231 wind turbines with 417.5 MW of gross capacity were in operation in Cloppenburg (Niedersachsen) as of 2026-11-05, with a further 121 units (804.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Cloppenburg (Niedersachsen), and how large are they, as of 2026-11-05?
- 231 wind turbines with 417.5 MW of gross capacity were in operation in Cloppenburg (Niedersachsen) as of 2026-11-05, with a further 121 units (804.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Cloppenburg?
- 231 wind turbines with 417.5 MW of gross capacity were in operation in Cloppenburg as of 2026-11-05, with a further 121 units (804.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Cloppenburg in 2021?
- 1 wind turbines with 0.10 MW went into operation in Cloppenburg in 2021; the strongest year of the last two decades was 2013 with 71.2 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Cloppenburg?
- Raiffeisen Windpark Saterland GmbH operates 17 wind turbines with 122.4 MW in Cloppenburg, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Cloppenburg?
- ENERCON GmbH leads with 227 wind turbines and 560.5 MW in Cloppenburg (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Cloppenburg?
- The largest registered wind turbine in Cloppenburg has 7.20 MW of gross capacity and is operated by Windpark Überhäsiges Viertel Projekt, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Cloppenburg distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 4 | 0.05 MW | 2 | 2 |
| 30 to 100 kW | 13 | 1.05 MW | 13 | 0 |
| over 100 kW | 371 | 1.28 GW | 216 | 119 |
How much wind power capacity was commissioned in Cloppenburg each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2021 | 1 | 0.10 MW |
| 2019 | 5 | 16.2 MW |
| 2018 | 5 | 12.9 MW |
| 2017 | 23 | 64.5 MW |
| 2015 | 1 | 3.05 MW |
| 2014 | 20 | 61.0 MW |
| 2013 | 24 | 71.2 MW |
| 2012 | 2 | 6.10 MW |
| 2011 | 10 | 23.0 MW |
| 2010 | 7 | 14.0 MW |
| 2009 | 5 | 10.3 MW |
| 2008 | 9 | 20.7 MW |
| 2007 | 9 | 19.5 MW |
| 2006 | 1 | 0.33 MW |
How many wind turbines in Cloppenburg are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 121 | 804.3 MW |
| in operation | 231 | 417.5 MW |
| permanently decommissioned | 36 | 61.9 MW |
Which wind turbines are registered in Cloppenburg?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WP Überhäsiges Viertel WEA 08 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WP Pehmertange WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| ONF WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Altenoythe WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürger-Energiepark Garrel - Letherfeld GmbH & Co. KG |
| WP Überhäsiges Viertel WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| ONF WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Pehmertange WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| WP Überhäsiges Viertel WEA 09 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WEA 2 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Altenoythe WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WP Altenoythe WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WP Überhäsiges Viertel WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WP Altenoythe WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WP Ehren WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| ONF WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Überhäsiges Viertel WEA 11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WP Ehren WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WEA 6 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Überhäsiges Viertel WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WP Pehmertange WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| WP Altenoythe WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WP Pehmertange WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| WP Überhäsiges Viertel WEA 07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WP Pehmertange WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürger-Energiepark Garrel - Letherfeld GmbH & Co. KG |
| WP Altenoythe WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WEA 4 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Überhäsiges Viertel WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürger-Energiepark Garrel - Letherfeld GmbH & Co. KG |
| WP Altenoythe WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WP Überhäsiges Viertel WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WP Pehmertange WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| WEA 10 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WEA 1 Dailer | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Heetberger Damm GmbH & Co.KG |
| WP Überhäsiges Viertel WEA 06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WEA 3 Dailer | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergieanlagen Dailer und Peters Moor Projekt GmbH & Co. KG |
| WEA 5 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| ONF WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WEA 2 Dailer | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergieanlagen Dailer und Peters Moor Projekt GmbH & Co. KG |
| WP Altenoythe WEA 9 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| ONF WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WEA 7 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| ONF WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Pehmertange WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| WEA 8 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Pehmertange WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| WEA 4 Dailer | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergieanlagen Dailer und Peters Moor Projekt GmbH & Co. KG |
| WP Überhäsiges Viertel WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WEA 9 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Überhäsiges Viertel WEA 12 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WP Ehren WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WEA 3 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürger-Energiepark Garrel - Letherfeld GmbH & Co. KG |
| ONF WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WP Ehren WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Überhäsiges Viertel Projekt |
| WEA 1 Repowering Ostermoor | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Raiffeisen Windpark Saterland GmbH |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windpark Neuvrees Projektierungs GmbH & Co. KG |
| WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Neuvrees Projektierungs GmbH & Co. KG |
| WEA 7 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Neuvrees Projektierungs GmbH & Co. KG |
| WEA Hammel 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | WP Hammel-Oldendorf GmbH & Co. KG |
| WEA 5 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Neuvrees Projektierungs GmbH & Co. KG |
| WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windpark Neuvrees Projektierungs GmbH & Co. KG |
| Herbergen WEA 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | WP Herbergen GmbH & Co. KG |
| WEA Hammel 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | WP Hammel-Oldendorf GmbH & Co. KG |
| WEA Hammel 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | WP Hammel-Oldendorf GmbH & Co. KG |
| Herbergen WEA 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | WP Herbergen GmbH & Co. KG |
| WEA 6 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Neuvrees Projektierungs GmbH & Co. KG |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windpark Neuvrees Projektierungs GmbH & Co. KG |
| WEA Hemmelte 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Hemmelte-Forts Feld GmbH & Co. KG |
| WEA 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windenergie Thüle GmbH & Co. KG |
| WEA 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windenergie Thüle GmbH & Co. KG |
| WEA Suhle 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Suhle - Hemmelte Projektierungsgesellschaft mbH & Co. KG |
| WEA Hemmelte 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Hemmelte-Forts Feld GmbH & Co. KG |
| WEA Norwegen 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Norwegen Projekt GmbH & Co. KG |
| WEA Suhle 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Suhle - Hemmelte Projektierungsgesellschaft mbH & Co. KG |
| WEA Hemmelte 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Hemmelte-Forts Feld GmbH & Co. KG |
| WEA Rosenmoor 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Rosenmoor Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Schnelten 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Schnelten GmbH & Co. KG |
| Lindern Garen 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Elfte Bürgerwind GmbH |
| Lindern Garen 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Lindern Bürgerwindpark GmbH & Co. KG |
| Lindern Garen 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Lindern Bürgerwindpark GmbH & Co. KG |
| WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Thüle Betriebs GmbH & Co. KG |
| WEA Schnelten 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Schnelten GmbH & Co. KG |
| WEA 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Thüle Betriebs GmbH & Co. KG |
| WEA Oldendorf 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Hammel-Oldendorf GmbH & Co. KG |
| WEA Norwegen 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Norwegen Projekt GmbH & Co. KG |
| WEA Rosenmoor 02 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | UGE Rosenmoor Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Suhle 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Suhle - Hemmelte Projektierungsgesellschaft mbH & Co. KG |
| WEA Schnelten 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Schnelten GmbH & Co. KG |
| WEA Oldendorf 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Hammel-Oldendorf GmbH & Co. KG |
| WEA Norwegen 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Norwegen Projekt GmbH & Co. KG |
| WEA Suhle 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Suhle - Hemmelte Projektierungsgesellschaft mbH & Co. KG |
| WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windenergie Thüle GmbH & Co. KG |
| WEA Oldendorf 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Hammel-Oldendorf GmbH & Co. KG |
| Lindern Marren 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Einunddreißigste Bürgerwindpark GmbH & Co. KG |
| WEA Norwegen 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Norwegen Projekt GmbH & Co. KG |
| WEA Norwegen 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | WP Norwegen Projekt GmbH & Co. KG |
| WEA 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | ENOVA Windpark Thüle Betriebs GmbH & Co. KG |
| WEA Rosenmoor 01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | UGE Rosenmoor Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 4 RBWP | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Repowering-Bürgerwindpark Gehlenberg GmbH & Co. KG |
| WEA 5 RBWP | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Repowering-Bürgerwindpark Gehlenberg GmbH & Co. KG |
| WEA 1 RBWP | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Repowering-Bürgerwindpark Gehlenberg GmbH & Co. KG |
| WEA 3 RBWP | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Repowering-Bürgerwindpark Gehlenberg GmbH & Co. KG |
| WEA 6 RBWP | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Repowering-Bürgerwindpark Gehlenberg GmbH & Co. KG |
| Repowering Cappeln 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind am Höger Weg GmbH & Co. KG |
| WEA 8 WPG | 5.56 MW | ENERCON GmbH | planned | planned 2027 | WP Gehlenberg Repowering GmbH & Co. KG |
| Repowering Cappeln 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind am Höger Weg GmbH & Co. KG |
| Repowering Cappeln 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind am Höger Weg GmbH & Co. KG |
| WEA 2 RBWP | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Repowering-Bürgerwindpark Gehlenberg GmbH & Co. KG |
| WEA 7 WPG | 5.56 MW | ENERCON GmbH | planned | planned 2027 | WP Gehlenberg Repowering GmbH & Co. KG |
| WEA 9 WPG | 5.56 MW | ENERCON GmbH | planned | planned 2027 | WP Gehlenberg Repowering GmbH & Co. KG |
| WEA 10 WPG | 5.56 MW | ENERCON GmbH | planned | planned 2027 | WP Gehlenberg Repowering GmbH & Co. KG |
| WEA 11 WPG | 5.56 MW | ENERCON GmbH | planned | planned 2027 | WP Gehlenberg Repowering II GmbH & Co. KG |
| WEA Stadtsholte 2 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windenergie GmbH&Co. Windpark Stadtsholte KG |
| unit operated by a private individual | 4.26 MW | ENERCON GmbH | planned | planned 2027 | private individual |
| unit operated by a private individual | 4.26 MW | ENERCON GmbH | planned | planned 2027 | private individual |
| WEA Stadtsholte 1 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windenergie GmbH&Co. Windpark Stadtsholte KG |
| WEA Hochartz 1 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Walter Hochartz Windenergie |
| WEA 05 1410131 | 4.20 MW | ENERCON GmbH | in operation | 2019-08-22 | Windpark Östliches Herberger Feld GmbH & Co. KG |
| WEA Ca04 | 3.30 MW | Nordex SE | in operation | 2018-02-09 | Bürger-Windpark Cappeln GmbH & Co. KG |
| WEA Ca03 | 3.30 MW | Nordex SE | in operation | 2018-02-09 | Bürger-Windpark Cappeln GmbH & Co. KG |
| WEA Ca01 | 3.30 MW | Nordex SE | in operation | 2018-02-09 | Bürger-Windpark Cappeln GmbH & Co. KG |
| WEA1011462 | 3.05 MW | ENERCON GmbH | in operation | 2017-09-28 | TB Kettmann GmbH & Co. KG |
| WEA1011463 | 3.05 MW | ENERCON GmbH | in operation | 2017-08-29 | TB Kettmann GmbH & Co. KG |
| Bösel 14 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-06 | GSW-Stadtwerke Straubing Bürgerenergie II GmbH & Co. KG |
| 1010119 | 3.05 MW | ENERCON GmbH | in operation | 2013-08-07 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| 1010121 | 3.05 MW | ENERCON GmbH | in operation | 2012-12-21 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| 1010206 | 3.05 MW | ENERCON GmbH | in operation | 2013-04-12 | Energiepark Ostermoor GmbH & Co. KG |
| 1010125 | 3.05 MW | ENERCON GmbH | in operation | 2013-07-05 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| WEA 1 1011460 | 3.05 MW | ENERCON GmbH | in operation | 2017-08-31 | Pieper & Brüggemann Windpark Garrel GmbH & Co. KG |
| WEA 10 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2014-12-03 | ENGIE Windpark Kündelmoor GmbH & Co. KG |
| 1010116 | 3.05 MW | ENERCON GmbH | in operation | 2013-08-09 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| WEA 04 | 3.05 MW | ENERCON GmbH | in operation | 2017-07-31 | Bürger-Energiepark Garrel GmbH & Co. KG |
| 1010115 | 3.05 MW | ENERCON GmbH | in operation | 2013-07-05 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| WEA 9 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2014-12-05 | ENGIE Windpark Bösel GmbH & Co. KG |
| 1010122 | 3.05 MW | ENERCON GmbH | in operation | 2013-03-07 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| 1010205 | 3.05 MW | ENERCON GmbH | in operation | 2013-03-21 | Energiepark Ostermoor GmbH & Co. KG |
| WEA 6 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2014-10-28 | ENGIE Windpark Bösel GmbH & Co. KG |
| 1010208 | 3.05 MW | ENERCON GmbH | in operation | 2013-07-24 | Energiepark Ostermoor GmbH & Co. KG |
| WEA 03 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-31 | Bürger-Energiepark Garrel GmbH & Co. KG |
| WEA 4 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2014-10-10 | ENGIE Windpark Bösel GmbH & Co. KG |
| WEA 8 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2014-12-16 | ENGIE Windpark Kündelmoor GmbH & Co. KG |
| WEA 5 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2015-02-13 | ENGIE Windpark Kündelmoor GmbH & Co. KG |
| 1010298 | 3.05 MW | ENERCON GmbH | in operation | 2013-08-09 | Energiepark Ostermoor GmbH & Co. KG |
| 1010297 | 3.05 MW | ENERCON GmbH | in operation | 2013-08-07 | Energiepark Ostermoor GmbH & Co. KG |
| WEA 2 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2014-09-25 | ENGIE Windpark Kündelmoor GmbH & Co. KG |
| 1010209 | 3.05 MW | ENERCON GmbH | in operation | 2013-05-31 | Energiepark Ostermoor GmbH & Co. KG |
| WEA 2 1011461 | 3.05 MW | ENERCON GmbH | in operation | 2017-08-21 | Pieper & Brüggemann Windpark Garrel GmbH & Co. KG |
| Bösel 12 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-11 | GSW-Stadtwerke Straubing Bürgerenergie II GmbH & Co. KG |
| 1010113 | 3.05 MW | ENERCON GmbH | in operation | 2013-07-04 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| 1010124 | 3.05 MW | ENERCON GmbH | in operation | 2012-12-21 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| 1010210 | 3.05 MW | ENERCON GmbH | in operation | 2013-06-27 | Energiepark Ostermoor GmbH & Co. KG |
| WEA 7 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2014-12-02 | ENGIE Windpark Kündelmoor GmbH & Co. KG |
| WEA 01 | 3.05 MW | ENERCON GmbH | in operation | 2017-06-30 | Bürger-Energiepark Garrel GmbH & Co. KG |
| WP Charlottendorf WEA 1 | 3.05 MW | ENERCON GmbH | in operation | 2014-12-24 | Windenergie Charlottendorf West Rote Erde GmbH & Co. KG |
| WP Charlottendorf WEA 2 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-26 | Windenergie Charlottendorf West Rote Erde GmbH & Co. KG |
| Bösel 11 | 3.05 MW | ENERCON GmbH | in operation | 2014-12-15 | GSW-Stadtwerke Straubing Bürgerenergie II GmbH & Co. KG |
| Bösel 15 | 3.05 MW | ENERCON GmbH | in operation | 2014-12-02 | GSW-Stadtwerke Straubing Bürgerenergie II GmbH & Co. KG |
| Bösel 13 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-21 | GSW-Stadtwerke Straubing Bürgerenergie II GmbH & Co. KG |
| WEA 02 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-31 | Bürger-Energiepark Garrel GmbH & Co. KG |
| 1010118 | 3.05 MW | ENERCON GmbH | in operation | 2013-03-22 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| WEA 02 | 3.05 MW | ENERCON GmbH | in operation | 2017-07-27 | Bürger-Energiepark Garrel GmbH & Co. KG |
| WEA 1 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2014-12-23 | ENGIE Windpark Bösel GmbH & Co. KG |
| 1010120 | 3.05 MW | ENERCON GmbH | in operation | 2013-03-15 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| WEA 3 (Windpark Bösel) | 3.05 MW | ENERCON GmbH | in operation | 2014-10-15 | ENGIE Windpark Bösel GmbH & Co. KG |
| WP Charlottendorf WEA 3 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-07 | Windenergie Charlottendorf West Rote Erde GmbH & Co. KG |
| WEA 06 | 3.05 MW | ENERCON GmbH | in operation | 2017-09-19 | Bürger-Energiepark Garrel GmbH & Co. KG |
| 1010128 | 3.05 MW | ENERCON GmbH | in operation | 2013-07-17 | Energiepark Ostermoor GmbH & Co. KG |
| 1010123 | 3.05 MW | ENERCON GmbH | in operation | 2013-02-11 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| WEA 03 | 3.05 MW | ENERCON GmbH | in operation | 2017-06-30 | Bürger-Energiepark Garrel GmbH & Co. KG |
| WEA 6 - 1150699 - 06 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-20 | Windpark Kammersand Pool GmbH & Co. KG |
| WEA 04 1151161 | 3.00 MW | ENERCON GmbH | in operation | 2019-08-20 | Windpark Östliches Herberger Feld GmbH & Co. KG |
| WEA 02 1151159 | 3.00 MW | ENERCON GmbH | in operation | 2019-09-19 | Windpark Östliches Herberger Feld GmbH & Co. KG |
| 1010207 | 3.00 MW | ENERCON GmbH | in operation | 2013-05-13 | Energiepark Ostermoor GmbH & Co. KG |
| WEA 2 - E1150695-02 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-02 | Windpark Kammersand Pool GmbH & Co. KG |
| WEA 01 1151158 | 3.00 MW | ENERCON GmbH | in operation | 2019-08-29 | Windpark Östliches Herberger Feld GmbH & Co. KG |
| 1010114 | 3.00 MW | ENERCON GmbH | in operation | 2013-04-26 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| Heinfelde Pool GbR | 3.00 MW | ENERCON GmbH | in operation | 2017-12-27 | Heinfelde Pool GbR |
| WEA 5 - 1150698 - 05 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-27 | Windpark Kammersand Pool GmbH & Co. KG |
| 1010117 | 3.00 MW | ENERCON GmbH | in operation | 2013-05-18 | Raiffeisen Energiepark Saterland GmbH & Co. KG |
| WEA 3 - E1150696-03 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-29 | Windpark Kammersand Pool GmbH & Co. KG |
| Heinfelde Pool GbR | 3.00 MW | ENERCON GmbH | in operation | 2017-11-17 | Heinfelde Pool GbR |
| Heinfelde Pool GbR | 3.00 MW | ENERCON GmbH | in operation | 2017-12-06 | Heinfelde Pool GbR |
| Heinfelde Pool GbR | 3.00 MW | ENERCON GmbH | in operation | 2017-12-08 | Heinfelde Pool GbR |
| 1010127 | 3.00 MW | ENERCON GmbH | in operation | 2013-06-12 | Energiepark Ostermoor GmbH & Co. KG |
| WEA 4 - E1150697-04 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-20 | Windpark Kammersand Pool GmbH & Co. KG |
| WEA 01 | 3.00 MW | ENERCON GmbH | in operation | 2014-07-30 | Bürger-Energiepark Garrel GmbH & Co. KG |
| WEA 03 1151160 | 3.00 MW | ENERCON GmbH | in operation | 2019-09-16 | Windpark Östliches Herberger Feld GmbH & Co. KG |
| WEA 1 - E1150694-01 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-08 | Windpark Kammersand Pool GmbH & Co. KG |
| 1010126 | 3.00 MW | ENERCON GmbH | in operation | 2013-07-03 | Energiepark Ostermoor GmbH & Co. KG |
| Heinfelde Pool GbR | 3.00 MW | ENERCON GmbH | in operation | 2017-12-27 | Heinfelde Pool GbR |
| WEA 12 | 2.35 MW | ENERCON GmbH | in operation | 2017-08-11 | Bürger-Energiepark Garrel GmbH & Co. KG |
| WEA 11 | 2.35 MW | ENERCON GmbH | in operation | 2017-07-28 | Bürger-Energiepark Garrel GmbH & Co. KG |
| WEA 10 | 2.35 MW | ENERCON GmbH | in operation | 2017-07-27 | Bürger-Energiepark Garrel GmbH & Co. KG |
| WEA 04 | 2.30 MW | ENERCON GmbH | in operation | 2011-07-27 | Bauherrengemeinschaft Windpark Stapelfeld GbR |
| 822860 | 2.30 MW | ENERCON GmbH | in operation | 2011-09-08 | Windpark Wardenburg GmbH & Co. KG |
| WEA 14 781704 | 2.30 MW | ENERCON GmbH | in operation | 2007-12-31 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| Webu III WEA 3 | 2.30 MW | ENERCON GmbH | in operation | 2011-09-01 | Windpark Westerburg/ Charlottendorf-Ost III GmbH & Co. KG |
| WEA 09 781709 | 2.30 MW | ENERCON GmbH | in operation | 2008-03-13 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA01 | 2.30 MW | ENERCON GmbH | in operation | 2011-07-27 | Bauherrengemeinschaft Windpark Stapelfeld GbR |
| Webu III WEA 1 | 2.30 MW | ENERCON GmbH | in operation | 2011-09-08 | Windpark Westerburg/ Charlottendorf-Ost III GmbH & Co. KG |
| WEA 19 781702 | 2.30 MW | ENERCON GmbH | in operation | 2007-12-30 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA 13 781705 | 2.30 MW | ENERCON GmbH | in operation | 2008-02-19 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA 15 781703 | 2.30 MW | ENERCON GmbH | in operation | 2008-02-06 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA 12 781706 | 2.30 MW | ENERCON GmbH | in operation | 2008-03-05 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| 822859 | 2.30 MW | ENERCON GmbH | in operation | 2011-09-01 | Windpark Wardenburg GmbH & Co. KG |
| WEA 01 781701 | 2.30 MW | ENERCON GmbH | in operation | 2007-12-28 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| Webu III WEA 7 | 2.30 MW | ENERCON GmbH | in operation | 2011-09-23 | Windpark Westerburg/ Charlottendorf-Ost III GmbH & Co. KG |
| WEA 02 781700 | 2.30 MW | ENERCON GmbH | in operation | 2007-12-28 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA 03 781699 | 2.30 MW | ENERCON GmbH | in operation | 2007-12-21 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA 11 781707 | 2.30 MW | ENERCON GmbH | in operation | 2008-02-28 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA 04 781710 | 2.30 MW | ENERCON GmbH | in operation | 2008-03-05 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA 05 781711 | 2.30 MW | ENERCON GmbH | in operation | 2008-02-26 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| Webu III WEA 4 | 2.30 MW | ENERCON GmbH | in operation | 2013-08-23 | Windpark Westerburg/ Charlottendorf-Ost III GmbH & Co. KG |
| LUV KG 5 | 2.30 MW | ENERCON GmbH | in operation | 2009-01-02 | LUV Windenergie GmbH & Co. WEA Lastrup 5 KG |
| WEA 03 | 2.30 MW | ENERCON GmbH | in operation | 2011-07-27 | Bauherrengemeinschaft Windpark Stapelfeld GbR |
| 822856 | 2.30 MW | ENERCON GmbH | in operation | 2011-09-02 | Windpark Wardenburg GmbH & Co. KG |
| WEA02 | 2.30 MW | ENERCON GmbH | in operation | 2011-07-27 | Bauherrengemeinschaft Windpark Stapelfeld GbR |
| WEA 10 781708 | 2.30 MW | ENERCON GmbH | in operation | 2008-03-10 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA 07 781712 | 2.30 MW | ENERCON GmbH | in operation | 2008-02-13 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| E 821655-18 | 2.00 MW | ENERCON GmbH | in operation | 2009-10-15 | Windpark Garther Heide GmbH & Co. KG |
| WEA Löningen 6 | 2.00 MW | ENERCON GmbH | in operation | 2010-06-30 | Bürgerwindpark Löningen GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-12-19 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-12-15 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-12-15 | private individual |
| Anlage3 | 2.00 MW | ENERCON GmbH | in operation | 2004-03-31 | Windpark Reekenmoor |
| Anlage2 | 2.00 MW | ENERCON GmbH | in operation | 2004-03-27 | Windpark Reekenmoor |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-12-15 | private individual |
| THU 04 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-01 | Energiekontor Windfarm ZWP THÜ GmbH & Co. KG |
| THU 01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-01 | Energiekontor Windfarm ZWP THÜ GmbH & Co. KG |
| WEA 08 821513 | 2.00 MW | ENERCON GmbH | in operation | 2009-10-15 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA Löningen 7 | 2.00 MW | ENERCON GmbH | in operation | 2010-06-30 | Bürgerwindpark Löningen GmbH & Co. KG |
| 781355_Elisabethfehn | 2.00 MW | ENERCON GmbH | in operation | 2007-05-31 | RWE Wind Onshore & PV Deutschland GmbH |
| THU 02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-01 | Energiekontor Windfarm ZWP THÜ GmbH & Co. KG |
| WEA Löningen 3 | 2.00 MW | ENERCON GmbH | in operation | 2010-06-30 | Bürgerwindpark Löningen GmbH & Co. KG |
| Anlage1 | 2.00 MW | ENERCON GmbH | in operation | 2004-03-25 | Windpark Reekenmoor |
| 781354_Elisabethfehn | 2.00 MW | ENERCON GmbH | in operation | 2007-05-31 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA Löningen 2 | 2.00 MW | ENERCON GmbH | in operation | 2010-06-30 | Bürgerwindpark Löningen GmbH & Co. KG |
| THU 03 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-01 | Energiekontor Windfarm ZWP THÜ GmbH & Co. KG |
| WEA 16 821512 | 2.00 MW | ENERCON GmbH | in operation | 2009-10-13 | Garther Windpark & Umspannwerk GmbH & Co. KG |
| WEA Löningen 5 | 2.00 MW | ENERCON GmbH | in operation | 2010-06-30 | Bürgerwindpark Löningen GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-12-19 | private individual |
| Anlage4 | 2.00 MW | ENERCON GmbH | in operation | 2004-03-31 | Windpark Reekenmoor |
| 781356_Elisabethfehn | 2.00 MW | ENERCON GmbH | in operation | 2007-05-23 | RWE Wind Onshore & PV Deutschland GmbH |
| THU 06 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-01 | Energiekontor Windfarm ZWP THÜ GmbH & Co. KG |
| THU 07 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-01 | Energiekontor Windfarm ZWP THÜ GmbH & Co. KG |
| 781357_Elisabethfehn | 2.00 MW | ENERCON GmbH | in operation | 2007-05-24 | RWE Wind Onshore & PV Deutschland GmbH |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-12-15 | private individual |
| WEA Löningen 1 | 2.00 MW | ENERCON GmbH | in operation | 2010-06-30 | Bürgerwindpark Löningen GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-12-19 | private individual |
| WEA 06 821514 | 2.00 MW | ENERCON GmbH | in operation | 2013-05-13 | Windkraft Christoph & Dominique Klaus GmbH & Co. KG |
| E 821654-17 | 2.00 MW | ENERCON GmbH | in operation | 2009-09-22 | Windpark Garther Heide GmbH & Co. KG |
| WEA Löningen 4 | 2.00 MW | ENERCON GmbH | in operation | 2010-06-30 | Bürgerwindpark Löningen GmbH & Co. KG |
| THU 05 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-01 | Energiekontor Windfarm ZWP THÜ GmbH & Co. KG |
| Gehlenberg 70131 | 1.80 MW | ENERCON GmbH | in operation | 2000-11-14 | Repowering-Bürgerwindpark Gehlenberg GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-05-22 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2000-11-02 | private individual |
| WEA Gehlenberg 70126 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-06-12 | Windpark Wöhrden West GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-04-12 | private individual |
| WEA Gehlenberg 70139 | 1.80 MW | ENERCON GmbH | in operation | 2000-09-25 | Windpark Gehlenberg GmbH & Co. KG |
| WEA Gehlenberg 70228 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2000-11-23 | Windpark Gehlenberg GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-05-29 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-05-03 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-12-20 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-12-18 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-09-20 | private individual |
| WEA Gehlenberg 70140 | 1.80 MW | ENERCON GmbH | in operation | 2000-10-05 | Windpark Gehlenberg GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-09-24 | private individual |
| WEA Gehlenberg 70137 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2000-10-25 | Windpark Gehlenberg GmbH & Co. KG |
| Rolfes Albers E70 | 1.80 MW | ENERCON GmbH | in operation | 2002-12-19 | Rolfes-Albers Windkraft Dailer |
| WP Ermke | 1.80 MW | ENERCON GmbH | in operation | 2003-12-19 | WP Ermke GmbH & Co.KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2000-10-27 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-12-22 | private individual |
| Alte Wiese | 1.80 MW | ENERCON GmbH | in operation | 2003-12-19 | Alte Wiese GmbH & Co KG |
| WEA Gehlenberg 70127 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-06-13 | Windpark Gehlenberg GmbH & Co. KG |
| WEA Gehlenberg 70229 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-06-18 | Windpark Gehlenberg GmbH & Co. KG |
| WEA Gehlenberg 70230 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-06-13 | Windpark Gehlenberg GmbH & Co. KG |
| Inno Energie | 1.80 MW | ENERCON GmbH | in operation | 2003-12-12 | Inno Energie |
| Gehlenberg 70134 | 1.80 MW | ENERCON GmbH | in operation | 2000-11-08 | Repowering-Bürgerwindpark Gehlenberg GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-05-17 | private individual |
| WEA Gehlenberg 70125 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2000-11-29 | Windpark Gehlenberg GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2001-04-26 | private individual |
| unit operated by a private individual | 1.50 MW | ENERCON GmbH | in operation | 2002-09-03 | private individual |
| WEA 1 (15830) | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-05-16 | MEG Windpark Karlshof GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | Nordex Energy GmbH | permanently decommissioned | 2002-11-06 | private individual |
| unit operated by a private individual | 1.50 MW | Nordex Energy GmbH | permanently decommissioned | 2002-11-19 | private individual |
| unit operated by a private individual | 1.50 MW | Nordex Energy GmbH | permanently decommissioned | 2002-11-20 | private individual |
| unit operated by a private individual | 1.50 MW | ENERCON GmbH | in operation | 1998-12-21 | private individual |
| unit operated by a private individual | 1.50 MW | Nordex Energy GmbH | permanently decommissioned | 2002-11-12 | private individual |
| 66248 | 1.50 MW | ENERCON GmbH | in operation | 2000-04-11 | Sieger Windkraft GmbH |
| unit operated by a private individual | 1.50 MW | Nordex Energy GmbH | permanently decommissioned | 2002-11-06 | private individual |
| 66247 | 1.50 MW | ENERCON GmbH | in operation | 2000-04-11 | Sieger Windkraft GmbH |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2000-10-05 | private individual |
| WEA Peheim 1 | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 2001-05-23 | MEG Windpark Karlshof GmbH & Co. KG |
| AN 1300-231-01 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2000-09-27 | ENOVA Windpark Molbergen GmbH & Co. KG |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2000-10-05 | private individual |
| AN Bonus Anlage 1 | 1.30 MW | Sonstige | in operation | 2003-08-28 | Böseler Rotor GmbH & Co. KG |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2000-10-19 | private individual |
| WEA Peheim 2 | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 2001-05-23 | MEG Windpark Karlshof GmbH & Co. KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Cloppenburg?
| Operator | Units | Capacity |
|---|---|---|
| Raiffeisen Windpark Saterland GmbH | 17 | 122.4 MW |
| Windpark Überhäsiges Viertel Projekt | 16 | 115.2 MW |
| PNE AG | 16 | 115.2 MW |
| Windpark Neuvrees Projektierungs GmbH & Co. KG | 7 | 49.0 MW |
| WP Hammel-Oldendorf GmbH & Co. KG | 6 | 41.4 MW |
| Raiffeisen Energiepark Saterland GmbH & Co. KG | 13 | 39.5 MW |
| Repowering-Bürgerwindpark Gehlenberg GmbH & Co. KG | 8 | 37.0 MW |
| Garther Windpark & Umspannwerk GmbH & Co. KG | 16 | 36.2 MW |
| WP Norwegen Projekt GmbH & Co. KG | 5 | 34.0 MW |
| Energiepark Ostermoor GmbH & Co. KG | 11 | 33.4 MW |
Which manufacturer accounts for the most wind power capacity in Cloppenburg?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 227 | 560.5 MW |
| Vestas Deutschland GmbH | 69 | 428.3 MW |
| Nordex Germany GmbH | 32 | 218.2 MW |
| Nordex Energy GmbH | 12 | 35.5 MW |
| Siemens Wind Power GmbH & Co. KG | 9 | 11.7 MW |
| Tacke GmbH & Co. KG | 24 | 10.2 MW |
| Nordex SE | 3 | 9.90 MW |
| Sonstige | 3 | 2.60 MW |
| AN-Maschinenbau- und Umweltschutzanlagen GmbH | 2 | 2.60 MW |
| GE Wind Energy GmbH | 1 | 1.50 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Cloppenburg (Niedersachsen), and how large are th can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.