Germany · renewables
Wind power in Kassel
137 wind turbines with 292.0 MW of gross capacity were in operation in Kassel (Hessen) as of 2026-11-05, with a further 48 units (290.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Kassel (Hessen), and how large are they, as of 2026-11-05?
- 137 wind turbines with 292.0 MW of gross capacity were in operation in Kassel (Hessen) as of 2026-11-05, with a further 48 units (290.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Kassel?
- 137 wind turbines with 292.0 MW of gross capacity were in operation in Kassel as of 2026-11-05, with a further 48 units (290.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Kassel in 2024?
- 2 wind turbines with 11.1 MW went into operation in Kassel in 2024; the strongest year of the last two decades was 2016 with 41.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Kassel?
- UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie operates 9 wind turbines with 61.2 MW in Kassel, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Kassel?
- ENERCON GmbH leads with 80 wind turbines and 226.4 MW in Kassel (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Kassel?
- The largest registered wind turbine in Kassel has 7.20 MW of gross capacity and is operated by Windpark Bad Karlshafen GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Kassel distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 5 | 0.02 MW | 4 | 0 |
| 30 to 100 kW | 1 | 0.10 MW | 1 | 0 |
| over 100 kW | 202 | 597.8 MW | 132 | 48 |
How much wind power capacity was commissioned in Kassel each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 11 | 68.1 MW |
| 2024 | 2 | 11.1 MW |
| 2022 | 1 | 2.75 MW |
| 2021 | 1 | 0.00 MW |
| 2020 | 3 | 10.3 MW |
| 2018 | 10 | 28.0 MW |
| 2017 | 5 | 12.4 MW |
| 2016 | 14 | 41.8 MW |
| 2015 | 13 | 28.0 MW |
| 2014 | 7 | 20.8 MW |
| 2013 | 6 | 15.4 MW |
| 2012 | 1 | 0.00 MW |
| 2011 | 2 | 1.60 MW |
| 2009 | 4 | 6.00 MW |
| 2007 | 13 | 17.6 MW |
| 2006 | 3 | 2.40 MW |
How many wind turbines in Kassel are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 137 | 292.0 MW |
| planned | 48 | 290.1 MW |
| permanently decommissioned | 20 | 13.4 MW |
| temporarily shut down | 3 | 2.32 MW |
Which wind turbines are registered in Kassel?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WP Bad Karlshafen - WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Bad Karlshafen GmbH & Co. KG |
| WP Bad Karlshafen - WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Bad Karlshafen GmbH & Co. KG |
| UDH01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | VSB Windpark Udenhausen GmbH & Co. KG |
| WP Bad Karlshafen - WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Bad Karlshafen GmbH & Co. KG |
| WP Bad Karlshafen - WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Bad Karlshafen GmbH & Co. KG |
| TRE II 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | WindStrom Trendelburg II GmbH & Co. KG |
| WPS-11 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Stiftswald GmbH & Co. KG |
| TRE II 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | WindStrom Trendelburg II GmbH & Co. KG |
| WPS-12 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Stiftswald GmbH & Co. KG |
| WPS-10 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Stiftswald GmbH & Co. KG |
| WEA Hombressen P05 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-06 | UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie |
| WEA Hombressen HF 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie |
| WEA Hombressen P01 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-05 | UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie |
| WKA 1 Rappenhagen | 6.80 MW | Vestas Deutschland GmbH | planned | planned 2028 | Statkraft Windpark Rappenhagen GmbH & Co. KG |
| WEA Hombressen HF 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie |
| WKA 4 Rappenhagen | 6.80 MW | Vestas Deutschland GmbH | planned | planned 2028 | Statkraft Windpark Rappenhagen GmbH & Co. KG |
| WKA 6 Rappenhagen | 6.80 MW | Vestas Deutschland GmbH | planned | planned 2028 | Statkraft Windpark Rappenhagen GmbH & Co. KG |
| WKA 5 Rappenhagen | 6.80 MW | Vestas Deutschland GmbH | planned | planned 2028 | Statkraft Windpark Rappenhagen GmbH & Co. KG |
| WEA Hombressen HF 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie |
| WKA 2 Rappenhagen | 6.80 MW | Vestas Deutschland GmbH | planned | planned 2028 | Statkraft Windpark Rappenhagen GmbH & Co. KG |
| WKA 3 Rappenhagen | 6.80 MW | Vestas Deutschland GmbH | planned | planned 2028 | Statkraft Windpark Rappenhagen GmbH & Co. KG |
| WEA Hombressen P06 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-05 | UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie |
| WEA Hombressen HF 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie |
| WEA Hombressen P02 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-05 | UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie |
| WEA Hombressen P04 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-06 | UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie |
| SCG_01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VSB Windpark Schlüsselgrund GmbH & Co. KG |
| SCG_04 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VSB Windpark Schlüsselgrund GmbH & Co. KG |
| WP Heisebeck WEA 1 (HSB01) | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | EnBW Windkraftprojekte GmbH |
| WEA 7 RB 2.0 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Stadtwerke Wolfhagen GmbH |
| WEA 01 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | WE Breuna GmbH & Co. KG |
| WEA 4 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-04-28 | innoVent WP Breuna |
| WEA 1 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-04-28 | innoVent WP Breuna |
| WEA S2 | 5.70 MW | Nordex SE | planned | planned 2027 | innoVent WP Staufenberg |
| WEA S1 | 5.70 MW | Nordex SE | planned | planned 2027 | innoVent WP Staufenberg |
| WEA 5 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-05-06 | innoVent WP Breuna |
| WEA S3 | 5.70 MW | Nordex SE | planned | planned 2027 | innoVent WP Staufenberg |
| WEA 2 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-04-28 | innoVent WP Breuna |
| WEA 3 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-04-28 | innoVent WP Breuna |
| WEA 3 Wolfhagen-Istha | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Bürgerwindpark Wolfhagen-Istha GmbH & Co. KG |
| WEA 8 Wolfhagen-Istha | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark GmbH & Co. Wolfhagen KG |
| WEA B2 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark Wettesingen GmbH & Co. KG |
| WEA 02 | 5.56 MW | ENERCON GmbH | in operation | 2026-10-27 | WE Breuna GmbH & Co. KG |
| WEA 04 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | WE Breuna GmbH & Co. KG |
| WEA 6 Wolfhagen-Istha | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark GmbH & Co. Wolfhagen KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2024-10-21 | Windpark Bratberg GmbH |
| WEA 5 Wolfhagen-Istha | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Bürgerwindpark Wolfhagen-Istha GmbH & Co. KG |
| WEA 7 Wolfhagen-Istha | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark GmbH & Co. Wolfhagen KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | in operation | 2024-09-17 | Windpark Bratberg GmbH |
| WEA 1 Wolfhagen-Istha | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Bürgerwindpark Wolfhagen-Istha GmbH & Co. KG |
| WEA 4 Wolfhagen-Istha | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Bürgerwindpark Wolfhagen-Istha GmbH & Co. KG |
| WEA 9 Wolfhagen-Istha | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark GmbH & Co. Wolfhagen KG |
| WEA 2 Wolfhagen-Istha | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Bürgerwindpark Wolfhagen-Istha GmbH & Co. KG |
| WEA A1 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark Wettesingen GmbH & Co. KG |
| WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | WE Breuna GmbH & Co. KG |
| WP Bratberg, WEA3 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | EAM Natur Energie GmbH |
| TRE II 3 | 4.50 MW | Nordex Energy GmbH | planned | planned 2027 | WindStrom Trendelburg II GmbH & Co. KG |
| WEA A2 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windpark Wettesingen GmbH & Co. KG |
| WEA 6 RB 2.0 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Stadtwerke Wolfhagen GmbH |
| WEA B1 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windpark Wettesingen GmbH & Co. KG |
| Hoppe 64 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Hoppe & Dietz GbR |
| WEA 5 RB 2.0 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Stadtwerke Wolfhagen GmbH |
| 229518 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-01-28 | Bürger Windpark Trendelburg GmbH & Co. KG |
| 229516 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-01-28 | Bürger Windpark Trendelburg GmbH & Co. KG |
| 229517 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-01-28 | Bürger Windpark Trendelburg GmbH & Co. KG |
| 85527 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-21 | Energiepark Mittelberg GmbH & Co. KG |
| 85531 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-27 | Energiepark Mittelberg GmbH & Co. KG |
| 85530 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-28 | Energiepark Mittelberg GmbH & Co. KG |
| 85528 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-21 | Energiepark Mittelberg GmbH & Co. KG |
| 85529 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-20 | Energiepark Mittelberg GmbH & Co. KG |
| 85532 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-29 | Energiepark Mittelberg GmbH & Co. KG |
| 85533 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-29 | Energiepark Mittelberg GmbH & Co. KG |
| Sö-02 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-12-21 | Windpark Söhrewald/Niestetal GmbH & Co. KG |
| Sö-01 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-12-17 | Windpark Söhrewald/Niestetal GmbH & Co. KG |
| Ni-01 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-02-06 | Windpark Söhrewald/Niestetal GmbH & Co. KG |
| Sö-04 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-12-16 | Windpark Söhrewald/Niestetal GmbH & Co. KG |
| Sö-05 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-12-16 | Windpark Söhrewald/Niestetal GmbH & Co. KG |
| Sö-03 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-12-20 | Windpark Söhrewald/Niestetal GmbH & Co. KG |
| Ni-02 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-01-31 | Windpark Söhrewald/Niestetal GmbH & Co. KG |
| Wind Wolfhagen GmbH 1 | 3.05 MW | ENERCON GmbH | in operation | 2014-12-18 | Wind Wolfhagen GmbH |
| Wind Wolfhagen GmbH 3 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-26 | Wind Wolfhagen GmbH |
| Wind Wolfhagen GmbH 4 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-20 | Wind Wolfhagen GmbH |
| Wind Wolfhagen GmbH 2 | 3.05 MW | ENERCON GmbH | in operation | 2014-12-02 | Wind Wolfhagen GmbH |
| WPS-06 | 3.00 MW | ENERCON GmbH | in operation | 2016-08-17 | Windpark Stiftswald GmbH & Co. KG |
| HAU WEA 01 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-13 | ENTEGA Windpark Hausfirste |
| WPS-08 | 3.00 MW | ENERCON GmbH | in operation | 2016-08-25 | Windpark Stiftswald GmbH & Co. KG |
| WPS-05 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-28 | Windpark Stiftswald GmbH & Co. KG |
| WPS-02 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-13 | Windpark Stiftswald GmbH & Co. KG |
| WPR-04 | 3.00 MW | ENERCON GmbH | in operation | 2015-12-23 | Windpark Rohrberg GmbH & Co. KG |
| WPS-07 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-02 | Windpark Stiftswald GmbH & Co. KG |
| WPR-05 | 3.00 MW | ENERCON GmbH | in operation | 2016-03-10 | Windpark Rohrberg GmbH & Co. KG |
| WPS-09 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-29 | Windpark Stiftswald GmbH & Co. KG |
| WPS-04 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-29 | Windpark Stiftswald GmbH & Co. KG |
| HAU WEA 04 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-30 | ENTEGA Windpark Hausfirste |
| WPR-01 | 3.00 MW | ENERCON GmbH | in operation | 2016-03-18 | Windpark Rohrberg GmbH & Co. KG |
| WPR-03 | 3.00 MW | ENERCON GmbH | in operation | 2015-12-30 | Windpark Rohrberg GmbH & Co. KG |
| WPR-02 | 3.00 MW | ENERCON GmbH | in operation | 2015-11-17 | Windpark Rohrberg GmbH & Co. KG |
| WPS-01 | 3.00 MW | ENERCON GmbH | in operation | 2016-09-28 | Windpark Stiftswald GmbH & Co. KG |
| WPS-03 | 3.00 MW | ENERCON GmbH | in operation | 2016-08-23 | Windpark Stiftswald GmbH & Co. KG |
| WEA Deiselberg | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-12-28 | Nordhessenwind GmbH & Co. KG |
| Hoppe 60 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-03-23 | Hoppe und Dietz GmbH und Co.KG |
| Hoppe 63 | 2.75 MW | GE Wind Energy GmbH | in operation | 2022-11-15 | Hoppe und Dietz GmbH und Co.KG |
| WEA 02 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-01-22 | Windpark Lindenberg GmbH & Co. KG |
| WEA 05 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-03-05 | Windpark Lindenberg GmbH & Co. KG |
| WEA 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-05-18 | innoVent WP Escheberg GmbH & Co.KG |
| WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-05-31 | innoVent WP Escheberg GmbH & Co.KG |
| WEA Z1 | 2.40 MW | Nordex Energy GmbH | in operation | 2018-07-26 | innoVent WP Escheberg GmbH & Co.KG |
| WEA 01 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-02-18 | Windpark Lindenberg GmbH & Co. KG |
| WEA 03 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-12-18 | Windpark Lindenberg GmbH & Co. KG |
| WEA 06 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-02-05 | Windpark Lindenberg GmbH & Co. KG |
| WEA 3 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-05-23 | innoVent WP Escheberg GmbH & Co.KG |
| WEA Z2 | 2.40 MW | Nordex Energy GmbH | in operation | 2018-07-26 | innoVent WP Escheberg GmbH & Co.KG |
| WEA 4 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-05-31 | innoVent WP Escheberg GmbH & Co.KG |
| 920692 | 2.35 MW | ENERCON GmbH | in operation | 2015-12-02 | Windpark GmbH & Co. Bad Emstal II KG |
| 920695 | 2.35 MW | ENERCON GmbH | in operation | 2015-11-27 | Windpark GmbH & Co. Bad Emstal II KG |
| 920693 | 2.35 MW | ENERCON GmbH | in operation | 2015-11-20 | Windpark GmbH & Co. Bad Emstal II KG |
| 920694 | 2.35 MW | ENERCON GmbH | in operation | 2015-11-20 | Windpark GmbH & Co. Bad Emstal II KG |
| 78658 | 2.00 MW | ENERCON GmbH | in operation | 2007-07-17 | Alterric Windpark GmbH & Co. Bad Emstal KG |
| 78660 | 2.00 MW | ENERCON GmbH | in operation | 2007-07-06 | Alterric Windpark GmbH & Co. Bad Emstal KG |
| 78659 | 2.00 MW | ENERCON GmbH | in operation | 2007-07-17 | Alterric Windpark GmbH & Co. Bad Emstal KG |
| 781121 | 2.00 MW | ENERCON GmbH | in operation | 2007-08-02 | Alterric Windpark GmbH & Co. Bad Emstal KG |
| 78657 | 2.00 MW | ENERCON GmbH | in operation | 2007-07-25 | Alterric Windpark GmbH & Co. Bad Emstal KG |
| 781120 | 2.00 MW | ENERCON GmbH | in operation | 2007-08-07 | Alterric Windpark GmbH & Co. Bad Emstal KG |
| Windpark Grimelsheim WEA 4 GmbH & Co. KG | 1.50 MW | Fuhrländer AG | in operation | 2009-12-31 | Windpark Grimelsheim WEA 4 GmbH & Co. KG |
| Windpark Grimelsheim WEA3 GmbH & Co. KG | 1.50 MW | Fuhrländer AG | in operation | 2009-12-30 | Windpark Grimelsheim WEA 3 GmbH & Co. KG |
| Vogt Grimelsheim WEA 1 GmbH & Co. KG | 1.50 MW | Fuhrländer AG | in operation | 2009-12-23 | Vogt Grimelsheim WEA 1 GmbH & CO. KG |
| Windpark Grimelsheim WEA 2 GmbH & Co. KG | 1.50 MW | Fuhrländer AG | in operation | 2009-12-23 | Windpark Grimelsheim WEA 2 GmbH & Co. KG |
| 1407 | 1.50 MW | Vestas Deutschland GmbH | in operation | 1997-12-09 | Momentum Energy Germany GmbH & Co.KG |
| 1405 | 1.50 MW | Vestas Deutschland GmbH | in operation | 1998-01-14 | Momentum Energy Germany GmbH & Co.KG |
| WP Breuna N60 - NX1002 | 1.30 MW | Nordex SE | permanently decommissioned | 1998-10-13 | SkyPower Windenergie e.K. |
| WP Breuna N60 - NX1003 | 1.30 MW | Nordex SE | in operation | 1998-10-13 | SkyPower Windenergie e.K. |
| WA 3 | 1.00 MW | AN Windanlagen GmbH | temporarily shut down | 2004-02-11 | Energieversorgung Franz Eusterholz |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2006-12-22 | private individual |
| 53006 | 0.80 MW | ENERCON GmbH | permanently decommissioned | 2007-11-16 | Windpark GmbH & Co. Wolfhagen KG |
| WP Schönhagen E-53 - 2 | 0.80 MW | ENERCON GmbH | in operation | 2011-03-29 | SkyPower Kraftwerke GmbH |
| 53003 | 0.80 MW | ENERCON GmbH | permanently decommissioned | 2007-11-21 | Windpark GmbH & Co. Wolfhagen KG |
| 53007 | 0.80 MW | ENERCON GmbH | permanently decommissioned | 2007-12-08 | Windpark GmbH & Co. Wolfhagen KG |
| 481132 | 0.80 MW | ENERCON GmbH | in operation | 2006-12-28 | Gamundia Windkraft GmbH & Co. KG |
| 53002 | 0.80 MW | ENERCON GmbH | permanently decommissioned | 2007-11-15 | Windpark GmbH & Co. Wolfhagen KG |
| 53008 | 0.80 MW | ENERCON GmbH | permanently decommissioned | 2007-12-07 | Windpark GmbH & Co. Wolfhagen KG |
| 53005 | 0.80 MW | ENERCON GmbH | permanently decommissioned | 2007-12-20 | Windpark GmbH & Co. Wolfhagen KG |
| 481134 - E-48 | 0.80 MW | ENERCON GmbH | in operation | 2006-12-22 | aeb WINDKRAFT Leinebergland GmbH & Co. BürgerWIND Zwei KG |
| 53004 | 0.80 MW | ENERCON GmbH | permanently decommissioned | 2007-12-04 | Windpark GmbH & Co. Wolfhagen KG |
| WP Schönhagen E-53 - 1 | 0.80 MW | ENERCON GmbH | in operation | 2011-03-25 | SkyPower Kraftwerke GmbH |
| Liebenau 1264 | 0.66 MW | Vestas Deutschland GmbH | in operation | 1998-07-01 | Hanse Windkraft GmbH |
| Liebenau 1268 | 0.66 MW | Vestas Deutschland GmbH | in operation | 1998-07-01 | Hanse Windkraft GmbH |
| Liebenau 1265 | 0.66 MW | Vestas Deutschland GmbH | in operation | 1998-07-01 | Hanse Windkraft GmbH |
| V 1267-05 | 0.66 MW | Vestas Deutschland GmbH | in operation | 1998-07-02 | Hanse Windkraft GmbH |
| Windpark Muddenhagen | 0.66 MW | Vestas Deutschland GmbH | temporarily shut down | 2001-04-04 | Reprojekt Plan und Invest GmbH & Co. KG |
| V1371 | 0.66 MW | Vestas Deutschland GmbH | permanently decommissioned | 1999-02-10 | NATURSTROM AG |
| WP Eberschütz V-1351 | 0.66 MW | Vestas Deutschland GmbH | in operation | 1999-02-19 | SkyPower Kraftwerke GmbH |
| V1372 | 0.66 MW | Vestas Deutschland GmbH | permanently decommissioned | 1999-02-13 | NATURSTROM AG |
| V12175 | 0.66 MW | Vestas Deutschland GmbH | permanently decommissioned | 2000-10-10 | WindStrom Trendelburg II GmbH & Co. KG |
| Windpark Eberschütz | 0.66 MW | Vestas Deutschland GmbH | temporarily shut down | 2001-04-04 | Reprojekt Plan und Invest GmbH & Co. KG |
| Liebenau 1266 | 0.66 MW | Vestas Deutschland GmbH | in operation | 1998-07-01 | Hanse Windkraft GmbH |
| WK_Anlage-2_1999 | 0.60 MW | ENERCON GmbH | in operation | 1999-07-01 | Stengelwind GbR. |
| WEA_04 | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1997-01-30 | Windkraft Bründersen-Istha GmbH & Co. KG |
| WEA_03 | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1997-01-29 | Windkraft Bründersen-Istha GmbH & Co. KG |
| WP Eber Mi 6 - NM 12991 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1997-03-19 | SkyPower Kraftwerke GmbH |
| Henkes Windkraft | 0.60 MW | ENERCON GmbH | in operation | 2004-03-16 | Henkes Windkraft GbR |
| 2523 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-06-12 | Momentum Energy Germany GmbH & Co.KG |
| Udenhausen-Mariendorf III | 0.60 MW | Vestas Deutschland GmbH | in operation | 1996-04-24 | H+F Energie GmbH & Co KG |
| WP Langenthal 1 - V2217 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-01-15 | SkyPower Windenergie e.K. |
| WEA_01 | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1996-12-26 | Windkraft Bründersen-Istha GmbH & Co. KG |
| WP Eber Mi 3 - NM 12985 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1997-03-19 | SkyPower Kraftwerke GmbH |
| WP Eberschütz V-1350 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1999-02-17 | SkyPower Kraftwerke GmbH |
| WP Langenthal 3 - V2296 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-01-17 | SkyPower Windenergie e.K. |
| WP Eber Mi 4 - NM 12977 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1997-03-19 | SkyPower Kraftwerke GmbH |
| V2824 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1998-11-06 | WindStrom Trendelburg II GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | NEG Micon Deutschland GmbH | permanently decommissioned | 1997-01-03 | private individual |
| V2811 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1998-11-06 | WindStrom Trendelburg II GmbH & Co. KG |
| WP Eberschütz V-2516 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-03-27 | SkyPower Kraftwerke GmbH |
| WEA_02 | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1996-12-26 | Windkraft Bründersen-Istha GmbH & Co. KG |
| WP Langenthal 4 - V2297 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-01-16 | SkyPower Windenergie e.K. |
| 2525 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-06-12 | Momentum Energy Germany GmbH & Co.KG |
| WP Langenthal 2- V2219 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-02-05 | SkyPower Windenergie e.K. |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 1998-03-03 | private individual |
| WP Eberschütz V-2515 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-03-27 | SkyPower Kraftwerke GmbH |
| Udenhausen-Mariendorf V | 0.60 MW | Vestas Deutschland GmbH | in operation | 1996-04-24 | H+F Energie GmbH & Co KG |
| unit operated by a private individual | 0.60 MW | NEG Micon Deutschland GmbH | permanently decommissioned | 1997-01-03 | private individual |
| V2825 | 0.60 MW | Vestas Deutschland GmbH | permanently decommissioned | 1998-11-06 | WindStrom Trendelburg II GmbH & Co. KG |
| Udenhausen-Mariendorf IV | 0.60 MW | Vestas Deutschland GmbH | in operation | 1996-04-24 | H+F Energie GmbH & Co KG |
| Udenhausen-Mariendorf I | 0.60 MW | Vestas Deutschland GmbH | in operation | 1996-07-01 | H+F Energie GmbH & Co KG |
| WP Eberschütz V-2514 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-03-27 | SkyPower Kraftwerke GmbH |
| WP Eber Mi 5 - NM 12981 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1997-03-19 | SkyPower Kraftwerke GmbH |
| 2524 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-06-11 | Momentum Energy Germany GmbH & Co.KG |
| WP Eber Mi 7 - NM 13328 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1997-03-19 | SkyPower Kraftwerke GmbH |
| Udenhausen-Mariendorf II | 0.60 MW | Vestas Deutschland GmbH | in operation | 1996-04-24 | H+F Energie GmbH & Co KG |
| V2810 | 0.60 MW | Vestas Deutschland GmbH | permanently decommissioned | 1998-11-06 | WindStrom Trendelburg II GmbH & Co. KG |
| WK-Anlage-3-2004 | 0.60 MW | ENERCON GmbH | in operation | 2004-05-16 | Haldessenwind GbR |
| WP Eber Mi 2 - NM 12984 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1997-03-19 | SkyPower Kraftwerke GmbH |
| Listingen I | 0.60 MW | NEG Micon Deutschland GmbH | permanently decommissioned | 1997-01-03 | WE Breuna GmbH & Co. KG |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-03-03 | private individual |
| Anlage 40729 | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1996-11-21 | Windpark Wettesingen GmbH & Co. KG |
| WA 2 | 0.50 MW | – | in operation | 1998-10-09 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| Anlage 41434 | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1998-10-09 | Windpark Wettesingen GmbH & Co. KG |
| Gut Bruchhof WA 1 | 0.50 MW | ENERCON GmbH | in operation | 1998-10-09 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-03-03 | private individual |
| Anlage 40728 | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1996-11-26 | Windpark Wettesingen GmbH & Co. KG |
| WK_Anlage-1_1997 | 0.50 MW | ENERCON GmbH | in operation | 1997-07-01 | Stengelwind GbR. |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-03-03 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-03-03 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-03-03 | private individual |
| SYS_WEA-1 | 0.10 MW | Sonstige | in operation | 2018-05-22 | Fraunhofer Institut für Energiewirtschaft und Energiesystemtechnik |
| unit operated by a private individual | 0.01 MW | PSW-Energiesysteme GmbH | in operation | 2013-10-22 | private individual |
| unit operated by a private individual | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2015-08-08 | private individual |
| unit operated by a private individual | 0.00 MW | – | in operation | 2021-10-19 | private individual |
| unit operated by a private individual | 0.00 MW | Sonstige | permanently decommissioned | 2015-10-26 | private individual |
| unit operated by a private individual | 0.00 MW | Sonstige | in operation | 2012-11-09 | private individual |
Which organisations operate the most wind power capacity in Kassel?
| Operator | Units | Capacity |
|---|---|---|
| UGE Hombressen Zwei GmbH & Co. KG Umweltgereche Energie | 9 | 61.2 MW |
| Windpark Stiftswald GmbH & Co. KG | 12 | 48.0 MW |
| Statkraft Windpark Rappenhagen GmbH & Co. KG | 6 | 40.8 MW |
| Windpark Bad Karlshafen GmbH & Co. KG | 4 | 28.8 MW |
| innoVent WP Breuna | 5 | 28.5 MW |
| Windpark GmbH & Co. Wolfhagen KG | 11 | 27.8 MW |
| Bürgerwindpark Wolfhagen-Istha GmbH & Co. KG | 5 | 27.8 MW |
| WE Breuna GmbH & Co. KG | 5 | 23.3 MW |
| Energiepark Mittelberg GmbH & Co. KG | 7 | 23.1 MW |
| WindStrom Trendelburg II GmbH & Co. KG | 8 | 21.6 MW |
Which manufacturer accounts for the most wind power capacity in Kassel?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 80 | 226.4 MW |
| Vestas Deutschland GmbH | 57 | 149.3 MW |
| Nordex Germany GmbH | 17 | 110.7 MW |
| Nordex Energy GmbH | 21 | 68.0 MW |
| Nordex SE | 5 | 19.7 MW |
| GE Wind Energy GmbH | 3 | 8.31 MW |
| Fuhrländer AG | 4 | 6.00 MW |
| NEG Micon Deutschland GmbH | 9 | 5.40 MW |
| AN-Maschinenbau- und Umweltschutzanlagen GmbH | 4 | 2.40 MW |
| AN Windanlagen GmbH | 1 | 1.00 MW |
Wind power in Hessen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Kassel (Hessen), and how large are they, as of 20 can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.