Germany · renewables
Wind power in Lahn-Dill-Kreis
73 wind turbines with 171.1 MW of gross capacity were in operation in Lahn-Dill-Kreis (Hessen) as of 2026-11-05, with a further 8 units (47.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Lahn-Dill-Kreis (Hessen), and how large are they, as of 2026-11-05?
- 73 wind turbines with 171.1 MW of gross capacity were in operation in Lahn-Dill-Kreis (Hessen) as of 2026-11-05, with a further 8 units (47.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Lahn-Dill-Kreis?
- 73 wind turbines with 171.1 MW of gross capacity were in operation in Lahn-Dill-Kreis as of 2026-11-05, with a further 8 units (47.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Lahn-Dill-Kreis in 2025?
- 3 wind turbines with 13.5 MW went into operation in Lahn-Dill-Kreis in 2025; the strongest year of the last two decades was 2013 with 42.1 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Lahn-Dill-Kreis?
- ENTEGA AG operates 4 wind turbines with 22.5 MW in Lahn-Dill-Kreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Lahn-Dill-Kreis?
- ENERCON GmbH leads with 34 wind turbines and 103.3 MW in Lahn-Dill-Kreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Lahn-Dill-Kreis?
- The largest registered wind turbine in Lahn-Dill-Kreis has 6.10 MW of gross capacity and is operated by ENTEGA AG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Lahn-Dill-Kreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 80 | 218.1 MW | 72 | 8 |
How much wind power capacity was commissioned in Lahn-Dill-Kreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 3 | 13.5 MW |
| 2024 | 2 | 8.40 MW |
| 2023 | 3 | 12.6 MW |
| 2021 | 1 | 2.78 MW |
| 2017 | 7 | 20.1 MW |
| 2016 | 1 | 3.00 MW |
| 2015 | 8 | 24.4 MW |
| 2014 | 2 | 6.10 MW |
| 2013 | 17 | 42.1 MW |
| 2012 | 6 | 12.0 MW |
| 2011 | 5 | 12.1 MW |
| 2009 | 1 | 0.80 MW |
| 2006 | 1 | 0.80 MW |
How many wind turbines in Lahn-Dill-Kreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 73 | 171.1 MW |
| planned | 8 | 47.0 MW |
Which wind turbines are registered in Lahn-Dill-Kreis?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| HAI3-WEA10 | 6.10 MW | ENERCON GmbH | planned | planned 2027 | ENTEGA AG |
| HAI3-WEA09 | 6.10 MW | ENERCON GmbH | planned | planned 2027 | ENTEGA AG |
| HAI3-WEA08 | 6.10 MW | ENERCON GmbH | planned | planned 2027 | ENTEGA AG |
| WEA 2 Windpark Arborn | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Arborn GmbH |
| WEA 1 Windpark Arborn | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Arborn GmbH |
| WEA03 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Siegfriedeiche Nord GmbH & Co. KG |
| WEA 2 Windpark Galgenberg | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windpark Galgenberg GmbH |
| WEA 1 Windpark Galgenberg | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windpark Galgenberg GmbH |
| Qair WP Altenschlag GmbH & Co. KG WEA 3 | 4.50 MW | Nordex Germany GmbH | in operation | 2025-06-11 | Qair WP Altenschlag GmbH & Co. KG |
| Qair WP Altenschlag GmbH & Co. KG WEA 1 | 4.50 MW | Nordex Germany GmbH | in operation | 2025-06-11 | Qair WP Altenschlag GmbH & Co. KG |
| Qair WP Altenschlag GmbH & Co. KG WEA 2 | 4.50 MW | Nordex Germany GmbH | in operation | 2025-06-11 | Qair WP Altenschlag GmbH & Co. KG |
| Windpark Blasbach WEA 1 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-02-22 | Windenergiepark Wetzlar GmbH |
| Windpark Blasbach WEA 2 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-02-22 | Windenergiepark Wetzlar GmbH |
| 1381015 | 4.20 MW | ENERCON GmbH | in operation | 2023-09-19 | Windpark GmbH & Co. Leun KG |
| 1381014 | 4.20 MW | ENERCON GmbH | in operation | 2023-07-28 | Windpark GmbH & Co. Leun KG |
| HAI2 - WEA 07 | 4.20 MW | ENERCON GmbH | in operation | 2023-09-05 | ENTEGA AG |
| V 219509-01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-08-31 | Windpark Odersberg GmbH & Co. KG |
| AVIA Windpark Haiger-Dillbrecht GmbH&Co.KG WEA 02 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-12-17 | AVIA Windpark Haiger-Dillbrecht GmbH&Co.KG |
| AVIA Windpark Haiger-Dillbrecht GmbH&Co.KG | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-12-16 | AVIA Windpark Haiger-Dillbrecht GmbH&Co.KG |
| AVIA Windpark Haiger-Dillbrecht GmbH&Co.KG WEA 03 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-12-22 | AVIA Windpark Haiger-Dillbrecht GmbH&Co.KG |
| WP LDBM - 1150157 - WEA 1 | 3.05 MW | ENERCON GmbH | in operation | 2015-12-31 | Windpark Lahn-Dill-Bergland-Mitte GmbH |
| WP LDBM - 1150163 - WEA 8 | 3.05 MW | ENERCON GmbH | in operation | 2015-12-23 | Windpark Lahn-Dill-Bergland-Mitte GmbH |
| WEA3 | 3.05 MW | ENERCON GmbH | in operation | 2013-12-19 | Windpark Knoten |
| WEA1 | 3.05 MW | ENERCON GmbH | in operation | 2014-01-23 | Windpark Knoten |
| WEA4 | 3.05 MW | ENERCON GmbH | in operation | 2013-12-19 | Windpark Knoten |
| WP LDBM - 1150162 - WEA 7 | 3.05 MW | ENERCON GmbH | in operation | 2015-12-30 | Windpark Lahn-Dill-Bergland-Mitte GmbH |
| E-101 | 3.05 MW | ENERCON GmbH | in operation | 2014-03-16 | K & N GbR |
| WP LDBM - 1150160 - WEA 5 | 3.05 MW | ENERCON GmbH | in operation | 2015-12-28 | Windpark Lahn-Dill-Bergland-Mitte GmbH |
| WEA2 | 3.05 MW | ENERCON GmbH | in operation | 2013-12-23 | Windpark Knoten |
| WEA2 | 3.00 MW | ENERCON GmbH | in operation | 2016-03-04 | Windpark Hemmrain |
| WEA1 | 3.00 MW | ENERCON GmbH | in operation | 2015-12-31 | Windpark Hemmrain |
| WP Aßlar WEA 4 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2017-05-31 | CEE Windpark Aßlar GmbH & Co. KG |
| WP Aßlar WEA 5 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2017-05-31 | CEE Windpark Aßlar GmbH & Co. KG |
| WP Aßlar WEA 6 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2017-03-25 | CEE Windpark Aßlar GmbH & Co. KG |
| WP Aßlar WEA 2 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2017-04-25 | CEE Windpark Aßlar GmbH & Co. KG |
| WP Aßlar WEA 3 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2017-05-31 | CEE Windpark Aßlar GmbH & Co. KG |
| BB03-GE-27191188 | 2.78 MW | GE Wind Energy GmbH | in operation | 2021-04-29 | MVV Windenergie GmbH |
| WP Aßlar WEA 1 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2017-04-25 | CEE Windpark Aßlar GmbH & Co. KG |
| Windpark Siegbach WEA03 | 2.50 MW | Nordex Energy GmbH | in operation | 2011-12-01 | Mainova Windpark Siegbach GmbH & Co. KG |
| Windpark Siegbach WEA01 | 2.50 MW | Nordex Energy GmbH | in operation | 2011-12-01 | Mainova Windpark Siegbach GmbH & Co. KG |
| Windpark Siegbach WEA02 | 2.50 MW | Nordex Energy GmbH | in operation | 2011-12-01 | Mainova Windpark Siegbach GmbH & Co. KG |
| Windpark Hohenahr WEA05 | 2.40 MW | Nordex SE | in operation | 2013-01-12 | Mainova Gemeinschaftswindpark Hohenahr GmbH & Co. KG |
| Windpark Hohenahr WEA04 | 2.40 MW | Nordex SE | in operation | 2012-12-13 | Mainova Gemeinschaftswindpark Hohenahr GmbH & Co. KG |
| Windpark Hohenahr WEA07 | 2.40 MW | Nordex SE | in operation | 2013-01-27 | Mainova Gemeinschaftswindpark Hohenahr GmbH & Co. KG |
| Windpark Hohenahr WEA06 | 2.40 MW | Nordex SE | in operation | 2012-12-06 | Mainova Gemeinschaftswindpark Hohenahr GmbH & Co. KG |
| WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-08-22 | Windpark Frohnhausen |
| Windpark Hohenahr WEA03 | 2.40 MW | Nordex SE | in operation | 2012-12-21 | Mainova Gemeinschaftswindpark Hohenahr GmbH & Co. KG |
| Windpark Hohenahr WEA02 | 2.40 MW | Nordex SE | in operation | 2012-12-30 | Mainova Gemeinschaftswindpark Hohenahr GmbH & Co. KG |
| WEA 4 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-08-23 | Windpark Frohnhausen |
| Windpark Hohenahr WEA01 | 2.40 MW | Nordex SE | in operation | 2012-11-28 | Mainova Gemeinschaftswindpark Hohenahr GmbH & Co. KG |
| WEA 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-07-26 | Windpark Frohnhausen |
| WEA 5 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-07-12 | Windpark Frohnhausen |
| WEA 6 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-08-01 | Windpark Frohnhausen |
| WEA 3 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-07-19 | Windpark Frohnhausen |
| WKA Würz | 2.30 MW | ENERCON GmbH | in operation | 2011-04-29 | Würz Fertigungstechnik GmbH |
| HAI WEA 06 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2013-03-07 | ENTEGA Windpark Haiger GmbH & Co. KG |
| 823417 | 2.30 MW | ENERCON GmbH | in operation | 2011-03-28 | Erhard und Ulrich Theis GbR |
| HAI WEA 04 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2013-01-08 | ENTEGA Windpark Haiger GmbH & Co. KG |
| HAI WEA 03 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2013-01-31 | ENTEGA Windpark Haiger GmbH & Co. KG |
| HAI WEA 05 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2013-03-16 | ENTEGA Windpark Haiger GmbH & Co. KG |
| HAI WEA 01 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2013-04-08 | ENTEGA Windpark Haiger GmbH & Co. KG |
| HAI WEA 02 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2013-03-27 | ENTEGA Windpark Haiger GmbH & Co. KG |
| Schelder Wald WEA 1 | 1.50 MW | Enron Wind GmbH | in operation | 2001-09-13 | energy 20+ Gmbh |
| Schelder Wald WEA 2 | 1.50 MW | Enron Wind GmbH | in operation | 2001-09-26 | energy 20+ Gmbh |
| Schelder Wald WEA 3 | 1.50 MW | Enron Wind GmbH | in operation | 2001-10-17 | energy 20+ Gmbh |
| unit operated by a private individual | 1.00 MW | Nordex Energy GmbH | in operation | 1997-02-13 | private individual |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2006-01-10 | private individual |
| unit operated by a private individual | 0.80 MW | Fuhrländer AG | in operation | 1997-07-01 | private individual |
| E-53 | 0.80 MW | ENERCON GmbH | in operation | 2009-01-23 | Walburga Kranz Energieerzeugung WEA Kranz 2 |
| unit operated by a private individual | 0.75 MW | Fuhrländer AG | in operation | 1997-10-01 | private individual |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1995-11-21 | private individual |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1995-11-01 | private individual |
| ENERCON E-44 | 0.60 MW | ENERCON GmbH | in operation | 2001-07-12 | HH-Erneuerbare Energien Projekt GmbH |
| GEMBRETT 3 | 0.50 MW | ENERCON GmbH | in operation | 1998-05-29 | K & N GbR |
| 41204 | 0.50 MW | ENERCON GmbH | in operation | 1998-03-13 | Erhard und Ulrich Theis GbR |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1997-02-27 | private individual |
| E_40943, WE04 | 0.50 MW | ENERCON GmbH | in operation | 1997-07-04 | WP6 Hohenlohe GmbH |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1995-01-17 | private individual |
| GEMBRETT 2 | 0.50 MW | ENERCON GmbH | in operation | 1998-05-29 | K & N GbR |
| GEMBRETT 1 | 0.50 MW | ENERCON GmbH | in operation | 1998-05-20 | K & N GbR |
| unit operated by a private individual | 0.00 MW | Honeywell Windtronics | in operation | 2012-12-11 | private individual |
Which organisations operate the most wind power capacity in Lahn-Dill-Kreis?
| Operator | Units | Capacity |
|---|---|---|
| ENTEGA AG | 4 | 22.5 MW |
| Mainova Gemeinschaftswindpark Hohenahr GmbH & Co. KG | 7 | 16.8 MW |
| CEE Windpark Aßlar GmbH & Co. KG | 6 | 16.7 MW |
| Windpark Frohnhausen | 6 | 14.4 MW |
| ENTEGA Windpark Haiger GmbH & Co. KG | 6 | 13.8 MW |
| Qair WP Altenschlag GmbH & Co. KG | 3 | 13.5 MW |
| Windpark Knoten | 4 | 12.2 MW |
| Windpark Lahn-Dill-Bergland-Mitte GmbH | 4 | 12.2 MW |
| Windpark Arborn GmbH | 2 | 12.0 MW |
| Windpark Galgenberg GmbH | 2 | 11.1 MW |
Which manufacturer accounts for the most wind power capacity in Lahn-Dill-Kreis?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 34 | 103.3 MW |
| Nordex Energy GmbH | 10 | 22.9 MW |
| Vestas Deutschland GmbH | 6 | 21.1 MW |
| Nordex SE | 7 | 16.8 MW |
| GE Renewable Germany GmbH | 6 | 16.7 MW |
| Siemens Wind Power GmbH & Co. KG | 6 | 13.8 MW |
| Nordex Germany GmbH | 3 | 13.5 MW |
| Enron Wind GmbH | 3 | 4.50 MW |
| GE Wind Energy GmbH | 1 | 2.78 MW |
| Fuhrländer AG | 2 | 1.55 MW |
Wind power in Hessen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Lahn-Dill-Kreis (Hessen), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.