Wind power in Waldeck-Frankenberg
176 wind turbines with 410.5 MW of gross capacity were in operation in Waldeck-Frankenberg (Hessen) as of 2026-11-05, with a further 91 units (557.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Waldeck-Frankenberg (Hessen), and how large are they, as of 2026-11-05?
- 176 wind turbines with 410.5 MW of gross capacity were in operation in Waldeck-Frankenberg (Hessen) as of 2026-11-05, with a further 91 units (557.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Waldeck-Frankenberg?
- 176 wind turbines with 410.5 MW of gross capacity were in operation in Waldeck-Frankenberg as of 2026-11-05, with a further 91 units (557.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Waldeck-Frankenberg in 2025?
- 14 wind turbines with 83.8 MW went into operation in Waldeck-Frankenberg in 2025; the strongest year of the last two decades was 2025 with 83.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Waldeck-Frankenberg?
- Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH operates 21 wind turbines with 119.9 MW in Waldeck-Frankenberg, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Waldeck-Frankenberg?
- Vestas Deutschland GmbH leads with 73 wind turbines and 331.4 MW in Waldeck-Frankenberg (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Waldeck-Frankenberg?
- The largest registered wind turbine in Waldeck-Frankenberg has 7.20 MW of gross capacity and is operated by PNE Windpark Welsche Lied GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Waldeck-Frankenberg distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 4 | 0.03 MW | 4 | 0 |
| over 100 kW | 269 | 972.9 MW | 172 | 91 |
How much wind power capacity was commissioned in Waldeck-Frankenberg each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 12 | 61.7 MW |
| 2025 | 14 | 83.8 MW |
| 2024 | 6 | 26.5 MW |
| 2021 | 2 | 4.00 MW |
| 2020 | 2 | 6.60 MW |
| 2019 | 2 | 6.90 MW |
| 2018 | 1 | 0.01 MW |
| 2017 | 10 | 24.6 MW |
| 2016 | 6 | 14.4 MW |
| 2015 | 1 | 3.00 MW |
| 2014 | 8 | 15.4 MW |
| 2013 | 10 | 19.7 MW |
| 2012 | 16 | 35.6 MW |
| 2011 | 11 | 22.1 MW |
| 2010 | 3 | 4.85 MW |
| 2009 | 6 | 13.8 MW |
| 2006 | 5 | 8.50 MW |
How many wind turbines in Waldeck-Frankenberg are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 91 | 557.6 MW |
| in operation | 176 | 410.5 MW |
| permanently decommissioned | 6 | 4.80 MW |
Which wind turbines are registered in Waldeck-Frankenberg?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WP Welsche Lied WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | PNE Windpark Welsche Lied GmbH & Co. KG |
| WP Welsche Lied WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | PNE Windpark Welsche Lied GmbH & Co. KG |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie am Quast GmbH & Co. KG |
| WP Holzhäuser Berg WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | PNE AG |
| WP Welsche Lied WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | PNE Windpark Welsche Lied GmbH & Co. KG |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie am Quast GmbH & Co. KG |
| WP Willingen WEA 02 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | WP Willingen GmbH & Co. KG |
| WP Willingen WEA 01 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | WP Willingen GmbH & Co. KG |
| WP Willingen WEA 03 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | WP Willingen GmbH & Co. KG |
| WP Willingen WEA 04 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | WP Willingen GmbH & Co. KG |
| Hopperkopf WKA 6 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| Hopperkopf WKA 5 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| Twistenberg WKA 3 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | CONTINENTAL REIFEN DEUTSCHLAND |
| Hopperkopf WKA 3 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| Twistenberg WKA 2 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | CONTINENTAL REIFEN DEUTSCHLAND |
| Hopperkopf WKA 9 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WEA Matzenhöhe 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Matzenhöhe GmbH & Co. KG Umweltgerechte Energie |
| WEA Matzenhöhe 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Matzenhöhe GmbH & Co. KG Umweltgerechte Energie |
| Hopperkopf WKA 10 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| RE-WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Rotes Land GmbH & Co. KG |
| Hopperkopf WKA 1 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WEA Matzenhöhe 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Matzenhöhe GmbH & Co. KG Umweltgerechte Energie |
| Hopperkopf WKA 4 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| Twistenberg WKA 1 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | CONTINENTAL REIFEN DEUTSCHLAND |
| Hopperkopf WKA 8 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WEA Matzenhöhe 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Matzenhöhe GmbH & Co. KG Umweltgerechte Energie |
| RE-WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Rotes Land GmbH & Co. KG |
| Rhoder Forst WKA 7 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| Rhoder Forst WKA 6 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| Rhoder Forst WKA 9 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| Rhoder Forst WKA 10 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| Rhoder Forst WKA 8 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| Rhoder Forst WKA 5 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| Rhoder Forst WKA 3 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| Rhoder Forst WKA 4 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| Rhoder Forst WKA 2 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| Rhoder Forst WKA 1 | 6.30 MW | ENERCON GmbH | planned | planned 2030 | Windpark Rhoder Forst GmbH & Co. KG |
| WEP Höringhausen WEA N03 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-08-15 | Windenergiepark Höringhausen GmbH |
| WP Welsche Lied WEA 01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | PNE Windpark Welsche Lied GmbH & Co. KG |
| WEP Höringhausen WEA S03 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-08-06 | Windenergiepark Höringhausen GmbH |
| WEP Höringhausen WEA S02 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-08-06 | Windenergiepark Höringhausen GmbH |
| WEA 10 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 07 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 03 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEP Höringhausen WEA N02 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-09-12 | Windenergiepark Höringhausen GmbH |
| WEP Höringhausen WEA WAL01 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-08-22 | Windenergiepark Höringhausen GmbH |
| WEA 05 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 08 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 01 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 02 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 11 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 04 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 09 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 06 Welsches Lied | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| ABO Wind WP Flechtdorf WEA 4 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Wind WP Flechtdorf GmbH & Co. KG |
| WP Bad Arolsen Landau WEA 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-01-27 | WP Bad Arolsen Landau GmbH & Co. KG |
| Windpark Bühle WKA 3 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-03-06 | Windpark Halsberg GmbH & Co. KG |
| ABO Energy WP Vasbeck-Süd WEA 04 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2029 | ABO Energy WP Vasbeck-Süd GmbH & Co. KG |
| WIR-WEA 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | VSB Windpark Wirmighausen GmbH & Co. KG |
| ABO Wind WP Flechtdorf WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Wind WP Flechtdorf GmbH & Co. KG |
| WP Bad Arolsen Landau WEA 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-12-22 | WP Bad Arolsen Landau GmbH & Co. KG |
| WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Moischeid GmbH & Co. KG |
| ABO Wind WP Flechtdorf WEA 3 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Wind WP Flechtdorf GmbH & Co. KG |
| WEA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Moischeid GmbH & Co. KG |
| Windpark Bühle WKA 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-03-06 | Windpark Halsberg GmbH & Co. KG |
| Windpark Bühle WKA 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-03-06 | Windpark Halsberg GmbH & Co. KG |
| WIR-WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | VSB Windpark Wirmighausen GmbH & Co. KG |
| ABO Wind WP Flechtdorf WEA 5 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Wind WP Flechtdorf GmbH & Co. KG |
| Windpark Bühle WKA 4 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-03-06 | Windpark Halsberg GmbH & Co. KG |
| ABO Energy WP Vasbeck-Süd WEA 02 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2029 | ABO Energy WP Vasbeck-Süd GmbH & Co. KG |
| ABO Energy WP Vasbeck-Süd WEA 01 | 6.00 MW | GE Wind Energy GmbH | planned | planned 2029 | ABO Energy WP Vasbeck-Süd GmbH & Co. KG |
| ABO Wind WP Flechtdorf WEA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Wind WP Flechtdorf GmbH & Co. KG |
| ABO Energy WP Vasbeck-Süd WEA 03 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2029 | ABO Energy WP Vasbeck-Süd GmbH & Co. KG |
| TAP Windpark Bad Arolsen WEA 3 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | TAP Windpark Bad Arolsen GmbH & Co. KG |
| WEA 9 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Gemünden II GmbH & Co. KG |
| Windpark Marke WKA 1 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-10-28 | Windpark Marke GmbH & Co. KG |
| WEA 1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Gemünden II GmbH & Co. KG |
| Windpark Marke WKA 3 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-11-05 | Windpark Marke GmbH & Co. KG |
| WEA 11 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Gemünden II GmbH & Co. KG |
| WEA 6 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Gemünden II GmbH & Co. KG |
| WKA 1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Heidberg Neue Wind GmbH & Co. KG |
| Windpark Marke WKA 4 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-10-29 | Windpark Marke GmbH & Co. KG |
| Windpark Marke WKA 5 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-10-27 | Windpark Marke GmbH & Co. KG |
| Nieder-Schleidern WEA 3 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2026-07-15 | Windpark Nieder-Schleidern GmbH & Co. KG |
| Nieder-Schleidern WEA 2 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2026-08-24 | Windpark Nieder-Schleidern GmbH & Co. KG |
| Nieder-Schleidern WEA 1 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2026-08-20 | Windpark Nieder-Schleidern GmbH & Co. KG |
| 1603391 | 5.56 MW | ENERCON GmbH | in operation | 2026-04-28 | Alterric Windpark Waldeck-Sachsenhausen GmbH & Co. KG |
| BüWi Heitz LAW | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Heitzelberg GmbH & Co. KG |
| BüWi Heitz FHG | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Heitzelberg GmbH & Co. KG |
| 1603390 | 5.56 MW | ENERCON GmbH | in operation | 2026-04-10 | Alterric Windpark Waldeck-Sachsenhausen GmbH & Co. KG |
| WEA-04 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Lichteberg GmbH & Co. KG |
| WEA-03 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Lichteberg GmbH & Co. KG |
| WP Vöhl WEA 3 (VHL03) | 5.56 MW | ENERCON GmbH | in operation | 2026-04-22 | EnBW Windkraftprojekte GmbH |
| 1603389 | 5.56 MW | ENERCON GmbH | in operation | 2026-04-13 | Alterric Windpark Waldeck-Sachsenhausen GmbH & Co. KG |
| WP Vöhl WEA 2 (VHL02) | 5.56 MW | ENERCON GmbH | in operation | 2026-05-07 | EnBW Windkraftprojekte GmbH |
| BSZ E-160 | 5.56 MW | ENERCON GmbH | in operation | 2026-04-02 | BSZ-Energie GmbH & Co. KG |
| WEA-01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Lichteberg GmbH & Co. KG |
| WP Vöhl WEA 1 (VHL01) | 5.56 MW | ENERCON GmbH | in operation | 2026-05-29 | EnBW Windkraftprojekte GmbH |
| WEA-02 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Lichteberg GmbH & Co. KG |
| Gembeck II_WKA 3 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WEA 2 | 5.50 MW | ENERCON GmbH | planned | planned 2026 | Windpark Ehringen GmbH & Co. KG |
| Gembeck II_WKA 5 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WEA 3 | 5.50 MW | ENERCON GmbH | planned | planned 2026 | Windpark Ehringen GmbH & Co. KG |
| Gembeck II_WKA 7 | 5.50 MW | – | planned | planned 2029 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| Gembeck II_WKA 4 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| Gembeck II_WKA 8 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| Wirmighausen WKA 1 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| Gembeck II_WKA 6 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WEA 1 | 5.50 MW | ENERCON GmbH | planned | planned 2026 | Alterric Windpark Ehringen GmbH & Co. KG |
| WEA 4 | 5.50 MW | ENERCON GmbH | planned | planned 2026 | Alterric Windpark Ehringen GmbH & Co. KG |
| WP Heitzelberg WEA 01 | 5.50 MW | GE Renewable Germany GmbH | in operation | 2024-02-15 | PNE WIND Park XXII GmbH & Co.KG |
| WKA 2 | 4.50 MW | Nordex Energy GmbH | planned | planned 2026 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WKA 6 | 4.50 MW | Nordex Energy GmbH | planned | planned 2026 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WKA 1 | 4.50 MW | Nordex Energy GmbH | planned | planned 2026 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WKA 3 | 4.50 MW | Nordex Energy GmbH | planned | planned 2026 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WKA 5 | 4.50 MW | Nordex Energy GmbH | planned | planned 2026 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| WKA 4 | 4.50 MW | Nordex Energy GmbH | planned | planned 2026 | Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH |
| NRDWCK-WEA5 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-07-08 | Windpark Helsen-Pessinghausen GmbH & Co. KG |
| NRDWCK-WEA8 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-07-09 | Windpark Helsen-Pessinghausen GmbH & Co. KG |
| NRDWCK-WEA9 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-07-08 | Windpark Helsen-Pessinghausen GmbH & Co. KG |
| NRDWCK-WEA6 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-07-09 | Windpark Helsen-Pessinghausen GmbH & Co. KG |
| NRDWCK-WEA7 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-07-16 | Windpark Helsen-Pessinghausen GmbH & Co. KG |
| WEA 3 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-17 | TAP Windpark Bad Arolsen GmbH & Co. KG |
| WEA 4 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-17 | TAP Windpark Bad Arolsen GmbH & Co. KG |
| Windpark Adorf WEA 1 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-01-06 | Windpark Adorf GmbH & Co. KG |
| Windpark Adorf WEA 2 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-01-06 | Windpark Adorf GmbH & Co. KG |
| WEA 190 E101-1010621 | 3.05 MW | ENERCON GmbH | in operation | 2014-05-05 | Windparkbetriebsgesellschaft Sachsenhausen GmbH & Co. KG |
| Hel 2 | 3.00 MW | Nordex Energy GmbH | in operation | 2017-11-30 | Windpark Helsen GmbH & Co. KG |
| 1150051 | 3.00 MW | ENERCON GmbH | in operation | 2015-01-26 | Windparkbetriebsgesellschaft Adorf/Diemelsee II (die Zweite) GmbH |
| N83215 | 2.50 MW | Nordex SE | in operation | 2014-07-31 | Windenergie Elverfeldt KG |
| WEA 4 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-02-27 | Windpark Gemünden GmbH & Co. KG |
| WEA 11 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-11-30 | Neudorfer Windkraft GmbH & Co. KG |
| NX 84920-10 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-22 | Windpark Mengeringhausen GmbH & Co. KG |
| N83147 | 2.40 MW | Nordex SE | in operation | 2014-08-01 | Windenergie Elverfeldt KG |
| NX 84921-11 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-25 | Windpark Mengeringhausen GmbH & Co. KG |
| NX 84922-09 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-01 | Bad Arolser Wind GmbH |
| WKA 24 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-11-19 | Neudorfer Windkraft GmbH & Co. KG |
| WKA 8 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-11-19 | Neudorfer Windkraft GmbH & Co. KG |
| WKA 10 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-11-19 | Neudorfer Windkraft GmbH & Co. KG |
| NX 84917-16 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-08 | Windpark Mengeringhausen GmbH & Co. KG |
| NX 84919-02 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-08 | Windpark Mengeringhausen GmbH & Co. KG |
| WEA 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-02-21 | Windpark Gemünden GmbH & Co. KG |
| WKA Massenhausen | 2.40 MW | Nordex Energy GmbH | in operation | 2017-03-31 | Windrad Rotes Land Massenhausen GmbH & Co. KG |
| WEA 5 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-02-28 | Windpark Gemünden GmbH & Co. KG |
| NX 84918-01 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-15 | Windpark Mengeringhausen GmbH & Co. KG |
| WKA 9 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-11-26 | Neudorfer Windkraft GmbH & Co. KG |
| WEA 7 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-03-30 | Windpark Gemünden GmbH & Co. KG |
| Hel 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-11-28 | Windpark Helsen GmbH & Co. KG |
| WEA 8 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-03-30 | Windpark Gemünden GmbH & Co. KG |
| WEA 10 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-04-20 | Windpark Gemünden GmbH & Co. KG |
| WEA 3 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-02-17 | Windpark Gemünden GmbH & Co. KG |
| Diemelsee - WEA04 | 2.30 MW | Nordex Energy GmbH | in operation | 2009-03-24 | Ingka Deutschland Windfarms GmbH |
| Martenberg 824359 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-09 | enercity Windpark Portfolio II GmbH |
| Diemelsee - WEA01 | 2.30 MW | Nordex Energy GmbH | in operation | 2009-03-24 | Ingka Deutschland Windfarms GmbH |
| EA-57723 Enercon E-82 | 2.30 MW | ENERCON GmbH | in operation | 2011-11-25 | Dahle Wind GbR |
| Diemelsee - WEA06 | 2.30 MW | Nordex Energy GmbH | in operation | 2009-02-05 | Ingka Deutschland Windfarms GmbH |
| WP Adorf/Diemelsee Anlage 8 (824357) | 2.30 MW | ENERCON GmbH | in operation | 2012-07-17 | Webbel Wind GmbH & Co. KG |
| WP Adorf/Diemelsee Anlage 7 (824356) | 2.30 MW | ENERCON GmbH | in operation | 2012-06-18 | Windparkbetriebsgesellschaft Adorf/Diemelsee mbH |
| 825646 | 2.30 MW | ENERCON GmbH | in operation | 2014-03-07 | Windpark GmbH & Co. Sachsenhausen KG |
| WP Adorf/Diemelsee Anlage 4 (824353) | 2.30 MW | ENERCON GmbH | in operation | 2012-08-22 | Windparkbetriebsgesellschaft Adorf/Diemelsee mbH |
| Diemelsee - WEA05 | 2.30 MW | Nordex Energy GmbH | in operation | 2009-02-06 | Ingka Deutschland Windfarms GmbH |
| Martenberg 824355 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-09 | enercity Windpark Portfolio II GmbH |
| Diemelsee - WEA03 | 2.30 MW | Nordex Energy GmbH | in operation | 2009-03-25 | Ingka Deutschland Windfarms GmbH |
| 824576 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-28 | Windpark GmbH & Co. Twistetal KG |
| 824575 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-28 | Windpark GmbH & Co. Twistetal KG |
| E 823811-01 | 2.30 MW | ENERCON GmbH | in operation | 2011-11-28 | Einzelanlage Kohlgrund GmbH & Co. KG |
| Windkraftanlage Diemelstadt - Neudorf | 2.30 MW | ENERCON GmbH | in operation | 2013-11-15 | Brandstätter Solarpark GmbH & Co. KG |
| Enercon E-82 | 2.30 MW | ENERCON GmbH | in operation | 2013-08-12 | Dahle Wind GbR |
| Diemelsee - WEA02 | 2.30 MW | Nordex Energy GmbH | in operation | 2009-02-12 | Ingka Deutschland Windfarms GmbH |
| Martenberg 824352 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-31 | enercity Windpark Portfolio II GmbH |
| Martenberg 824358 | 2.30 MW | ENERCON GmbH | in operation | 2012-07-03 | enercity Windpark Portfolio II GmbH |
| 824578 | 2.30 MW | ENERCON GmbH | in operation | 2013-02-08 | Windpark GmbH & Co. Twistetal KG |
| 825647 | 2.30 MW | ENERCON GmbH | in operation | 2014-03-12 | Windpark GmbH & Co. Sachsenhausen KG |
| 824577 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-28 | Windpark GmbH & Co. Twistetal KG |
| Kohlgrund 823803 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-13 | Fünf-Windenergie GmbH&Co. KG |
| Martenberg 824350 | 2.30 MW | ENERCON GmbH | in operation | 2012-05-21 | enercity Windpark Portfolio II GmbH |
| Martenberg 824351 | 2.30 MW | ENERCON GmbH | in operation | 2012-06-05 | enercity Windpark Portfolio II GmbH |
| Kohlgrund 823757 | 2.30 MW | ENERCON GmbH | in operation | 2011-11-30 | Weidbusch-Wind GmbH & Co. KG |
| FL3 - 91295 | 2.05 MW | REpower Systems SE | in operation | 2010-12-01 | WINDPOOL Flechtdorf GmbH & Co. KG |
| FL4 - 91613 | 2.05 MW | REpower Systems SE | in operation | 2011-11-03 | WINDPOOL Flechtdorf II GmbH & Co. KG |
| V42876 - WEA 3 Ernsthausen | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-10 | Erlanger Stadtwerke AG |
| V-13979 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2001-12-18 | Windpark Rotes Land GmbH & Co. KG |
| WKA 2 V90 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2021-02-11 | Heidberg-Wind GmbH & Co. KG |
| V35725 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-31 | Cerventus Naturenergie GmbH |
| V-13982 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-02-05 | Windpark Rotes Land GmbH & Co. KG |
| V42878 - WEA 2 Ernsthausen | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-01 | Erlanger Stadtwerke AG |
| V 47751-01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-09-19 | Windpark Massenhausen GmbH & Co. KG |
| WEA 2 Flechtdorf | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-11-16 | Oberhessische Versorgungsbetriebe AG |
| V 47750-02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-09-27 | Windpark Massenhausen GmbH & Co. KG |
| V-13981 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-02-14 | Windpark Rotes Land GmbH & Co. KG |
| V-24958 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-09-29 | Buche Wind GmbH & Co. KG |
| HW E5 | 2.00 MW | ENERCON GmbH | in operation | 2014-12-23 | Haidwind GbR |
| V42875 - WEA 4 Ernsthausen | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-22 | Erlanger Stadtwerke AG |
| V42877 - WEA 1 Ernsthausen | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-16 | Erlanger Stadtwerke AG |
| V-13980 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2001-12-28 | Bürgerwindpark Rotes Land GmbH & CoKG |
| WEA 1 Flechtdorf | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-11-15 | Oberhessische Versorgungsbetriebe AG |
| V-13983 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-02-07 | Windpark Rotes Land GmbH & Co. KG |
| V-24957 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-27 | Buche Wind GmbH & Co. KG |
| V35676 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-01-24 | Cerventus Naturenergie GmbH |
| WKA 3 V90 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2021-02-11 | Heidberg-Wind GmbH & Co. KG |
| Diemelsee E 66 WEA 7 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-10 | Brecht & Hanle GmbH & Co. KG |
| Diemelsee E 66 WEA 2 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-10 | Brecht & Hanle GmbH & Co. KG |
| Diemelsee E 66 WEA 1 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-10 | Brecht & Hanle GmbH & Co. KG |
| Diemelsee E 66 WEA 8 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-10 | Brecht & Hanle GmbH & Co. KG |
| Diemelsee E 66 WEA 3 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-10 | Brecht & Hanle GmbH & Co. KG |
| Diemelsee E 66 WEA 4 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-10 | Brecht & Hanle GmbH & Co. KG |
| Diemelsee E 66 WEA 6 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-10 | Brecht & Hanle GmbH & Co. KG |
| Diemelsee E 66 WEA 5 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-10 | Brecht & Hanle GmbH & Co. KG |
| WEA G2B08 70304 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2003-12-07 | ERG Wind MEG 2 LLP |
| WEA Flechtdorf 70285 | 1.50 MW | Nordex Energy GmbH | in operation | 2004-09-29 | SK Wind GmbH & Co. KG |
| WEA G2B05 70307 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2003-12-09 | ERG Wind MEG 2 LLP |
| WEA Flechtdorf 70284 | 1.50 MW | Nordex Energy GmbH | in operation | 2004-09-28 | SK Wind GmbH & Co. KG |
| Gembeck 70284 | 1.50 MW | REpower Systems SE | in operation | 2003-08-21 | WP Gembeck GmbH & Co. KG |
| WEA G2B07 70305 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2003-12-06 | ERG Wind MEG 2 LLP |
| WEA G2B06 70306 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2003-12-08 | ERG Wind MEG 2 LLP |
| WEA Helmscheid 70286 | 1.50 MW | Nordex Energy GmbH | in operation | 2004-10-05 | SK Wind GmbH & Co. KG |
| WEA Flechtdorf 70282 | 1.50 MW | Nordex Energy GmbH | in operation | 2004-09-22 | SK Wind GmbH & Co. KG |
| F2L 06 70375 | 1.50 MW | Nordex Energy GmbH | in operation | 2006-05-18 | ABO Wind WP Flechtdorf II GmbH & Co. KG |
| WEA Diemelsee 70420 | 1.50 MW | Nordex Energy GmbH | in operation | 2006-12-13 | SK Wind GmbH & Co. KG |
| Gembeck 70302 | 1.50 MW | REpower Systems SE | in operation | 2003-09-02 | WP Gembeck GmbH & Co. KG |
| WEA Flechtdorf 70283 | 1.50 MW | Nordex Energy GmbH | in operation | 2004-09-28 | SK Wind GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2003-08-26 | private individual |
| Gembeck 70283 | 1.50 MW | REpower Systems SE | in operation | 2003-08-29 | WP Gembeck GmbH & Co. KG |
| WEA Diemelsee 26021 | 1.50 MW | Vestas Deutschland GmbH | in operation | 2006-12-13 | SK Wind GmbH & Co. KG |
| WEA Helmscheid 70650 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2004-10-05 | SK Wind GmbH & Co. KG |
| WEA Helmscheid 70649 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2004-10-01 | SK Wind GmbH & Co. KG |
| HW E1 | 0.80 MW | ENERCON GmbH | in operation | 2010-11-16 | Haidwind GbR |
| Kohlgrund 531585 | 0.80 MW | ENERCON GmbH | in operation | 2014-07-23 | Schmiedehagen UG (haftungsbeschränkt) & Co. KG |
| Steinknappe Wind | 0.80 MW | ENERCON GmbH | in operation | 2011-11-29 | Steinknappe Wind UG |
| Enercon E-53 | 0.80 MW | ENERCON GmbH | in operation | 2013-11-08 | Dahle Wind GbR |
| unit operated by a private individual | 0.66 MW | Vestas Deutschland GmbH | permanently decommissioned | 1998-12-07 | private individual |
| unit operated by a private individual | 0.66 MW | – | permanently decommissioned | 1998-12-07 | private individual |
| unit operated by a private individual | 0.66 MW | Vestas Deutschland GmbH | permanently decommissioned | 1998-12-07 | private individual |
| unit operated by a private individual | 0.66 MW | Vestas Deutschland GmbH | permanently decommissioned | 1998-12-07 | private individual |
| unit operated by a private individual | 0.66 MW | Vestas Deutschland GmbH | permanently decommissioned | 1998-12-07 | private individual |
| WEA 3 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-12-22 | Windpark Burgwald GbR |
| WEA 2 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-12-22 | Windpark Burgwald GbR |
| unit operated by a private individual | 0.60 MW | Nordex SE | in operation | 1997-10-01 | private individual |
| WEA 4 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-12-22 | Windpark Burgwald GbR |
| unit operated by a private individual | 0.60 MW | Nordex Energy GmbH | in operation | 1997-12-15 | private individual |
| unit operated by a private individual | 0.60 MW | Nordex SE | in operation | 1997-10-01 | private individual |
| unit operated by a private individual | 0.60 MW | Nordex SE | in operation | 1997-09-30 | private individual |
| unit operated by a private individual | 0.60 MW | Nordex Energy GmbH | in operation | 1997-12-15 | private individual |
| Gemb 2 | 0.50 MW | ENERCON GmbH | in operation | 1995-02-12 | Windpark Gembeck GmbH & Co. KG |
| WEA 3 40710 | 0.50 MW | ENERCON GmbH | in operation | 1996-12-17 | Vallop Energy GmbH |
| Gemb 4 | 0.50 MW | ENERCON GmbH | in operation | 1995-02-12 | Windpark Gembeck GmbH & Co. KG |
| Gemb 3 | 0.50 MW | ENERCON GmbH | in operation | 1995-02-12 | Windpark Gembeck GmbH & Co. KG |
| 40912 | 0.50 MW | ENERCON GmbH | in operation | 1997-06-20 | Bergwind Neumann GbRmbH |
| Gemb 5 | 0.50 MW | ENERCON GmbH | in operation | 1995-02-12 | Windpark Gembeck GmbH & Co. KG |
| WEA 4 40711 | 0.50 MW | ENERCON GmbH | in operation | 1996-12-17 | Vallop Energy GmbH |
| Gemb 1 | 0.50 MW | ENERCON GmbH | in operation | 1995-02-12 | Windpark Gembeck GmbH & Co. KG |
| WEA 5 40712 | 0.50 MW | ENERCON GmbH | in operation | 1996-12-19 | Vallop Energy GmbH |
| NTK 2 | 0.50 MW | NEG Micon Deutschland GmbH | in operation | 1994-12-22 | Haidwind GbR |
| NTK 3 | 0.50 MW | NEG Micon Deutschland GmbH | in operation | 1994-12-22 | Haidwind GbR |
| 40913 | 0.50 MW | ENERCON GmbH | in operation | 1997-06-20 | Bergwind Neumann GbRmbH |
| WEA 2 40857 | 0.50 MW | ENERCON GmbH | in operation | 1997-06-03 | Vallop Energy GmbH |
| WEA 1 40858 | 0.50 MW | ENERCON GmbH | in operation | 1997-05-29 | Vallop Energy GmbH |
| NTK 4 | 0.50 MW | NEG Micon Deutschland GmbH | in operation | 1994-12-22 | Haidwind GbR |
| Zollwind 8 | 0.25 MW | Nordex SE | in operation | 1995-01-03 | Wagner & Sohn Energie GmbH |
| 80005387 | 0.25 MW | Nordex SE | in operation | 1995-01-10 | Kanelwind GbR |
| Zollwind 6 | 0.25 MW | Nordex SE | in operation | 1994-04-13 | Wagner & Sohn Energie GmbH |
| 80005386 | 0.25 MW | Nordex SE | in operation | 1995-01-10 | Kanelwind GbR |
| 80005384 | 0.25 MW | Nordex Energy GmbH | in operation | 1995-01-10 | Kanelwind GbR |
| Zollwind 2 | 0.25 MW | Nordex SE | in operation | 1994-04-12 | Wagner & Sohn Energie GmbH |
| 80005383 | 0.25 MW | Nordex SE | in operation | 1995-01-10 | Kanelwind GbR |
| 80005385 | 0.25 MW | Nordex SE | in operation | 1995-01-10 | Kanelwind GbR |
| Nordex-M-1 | 0.15 MW | Nordex Energy GmbH | in operation | 1993-11-19 | Heine und Heine Windkraft |
| Zollwind 3 | 0.15 MW | Nordex SE | in operation | 1994-04-12 | Wagner & Sohn Energie GmbH |
| Nordex-M-2 | 0.15 MW | Nordex Energy GmbH | in operation | 1993-11-19 | Heine und Heine Windkraft |
| WKA 1 | 0.01 MW | Sonstige | in operation | 2018-01-29 | E.P.Möller GbR |
| unit operated by a private individual | 0.01 MW | – | in operation | 2014-07-24 | private individual |
| unit operated by a private individual | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2026-06-23 | private individual |
| unit operated by a private individual | 0.00 MW | WindTec GmbH | in operation | 2013-04-23 | private individual |
Which organisations operate the most wind power capacity in Waldeck-Frankenberg?
| Operator | Units | Capacity |
|---|---|---|
| Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH | 21 | 119.9 MW |
| Alterric Deutschland GmbH | 11 | 68.2 MW |
| Windpark Rhoder Forst GmbH & Co. KG | 10 | 63.0 MW |
| Windenergiepark Höringhausen GmbH | 5 | 31.0 MW |
| ABO Wind WP Flechtdorf GmbH & Co. KG | 5 | 30.0 MW |
| WP Willingen GmbH & Co. KG | 4 | 28.0 MW |
| PNE Windpark Welsche Lied GmbH & Co. KG | 4 | 27.8 MW |
| UGE Matzenhöhe GmbH & Co. KG Umweltgerechte Energie | 4 | 27.2 MW |
| ABO Energy WP Vasbeck-Süd GmbH & Co. KG | 4 | 24.0 MW |
| Windpark Halsberg GmbH & Co. KG | 4 | 24.0 MW |
Which manufacturer accounts for the most wind power capacity in Waldeck-Frankenberg?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 73 | 331.4 MW |
| ENERCON GmbH | 75 | 237.2 MW |
| Nordex Energy GmbH | 66 | 236.2 MW |
| Nordex Germany GmbH | 11 | 69.3 MW |
| GE Wind Energy GmbH | 7 | 39.0 MW |
| GE Renewable Germany GmbH | 4 | 23.5 MW |
| REpower Systems SE | 6 | 10.1 MW |
| Nordex SE | 13 | 8.60 MW |
| Senvion Deutschland GmbH | 4 | 6.00 MW |
| NEG Micon Deutschland GmbH | 5 | 3.50 MW |
Wind power in Hessen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Waldeck-Frankenberg (Hessen), and how large are t can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.