Germany · renewables
Wind power in Ammerland
40 wind turbines with 62.0 MW of gross capacity were in operation in Ammerland (Niedersachsen) as of 2026-11-05, with a further 69 units (448.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Ammerland (Niedersachsen), and how large are they, as of 2026-11-05?
- 40 wind turbines with 62.0 MW of gross capacity were in operation in Ammerland (Niedersachsen) as of 2026-11-05, with a further 69 units (448.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Ammerland?
- 40 wind turbines with 62.0 MW of gross capacity were in operation in Ammerland as of 2026-11-05, with a further 69 units (448.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Ammerland in 2024?
- 1 wind turbines with 0.01 MW went into operation in Ammerland in 2024; the strongest year of the last two decades was 2018 with 4.20 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Ammerland?
- Windpark Ipweger Moor GmbH & Co. KG operates 13 wind turbines with 88.4 MW in Ammerland, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Ammerland?
- Nordex Germany GmbH leads with 30 wind turbines and 203.4 MW in Ammerland (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Ammerland?
- The largest registered wind turbine in Ammerland has 7.20 MW of gross capacity and is operated by Prowind GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Ammerland distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 3 | 0.03 MW | 3 | 0 |
| over 100 kW | 117 | 524.2 MW | 37 | 69 |
How much wind power capacity was commissioned in Ammerland each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 2 | 12.4 MW |
| 2024 | 1 | 0.01 MW |
| 2023 | 1 | 0.01 MW |
| 2022 | 1 | 0.01 MW |
| 2018 | 1 | 4.20 MW |
| 2013 | 1 | 3.37 MW |
| 2012 | 1 | 3.37 MW |
How many wind turbines in Ammerland are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 69 | 448.0 MW |
| in operation | 40 | 62.0 MW |
| permanently decommissioned | 11 | 14.3 MW |
Which wind turbines are registered in Ammerland?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Hogenset 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prowind GmbH |
| Hogenset 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prowind GmbH |
| Hogenset 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prowind GmbH |
| Hogenset 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prowind GmbH |
| Hogenset 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prowind GmbH |
| Hogenset 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prowind GmbH |
| WEA 06 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ihausen GmbH & Co. KG |
| WEA 02 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ihausen GmbH & Co. KG |
| Fintlandsmoor WEA 4 | 7.00 MW | Nordex SE | planned | planned 2029 | Alterric Deutschland GmbH |
| WEA 03 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ihausen GmbH & Co. KG |
| WEA 01 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ihausen GmbH & Co. KG |
| Pirsch WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | 24. Lintas Energiepark GmbH & Co. KG |
| WEA 02 | 7.00 MW | – | planned | planned 2027 | CGE Windpark Karlshof GmbH & Co. KG |
| Fintlandsmoor WEA 3 | 7.00 MW | Nordex SE | planned | planned 2029 | Alterric Deutschland GmbH |
| Fintlandsmoor WEA 1 | 7.00 MW | Nordex SE | planned | planned 2029 | Alterric Deutschland GmbH |
| WEA 04 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ihausen GmbH & Co. KG |
| WEA 03 | 7.00 MW | – | planned | planned 2027 | CGE Windpark Karlshof GmbH & Co. KG |
| WEA 01 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Herrenhausen-Hullenhausen GmbH & Co. KG |
| WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Vierzehnte ENP Windpark GmbH & Co. KG |
| WEA 05 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ihausen GmbH & Co. KG |
| Fintlandsmoor WEA 2 | 7.00 MW | Nordex SE | planned | planned 2029 | Alterric Deutschland GmbH |
| WEA 01 | 7.00 MW | – | planned | planned 2027 | CGE Windpark Karlshof GmbH & Co. KG |
| WEA 06 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| WEA Querenstede 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| WEA Aschhausen Nord 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| Dingsfelde 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Prowind GmbH |
| WEA 3 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| WEA Aschhausen Nord 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| WEA 13 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| Garnholt Repowering WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Garnholt II GmbH & Co. KG |
| Garnholt Repowering WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Garnholt II GmbH & Co. KG |
| WEA 12 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| Dingsfelde 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Prowind GmbH |
| WEA 09 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| WEA 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| Garnholt Repowering WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Garnholt II GmbH & Co. KG |
| WEA 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| Dingsfelde 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Prowind GmbH |
| WEA 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| Garnholt Repowering WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Garnholt II GmbH & Co. KG |
| WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| WEA 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| WEA 4 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | NEN Projekt GmbH & Co. KG |
| WEA 11 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| Garnholt Repowering WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Garnholt II GmbH & Co. KG |
| WEA 10 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Ipweger Moor GmbH & Co. KG |
| Repowering Windpark Liethe, Rehornweg WEA 2 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-10-29 | BGK GmbH & Co. KG |
| Rastede-Kleibrok, Strothweg, WEA 1 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-11-04 | BGK GmbH & Co. KG |
| Rastede-Liethe, Rehornweg WEA 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2025 | BGK GmbH & Co. KG |
| WP Rastede (Liethe) - WEA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Rastede GmbH & Co. KG |
| Delfshausen WEA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Rastede GmbH & Co. KG |
| LEH06 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | VSB Windpark Liethe-Lehmden |
| LEH02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | VSB Windpark Liethe-Lehmden |
| Windpark Rastede (Wapeldorf Süd) - WEA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Rastede GmbH & Co. KG |
| Windpark Rastede (Wapeldorf Süd) - WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Rastede GmbH & Co. KG |
| WP Windpark Rastede (Wapeldorf Nord) - WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Rastede GmbH & Co. KG |
| Delfshausen WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Rastede GmbH & Co. KG |
| WP Rastede (Liethe) - WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Rastede GmbH & Co. KG |
| Delfshausen WEA 3 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Rastede GmbH & Co. KG |
| LEH01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2025 | VSB Windpark Liethe-Lehmden |
| WEA 04 | 4.80 MW | Nordex Germany GmbH | planned | planned 2027 | CGE Windpark Karlshof GmbH & Co. KG |
| WEA 3 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | innoVent WP Tange GmbH & Co. KG |
| WEA 1 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | innoVent WP Tange GmbH & Co. KG |
| WEA 2 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | innoVent WP Tange GmbH & Co. KG |
| WEA 1 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | innoVent WP Ekernermoor |
| WEA 1 | 4.20 MW | ENERCON GmbH | in operation | 2018-04-27 | Bürger-Energiegenossenschaft Detern eG |
| WEA 2 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | innoVent WP Ekernermoor |
| WEA 3 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | innoVent WP Ekernermoor |
| WEA 3 | 3.37 MW | REpower Systems SE | in operation | 2012-12-29 | WP Ammersche Länder |
| WEA 05 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-01-19 | Windpark Twickels GmbH & Co. KG |
| E 70488-09 | 1.80 MW | ENERCON GmbH | in operation | 2002-03-01 | Windpark Fehnland GmbH & Co. KG Renditefonds |
| E 70486-10 | 1.80 MW | ENERCON GmbH | in operation | 2001-12-21 | Windpark Fehnland GmbH & Co. KG Renditefonds |
| E 70493-03 | 1.80 MW | ENERCON GmbH | in operation | 2002-03-14 | Windpark Fehnland GmbH & Co. KG Renditefonds |
| WKA 1 | 1.80 MW | ENERCON GmbH | in operation | 2002-03-14 | innoVent Windkraft Augustfehn GmbH &Co. KG Renditefonds |
| WEA 02 | 1.80 MW | ENERCON GmbH | in operation | 2004-03-05 | Windpark Hohelucht |
| E 70492-02 | 1.80 MW | ENERCON GmbH | in operation | 2002-03-14 | Windenergieanlage Fehnland GmbH & Co. KG |
| 701243 | 1.80 MW | ENERCON GmbH | in operation | 2003-05-16 | ENOVA Windpark Bad Zwischenahn GmbH & Co. KG |
| E 70483-04 | 1.80 MW | ENERCON GmbH | in operation | 2001-12-21 | Windpark Fehnland GmbH & Co. KG Renditefonds |
| E 70489-11 | 1.80 MW | ENERCON GmbH | in operation | 2002-02-19 | Windpark Fehnland GmbH & Co. KG Renditefonds |
| 701246 | 1.80 MW | ENERCON GmbH | in operation | 2003-06-16 | K/S Vindinvest 66 |
| WEA 01 | 1.80 MW | ENERCON GmbH | in operation | 2004-03-10 | Windpark Hohelucht |
| 701244 | 1.80 MW | ENERCON GmbH | in operation | 2003-05-16 | ENOVA Windpark Bad Zwischenahn GmbH & Co. KG |
| E 70487-08 | 1.80 MW | ENERCON GmbH | in operation | 2002-02-22 | Windpark Fehnland GmbH & Co. KG Renditefonds |
| E 70490-05 | 1.80 MW | ENERCON GmbH | in operation | 2002-03-12 | Windpark Fehnland GmbH & Co. KG Renditefonds |
| 701245 | 1.80 MW | ENERCON GmbH | in operation | 2003-06-16 | K/S Vindinvest 66 |
| E 70484-06 | 1.80 MW | ENERCON GmbH | in operation | 2001-12-21 | Windpark Fehnland GmbH & Co. KG Renditefonds |
| E 70485-07 | 1.80 MW | ENERCON GmbH | in operation | 2001-12-28 | Windpark Fehnland GmbH & Co. KG Renditefonds |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-12-31 | private individual |
| WEA Karlshof 1 | 1.30 MW | Sonstige | permanently decommissioned | 2001-10-16 | MEG Windpark Karlshof GmbH & Co. KG |
| WEA Karlshof 4 | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | permanently decommissioned | 2001-10-16 | MEG Windpark Karlshof GmbH & Co. KG |
| WEA Karlshof 2 | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | permanently decommissioned | 2001-10-16 | MEG Windpark Karlshof GmbH & Co. KG |
| WEA Karlshof 3 | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | permanently decommissioned | 2001-10-16 | MEG Windpark Karlshof GmbH & Co. KG |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-12-31 | private individual |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-12-31 | private individual |
| unit operated by a private individual | 1.30 MW | Sonstige | permanently decommissioned | 2002-09-25 | private individual |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-12-31 | private individual |
| WEA Karlshof 5 | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | permanently decommissioned | 1999-01-31 | MEG Windpark Karlshof GmbH & Co. KG |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-12-31 | private individual |
| Felix Müller Windkraftanlage Esch | 1.00 MW | ENERCON GmbH | in operation | 2001-06-28 | Müller u. Müller GbR |
| 42224 | 0.60 MW | ENERCON GmbH | in operation | 2000-04-03 | Windpark GmbH & Co. Conneforde KG |
| 44222 | 0.60 MW | ENERCON GmbH | in operation | 2000-04-03 | Windpark GmbH & Co. Conneforde KG |
| 44223 | 0.60 MW | ENERCON GmbH | in operation | 2000-04-03 | Windpark GmbH & Co. Conneforde KG |
| WEA E40 | 0.50 MW | ENERCON GmbH | in operation | 1998-05-14 | Reil`s Windpark, Inh. Uwe Reil |
| WEA 01 | 0.50 MW | Nordtank Energy Group | in operation | 1995-01-19 | Bahlsen Gmbh & Co. KG |
| WEA 03 | 0.50 MW | Nordtank Energy Group | in operation | 1995-01-19 | Bahlsen Gmbh & Co. KG |
| 441249 | 0.50 MW | ENERCON GmbH | in operation | 2002-04-01 | Windpark Westerscheps GmbH & Co. KG |
| WEA E40 | 0.50 MW | ENERCON GmbH | in operation | 1998-05-14 | Reil`s Windpark, Inh. Uwe Reil |
| WEA E40 | 0.50 MW | ENERCON GmbH | in operation | 1998-05-14 | Reil`s Windpark, Inh. Uwe Reil |
| 441247 | 0.50 MW | ENERCON GmbH | in operation | 2002-03-01 | Windpark Westerscheps GmbH & Co. KG |
| 441248 | 0.50 MW | ENERCON GmbH | in operation | 2002-04-01 | Windpark Westerscheps GmbH & Co. KG |
| WEA 02 | 0.50 MW | Nordtank Energy Group | in operation | 1995-01-19 | Bahlsen Gmbh & Co. KG |
| 40171 | 0.50 MW | ENERCON GmbH | in operation | 2002-03-01 | Windpark Westerscheps GmbH & Co. KG |
| WEA 04 | 0.18 MW | Nordtank Energy Group | in operation | 1996-12-05 | Bahlsen Gmbh & Co. KG |
| Windmühle | 0.01 MW | E.A.Z. Wind GmbH | in operation | 2022-04-26 | Meinen GbR |
| Windrad | 0.01 MW | Smart Power Electronics GmbH | in operation | 2023-02-10 | Thomas Gröneweg GmbH & Co. KG |
| unit operated by a private individual | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2024-08-01 | private individual |
Which organisations operate the most wind power capacity in Ammerland?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Ipweger Moor GmbH & Co. KG | 13 | 88.4 MW |
| Prowind GmbH | 9 | 63.6 MW |
| Windpark Rastede GmbH & Co. KG | 8 | 48.0 MW |
| Windpark Ihausen GmbH & Co. KG | 6 | 42.0 MW |
| Windpark Garnholt II GmbH & Co. KG | 5 | 34.0 MW |
| Alterric Deutschland GmbH | 4 | 28.0 MW |
| NEN Projekt GmbH & Co. KG | 4 | 27.2 MW |
| CGE Windpark Karlshof GmbH & Co. KG | 4 | 25.8 MW |
| UKA Umweltgerechte Kraftanlagen GmbH & Co. KG | 3 | 20.4 MW |
| BGK GmbH & Co. KG | 3 | 18.6 MW |
Which manufacturer accounts for the most wind power capacity in Ammerland?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Germany GmbH | 30 | 203.4 MW |
| Vestas Deutschland GmbH | 23 | 140.4 MW |
| ENERCON GmbH | 34 | 67.9 MW |
| Nordex Energy GmbH | 6 | 40.8 MW |
| Nordex SE | 4 | 28.0 MW |
| AN Windenergie GmbH | 5 | 6.50 MW |
| AN-Maschinenbau- und Umweltschutzanlagen GmbH | 4 | 5.20 MW |
| REpower Systems SE | 1 | 3.37 MW |
| Senvion Deutschland GmbH | 1 | 3.37 MW |
| Sonstige | 2 | 2.60 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Ammerland (Niedersachsen), and how large are they can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.