nordex Energy GmbH | in operation | 2014-01-01 | Energiekontor Windstrom GmbH & Co. ÜWP KRE II KG |
| KRE 06 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| KRE 10 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| KRE 11 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| KRE 07 | 1.30 MW | Nordex Energy GmbH | in operation | 2000-01-01 | Energiekontor Windinvest GmbH & Co. ÜWP KRE KG |
| KREII 14 | 1.30 MW | Nordex Energy GmbH | in operation | 2014-01-01 | Energiekontor Windstrom GmbH & Co. ÜWP KRE II KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Cuxhaven?
| Operator | Units | Capacity |
|---|---|---|
| NeXtWind Windpark Beteiligung 28 GmbH & Co. KG | 16 | 64.0 MW |
| Windpark Belum Repowering GmbH & Co. KG | 12 | 51.1 MW |
| Energiekontor Windkraft GmbH & Co. WP HOL KG | 19 | 43.7 MW |
| BayWa r.e. Energieprojekte GmbH | 7 | 39.9 MW |
| ENOVA Windpark Midlum GmbH & Co. KG | 70 | 35.0 MW |
| Alterric Deutschland GmbH | 7 | 34.3 MW |
| FP Lux Wind GmbH & Co. Uthlede KG | 12 | 33.0 MW |
| Friesen Elektra VII GmbH & Co. KG | 5 | 31.0 MW |
| Alterric Windpark Köhlen GmbH & Co. KG | 9 | 27.4 MW |
| PNE WIND Park Kührstedt-Alfstedt A | 8 | 27.2 MW |
Which manufacturer accounts for the most wind power capacity in Cuxhaven?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 283 | 485.1 MW |
| Nordex Energy GmbH | 37 | 106.6 MW |
| Senvion Deutschland GmbH | 21 | 70.7 MW |
| AN Windenergie GmbH | 57 | 49.6 MW |
| Siemens Wind Power GmbH & Co. KG | 16 | 42.8 MW |
| General Electric Deutschland Holding GmbH | 14 | 38.5 MW |
| Vestas Deutschland GmbH | 42 | 37.8 MW |
| GE Wind Energy GmbH | 13 | 33.2 MW |
| Gamesa Corporación Tecnológica S.A. | 9 | 28.0 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 4 | 26.4 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Cuxhaven (Niedersachsen), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.