Germany · renewables
Wind power in Marburg-Biedenkopf
98 wind turbines with 261.9 MW of gross capacity were in operation in Marburg-Biedenkopf (Hessen) as of 2026-11-05, with a further 59 units (357.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Marburg-Biedenkopf (Hessen), and how large are they, as of 2026-11-05?
- 98 wind turbines with 261.9 MW of gross capacity were in operation in Marburg-Biedenkopf (Hessen) as of 2026-11-05, with a further 59 units (357.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Marburg-Biedenkopf?
- 98 wind turbines with 261.9 MW of gross capacity were in operation in Marburg-Biedenkopf as of 2026-11-05, with a further 59 units (357.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Marburg-Biedenkopf in 2025?
- 4 wind turbines with 11.4 MW went into operation in Marburg-Biedenkopf in 2025; the strongest year of the last two decades was 2017 with 72.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Marburg-Biedenkopf?
- JUWI GmbH operates 7 wind turbines with 42.0 MW in Marburg-Biedenkopf, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Marburg-Biedenkopf?
- ENERCON GmbH leads with 66 wind turbines and 226.3 MW in Marburg-Biedenkopf (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Marburg-Biedenkopf?
- The largest registered wind turbine in Marburg-Biedenkopf has 7.00 MW of gross capacity and is operated by INNEXIS Marburg GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Marburg-Biedenkopf distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 4 | 0.00 MW | 2 | 1 |
| over 100 kW | 161 | 625.0 MW | 96 | 58 |
How much wind power capacity was commissioned in Marburg-Biedenkopf each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 8 | 44.9 MW |
| 2025 | 4 | 11.4 MW |
| 2022 | 1 | 3.30 MW |
| 2017 | 26 | 72.8 MW |
| 2016 | 13 | 36.1 MW |
| 2015 | 12 | 34.5 MW |
| 2014 | 6 | 11.1 MW |
| 2013 | 3 | 7.85 MW |
| 2012 | 7 | 16.1 MW |
| 2011 | 1 | 3.05 MW |
| 2010 | 3 | 6.90 MW |
| 2007 | 5 | 4.00 MW |
| 2006 | 6 | 5.10 MW |
How many wind turbines in Marburg-Biedenkopf are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 59 | 357.4 MW |
| in operation | 98 | 261.9 MW |
| permanently decommissioned | 8 | 5.70 MW |
Which wind turbines are registered in Marburg-Biedenkopf?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| KE2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | INNEXIS Marburg GmbH |
| WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windpark GmbH & Co. Hemmerich KG |
| KE1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | INNEXIS Marburg GmbH |
| PH3 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | INNEXIS Marburg GmbH |
| PH4 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | INNEXIS Marburg GmbH |
| PH2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | INNEXIS Marburg GmbH |
| PH1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | INNEXIS Marburg GmbH |
| WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windpark GmbH & Co. Hemmerich KG |
| WEA 04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark GmbH & Co. Hemmerich KG |
| Langenstein WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Alterric Windpark Langenstein GmbH & Co. KG |
| WEA Eichwald 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Sichertshausen GmbH & Co. KG Umweltgerechte Energie |
| WEA 6 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Repowering Sonnblick GmbH & Co. KG |
| Langenstein WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Alterric Windpark Langenstein GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Repowering Sonnblick GmbH & Co. KG |
| WEA Eichwald 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Sichertshausen GmbH & Co. KG Umweltgerechte Energie |
| Langenstein WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Alterric Windpark Langenstein GmbH & Co. KG |
| WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Repowering Sonnblick GmbH & Co. KG |
| WEA Eichwald 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Sichertshausen GmbH & Co. KG Umweltgerechte Energie |
| WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Repowering Sonnblick GmbH & Co. KG |
| Langenstein WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Alterric Windpark Langenstein GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Repowering Sonnblick GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Repowering Sonnblick GmbH & Co. KG |
| WP Leidenhofen - WEA 08 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | wpd Windpark Nr. 694 GmbH & Co. KG |
| WP Leidenhofen - WEA 01-L | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | wpd Windpark Nr. 694 GmbH & Co. KG |
| WP Leidenhofen - WEA 02-L | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | wpd Windpark Nr. 694 GmbH & Co. KG |
| Ebsdorfergrund WEA 10 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Ebsdorfergrund WEA 06 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Ebsdorfergrund WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Ebsdorfergrund WEA 05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Ebsdorfergrund WEA 09 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Ebsdorfergrund WEA 11 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Ebsdorfergrund WEA 03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| WEA Niederasphe 01 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-01-27 | Windenergie Niederasphe GmbH & Co. KG |
| WEA Niederasphe 05 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-02-05 | Windenergie Niederasphe GmbH & Co. KG |
| WEA Niederasphe 06 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| Warthstrauch WEA 02 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| Warthstrauch WEA 03 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 1 | 5.70 MW | Nordex SE | planned | planned 2028 | Windpark Hassenhausen 2 GmbH & Co. KG |
| WEA Niederasphe 02 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-12-18 | Windenergie Niederasphe GmbH & Co. KG |
| WEA Ebsdorfergrund | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | VERBUND Green Power Deutschland GmbH |
| WEA 2 | 5.70 MW | Nordex SE | planned | planned 2028 | Windpark Hassenhausen 2 GmbH & Co. KG |
| WEA Niederasphe 03 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-12-11 | Windenergie Niederasphe GmbH & Co. KG |
| Warthstrauch WEA 04 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA Niederasphe 04 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-02-19 | Windenergie Niederasphe GmbH & Co. KG |
| WEA Görzhausen 01 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Marbach GmbH & Co. KG Umweltgerechte Energie |
| WEA 11 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | wpd Windpark Dreihausen GmbH & Co. KG |
| WEA 10 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | wpd Windpark Dreihausen GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | in operation | 2026-05-19 | Windpark Hopfenberg GmbH |
| WEA 3 | 5.56 MW | ENERCON GmbH | in operation | 2026-04-01 | Windpark Hopfenberg GmbH |
| WP Dreiherrenstein - WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Rudewig Windpower - Michael Rudewig |
| Stocksol WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Stocksol GmbH |
| WP Dreiherrenstein - WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Rudewig Windpower - Michael Rudewig |
| WP Dreiherrenstein - WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Rudewig Windpower - Michael Rudewig |
| Stocksol WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Stocksol GmbH |
| Stocksol WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Stocksol GmbH |
| WEA 4 | 5.56 MW | ENERCON GmbH | in operation | 2026-03-19 | Windpark Hopfenberg GmbH |
| Erweiterung WP Rauschenberg | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Krug Immobilien GmbH & Co. KG |
| WEA Trillrodt | 5.56 MW | ENERCON GmbH | in operation | 2026-05-29 | Windpark Trillrodt GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2026-03-05 | Windpark Hopfenberg GmbH |
| WP Dreiherrenstein - WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Rudewig Windpower - Michael Rudewig |
| WP Dreiherrenstein - WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Rudewig Windpower - Michael Rudewig |
| Stocksol WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Stocksol GmbH |
| WP Herzhausen WEA 06 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | PNE AG |
| WP Herzhausen WEA 08 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2025 | PNE AG |
| WP Herzhausen WEA 07 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | PNE AG |
| WP Herzhausen WEA 03 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | PNE AG |
| WP Herzhausen WEA 01 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | PNE AG |
| WP Herzhausen WEA 02 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | PNE AG |
| WEA 11 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2022-04-12 | Boxbach Energy GmbH & Co. KG |
| WP LDBM - 1150159 - WEA 3 | 3.05 MW | ENERCON GmbH | in operation | 2015-12-17 | Windpark Lahn-Dill-Bergland-Mitte GmbH |
| Windpark Hilsberg - WEA 1 - 1010758 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-26 | Gemeinde Bad Endbach |
| WP LDBM - 1150158 - WEA 2 | 3.05 MW | ENERCON GmbH | in operation | 2015-12-28 | Windpark Lahn-Dill-Bergland-Mitte GmbH |
| Windpark Hilsberg - WEA 2 - 1010759 | 3.05 MW | ENERCON GmbH | in operation | 2015-01-13 | Gemeinde Bad Endbach |
| Windpark Hilsberg - WEA 4 - 1010760 | 3.05 MW | ENERCON GmbH | in operation | 2015-02-26 | Gemeinde Bad Endbach |
| WEA 4 | 3.05 MW | ENERCON GmbH | in operation | 2011-09-30 | Strauch & Strauch GmbH & Co. KG |
| WEA 5 | 3.05 MW | ENERCON GmbH | in operation | 2013-11-06 | Strauch & Strauch GmbH & Co. KG |
| WP LDBM - 1150161 - WEA 6 | 3.05 MW | ENERCON GmbH | in operation | 2016-02-25 | Windpark Lahn-Dill-Bergland-Mitte GmbH |
| Windpark Hilsberg - WEA 6 - 1010762 | 3.05 MW | ENERCON GmbH | in operation | 2015-02-06 | Gemeinde Bad Endbach |
| Windpark Hilsberg - WEA 5 - 1010761 | 3.05 MW | ENERCON GmbH | in operation | 2015-01-09 | Gemeinde Bad Endbach |
| WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2015-10-10 | Mattenberg GmbH& Co. KG Energie |
| WEA 4 | 3.00 MW | Nordex Energy GmbH | in operation | 2017-12-14 | Windpark Hassenhausen GmbH & Co. KG |
| WP Mengsberger Wald - WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-22 | Bürgerwindenergieanlage Mengsberg eG |
| WEA 3 | 3.00 MW | Nordex Energy GmbH | in operation | 2017-09-26 | Windpark Hassenhausen GmbH & Co. KG |
| WEA3 | 3.00 MW | ENERCON GmbH | in operation | 2016-11-18 | Windpark Weißenberg |
| WP Mengsberger Wald - WEA 4 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-28 | Rudewig & Lompe Energie GbR |
| RACH 1 | 3.00 MW | ENERCON GmbH | in operation | 2017-11-08 | WP Rachelshausen GmbH & Co.KG |
| WP Mengsberger Wald - WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-24 | Rudewig Windpower - Michael Rudewig |
| WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2015-12-11 | Mattenberg GmbH& Co. KG Energie |
| WEA2 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-29 | Windpark Weißenberg |
| WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-28 | Windpark Rauschenberg |
| WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-30 | Windpark Rauschenberg |
| WP Mengsberger Wald - WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-09 | Rudewig & Lompe Energie GbR |
| WEA1 | 3.00 MW | ENERCON GmbH | in operation | 2016-11-30 | Windpark Weißenberg |
| RACH 3 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-20 | WP Rachelshausen GmbH & Co.KG |
| WEA6 | 3.00 MW | ENERCON GmbH | in operation | 2016-11-02 | Windpark Weißenberg |
| WEA 4 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-26 | Windpark Rauschenberg |
| RACH 2 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-04 | WP Rachelshausen GmbH & Co.KG |
| WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2015-11-12 | Mattenberg GmbH& Co. KG Energie |
| WEA4 | 3.00 MW | ENERCON GmbH | in operation | 2016-10-21 | Windpark Weißenberg |
| WEA 2 | 3.00 MW | Nordex Energy GmbH | in operation | 2017-12-21 | Windpark Hassenhausen GmbH & Co. KG |
| WEA5 | 3.00 MW | ENERCON GmbH | in operation | 2016-11-09 | Windpark Weißenberg |
| WEA 5 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-20 | Windpark Rauschenberg |
| WEA 1 | 3.00 MW | Nordex Energy GmbH | in operation | 2017-12-29 | Windpark Hassenhausen GmbH & Co. KG |
| WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2017-05-30 | Windpark Rauschenberg |
| GE_27170121, W875 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-10-21 | Windpark Amöneburg-Roßdorf II GmbH & Co. KG |
| GE_27170120, W874 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-09-29 | Windpark Amöneburg-Roßdorf II GmbH & Co. KG |
| Amöneburg WEA GE28150059 (04) | 2.53 MW | GE Renewable Germany GmbH | in operation | 2016-04-22 | CHORUS Wind Amöneburg GmbH & Co. KG |
| Amöneburg WEA GE28150060 (05) | 2.53 MW | GE Renewable Germany GmbH | in operation | 2016-03-31 | CHORUS Wind Amöneburg GmbH & Co. KG |
| Amöneburg WEA GE28150058 (03) | 2.53 MW | GE Renewable Germany GmbH | in operation | 2016-03-29 | CHORUS Wind Amöneburg GmbH & Co. KG |
| Amöneburg WEA GE28150062 (01) | 2.53 MW | GE Renewable Germany GmbH | in operation | 2016-03-30 | CHORUS Wind Amöneburg GmbH & Co. KG |
| Amöneburg WEA GE28150061 (06) | 2.53 MW | GE Renewable Germany GmbH | in operation | 2016-03-31 | CHORUS Wind Amöneburg GmbH & Co. KG |
| KIR WEA02 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-10-29 | EWI Kirchhain GmbH & Co. KG |
| CEE Mainova Kirchhain WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-12-28 | CEE Mainova WP Kirchhain GmbH & Co. KG |
| CEE Mainova Kirchhain WEA 4 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-01-30 | CEE Mainova WP Kirchhain GmbH & Co. KG |
| WEA6 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-06 | Windpark Schwarzenberg |
| WEA3 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-11-16 | Windpark Schwarzenberg |
| WEA8 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-06 | Windpark Schwarzenberg |
| KIR WEA01 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-10-21 | EWI Kirchhain GmbH & Co. KG |
| CEE Mainova Kirchhain WEA 3 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-01-29 | CEE Mainova WP Kirchhain GmbH & Co. KG |
| WEA2 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-18 | Windpark Schwarzenberg |
| KIR WEA03 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-10-30 | EWI Kirchhain GmbH & Co. KG |
| CEE Mainova Kirchhain WEA 5 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-02-06 | CEE Mainova WP Kirchhain GmbH & Co. KG |
| WEA1 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-18 | Windpark Schwarzenberg |
| WEA10 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-18 | Windpark Schwarzenberg |
| CEE Mainova Kirchhain WEA 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-12-29 | CEE Mainova WP Kirchhain GmbH & Co. KG |
| WEA9 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-11 | Windpark Schwarzenberg |
| WEA4 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-06 | Windpark Schwarzenberg |
| WEA7 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-06 | Windpark Schwarzenberg |
| WP Erksdorf - WEA 4 | 2.30 MW | ENERCON GmbH | in operation | 2012-04-10 | Rudewig Windpower Erksdorf - Michael Rudewig |
| WP Speckswinkel2 - WEA 1 | 2.30 MW | ENERCON GmbH | in operation | 2010-10-14 | Rudewig Windpower - Michael Rudewig |
| ERK WEA 01 | 2.30 MW | ENERCON GmbH | in operation | 2012-09-19 | ENTEGA Windpark Erksdorf |
| ERK WEA03 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-31 | ENTEGA Windpark Erksdorf |
| WP Erksdorf - WEA 2 | 2.30 MW | ENERCON GmbH | in operation | 2012-04-16 | Lompe Windpower Erksdorf |
| WP Erksdorf - WEA 3 | 2.30 MW | ENERCON GmbH | in operation | 2012-04-05 | Windenergie Erksdorf GbR |
| WP Speckswinkel2 - WEA 3 | 2.30 MW | ENERCON GmbH | in operation | 2010-10-17 | Lompe Windpower |
| ERK WEA02 | 2.30 MW | ENERCON GmbH | in operation | 2012-09-07 | ENTEGA Windpark Erksdorf |
| WP Speckswinkel2 - WEA 2 | 2.30 MW | ENERCON GmbH | in operation | 2010-10-11 | Windenergie Krückeberg GbR |
| WP Erksdorf - WEA 1 | 2.30 MW | ENERCON GmbH | in operation | 2012-04-05 | Windenergie Erksdorf GbR |
| WEA 2 - FL 259 | 1.50 MW | Fuhrländer AG | in operation | 2005-06-14 | Stadtwerke Marburg GmbH |
| WEA 3 - FL 258 | 1.50 MW | Fuhrländer AG | in operation | 2003-12-22 | Stadtwerke Marburg GmbH |
| WEA 1 | 1.00 MW | DeWind GmbH | in operation | 2003-10-23 | Oberhessische Versorgungsbetriebe AG |
| FL NEU | 1.00 MW | Fuhrländer AG | in operation | 2002-12-11 | BKB Windkraft Betriebs GmbH & Co.KG |
| WEA 2 | 1.00 MW | DeWind GmbH | in operation | 2003-10-31 | Oberhessische Versorgungsbetriebe AG |
| FL ALT | 1.00 MW | Fuhrländer AG | in operation | 1998-07-01 | BKB Windkraft Betriebs GmbH & Co.KG |
| WEA 3 | 1.00 MW | DeWind GmbH | in operation | 2003-10-31 | Oberhessische Versorgungsbetriebe AG |
| unit operated by a private individual | 0.85 MW | Frisia Windkraftanlagen Service GmbH | permanently decommissioned | 2006-11-17 | private individual |
| unit operated by a private individual | 0.85 MW | Frisia Windkraftanlagen Service GmbH | permanently decommissioned | 2006-11-17 | private individual |
| unit operated by a private individual | 0.85 MW | Frisia Windkraftanlagen Service GmbH | permanently decommissioned | 2006-11-17 | private individual |
| unit operated by a private individual | 0.85 MW | Frisia Windkraftanlagen Service GmbH | permanently decommissioned | 2006-11-17 | private individual |
| unit operated by a private individual | 0.85 MW | Frisia Windkraftanlagen Service GmbH | permanently decommissioned | 2006-11-17 | private individual |
| unit operated by a private individual | 0.85 MW | Frisia Windkraftanlagen Service GmbH | permanently decommissioned | 2006-11-17 | private individual |
| WP Speckswinkel1 - WEA 3 | 0.80 MW | ENERCON GmbH | in operation | 2007-07-19 | Rudewig Windpower - Michael Rudewig |
| WP Speckswinkel1 - WEA 2 | 0.80 MW | ENERCON GmbH | in operation | 2007-08-01 | J&W WINDPOWER GbR |
| WP Speckswinkel1 - WEA 1 | 0.80 MW | ENERCON GmbH | in operation | 2007-07-18 | Rudewig Windpower - Michael Rudewig |
| WP Speckswinkel1 - WEA 5 | 0.80 MW | ENERCON GmbH | in operation | 2007-08-13 | Lompe Windpower |
| WP Speckswinkel1 - WEA 4 | 0.80 MW | ENERCON GmbH | in operation | 2007-08-07 | Lompe Windpower |
| E53 MeusAir-Energy | 0.80 MW | ENERCON GmbH | in operation | 2014-07-23 | MeusAir-Energy Dirk und Rüdiger Meuser GbR |
| WKAHirzenhain | 0.80 MW | Fuhrländer AG | in operation | 1997-09-01 | Klein & Hermann GbR |
| WEA 3 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 2003-12-06 | K. Strauch Windenergie |
| WEA Speckswinkel | 0.60 MW | ENERCON GmbH | in operation | 2005-02-24 | Windenergie Speckswinkel GbR |
| unit operated by a private individual | 0.60 MW | Sonstige | permanently decommissioned | 2003-12-11 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | planned | planned 2026 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2025-12-08 | private individual |
| unit operated by a private individual | 0.00 MW | WSD - Windsysteme | permanently decommissioned | 2014-12-01 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2025-01-27 | private individual |
Which organisations operate the most wind power capacity in Marburg-Biedenkopf?
| Operator | Units | Capacity |
|---|---|---|
| JUWI GmbH | 7 | 42.0 MW |
| INNEXIS Marburg GmbH | 6 | 42.0 MW |
| EE Repowering Sonnblick GmbH & Co. KG | 6 | 40.8 MW |
| Rudewig Windpower - Michael Rudewig | 9 | 34.7 MW |
| PNE AG | 6 | 33.0 MW |
| Windenergie Niederasphe GmbH & Co. KG | 5 | 28.5 MW |
| Alterric Windpark Langenstein GmbH & Co. KG | 4 | 27.2 MW |
| Windpark Hopfenberg GmbH | 4 | 22.2 MW |
| Windpark Stocksol GmbH | 4 | 22.2 MW |
| Windpark Schwarzenberg | 9 | 21.6 MW |
Which manufacturer accounts for the most wind power capacity in Marburg-Biedenkopf?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 66 | 226.3 MW |
| Nordex Germany GmbH | 23 | 145.4 MW |
| Nordex Energy GmbH | 28 | 100.5 MW |
| Vestas Deutschland GmbH | 13 | 75.1 MW |
| GE Wind Energy GmbH | 8 | 38.6 MW |
| GE Renewable Germany GmbH | 5 | 12.7 MW |
| Nordex SE | 2 | 11.4 MW |
| Fuhrländer AG | 5 | 5.80 MW |
| Frisia Windkraftanlagen Service GmbH | 6 | 5.10 MW |
| DeWind GmbH | 3 | 3.00 MW |
Wind power in Hessen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Marburg-Biedenkopf (Hessen), and how large are th can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.