Germany · renewables
Wind power in Wetteraukreis
27 wind turbines with 43.8 MW of gross capacity were in operation in Wetteraukreis (Hessen) as of 2026-11-05, with a further 33 units (223.2 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Wetteraukreis (Hessen), and how large are they, as of 2026-11-05?
- 27 wind turbines with 43.8 MW of gross capacity were in operation in Wetteraukreis (Hessen) as of 2026-11-05, with a further 33 units (223.2 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Wetteraukreis?
- 27 wind turbines with 43.8 MW of gross capacity were in operation in Wetteraukreis as of 2026-11-05, with a further 33 units (223.2 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Wetteraukreis in 2025?
- 1 wind turbines with 0.00 MW went into operation in Wetteraukreis in 2025; the strongest year of the last two decades was 2016 with 13.2 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Wetteraukreis?
- Windpark Nidda-Höllberg GmbH operates 7 wind turbines with 50.4 MW in Wetteraukreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Wetteraukreis?
- Vestas Deutschland GmbH leads with 26 wind turbines and 144.4 MW in Wetteraukreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Wetteraukreis?
- The largest registered wind turbine in Wetteraukreis has 7.20 MW of gross capacity and is operated by Windpark Nidda-Harbwald GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Wetteraukreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 0 | 0 |
| over 100 kW | 62 | 269.0 MW | 27 | 33 |
How much wind power capacity was commissioned in Wetteraukreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 1 | 0.00 MW |
| 2018 | 3 | 9.00 MW |
| 2016 | 4 | 13.2 MW |
| 2011 | 3 | 6.00 MW |
| 2009 | 2 | 4.00 MW |
| 2007 | 2 | 3.00 MW |
How many wind turbines in Wetteraukreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 33 | 223.2 MW |
| in operation | 27 | 43.8 MW |
| permanently decommissioned | 3 | 2.00 MW |
Which wind turbines are registered in Wetteraukreis?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WKA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Nidda-Harbwald GmbH |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Nidda-Höllberg GmbH |
| WP Winterstein WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Windpark Winterstein GmbH & Co. KG |
| WKA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Nidda-Harbwald GmbH |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Nidda-Höllberg GmbH |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Nidda-Höllberg GmbH |
| WP Winterstein WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Windpark Winterstein GmbH & Co. KG |
| WKA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Nidda-Harbwald GmbH |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Nidda-Höllberg GmbH |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Nidda-Höllberg GmbH |
| WP Winterstein WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Windpark Winterstein GmbH & Co. KG |
| WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Nidda-Höllberg GmbH |
| WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Nidda-Höllberg GmbH |
| WP Winterstein WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Windpark Winterstein GmbH & Co. KG |
| ABO Wind WP Ortenberg WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | ABO Energy WP Ortenberg GmbH & Co. KG |
| ABO Wind WP Ortenberg WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | ABO Energy WP Ortenberg GmbH & Co. KG |
| ABO Wind WP Ortenberg WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | ABO Energy WP Ortenberg GmbH & Co. KG |
| WEA 1 Karben-Petterweil | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Alterric Windpark Karben-Petterweil GmbH & Co. KG |
| WEA 6 Gedern Kommunalwald | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | HessenEnergie Gesellschaft für rationelle Energienutzung mbH |
| WEA 4 Gedern Kommunalwald | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | HessenEnergie Gesellschaft für rationelle Energienutzung mbH |
| WEA 4 Karben-Petterweil | 6.80 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Windpark Karben-Petterweil GmbH & Co. KG |
| WEA 3 Gedern Kommunalwald | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | HessenEnergie Gesellschaft für rationelle Energienutzung mbH |
| WEA 1 Gedern Kommunalwald | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | HessenEnergie Gesellschaft für rationelle Energienutzung mbH |
| WEA 2 Karben-Petterweil | 6.80 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Windpark Karben-Petterweil GmbH & Co. KG |
| WEA 5 Gedern Kommunalwald | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | HessenEnergie Gesellschaft für rationelle Energienutzung mbH |
| WEA 2 Gedern Kommunalwald | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | HessenEnergie Gesellschaft für rationelle Energienutzung mbH |
| WEA 3 Karben-Petterweil | 6.80 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Windpark Karben-Petterweil GmbH & Co. KG |
| ABO Energy WP Nidda-Ulfa WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Nidda-Ulfa GmbH & Co. KG |
| ABO Energy WP Nidda-Ulfa WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Nidda-Ulfa GmbH & Co. KG |
| ABO Energy WP Nidda-Ulfa WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Nidda-Ulfa GmbH & Co. KG |
| WEA 6 Kefenrod Erweiterung | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Oberhessische Versorgungsbetriebe AG |
| WEA Ortenberg-Gelnhaar | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Öko-Aktiv Beteiligungsgesellschaft mbH |
| WEA 5 Kefenrod Erweiterung | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Oberhessische Versorgungsbetriebe AG |
| WEA D Gedern | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-13 | Oberhessische Versorgungsbetriebe AG |
| WEA C Gedern | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-29 | Oberhessische Versorgungsbetriebe AG |
| WEA B Gedern | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-17 | Oberhessische Versorgungsbetriebe AG |
| WEA A Gedern | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-09 | Oberhessische Versorgungsbetriebe AG |
| 1150857 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-23 | Windpark Soderwald GmbH & Co. KG |
| 1150856 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-28 | Windpark Soderwald GmbH & Co. KG |
| 1150855 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-23 | Windpark Soderwald GmbH & Co. KG |
| Friedberg WEA 2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-16 | EnBW Onshore Portfolio GmbH |
| Windpark Kloppenheim WEA01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-05-15 | Mainova Windpark Kloppenheim GmbH & Co. KG |
| Windpark Kloppenheim WEA02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-05-15 | Mainova Windpark Kloppenheim GmbH & Co. KG |
| Friedberg WEA 1 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-16 | EnBW Onshore Portfolio GmbH |
| Friedberg WEA 3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-16 | EnBW Onshore Portfolio GmbH |
| WP Vogelsberg 12 | 1.50 MW | Fuhrländer AG | in operation | 2007-12-21 | Cersovsky GbR |
| Vogelsberg II 02 | 1.50 MW | Fuhrländer AG | in operation | 2007-12-21 | Hanse Windkraft GmbH |
| KAR-2(60005) | 1.00 MW | DeWind GmbH | permanently decommissioned | 2002-08-29 | SB Wind |
| WEA 3 Hirzenhain | 1.00 MW | DeWind GmbH | in operation | 2001-12-28 | Oberhessische Versorgungsbetriebe AG |
| WEA 1 Hirzenhain | 1.00 MW | DeWind GmbH | in operation | 2001-12-28 | Oberhessische Versorgungsbetriebe AG |
| KAR-1(60004) | 1.00 MW | DeWind GmbH | permanently decommissioned | 2002-08-29 | SB Wind |
| FAU-1(50238) | 0.60 MW | DeWind GmbH | in operation | 2002-08-27 | SB Wind |
| FLO-1(50245) | 0.60 MW | DeWind GmbH | in operation | 2002-09-10 | SB Wind |
| Gedern 50228 (B) | 0.60 MW | DeWind GmbH | in operation | 2002-01-17 | Hanse Windkraft GmbH |
| FAU-4(50237) | 0.60 MW | DeWind GmbH | in operation | 2002-08-27 | SB Wind |
| FAU-2(50239) | 0.60 MW | DeWind GmbH | in operation | 2002-08-27 | SB Wind |
| FLO-3(50253) | 0.60 MW | DeWind GmbH | in operation | 2002-09-10 | SB Wind |
| Nidda | 0.60 MW | Bonus Energy A/S | in operation | 1997-10-09 | re.Energie |
| Gedern 50227 (E) | 0.60 MW | DeWind GmbH | in operation | 2002-01-17 | Hanse Windkraft GmbH |
| Nidda | 0.60 MW | Bonus Energy A/S | in operation | 1997-10-09 | re.Energie |
| FAU-3(50240) | 0.60 MW | DeWind GmbH | in operation | 2002-08-27 | SB Wind |
| FLO-2(50252) | 0.60 MW | DeWind GmbH | in operation | 2002-09-10 | SB Wind |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | permanently decommissioned | 2025-05-31 | private individual |
Which organisations operate the most wind power capacity in Wetteraukreis?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Nidda-Höllberg GmbH | 7 | 50.4 MW |
| HessenEnergie Gesellschaft für rationelle Energienutzung mbH | 6 | 40.8 MW |
| Alterric Windpark Winterstein GmbH & Co. KG | 4 | 28.8 MW |
| Alterric Windpark Karben-Petterweil GmbH & Co. KG | 4 | 27.2 MW |
| Oberhessische Versorgungsbetriebe AG | 8 | 26.3 MW |
| Windpark Nidda-Harbwald GmbH | 3 | 21.6 MW |
| ABO Energy WP Ortenberg GmbH & Co. KG | 3 | 21.0 MW |
| ABO Energy WP Nidda-Ulfa GmbH & Co. KG | 3 | 16.7 MW |
| Windpark Soderwald GmbH & Co. KG | 3 | 9.00 MW |
| SB Wind | 9 | 6.20 MW |
Which manufacturer accounts for the most wind power capacity in Wetteraukreis?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 26 | 144.4 MW |
| ENERCON GmbH | 12 | 63.4 MW |
| Nordex Germany GmbH | 7 | 47.6 MW |
| DeWind GmbH | 13 | 9.40 MW |
| Fuhrländer AG | 2 | 3.00 MW |
| Bonus Energy A/S | 2 | 1.20 MW |
| SkyWind GmbH | 1 | 0.00 MW |
Wind power in Hessen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Wetteraukreis (Hessen), and how large are they, a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.