Germany · renewables
Wind power in Nordwestmecklenburg
183 wind turbines with 401.2 MW of gross capacity were in operation in Nordwestmecklenburg (Mecklenburg-Vorpommern) as of 2026-11-05, with a further 70 units (434.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Nordwestmecklenburg (Mecklenburg-Vorpommern), and how large are they, as of 2026-11-05?
- 183 wind turbines with 401.2 MW of gross capacity were in operation in Nordwestmecklenburg (Mecklenburg-Vorpommern) as of 2026-11-05, with a further 70 units (434.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Nordwestmecklenburg?
- 183 wind turbines with 401.2 MW of gross capacity were in operation in Nordwestmecklenburg as of 2026-11-05, with a further 70 units (434.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Nordwestmecklenburg in 2025?
- 6 wind turbines with 37.6 MW went into operation in Nordwestmecklenburg in 2025; the strongest year of the last two decades was 2023 with 47.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Nordwestmecklenburg?
- Erneuerbare Energie Mecklenburg GmbH & Co. KG operates 22 wind turbines with 149.6 MW in Nordwestmecklenburg, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Nordwestmecklenburg?
- Nordex Germany GmbH leads with 39 wind turbines and 257.0 MW in Nordwestmecklenburg (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Nordwestmecklenburg?
- The largest registered wind turbine in Nordwestmecklenburg has 7.20 MW of gross capacity and is operated by WIND-projekt GmbH & Co. 35. Betriebs-KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Nordwestmecklenburg distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 257 | 838.9 MW | 182 | 70 |
How much wind power capacity was commissioned in Nordwestmecklenburg each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 5 | 24.8 MW |
| 2025 | 6 | 37.6 MW |
| 2024 | 4 | 23.7 MW |
| 2023 | 8 | 47.8 MW |
| 2022 | 3 | 12.8 MW |
| 2021 | 1 | 5.70 MW |
| 2020 | 3 | 7.00 MW |
| 2019 | 8 | 18.8 MW |
| 2018 | 1 | 2.30 MW |
| 2017 | 1 | 2.30 MW |
| 2016 | 1 | 2.35 MW |
| 2015 | 16 | 36.8 MW |
| 2014 | 2 | 4.60 MW |
| 2013 | 10 | 23.0 MW |
| 2012 | 11 | 23.1 MW |
| 2011 | 4 | 6.80 MW |
| 2010 | 8 | 16.4 MW |
| 2009 | 1 | 2.30 MW |
| 2008 | 1 | 1.50 MW |
| 2007 | 8 | 16.0 MW |
| 2006 | 5 | 7.50 MW |
How many wind turbines in Nordwestmecklenburg are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 70 | 434.7 MW |
| in operation | 183 | 401.2 MW |
| permanently decommissioned | 5 | 3.00 MW |
Which wind turbines are registered in Nordwestmecklenburg?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WIND-projekt GmbH & Co. 35. Betriebs-KG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WIND-projekt GmbH & Co. 35. Betriebs-KG |
| WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WIND-projekt GmbH & Co. 35. Betriebs-KG |
| S1 Stepenitztal 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WIND-projekt GmbH & Co. 35. Betriebs-KG |
| S3 Stepenitztal 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| S2 Stepenitztal 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WIND-projekt GmbH & Co. 35. Betriebs-KG |
| WEA 07 | 7.00 MW | Nordex Germany GmbH | planned | planned 2031 | WIND-projekt GmbH & Co. 57. Betriebs-KG |
| WEA Rambeel 20 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 14 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA 04 | 6.80 MW | Nordex Germany GmbH | in operation | 2024-06-19 | WIND-projekt GmbH & Co. 33. Betriebs-KG |
| WEA Rambeel 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 10 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2031 | WIND-projekt GmbH & Co. 57. Betriebs-KG |
| WEA MühlenEichsen 01 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-09-08 | UGE Goddin GmbH & Co. KG Umweltgerechte Energie |
| WEA Rambeel 19 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WIND-projekt GmbH & Co. 55. Betriebs-KG |
| WEA Rambeel 09 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA 03 | 6.80 MW | Nordex Germany GmbH | in operation | 2023-11-16 | Windenergie Dorf Gutow GmbH & Co.KG |
| WEA Schönberg 01 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-03 | UGE Schönberg GmbH & Co. KG Umweltgerechte Energie |
| WEA Rambeel 15 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA 05 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-03-05 | WIND-projekt GmbH & Co. 47. Betriebs-KG |
| WEA Rambeel 22 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 18 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 11 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 12 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | WIND-projekt GmbH & Co. 55. Betriebs-KG |
| WEA 04 | 6.80 MW | Nordex Germany GmbH | in operation | 2023-11-14 | WIND-projekt GmbH & Co. 41. Betriebs-KG |
| WEA Rambeel 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 21 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 16 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 13 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA 09 | 6.80 MW | Nordex Germany GmbH | planned | planned 2031 | WIND-projekt GmbH & Co. 57. Betriebs-KG |
| WEA Rambeel 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Rambeel 17 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA 04 / 253269 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-04-11 | Windpark Mühlen Eichsen GmbH & Co. KG |
| WEA 03 / 253268 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-04-11 | Windpark Mühlen Eichsen GmbH & Co. KG |
| WEA05 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Gadebusch GmbH & Co. KG |
| WEA03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Gadebusch GmbH & Co. KG |
| WEA06 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Gadebusch GmbH & Co. KG |
| WEA02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Gadebusch GmbH & Co. KG |
| WEA12 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | KNE Windpark Nr. 17 GmbH & Co. KG |
| K2 Kwillsberg 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-12-05 | Windpark Westliches Hügelland GmbH & Co. KG |
| WEA11 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | KNE Windpark Nr. 17 GmbH & Co. KG |
| K4 Kwillsberg 4 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-12-11 | Windpark Westliches Hügelland GmbH & Co. KG |
| K1 Kwillsberg 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-11-12 | Windpark Westliches Hügelland GmbH & Co. KG |
| WEA01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Gadebusch GmbH & Co. KG |
| WEA04 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Gadebusch GmbH & Co. KG |
| K3 Kwillsberg 3 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-11-14 | Windpark Westliches Hügelland GmbH & Co. KG |
| Rieps WEA04 N-149 | 5.70 MW | Nordex SE | in operation | 2023-10-20 | Energiepark Rieps GmbH & Co. KG |
| WEA 02 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-01-10 | WIND-projekt GmbH & Co. 47. Betriebs-KG |
| WEA 02 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-07-10 | WIND-projekt GmbH & Co. 33. Betriebs-KG |
| Rieps WEA03 N-149 | 5.70 MW | Nordex SE | in operation | 2023-10-20 | Energiepark Rieps GmbH & Co. KG |
| WEA 06 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | WIND-projekt GmbH & Co. 52. Betriebs-KG |
| Rieps WEA05 N-149 | 5.70 MW | Nordex SE | in operation | 2023-10-20 | Energiepark Rieps GmbH & Co. KG |
| WEA 03 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-07-16 | WIND-projekt GmbH & Co. 33. Betriebs-KG |
| WEA-01_N149 | 5.70 MW | Nordex Energy GmbH | in operation | 2021-02-12 | Stadtwerke Grevesmühlen Windenergie GmbH & Co.KG |
| Rieps WEA02 N-149 | 5.70 MW | Nordex SE | in operation | 2023-10-20 | Energiepark Rieps GmbH & Co. KG |
| Rieps WEA06 N-149 | 5.70 MW | Nordex SE | in operation | 2023-10-20 | Energiepark Rieps GmbH & Co. KG |
| WEA 05 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | WIND-projekt GmbH & Co. 52. Betriebs-KG |
| Rieps WEA01 N-149 | 5.70 MW | Nordex SE | in operation | 2023-10-20 | Energiepark Rieps GmbH & Co. KG |
| WEA04 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| WEA10 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| WEA07 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| WEA05 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| WP Mühlen Eichsen - WEA 2 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2026-10-21 | wpd Windpark Mühlen Eichsen GmbH & Co. KG |
| WEA01 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| WKA 19 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windstrom Kalsow II GmbH & Co. KG |
| WEA06 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| WEA03 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| WEA08 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| WEA09 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| WEA02 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | KNE Windpark Nr. 17 GmbH & Co. KG |
| Börzow-Grieben WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Börzow-Grieben WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Börzow-Grieben WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WEA Questin | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-04-11 | MBBF Windpark Wokrent GmbH & Co. KG |
| Groß Voigtshagen WEA 11 | 5.00 MW | – | planned | planned 2027 | Windpark GmbH & Co. Groß Voigtshagen KG |
| Groß Voigtshagen WEA 4 | 5.00 MW | – | planned | planned 2027 | Windpark GmbH & Co. Groß Voigtshagen KG |
| Groß Voigtshagen WEA 2 | 5.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark GmbH & Co. Groß Voigtshagen KG |
| Groß Voigtshagen WEA 9 | 5.00 MW | – | planned | planned 2027 | Windpark GmbH & Co. Groß Voigtshagen KG |
| Groß Voigtshagen WEA 8 | 5.00 MW | – | planned | planned 2027 | Windpark GmbH & Co. Groß Voigtshagen KG |
| Groß Voigtshagen WEA 10 | 5.00 MW | – | planned | planned 2027 | Windpark GmbH & Co. Groß Voigtshagen KG |
| Groß Voigtshagen WEA 7 | 5.00 MW | – | planned | planned 2027 | Windpark GmbH & Co. Groß Voigtshagen KG |
| Groß Voigtshagen WEA 6 | 5.00 MW | – | planned | planned 2027 | Windpark GmbH & Co. Groß Voigtshagen KG |
| Groß Voigtshagen WEA 5 | 5.00 MW | – | planned | planned 2027 | Windpark GmbH & Co. Groß Voigtshagen KG |
| Groß Voigtshagen WEA 3 | 5.00 MW | – | planned | planned 2027 | Windpark GmbH & Co. Groß Voigtshagen KG |
| WP Alt Bukow | 4.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Alt Bukow GmbH & Co. KG |
| WEA 01 | 4.80 MW | Nordex Germany GmbH | in operation | 2022-11-02 | WIND-projekt GmbH & Co. 37. Betriebs-KG |
| Bernstorf K100 | 2.50 MW | Kenersys Europe GmbH | in operation | 2010-06-29 | WIND-projekt GmbH & Co. Zweite Betriebs-KG |
| Bernstorf K110 | 2.40 MW | Kenersys Europe GmbH | in operation | 2012-05-30 | WIND-projekt GmbH & Co. Zweite Betriebs-KG |
| WEA01 | 2.35 MW | ENERCON GmbH | in operation | 2019-11-27 | Bürgerwindpark Schönberg GmbH & Co. KG |
| 921058 | 2.35 MW | ENERCON GmbH | in operation | 2016-12-30 | Meins Energy GmbH & Co.KG |
| WEA07 | 2.35 MW | ENERCON GmbH | in operation | 2019-12-03 | Bürgerwindpark Schönberg GmbH & Co. KG |
| WEA03 | 2.35 MW | ENERCON GmbH | in operation | 2019-12-02 | Bürgerwindpark Schönberg GmbH & Co. KG |
| WEA10 | 2.35 MW | ENERCON GmbH | in operation | 2020-09-23 | Bürgerwindpark Schönberg GmbH & Co. KG |
| WEA06 | 2.35 MW | ENERCON GmbH | in operation | 2019-12-06 | Bürgerwindpark Schönberg GmbH & Co. KG |
| WEA08 | 2.35 MW | ENERCON GmbH | in operation | 2019-12-13 | Bürgerwindpark Schönberg GmbH & Co. KG |
| WEA02 | 2.35 MW | ENERCON GmbH | in operation | 2019-11-27 | Bürgerwindpark Schönberg GmbH & Co. KG |
| WEA04 | 2.35 MW | ENERCON GmbH | in operation | 2019-12-04 | Bürgerwindpark Schönberg GmbH & Co. KG |
| WEA9 | 2.35 MW | ENERCON GmbH | in operation | 2020-09-10 | Bürgerwindpark Schönberg GmbH & Co. KG |
| WEA05 | 2.35 MW | ENERCON GmbH | in operation | 2019-12-18 | Bürgerwindpark Schönberg GmbH & Co. KG |
| WI WF01 Wendenfeld 01 | 2.30 MW | ENERCON GmbH | in operation | 2013-07-04 | Wind am Wendenfeld GmbH & Co. KG |
| PJJ 10 Enercon E70/E4 113 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-28 | PJJ Future Wind 10. GmbH & Co. KG |
| E-825638 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-02 | Windpark Selmsdorf III GmbH & Co. KG |
| E 826162-14 | 2.30 MW | ENERCON GmbH | in operation | 2015-02-06 | Windpark Badow GmbH & Co. KG |
| E 826160-12 | 2.30 MW | ENERCON GmbH | in operation | 2015-01-22 | Windpark Badow GmbH & Co. KG |
| Rosenhof Landwind GmbH & Co. KG | 2.30 MW | ENERCON GmbH | in operation | 2013-10-10 | Rosenhof Landwind GmbH & Co.KG |
| E 826153-05 | 2.30 MW | ENERCON GmbH | in operation | 2015-01-29 | Windpark Renzow GmbH & Co. KG |
| 827554 | 2.30 MW | ENERCON GmbH | in operation | 2020-11-24 | Windenergie Gägelow GmbH & Co. KG |
| E 826159-11 | 2.30 MW | ENERCON GmbH | in operation | 2015-01-16 | Windpark Badow GmbH & Co. KG |
| E 826157-09 | 2.30 MW | ENERCON GmbH | in operation | 2015-01-20 | Windpark Badow GmbH & Co. KG |
| WEA 822984 | 2.30 MW | ENERCON GmbH | in operation | 2010-12-16 | Hocke Energieerzeugung GmbH & Co. KG |
| Upahl II | 2.30 MW | ENERCON GmbH | in operation | 2013-10-18 | Windenergie Kastahn GmbH & Co.KG |
| E 826156-08 | 2.30 MW | ENERCON GmbH | in operation | 2015-01-20 | Windpark Badow GmbH & Co. KG |
| WEA | 2.30 MW | ENERCON GmbH | in operation | 2015-09-15 | RNE ReinNordEnergie |
| WP Selmsdorf II | 2.30 MW | ENERCON GmbH | in operation | 2012-02-07 | Windpark Selmsdorf II GmbH & Co. KG |
| WEA | 2.30 MW | ENERCON GmbH | in operation | 2017-11-08 | RNE ReinNordEnergie |
| E 826164-16 | 2.30 MW | ENERCON GmbH | in operation | 2015-02-04 | Windpark Badow GmbH & Co. KG |
| WP Losten 8098 | 2.30 MW | Nordex Energy GmbH | in operation | 2004-04-05 | e.disnatur Erneuerbare Energien GmbH |
| JeKa Wind Bernstorf | 2.30 MW | Kenersys Europe GmbH | in operation | 2014-04-24 | Jeka Wind GmbH |
| WP Losten 8104 | 2.30 MW | Nordex Energy GmbH | in operation | 2004-04-05 | e.disnatur Erneuerbare Energien GmbH |
| WP Losten 8105 | 2.30 MW | Nordex Energy GmbH | in operation | 2004-04-05 | e.disnatur Erneuerbare Energien GmbH |
| E 826154-06 | 2.30 MW | ENERCON GmbH | in operation | 2015-02-03 | Windpark Badow GmbH & Co. KG |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2018-02-28 | private individual |
| E-825636 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-20 | Windpark Selmsdorf III GmbH & Co. KG |
| 822644 | 2.30 MW | ENERCON GmbH | in operation | 2010-12-09 | Meins Energy GmbH & Co.KG |
| Rosenhof Landwind GmbH & Co. KG | 2.30 MW | ENERCON GmbH | in operation | 2013-10-04 | Rosenhof Landwind GmbH & Co.KG |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2013-12-18 | private individual |
| 822645 | 2.30 MW | ENERCON GmbH | in operation | 2010-12-09 | Meins Energy GmbH & Co.KG |
| Rosenhof Landwind GmbH & Co. KG | 2.30 MW | ENERCON GmbH | in operation | 2013-10-11 | Rosenhof Landwind GmbH & Co.KG |
| E 826161-13 | 2.30 MW | ENERCON GmbH | in operation | 2015-01-29 | Windpark Badow GmbH & Co. KG |
| E 826155-07 | 2.30 MW | ENERCON GmbH | in operation | 2015-02-06 | Windpark Badow GmbH & Co. KG |
| WEA 782965 | 2.30 MW | ENERCON GmbH | in operation | 2012-03-12 | Windstrom Kalsow GmbH & Co. KG |
| WEA 783589 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-23 | Windstrom Kalsow GmbH & Co. KG |
| WP Losten 8107 | 2.30 MW | Nordex Energy GmbH | in operation | 2004-04-05 | e.disnatur Erneuerbare Energien GmbH |
| WEA | 2.30 MW | ENERCON GmbH | in operation | 2015-09-15 | RNE ReinNordEnergie |
| PJJ 10 Enercon E70/E4 85 | 2.30 MW | ENERCON GmbH | in operation | 2009-02-17 | PJJ Future Wind 10. GmbH & Co. KG |
| E 826152-04 | 2.30 MW | ENERCON GmbH | in operation | 2015-01-16 | Windpark Badow GmbH & Co. KG |
| WEA | 2.30 MW | ENERCON GmbH | in operation | 2014-12-17 | RNE ReinNordEnergie |
| E-825635 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-20 | Windpark Selmsdorf III GmbH & Co. KG |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2022-02-14 | private individual |
| E-825637 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-20 | Windpark Selmsdorf III GmbH & Co. KG |
| E 826158-10 | 2.30 MW | ENERCON GmbH | in operation | 2015-01-16 | Windpark Badow GmbH & Co. KG |
| WP Losten 8106 | 2.30 MW | Nordex Energy GmbH | in operation | 2004-04-05 | e.disnatur Erneuerbare Energien GmbH |
| E 826163-15 | 2.30 MW | ENERCON GmbH | in operation | 2015-01-21 | Windpark Renzow GmbH & Co. KG |
| E 826528-02 | 2.30 MW | ENERCON GmbH | in operation | 2015-12-30 | Windpark Badow GmbH & Co. KG |
| Groß Trebbow WEA 3 | 2.05 MW | eno energy GmbH | in operation | 2012-01-19 | TOBi Windenergie GmbH & Co. KG |
| Rüting 821008 | 2.05 MW | eno energy GmbH | in operation | 2012-07-09 | Hanse Windkraft GmbH |
| Rüting 821010 | 2.05 MW | eno energy GmbH | in operation | 2012-07-09 | Hanse Windkraft GmbH |
| Groß Trebbow WEA 2 | 2.05 MW | eno energy GmbH | in operation | 2012-01-13 | TOBi Windenergie GmbH & Co. KG |
| Rüting 821009 | 2.05 MW | eno energy GmbH | in operation | 2012-07-09 | Hanse Windkraft GmbH |
| Groß Trebbow WEA 4 | 2.05 MW | eno energy GmbH | in operation | 2012-01-31 | TOBi Windenergie GmbH & Co. KG |
| E-781482 | 2.00 MW | ENERCON GmbH | in operation | 2007-06-28 | AREF Windpark Selmsdorf-Sülsdorf GmbH & Co. KG |
| E-781485 | 2.00 MW | ENERCON GmbH | in operation | 2007-06-25 | AREF Windpark Selmsdorf-Sülsdorf GmbH & Co. KG |
| E-781486 | 2.00 MW | ENERCON GmbH | in operation | 2007-06-25 | AREF Windpark Selmsdorf-Sülsdorf GmbH & Co. KG |
| E-781483 | 2.00 MW | ENERCON GmbH | in operation | 2007-06-25 | AREF Windpark Selmsdorf-Sülsdorf GmbH & Co. KG |
| E-781484 | 2.00 MW | ENERCON GmbH | in operation | 2007-06-25 | AREF Windpark Selmsdorf-Sülsdorf GmbH & Co. KG |
| E-781479 | 2.00 MW | ENERCON GmbH | in operation | 2007-06-28 | AREF Windpark Selmsdorf-Sülsdorf GmbH & Co. KG |
| E-781481 | 2.00 MW | ENERCON GmbH | in operation | 2007-06-29 | AREF Windpark Selmsdorf-Sülsdorf GmbH & Co. KG |
| Upahl I | 2.00 MW | ENERCON GmbH | in operation | 2010-11-19 | Windenergie Kastahn GmbH & Co.KG |
| K82-00004 | 2.00 MW | Kenersys Europe GmbH | in operation | 2010-06-29 | Stadtwerke Grevesmühlen Windenergie GmbH & Co.KG |
| E-781480 | 2.00 MW | ENERCON GmbH | in operation | 2007-06-29 | AREF Windpark Selmsdorf-Sülsdorf GmbH & Co. KG |
| Windpark Schönberg | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-11-04 | EnerVest Windpark Schönberg |
| WEA | 1.80 MW | ENERCON GmbH | in operation | 2002-09-26 | RNE ReinNordEnergie |
| WEA | 1.80 MW | ENERCON GmbH | in operation | 2002-09-27 | RNE ReinNordEnergie |
| WEA | 1.80 MW | ENERCON GmbH | in operation | 2002-09-25 | RNE ReinNordEnergie |
| WEA | 1.80 MW | ENERCON GmbH | in operation | 2002-09-12 | RNE ReinNordEnergie |
| WEA | 1.80 MW | ENERCON GmbH | in operation | 2002-09-10 | RNE ReinNordEnergie |
| WEA | 1.80 MW | ENERCON GmbH | in operation | 2002-09-24 | RNE ReinNordEnergie |
| WEA | 1.80 MW | ENERCON GmbH | in operation | 2002-09-19 | RNE ReinNordEnergie |
| WEA | 1.80 MW | ENERCON GmbH | in operation | 2002-09-11 | RNE ReinNordEnergie |
| WP Löwitz 70273 | 1.50 MW | Nordex Energy GmbH | in operation | 2004-03-29 | e.disnatur Erneuerbare Energien GmbH |
| Barnekow | 1.50 MW | VENSYS Energy AG | in operation | 2011-11-22 | Jacobs Immobilien GmbH & Co. KG |
| WP Kalkhorst 70280 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2004-09-28 | BMV Energie GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2001-05-17 | private individual |
| 67282 | 1.50 MW | Vestas Deutschland GmbH | in operation | 2002-11-27 | Windpark Passow GmbH & Co. KG |
| FL 429 | 1.50 MW | Fuhrländer AG | in operation | 2006-12-05 | Krag Invest GmbH & Co. Passow II KG |
| WP Kalkhorst 70281 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2004-09-28 | BMV Energie GmbH & Co. KG |
| Barnekow Wind 1 | 1.50 MW | VENSYS Energy AG | in operation | 2011-06-28 | Barnekow Wind 1 GmbH & Co.KG |
| WP Löwitz 70274 | 1.50 MW | Nordex Energy GmbH | in operation | 2004-03-29 | e.disnatur Erneuerbare Energien GmbH |
| Barnekow Wind 2 | 1.50 MW | VENSYS Energy AG | in operation | 2011-06-29 | Barnekow Wind 2 GmbH & Co.KG |
| Windpark Passow III | 1.50 MW | Fuhrländer AG | in operation | 2006-12-01 | Windenergie Management GmbH & Co. 3 Windpark KG |
| S 70455 | 1.50 MW | Nordex Energy GmbH | in operation | 2008-02-01 | AREF Windpark Kalsow GmbH & Co. KG |
| WEA 105 S77-70487 - Kalsow | 1.50 MW | Nordex Energy GmbH | in operation | 2010-12-21 | WeGo Energie GmbH & Co. KG |
| WEA 104 S77-70488 - Kalsow | 1.50 MW | Nordex Energy GmbH | in operation | 2010-12-21 | Dorit und Franz Russ GbR |
| PJJ-Future-Wind 17. | 1.50 MW | VENSYS Energy AG | in operation | 2012-09-21 | PJJ-Future-Wind 17 GmbH & Co. KG |
| 70536 | 1.50 MW | REpower Systems SE | in operation | 2006-01-01 | Windkraftkontor Ost GmbH & Co. KG |
| FL 430 | 1.50 MW | Fuhrländer AG | in operation | 2006-11-30 | Krag Invest GmbH & Co. Passow II KG |
| 67281 | 1.50 MW | Vestas Deutschland GmbH | in operation | 2002-11-26 | Windpark Passow GmbH & Co. KG |
| 70537 | 1.50 MW | REpower Systems SE | in operation | 2006-01-01 | Windkraftkontor Ost GmbH & Co. KG |
| WP Kalkhorst 70279 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2004-09-28 | BMV Energie GmbH & Co. KG |
| WEA 01 (NX1363) | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-17 | GET Windpark KARO GmbH & Co. KG |
| ROH 08 NX1366 | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-17 | GET Windpark KARO GmbH & Co. KG |
| WEA 03 (NX1365) | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-17 | GET Windpark KARO GmbH & Co. KG |
| ROH 07 NX1367 | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-17 | GET Windpark KARO GmbH & Co. KG |
| WEA 04 (NX1369) | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-17 | GET Windpark KARO GmbH & Co. KG |
| WEA 02 (NX1370) | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-17 | GET Windpark KARO GmbH & Co. KG |
| WEA 06 (NX1364) | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-17 | GET Windpark KARO GmbH & Co. KG |
| ROH 09 NX1371 | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-17 | GET Windpark KARO GmbH & Co. KG |
| WEA 05 (NX1368) | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-17 | GET Windpark KARO GmbH & Co. KG |
| 56093 | 1.05 MW | HSW Husumer Schiffswerft GmbH & Co. KG | in operation | 2004-06-17 | Windpark Gadebusch A/S dänischen Rechts & Co. KG |
| 56092 | 1.05 MW | HSW Husumer Schiffswerft GmbH & Co. KG | in operation | 2004-06-18 | Windpark Gadebusch A/S dänischen Rechts & Co. KG |
| 56095 | 1.05 MW | HSW Husumer Schiffswerft GmbH & Co. KG | in operation | 2004-06-22 | Windpark Gadebusch A/S dänischen Rechts & Co. KG |
| 56094 | 1.05 MW | HSW Husumer Schiffswerft GmbH & Co. KG | in operation | 2004-06-23 | Windpark Gadebusch A/S dänischen Rechts & Co. KG |
| 56096 | 1.05 MW | HSW Husumer Schiffswerft GmbH & Co. KG | in operation | 2004-06-24 | Windpark Gadebusch A/S dänischen Rechts & Co. KG |
| CRA-02-69396 | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2003-12-15 | Perdita Energie GmbH & Co. KG |
| CRA-01-69397 | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2003-12-15 | Galatea Energie GmbH & Co. KG |
| unit operated by a private individual | 0.85 MW | Vestas Deutschland GmbH | in operation | 2003-12-16 | private individual |
| unit operated by a private individual | 0.85 MW | Vestas Deutschland GmbH | in operation | 2003-12-16 | private individual |
| unit operated by a private individual | 0.60 MW | Vestas Deutschland GmbH | permanently decommissioned | 1997-05-14 | private individual |
| CRA-I-04-50911 | 0.60 MW | Wind World A/S | in operation | 1998-12-30 | wind 7 Service GmbH |
| WP Gr. Pravtshagen 3 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-07-15 | Windpark Groß Pravtshagen GmbH |
| CRA-I-01-50908 | 0.60 MW | Wind World A/S | in operation | 1998-12-30 | wind 7 Service GmbH |
| Barnekow 1 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1995-07-25 | Nielsen und Bukowsky Wind Pattensen GbR |
| CRA-I-02-50909 | 0.60 MW | Wind World A/S | in operation | 1998-12-30 | wind 7 Service GmbH |
| WP Gr. Pravtshagen 2 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-07-15 | Windpark Groß Pravtshagen GmbH |
| unit operated by a private individual | 0.60 MW | Vestas Deutschland GmbH | permanently decommissioned | 1997-05-14 | private individual |
| CRA-I-03-50910 | 0.60 MW | Wind World A/S | in operation | 1998-12-30 | wind 7 Service GmbH |
| WP Gr. Pravtshagen 4 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-07-15 | Windpark Groß Pravtshagen GmbH |
| WP Gr. Pravtshagen 6 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-07-15 | Windpark Groß Pravtshagen GmbH |
| E 44226-01 | 0.60 MW | ENERCON GmbH | in operation | 2000-02-21 | Windpark Kalkhorst/Brake GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | Vestas Deutschland GmbH | permanently decommissioned | 1997-05-14 | private individual |
| WP Gr. Pravtshagen 7 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-07-15 | Windpark Groß Pravtshagen GmbH |
| Windrad | 0.60 MW | ENERCON GmbH | in operation | 2000-01-01 | Agrargenossenschaft eG Köchelstorf |
| WP Gr. Pravtshagen 1 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-07-22 | Windpark Groß Pravtshagen GmbH |
| Barnekow 3 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1995-07-25 | Nielsen und Bukowsky Wind Pattensen GbR |
| unit operated by a private individual | 0.60 MW | Vestas Deutschland GmbH | permanently decommissioned | 1997-05-14 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2000-02-21 | private individual |
| Barnekow 2 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1995-07-25 | Nielsen und Bukowsky Wind Pattensen GbR |
| WP Gr. Pravtshagen 5 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-07-15 | Windpark Groß Pravtshagen GmbH |
| CRA-I-05-50912 | 0.60 MW | Wind World A/S | in operation | 1998-12-30 | wind 7 Service GmbH |
| unit operated by a private individual | 0.60 MW | Vestas Deutschland GmbH | permanently decommissioned | 1997-05-14 | private individual |
| CRA-I-06-50912 | 0.60 MW | Wind World A/S | in operation | 1998-12-30 | wind 7 Service GmbH |
| E40-40994 | 0.50 MW | ENERCON GmbH | in operation | 1997-09-17 | LEJ Wind |
| WKA Ventschow | 0.50 MW | ENERCON GmbH | in operation | 1996-04-03 | Walter Huning-Wesseler |
| unit operated by a private individual | 0.50 MW | Jacobs Energie GmbH | in operation | 1997-12-01 | private individual |
| WEA 3 | 0.50 MW | ENERCON GmbH | in operation | 1996-04-30 | S&W Energy Lübow GbR Jakob Schünemann & Frank Wiedenhöft |
| WEA 4 | 0.50 MW | ENERCON GmbH | in operation | 1996-04-29 | S&W Energy Lübow GbR Jakob Schünemann & Frank Wiedenhöft |
| WEA 1 | 0.50 MW | ENERCON GmbH | in operation | 1996-04-22 | S&W Energy Lübow GbR Jakob Schünemann & Frank Wiedenhöft |
| WEA 2 | 0.50 MW | ENERCON GmbH | in operation | 1996-04-23 | S&W Energy Lübow GbR Jakob Schünemann & Frank Wiedenhöft |
| Wismar | 0.50 MW | Vestas Deutschland GmbH | in operation | 1996-12-02 | Wind NOW GmbH |
| E40-40995 | 0.50 MW | ENERCON GmbH | in operation | 1997-09-17 | LEJ Wind |
| unit operated by a private individual | 0.35 MW | Südwind Borsig Energy GmbH | in operation | 1995-02-04 | private individual |
| unit operated by a private individual | 0.30 MW | Nordtank Energy Group | in operation | 1994-01-28 | private individual |
| unit operated by a private individual | 0.27 MW | Südwind Borsig Energy GmbH | in operation | 1995-02-04 | private individual |
| unit operated by a private individual | 0.25 MW | – | in operation | 1996-04-16 | private individual |
| unit operated by a private individual | 0.23 MW | Vestas Deutschland GmbH | in operation | 1993-03-18 | private individual |
| unit operated by a private individual | 0.15 MW | Nordtank Energy Group | in operation | 1993-02-01 | private individual |
| unit operated by a private individual | 0.15 MW | Nordtank Energy Group | in operation | 1993-02-01 | private individual |
| unit operated by a private individual | 0.11 MW | SEEWIND Windenergiesysteme GmbH | in operation | 1993-11-19 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2026-06-20 | private individual |
Which organisations operate the most wind power capacity in Nordwestmecklenburg?
| Operator | Units | Capacity |
|---|---|---|
| Erneuerbare Energie Mecklenburg GmbH & Co. KG | 22 | 149.6 MW |
| KNE Windpark Nr. 17 GmbH & Co. KG | 12 | 68.0 MW |
| Windpark GmbH & Co. Groß Voigtshagen KG | 10 | 50.0 MW |
| Energiepark Gadebusch GmbH & Co. KG | 6 | 36.8 MW |
| WIND-projekt GmbH & Co. 35. Betriebs-KG | 5 | 36.0 MW |
| Energiepark Rieps GmbH & Co. KG | 6 | 34.2 MW |
| Windpark Badow GmbH & Co. KG | 12 | 27.6 MW |
| Windpark Westliches Hügelland GmbH & Co. KG | 4 | 24.0 MW |
| RNE ReinNordEnergie | 12 | 23.6 MW |
| Bürgerwindpark Schönberg GmbH & Co. KG | 10 | 23.5 MW |
Which manufacturer accounts for the most wind power capacity in Nordwestmecklenburg?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Germany GmbH | 39 | 257.0 MW |
| Vestas Deutschland GmbH | 46 | 220.4 MW |
| ENERCON GmbH | 81 | 174.9 MW |
| Nordex Energy GmbH | 21 | 42.1 MW |
| Nordex SE | 6 | 34.2 MW |
| eno energy GmbH | 6 | 12.3 MW |
| Kenersys Europe GmbH | 4 | 9.20 MW |
| NEG Micon Deutschland GmbH | 12 | 7.80 MW |
| Südwind Borsig Energy GmbH | 6 | 6.62 MW |
| VENSYS Energy AG | 4 | 6.00 MW |
Wind power in Mecklenburg-Vorpommern · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Nordwestmecklenburg (Mecklenburg-Vorpommern), and can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.