Germany · renewables
Wind power in Ludwigslust-Parchim
338 wind turbines with 923.6 MW of gross capacity were in operation in Ludwigslust-Parchim (Mecklenburg-Vorpommern) as of 2026-11-05, with a further 139 units (780.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Ludwigslust-Parchim (Mecklenburg-Vorpommern), and how large are they, as of 2026-11-05?
- 338 wind turbines with 923.6 MW of gross capacity were in operation in Ludwigslust-Parchim (Mecklenburg-Vorpommern) as of 2026-11-05, with a further 139 units (780.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Ludwigslust-Parchim?
- 338 wind turbines with 923.6 MW of gross capacity were in operation in Ludwigslust-Parchim as of 2026-11-05, with a further 139 units (780.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Ludwigslust-Parchim in 2025?
- 22 wind turbines with 119.7 MW went into operation in Ludwigslust-Parchim in 2025; the strongest year of the last two decades was 2025 with 119.7 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Ludwigslust-Parchim?
- UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie operates 14 wind turbines with 79.8 MW in Ludwigslust-Parchim, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Ludwigslust-Parchim?
- Nordex Germany GmbH leads with 86 wind turbines and 532.8 MW in Ludwigslust-Parchim (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Ludwigslust-Parchim?
- The largest registered wind turbine in Ludwigslust-Parchim has 7.20 MW of gross capacity and is operated by Windpark Vellahn GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Ludwigslust-Parchim distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 511 | 1.73 GW | 337 | 139 |
How much wind power capacity was commissioned in Ludwigslust-Parchim each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 14 | 94.9 MW |
| 2025 | 22 | 119.7 MW |
| 2023 | 8 | 32.8 MW |
| 2022 | 7 | 25.0 MW |
| 2021 | 10 | 34.4 MW |
| 2020 | 15 | 53.4 MW |
| 2019 | 14 | 52.8 MW |
| 2018 | 1 | 3.60 MW |
| 2017 | 19 | 59.1 MW |
| 2016 | 23 | 75.5 MW |
| 2015 | 6 | 19.6 MW |
| 2014 | 38 | 103.8 MW |
| 2013 | 16 | 39.0 MW |
| 2012 | 5 | 11.5 MW |
| 2011 | 10 | 22.5 MW |
| 2010 | 8 | 16.0 MW |
| 2009 | 3 | 5.40 MW |
| 2008 | 5 | 8.80 MW |
| 2007 | 7 | 14.0 MW |
| 2006 | 29 | 59.5 MW |
How many wind turbines in Ludwigslust-Parchim are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 338 | 923.6 MW |
| planned | 139 | 780.4 MW |
| permanently decommissioned | 35 | 24.1 MW |
Which wind turbines are registered in Ludwigslust-Parchim?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 8 / Vellahn | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Vellahn GmbH & Co. KG |
| WEA 5 / Vellahn | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Vellahn GmbH & Co. KG |
| WEA 6 / Vellahn | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Vellahn GmbH & Co. KG |
| WEA 4 / Vellahn | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Vellahn GmbH & Co. KG |
| WEA 3 / Vellahn | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Vellahn GmbH & Co. KG |
| WEA 2 / Vellahn | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Vellahn GmbH & Co. KG |
| WEA 9 / Vellahn | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Vellahn GmbH & Co. KG |
| WEA 1 / Vellahn | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Vellahn GmbH & Co. KG |
| WEA 7 / Vellahn | 7.20 MW | – | planned | planned 2028 | Windpark Vellahn GmbH & Co. KG |
| WEA Passow 01 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-09-10 | mea Energieagentur Mecklenburg-Vorpommern GmbH |
| WEA Passow 03 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-27 | mea Energieagentur Mecklenburg-Vorpommern GmbH |
| WEA Passow 04 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-27 | mea Energieagentur Mecklenburg-Vorpommern GmbH |
| WEA Passow 02 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-27 | mea Energieagentur Mecklenburg-Vorpommern GmbH |
| WEA Gischow 03 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Gischow 01 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Gischow 02 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Erneuerbare Energie Mecklenburg GmbH & Co. KG |
| WEA Klein Dammerow 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Marsow 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| Kladrum N-163 6.8 WEA9 | 6.80 MW | Nordex SE | planned | planned 2028 | Naturwind GmbH |
| WEA Marsow 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Klein Dammerow 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Herzberg 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WEA Marsow 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Herzberg 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | NaturStromVersorgung Wöbbelin GmbH & Co. KG |
| Kladrum N-163 6.8 WEA7 | 6.80 MW | Nordex SE | planned | planned 2028 | Naturwind GmbH |
| WEA Klein Dammerow 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Domsühl 05 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-03-09 | UGE Severin Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Herzberg 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WEA Domsühl 02 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-03-09 | UGE Severin Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Herzberg 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WEA Marsow 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Herzberg 09 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WEA Herzberg 10 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| Kladrum N-163 6.8 WEA8 | 6.80 MW | Nordex SE | planned | planned 2028 | Naturwind GmbH |
| WEA Klein Dammerow 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie |
| Kladrum N-163 6.8 WEA10 | 6.80 MW | Nordex SE | planned | planned 2028 | Naturwind GmbH |
| WEA 02 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | WIND-projekt GmbH & Co. 39. Betriebs-KG |
| WEA Herzberg 01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | NaturStromVersorgung Wöbbelin GmbH & Co. KG |
| WEA Marsow 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Klein Dammerow 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Klein Dammerow 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Passow 09 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-09-10 | UGE Welzin Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Klein Dammerow 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | NaturStromVersorgung Wöbbelin GmbH & Co. KG |
| WEA Marsow 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Badekow 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Domsühl 01 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-03-04 | UGE Severin Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | NaturStromVersorgung Wöbbelin GmbH & Co. KG |
| WEA Domsühl 04 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-03-09 | UGE Severin Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Klein Dammerow 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Passow 07 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-27 | UGE Welzin Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Domsühl 03 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-03-09 | UGE Severin Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Passow 05 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-27 | UGE Welzin Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Marsow 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Herzberg 05 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WEA Passow 08 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-09-10 | UGE Welzin Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | WIND-projekt GmbH & Co. 39. Betriebs-KG |
| WEA Herzberg 03 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WKA 1 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | BS Windertrag Nr. 17 GmbH &Co. KG |
| WKA 55 RP | 6.00 MW | eno energy systems GmbH | planned | planned 2028 | eno energy GmbH |
| WEA VK 14 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-09-22 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| KladrumVII N163-5,7 WEA6 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | enercity Windpark Zölkow-Kladrum GmbH & Co. KG |
| WP Hoort WEA7 | 5.70 MW | Nordex Germany GmbH | planned | planned 2031 | EnBW Windkraftprojekte GmbH |
| WP Hoort WEA6 | 5.70 MW | Nordex Germany GmbH | planned | planned 2031 | EnBW Windkraftprojekte GmbH |
| WKA 6 - NX93861 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-05-12 | Werder Wind & Wärme GmbH |
| ABO Energy WP Karenz WEA 2 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | ABO Wind WP Karenz GmbH & Co. KG |
| Uelitz WEA 8 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-07-29 | VR-Windpark Milow GmbH & Co. KG |
| WEA VK 10 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-10-15 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WP Hoort WEA8 | 5.70 MW | Nordex Germany GmbH | planned | planned 2031 | EnBW Windkraftprojekte GmbH |
| WEA11 - NX96876 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | REpulse Werder Lübz WEA 11 GmbH & Co. KG |
| WEA08 - NX96879 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | REpulse Werder Lübz WEA 8 GmbH & Co. KG |
| WP Hoort WEA9 | 5.70 MW | Nordex Germany GmbH | planned | planned 2031 | EnBW Windkraftprojekte GmbH |
| WEA01 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Energiepark Kraak GmbH & Co. KG |
| KladrumVII N163-5,7 WEA5 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Kladrum Mitte GmbH & Co. KG |
| WEA Herzberg 12 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WEA VK 11 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-09-25 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA11 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Energiepark Kraak GmbH & Co. KG |
| WEA 2 | 5.70 MW | Nordex SE | planned | planned 2030 | Qualitas Energy Entwicklungs GmbH |
| WEA VK 16 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-11-13 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WKA 7 - NX93862 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-05-12 | Werder Wind & Wärme GmbH |
| WEA L1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2029 | Energiepark Sülte GmbH & Co. KG |
| WEA VK 15 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-10-16 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| ABO Energy WP Karenz WEA 1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | ABO Wind WP Karenz GmbH & Co. KG |
| WEA VK 12 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-09-24 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WKA 1 - NX93857 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-04-15 | Werder Wind & Wärme GmbH |
| WEA Herzberg 11 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| Lübesse WEA 2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Naturwind Schwerin GmbH |
| WEA VK 07 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-10-08 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA VK 04 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-10-21 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 06 | 5.70 MW | Nordex Energy GmbH | planned | planned 2029 | Energiepark Sülte GmbH & Co. KG |
| KladrumVI N149-5,7 WEA2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Kladrum West GmbH & Co. KG |
| WEA10 - NX96877 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | REpulse Werder Lübz WEA 10 GmbH & Co. KG |
| WEA VK 13 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-09-24 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 4 | 5.70 MW | Nordex SE | planned | planned 2030 | Qualitas Energy Entwicklungs GmbH |
| KladrumVII N163-5,7 WEA3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Kladrum Mitte GmbH & Co. KG |
| WKA 4 - NX93859 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-04-24 | Werder Wind & Wärme GmbH |
| WEA10 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Energiepark Kraak GmbH & Co. KG |
| WP Hoort WEA5 | 5.70 MW | Nordex Germany GmbH | planned | planned 2031 | EnBW Windkraftprojekte GmbH |
| WKA 5 - NX93860 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-05-12 | REpulse Werder Lübz WEA 5 GmbH & Co. KG |
| WEA09 - NX96878 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | REpulse Werder Lübz WEA 9 GmbH & Co. KG |
| WEA Herzberg 06 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | KWE Windpark Herzberg Eins GmbH & Co. KG |
| WKA 2 - NX96006 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-04-15 | Werder Wind & Wärme GmbH |
| WEA VK 09 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-10-08 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA VK 03 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-11-06 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WP Hoort WEA4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2031 | EnBW Windkraftprojekte GmbH |
| KladrumVII N163-5,7 WEA4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Kladrum Mitte GmbH & Co. KG |
| WEA 09 | 5.70 MW | Nordex Energy GmbH | planned | planned 2029 | Energiepark Sülte GmbH & Co. KG |
| WEA 07 | 5.70 MW | Nordex Energy GmbH | planned | planned 2029 | Energiepark Sülte GmbH & Co. KG |
| WEA VK 06 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-10-28 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA VK 01 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-10-28 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA02 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Energiepark Kraak GmbH & Co. KG |
| ABO Energy WP Karenz WEA 4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Wind WP Karenz GmbH & Co. KG |
| WKA 3 - NX93858 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-04-24 | REpulse Werder Lübz WEA 3 GmbH & Co. KG |
| WEA12 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Energiepark Kraak GmbH & Co. KG |
| ABO Energy WP Karenz WEA 3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Wind WP Karenz GmbH & Co. KG |
| WP Hoort WEA3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2031 | EnBW Windkraftprojekte GmbH |
| WEA VK 08 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-10-08 | UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie |
| Plate I V-150 WEA 2 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Plate GmbH & Co. KG |
| WEA 03 | 5.60 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| WEA 04 | 5.60 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| WEA Boizenburg 01 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| Plate I V-150 WEA 3 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Plate GmbH & Co. KG |
| Plate I V-150 WEA 1 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Plate GmbH & Co. KG |
| WEA 01 | 5.60 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| WEA 05 | 5.60 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| WEA 02 | 5.60 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| WKA 2 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2027 | eno energy GmbH |
| WKA 1 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2027 | eno energy GmbH |
| Brunow Klüß II, WEA 1 | 5.00 MW | ENERCON GmbH | planned | planned 2028 | Energiepark Brunow Klüß GmbH & Co. KG |
| eno126034 - WEA4 | 4.80 MW | eno energy GmbH | in operation | 2022-04-14 | Bürgerenergiegesellschaft Windpark Milow auf der Nachtkoppel GmbH & Co. KG |
| WEA 15 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 9 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 17 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 5 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 13 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 10 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 2 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windpark LGMV Wessin GmbH |
| WEA 16 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 6 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 8 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 18 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 1 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windpark Crivitz GmbH |
| WEA 3 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 14 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 11 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 20 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 19 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 7 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 12 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| WEA 4 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Energieallianz MV Projekt Nr. 11 GmbH & Co. KG |
| Alt Krenzlin I E-138-4,2 WEA5 | 4.20 MW | ENERCON GmbH | planned | planned 2030 | Naturwind Schwerin GmbH |
| Brunow Klüß, WEA 1 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Brunow Klüß GmbH & Co. KG |
| Brunow Klüß, WEA 4 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Brunow Klüß GmbH & Co. KG |
| Brunow Klüß, WEA 5 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Brunow Klüß GmbH & Co. KG |
| Alt Krenzlin I E-138-4,2 WEA1 | 4.20 MW | ENERCON GmbH | planned | planned 2030 | Naturwind Schwerin GmbH |
| Brunow Klüß, WEA 3 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Brunow Klüß GmbH & Co. KG |
| Brunow Klüß, WEA 2 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | NE-WEA Brunow-Klüß GmbH & Co. KG |
| Brunow Klüß, WEA 6 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Brunow Klüß GmbH & Co. KG |
| Alt Krenzlin I E-138-4,2 WEA4 | 4.20 MW | ENERCON GmbH | planned | planned 2030 | Naturwind Schwerin GmbH |
| Alt Krenzlin I E-138-4,2 WEA3 | 4.20 MW | ENERCON GmbH | planned | planned 2030 | Naturwind Schwerin GmbH |
| Alt Krenzlin I E-138-4,2 WEA2 | 4.20 MW | ENERCON GmbH | planned | planned 2030 | Naturwind Schwerin GmbH |
| Brunow Klüß II, WEA 2 | 4.20 MW | ENERCON GmbH | planned | planned 2028 | Energiepark Brunow Klüß GmbH & Co. KG |
| Brunow Klüß II, WEA 3 | 4.20 MW | ENERCON GmbH | planned | planned 2028 | Energiepark Brunow Klüß GmbH & Co. KG |
| STRA06 | 4.10 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-02-21 | Windpark Strassen GmbH & Co. KG |
| STRA05 | 4.10 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-03-23 | Windpark Strassen GmbH & Co. KG |
| STRA08 | 4.10 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-02-27 | Windpark Strassen GmbH & Co. KG |
| STRA02 | 4.10 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-03-24 | Windpark Strassen GmbH & Co. KG |
| STRA01 | 4.10 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2023-02-27 | Windpark Strassen GmbH & Co. KG |
| STRA04 | 4.10 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-04-19 | Windpark Strassen GmbH & Co. KG |
| STRA07 | 4.10 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-02-01 | Windpark Strassen GmbH & Co. KG |
| STRA03 | 4.10 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-03-25 | Windpark Strassen GmbH & Co. KG |
| eno126036 - WEA14 | 4.00 MW | eno energy GmbH | in operation | 2022-06-10 | Bürgerenergie Windpark Milow am Göbengraben GmbH & Co. KG |
| eno126027 - WEA13 | 4.00 MW | eno energy GmbH | in operation | 2021-02-12 | Norddeutsche Energie WP Plauerhagen III GmbH & Co. KG |
| eno126035 - WEA3 | 4.00 MW | eno energy GmbH | in operation | 2022-05-13 | Bürgerenergiegesellschaft Windpark Milow auf der Nachtkoppel GmbH & Co. KG |
| eno114023 - WEA8 | 4.00 MW | eno energy GmbH | in operation | 2019-03-27 | Norddeutsche Energie WP Milow I GmbH & Co. KG |
| eno126023 - WEA7 | 4.00 MW | eno energy GmbH | in operation | 2019-06-12 | Bürgerenergie Windpark Milow am Göbengraben GmbH & Co. KG |
| eno114025 - WEA12 | 4.00 MW | eno energy GmbH | in operation | 2019-04-17 | Norddeutsche Energie WP Milow I GmbH & Co. KG |
| eno126026 - WEA14 | 4.00 MW | eno energy GmbH | in operation | 2021-01-21 | Norddeutsche Energie WP Plauerhagen III GmbH & Co. KG |
| eno114024 - WEA13 | 4.00 MW | eno energy GmbH | in operation | 2019-04-09 | Norddeutsche Energie WP Milow I GmbH & Co. KG |
| eno114026 - WEA11 | 4.00 MW | eno energy GmbH | in operation | 2019-05-02 | Norddeutsche Energie WP Milow I GmbH & Co. KG |
| eno126022 - WEA9 | 4.00 MW | eno energy GmbH | in operation | 2019-05-22 | Bürgerenergie Windpark Milow am Göbengraben GmbH & Co. KG |
| WPK_09 | 3.90 MW | Siemens Wind Power GmbH & Co. KG | planned | planned 2026 | Windpark Kloddram GmbH |
| WPK_03 | 3.90 MW | Siemens Wind Power GmbH & Co. KG | planned | planned 2026 | Windpark Kloddram GmbH |
| WPK_06 | 3.90 MW | Siemens Wind Power GmbH & Co. KG | planned | planned 2026 | Windpark Kloddram GmbH |
| WPK_04 | 3.90 MW | Siemens Wind Power GmbH & Co. KG | planned | planned 2026 | Windpark Kloddram GmbH |
| WPK_02 | 3.90 MW | Siemens Wind Power GmbH & Co. KG | planned | planned 2026 | Windpark Kloddram GmbH |
| WPK_07 | 3.90 MW | Siemens Wind Power GmbH & Co. KG | planned | planned 2026 | Windpark Kloddram GmbH |
| WPK_08 | 3.90 MW | Siemens Wind Power GmbH & Co. KG | planned | planned 2026 | Windpark Kloddram GmbH |
| WPK_01 | 3.90 MW | Siemens Wind Power GmbH & Co. KG | planned | planned 2026 | Windpark Kloddram GmbH |
| WPK_05 | 3.90 MW | Siemens Wind Power GmbH & Co. KG | planned | planned 2026 | Windpark Kloddram GmbH |
| WEA 11 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-01-22 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| WEA 1 SIG | 3.60 MW | Vestas Deutschland GmbH | in operation | 2020-02-12 | Energiepark Redlin GmbH & Co. KG |
| WP Hoort 2 - WEA17 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-03-27 | Windpark Hoort 2 GmbH & Co. KG |
| WP Hoort 2 - WEA16 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-03-19 | Windpark Hoort 2 GmbH & Co. KG |
| WP Hoort 2 - WEA09 | 3.60 MW | Nordex Energy GmbH | in operation | 2019-11-28 | Windpark Hoort 2 GmbH & Co. KG |
| WP Hoort 3 - WEA15 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-04-08 | Windpark Hoort 3 GmbH |
| WEA 17 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2018-12-22 | BEE Kritzow GmbH & Co. KG |
| WP Hoort 2 - WEA14 | 3.60 MW | Nordex SE | in operation | 2019-12-18 | Windpark Hoort 2 GmbH & Co. KG |
| WEA 4 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-06-16 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| WEA 2 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-04-23 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| WP Hoort 3 - WEA10 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-02-14 | Windpark Hoort 3 GmbH |
| WEA 12 | 3.60 MW | Nordex Energy GmbH | in operation | 2019-12-09 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| V226767 - WEA5 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-03-12 | Bürgerenergiegesellschaft Windpark Milow auf der Nachtkoppel GmbH & Co. KG |
| WEA 6 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-04-01 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| NX85381 | 3.60 MW | Nordex SE | in operation | 2017-09-06 | Werder Wind & Wärme GmbH |
| V226768 - WEA6 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-03-12 | Bürgerenergiegesellschaft Windpark Milow auf der Nachtkoppel GmbH & Co. KG |
| WEA 5 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-08-06 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| WEA 13 | 3.60 MW | Nordex Energy GmbH | in operation | 2019-11-28 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| V229521 - WEA10 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-09-13 | Bürgerenergie Windpark Milow am Göbengraben GmbH & Co. KG |
| Brunow Klüß, WEA 7 | 3.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Brunow Klüß GmbH & Co. KG |
| WEA 7 | 3.60 MW | Nordex Energy GmbH | in operation | 2019-12-03 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| WEA 1 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-07-02 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| WEA 8 | 3.60 MW | Nordex Energy GmbH | in operation | 2020-03-12 | Windpark Hoort 1 GmbH & Co. Betriebs-KG |
| WEA 08 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2020-02-12 | EWI Redlin Eins GmbH & Co. KG |
| 114016 | 3.50 MW | eno energy GmbH | in operation | 2016-12-30 | Norddeutsche Energie WP Plauerhagen 2 GmbH & Co. KG |
| Plauerhagen eno114013 | 3.50 MW | eno energy GmbH | in operation | 2016-06-23 | Windpark Plauerhagen GmbH & Co. KG |
| Plauerhagen eno114012 | 3.50 MW | eno energy GmbH | in operation | 2016-06-23 | Windpark Plauerhagen GmbH & Co. KG |
| Plauerhagen eno114010 | 3.50 MW | eno energy GmbH | in operation | 2016-03-30 | Windpark Plauerhagen GmbH & Co. KG |
| 114018 | 3.50 MW | eno energy GmbH | in operation | 2017-02-28 | Norddeutsche Energie WP Plauerhagen 2 GmbH & Co. KG |
| Plauerhagen eno114011 | 3.50 MW | eno energy GmbH | in operation | 2016-05-04 | Windpark Plauerhagen GmbH & Co. KG |
| 114021 | 3.50 MW | eno energy GmbH | in operation | 2017-06-30 | Norddeutsche Energie WP Plauerhagen 2 GmbH & Co. KG |
| Plauerhagen eno114009 | 3.50 MW | eno energy GmbH | in operation | 2016-02-04 | Windpark Plauerhagen GmbH & Co. KG |
| 114019 | 3.50 MW | eno energy GmbH | in operation | 2017-04-30 | Norddeutsche Energie WP Plauerhagen 2 GmbH & Co. KG |
| 114020 | 3.50 MW | eno energy GmbH | in operation | 2017-05-18 | Norddeutsche Energie WP Plauerhagen 2 GmbH & Co. KG |
| Plauerhagen eno114014 | 3.50 MW | eno energy GmbH | in operation | 2016-06-29 | Windpark Plauerhagen GmbH & Co. KG |
| 114017 | 3.50 MW | eno energy GmbH | in operation | 2017-02-28 | Norddeutsche Energie WP Plauerhagen 2 GmbH & Co. KG |
| WEA 23 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-03-31 | Windpark Parchim Fünf GmbH & Co. KG |
| PCH WEA 21 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-03-22 | EWI Parchim Sechs GmbH & Co. KG |
| WEA 25 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2015-12-29 | Windpark Parchim Fünf GmbH & Co. KG |
| WEA 18 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-09-29 | BEE Barkow GmbH & Co. KG. |
| WEA 01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-06-26 | UGE Lutheran GmbH & Co. KG Umweltgerechte Energie |
| PCH WEA 27 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-09-13 | EWI Parchim Sechs GmbH & Co. KG |
| WEA 19 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-09-28 | BEE Barkow GmbH & Co. KG. |
| WEA 24 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-04-15 | Windpark Parchim Fünf GmbH & Co. KG |
| WEA 22 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-03-24 | Windpark Parchim Fünf GmbH & Co. KG |
| WEA 18 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2015-12-23 | Windpark Parchim Fünf GmbH & Co. KG |
| PCH WEA 26 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-09-16 | EWI Parchim Sechs GmbH & Co. KG |
| WEA 08 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-12-02 | BEE Barkow GmbH & Co. KG. |
| WKA 3 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2021-07-15 | Kommunaler Windpark Westmecklenburg GmbH & Co. KG |
| NX90134 | 3.30 MW | Nordex SE | in operation | 2022-12-08 | Windpark Kladrum III GmbH & Co. KG |
| WEA 20 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-04-21 | 4. Huning Windpower |
| WEA 12 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-12-07 | BEE Barkow GmbH & Co. KG. |
| WKA 8 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2021-07-15 | Kommunaler Windpark Westmecklenburg GmbH & Co. KG |
| NX90135 | 3.30 MW | Nordex SE | in operation | 2022-12-08 | Windpark Kladrum III GmbH & Co. KG |
| NX90133 | 3.30 MW | Nordex SE | in operation | 2022-12-08 | Windpark Kladrum III GmbH & Co. KG |
| WKA 4 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2021-07-15 | Kommunaler Windpark Westmecklenburg GmbH & Co. KG |
| WP Uelitz WEA 3 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-09-23 | Energiepark Uelitz GmbH & Co. KG |
| WKA 6 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2021-07-15 | Kommunaler Windpark Westmecklenburg GmbH & Co. KG |
| WKA 5 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2021-07-15 | Kommunaler Windpark Westmecklenburg GmbH & Co. KG |
| WEA 19 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-04-15 | 3. Huning Windpower |
| WP Uelitz WEA 4 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-09-29 | Energiepark Uelitz GmbH & Co. KG |
| WKA 2 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2021-07-15 | Kommunaler Windpark Westmecklenburg GmbH & Co. KG |
| WEA 11 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-12-16 | BEE Barkow GmbH & Co. KG. |
| WKA 7 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2021-07-15 | Kommunaler Windpark Westmecklenburg GmbH & Co. KG |
| WKA 1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2021-07-15 | Kommunaler Windpark Westmecklenburg GmbH & Co. KG |
| WKA16 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-10-14 | UGE Parchim Vier GmbH & Co. KG Umweltgerechte Energie |
| WKA17 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-09-29 | UGE Parchim Vier GmbH & Co. KG Umweltgerechte Energie |
| WEA15 204890 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-07-29 | UGE Barkow GmbH & Co. KG Umweltgerechte Energie |
| WEA16 204984 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-07-29 | UGE Barkow GmbH & Co. KG Umweltgerechte Energie |
| WEA 3 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-05-16 | 9. Huning Windpower |
| WEA 14 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-04-01 | 1. Huning Windpower |
| WEA1 202890 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-28 | UGE Barkow GmbH & Co KG Umweltgerechte Energie |
| WEA 06 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-31 | Windpark Parchim GmbH & Co. KG |
| WEA 2 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-05-15 | 8. Huning Windpower |
| WEA 13 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-07-29 | 7. Huning Windpower |
| WEA 07 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-04-23 | Windpark Parchim GmbH & Co. KG |
| WEA 12 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-07-22 | Windpark Parchim GmbH & Co. KG |
| WEA2 202889 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-28 | UGE Barkow GmbH & Co KG Umweltgerechte Energie |
| WEA 01 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-04-30 | Windpark Parchim GmbH & Co. KG |
| WEA 04 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-05-12 | Windpark Parchim GmbH & Co. KG |
| WEA14 204889 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-07-30 | UGE Barkow GmbH & Co. KG Umweltgerechte Energie |
| WEA 11 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-07-17 | 6. Huning Windpower |
| WEA4 202891 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-28 | UGE Barkow GmbH & Co KG Umweltgerechte Energie |
| WEA 15 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-04-01 | 2. Huning Windpower |
| WEA10 202893 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-28 | UGE Barkow GmbH & Co KG Umweltgerechte Energie |
| WEA 09 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-31 | Windpark Parchim GmbH & Co. KG |
| WEA13 204888 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-07-31 | UGE Barkow GmbH & Co. KG Umweltgerechte Energie |
| WEA5 202894 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-28 | UGE Barkow GmbH & Co KG Umweltgerechte Energie |
| WEA9 202892 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-28 | UGE Barkow GmbH & Co KG Umweltgerechte Energie |
| WEA 05 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-04-30 | Windpark Parchim GmbH & Co. KG |
| WEA6 202895 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-28 | UGE Barkow GmbH & Co KG Umweltgerechte Energie |
| WEA 10 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-07-31 | Windpark Parchim GmbH & Co. KG |
| WEA 08 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-31 | Windpark Parchim GmbH & Co. KG |
| E 1011423-17 | 3.05 MW | ENERCON GmbH | in operation | 2017-09-21 | Windpark Redlin GmbH & Co. KG |
| E 1011420-05 | 3.05 MW | ENERCON GmbH | in operation | 2017-06-30 | Windpark Redlin GmbH & Co. KG |
| E 1011427-14 | 3.05 MW | ENERCON GmbH | in operation | 2017-08-29 | Windpark Redlin GmbH & Co. KG |
| E 1011424-18 | 3.05 MW | ENERCON GmbH | in operation | 2017-09-22 | Windpark Redlin GmbH & Co. KG |
| E 1011425-09 | 3.05 MW | ENERCON GmbH | in operation | 2017-07-28 | Windpark Redlin GmbH & Co. KG |
| E 1011426-12 | 3.05 MW | ENERCON GmbH | in operation | 2017-07-29 | Windpark Redlin GmbH & Co. KG |
| E 1011421-11 | 3.05 MW | ENERCON GmbH | in operation | 2017-09-20 | Windpark Redlin GmbH & Co. KG |
| E 1011422-15 | 3.05 MW | ENERCON GmbH | in operation | 2017-09-20 | Windpark Redlin GmbH & Co. KG |
| E 1011418-02 | 3.05 MW | ENERCON GmbH | in operation | 2017-07-21 | Windpark Redlin GmbH & Co. KG |
| E 1011419-03 | 3.05 MW | ENERCON GmbH | in operation | 2017-07-26 | Windpark Redlin GmbH & Co. KG |
| NX82503-WEA08 | 2.50 MW | Nordex SE | in operation | 2013-01-18 | SüdWestStrom StadtKraftWerk Windpark Suckow GmbH & Co. KG |
| NX82508-WEA11 | 2.50 MW | Nordex SE | in operation | 2013-01-24 | SüdWestStrom StadtKraftWerk Windpark Suckow GmbH & Co. KG |
| NX82504-WEA13 | 2.50 MW | Nordex SE | in operation | 2013-02-15 | SüdWestStrom StadtKraftWerk Windpark Suckow GmbH & Co. KG |
| NX82502-WEA04 | 2.50 MW | Nordex SE | in operation | 2013-01-25 | SüdWestStrom StadtKraftWerk Windpark Suckow GmbH & Co. KG |
| 8298 | 2.50 MW | Nordex Energy GmbH | in operation | 2006-06-23 | EOS Windpark Uelitz GmbH & Co.KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Ludwigslust-Parchim?
| Operator | Units | Capacity |
|---|---|---|
| UGE Wilsen Eins GmbH & Co. KG Umweltgerechte Energie | 14 | 79.8 MW |
| KWE Windpark Herzberg Eins GmbH & Co. KG | 12 | 78.3 MW |
| Energieallianz MV Projekt Nr. 11 GmbH & Co. KG | 18 | 76.7 MW |
| Windpark Vellahn GmbH & Co. KG | 9 | 64.8 MW |
| UKA Umweltgerechte Kraftanlagen GmbH & Co. KG | 9 | 60.0 MW |
| UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie | 8 | 54.4 MW |
| eno energy GmbH | 8 | 45.0 MW |
| Windpark Zölkow GmbH & Co. KG | 20 | 40.0 MW |
| EnBW Windkraftprojekte GmbH | 7 | 39.9 MW |
| Energiepark Brunow Klüß GmbH & Co. KG | 9 | 38.0 MW |
Which manufacturer accounts for the most wind power capacity in Ludwigslust-Parchim?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Germany GmbH | 86 | 532.8 MW |
| ENERCON GmbH | 139 | 323.4 MW |
| Vestas Deutschland GmbH | 84 | 313.8 MW |
| Nordex Energy GmbH | 34 | 151.3 MW |
| eno energy GmbH | 43 | 127.8 MW |
| Nordex SE | 25 | 89.5 MW |
| Siemens Wind Power GmbH & Co. KG | 16 | 63.8 MW |
| eno energy systems GmbH | 6 | 34.0 MW |
| NEG Micon Deutschland GmbH | 33 | 28.5 MW |
| Südwind Borsig Energy GmbH | 16 | 24.0 MW |
Wind power in Mecklenburg-Vorpommern · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Ludwigslust-Parchim (Mecklenburg-Vorpommern), and can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.