Germany · renewables
Wind power in Hersfeld-Rotenburg
83 wind turbines with 258.5 MW of gross capacity were in operation in Hersfeld-Rotenburg (Hessen) as of 2026-11-05, with a further 48 units (294.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Hersfeld-Rotenburg (Hessen), and how large are they, as of 2026-11-05?
- 83 wind turbines with 258.5 MW of gross capacity were in operation in Hersfeld-Rotenburg (Hessen) as of 2026-11-05, with a further 48 units (294.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Hersfeld-Rotenburg?
- 83 wind turbines with 258.5 MW of gross capacity were in operation in Hersfeld-Rotenburg as of 2026-11-05, with a further 48 units (294.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Hersfeld-Rotenburg in 2024?
- 5 wind turbines with 26.4 MW went into operation in Hersfeld-Rotenburg in 2024; the strongest year of the last two decades was 2023 with 74.4 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Hersfeld-Rotenburg?
- Windpark Wippershainer Höhe I GmbH operates 8 wind turbines with 56.0 MW in Hersfeld-Rotenburg, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Hersfeld-Rotenburg?
- ENERCON GmbH leads with 40 wind turbines and 161.7 MW in Hersfeld-Rotenburg (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Hersfeld-Rotenburg?
- The largest registered wind turbine in Hersfeld-Rotenburg has 7.20 MW of gross capacity and is operated by JUWI GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Hersfeld-Rotenburg distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 134 | 555.2 MW | 82 | 48 |
How much wind power capacity was commissioned in Hersfeld-Rotenburg each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2024 | 5 | 26.4 MW |
| 2023 | 17 | 74.4 MW |
| 2022 | 1 | 4.20 MW |
| 2021 | 11 | 38.1 MW |
| 2018 | 6 | 20.0 MW |
| 2017 | 5 | 15.5 MW |
| 2016 | 7 | 23.1 MW |
| 2014 | 6 | 16.5 MW |
| 2013 | 6 | 12.8 MW |
| 2009 | 2 | 4.00 MW |
How many wind turbines in Hersfeld-Rotenburg are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 48 | 294.3 MW |
| in operation | 83 | 258.5 MW |
| permanently decommissioned | 4 | 2.40 MW |
Which wind turbines are registered in Hersfeld-Rotenburg?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Haunetal-Dörnerbusch WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | JUWI GmbH |
| Haunetal-Dörnerbusch WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | JUWI GmbH |
| Haunetal-Dörnerbusch WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | JUWI GmbH |
| GH3 WEA P7 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | BürgerWind Gaishecke 2 GmbH & Co. Betriebs KG |
| WEA 03 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Wippershainer Höhe I GmbH |
| GH3 WEA P1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | BürgerWind Gaishecke 2 GmbH & Co. Betriebs KG |
| WEA 02 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Wippershainer Höhe I GmbH |
| WEA 06 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Wippershainer Höhe I GmbH |
| WEA01 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Wippershainer Höhe I GmbH |
| WEA 05 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Wippershainer Höhe I GmbH |
| GH3 WEA P4 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | BürgerWind Gaishecke 2 GmbH & Co. Betriebs KG |
| GH3 WEA P6 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | BürgerWind Gaishecke 2 GmbH & Co. Betriebs KG |
| WEA 08 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Wippershainer Höhe I GmbH |
| WEA 07 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Wippershainer Höhe I GmbH |
| GH3 WEA P8 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | BürgerWind Gaishecke 2 GmbH & Co. Betriebs KG |
| GH3 WEA P2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | BürgerWind Gaishecke 2 GmbH & Co. Betriebs KG |
| WEA 04 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Wippershainer Höhe I GmbH |
| Cornberg-Bebra WEA 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Cornberg-Bebra WEA 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Cornberg-Bebra WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Cornberg-Bebra WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Cornberg-Bebra WEA 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| WP Schenklengsfeld II WEA 02 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2024-01-20 | PNE WIND Park XXXI GmbH & Co.KG |
| WP Schenklengsfeld III WEA 05 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2027 | PNE AG |
| WP Odensachsen WEA 02 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | PNE AG |
| WP Schenklengsfeld III WEA 06 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2027 | PNE AG |
| WP Schenklengsfeld I WEA 01 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2024-03-27 | PNE WIND Park XXVIII GmbH & Co.KG |
| WP Odensachsen WEA 01 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | PNE AG |
| WP Schenklengsfeld I WEA 04 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2024-04-30 | PNE WIND Park XXVIII GmbH & Co.KG |
| WP Schenklengsfeld I WEA 03 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2024-01-10 | PNE WIND Park XXVIII GmbH & Co.KG |
| WEA 09 Waltersberg II | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 10 Waltersberg II | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WP Hohenroda-Mansbach WEA 03 | 5.70 MW | Nordex SE | in operation | 2023-04-11 | PNE WIND Park XXV GmbH & Co.KG |
| WP Hohenroda-Mansbach WEA 02 | 5.70 MW | Nordex SE | in operation | 2023-04-11 | PNE WIND Park XXV GmbH & Co.KG |
| WP Hohenroda-Mansbach WEA 04 | 5.70 MW | Nordex SE | in operation | 2023-04-11 | PNE WIND Park XXV GmbH & Co.KG |
| WEA 2 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-12-05 | Energiepark Heringen-Philippsthal WP HP GmbH & Co. KG |
| WP Hohenroda-Mansbach WEA 01 | 5.70 MW | Nordex SE | in operation | 2023-04-11 | PNE WIND Park XXV GmbH & Co.KG |
| WP Hohenroda-Mansbach WEA 05 | 5.70 MW | Nordex SE | in operation | 2023-04-12 | PNE WIND Park XXV GmbH & Co.KG |
| WEA 1 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-12-05 | Energiepark Heringen-Philippsthal WP HP GmbH & Co. KG |
| BBH II WEA1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Grünwerke GmbH |
| ABO Energy WP Eichkopf WEA2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Rotenburg Fulda GmbH & Co. KG |
| ABO Energy WP Eichkopf WEA6 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Rotenburg Fulda GmbH & Co. KG |
| WP Gaishecke II - WEA02 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark GmbH & Co. Heringen-Monte Kali KG |
| ABO Energy WP Eichkopf WEA5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Rotenburg Fulda GmbH & Co. KG |
| WP Gaishecke II - WEA03 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark GmbH & Co. Heringen-Monte Kali KG |
| ABO Energy WP Eichkopf WEA3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Rotenburg Fulda GmbH & Co. KG |
| WP Gaishecke II - WEA06 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark GmbH & Co. Heringen-Monte Kali KG |
| ABO Energy WP Eichkopf WEA4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Rotenburg Fulda GmbH & Co. KG |
| WEA 08 Waltersberg II | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| ABO Energy WP Eichkopf WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | ABO Energy WP Rotenburg Fulda GmbH & Co. KG |
| WP Gaishecke II - WEA01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark GmbH & Co. Heringen-Monte Kali KG |
| Gethsemane-Repowering WEA 02 | 4.80 MW | Nordex Germany GmbH | planned | planned 2029 | RWE Wind Onshore & PV Deutschland GmbH |
| Gethsemane-Repowering_WEA03 | 4.80 MW | Nordex Germany GmbH | planned | planned 2029 | RWE Wind Onshore & PV Deutschland GmbH |
| Gethsemane-Repowering WEA 01 | 4.80 MW | Nordex Germany GmbH | planned | planned 2029 | RWE Wind Onshore & PV Deutschland GmbH |
| ABO Energy WP Nentershausen WEA 4 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Energy GmbH & Co. KGaA |
| CEE Windpark Haunetal WEA 05 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-06-30 | CEE Windpark Haunetal GmbH & Co. KG |
| CEE Windpark Haunetal WEA 04 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-06-30 | CEE Windpark Haunetal GmbH & Co. KG |
| ABO Energy WP Nentershausen WEA 1 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Energy GmbH & Co. KGaA |
| Haunetal-Stärklos WEA 05 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2022-11-21 | Mubea Windpark 2 Haunetal GmbH & Co. KG |
| CEE Windpark Haunetal WEA 01 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-06-30 | CEE Windpark Haunetal GmbH & Co. KG |
| ABO Energy WP Nentershausen WEA 5 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Energy GmbH & Co. KGaA |
| ABO Energy WP Nentershausen WEA 2 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Energy GmbH & Co. KGaA |
| Haunetal WEA 02 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-06-30 | Bürgerwindenergie Haunetal GmbH & Co. KG |
| ABO Energy WP Nentershausen WEA 3 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ABO Energy GmbH & Co. KGaA |
| WP-Gaishecke 01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-21 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WP-Gaishecke 06 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-15 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WEA01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-12-29 | Windpark Roteberg GmbH &Co. KG |
| WP-Gaishecke 05 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-13 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WP-Gaishecke 09 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-14 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WEA06 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-12-29 | Windpark Roteberg GmbH &Co. KG |
| WP-Gaishecke 12 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-13 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WP-Gaishecke 03 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-13 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WP-Gaishecke 11 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-13 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WEA02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-12-29 | Windpark Roteberg GmbH &Co. KG |
| WP-Gaishecke 02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-13 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WEA03 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-12-28 | Windpark Roteberg GmbH &Co. KG |
| WP-Gaishecke 08 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-13 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WEA07 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-12-29 | Windpark Roteberg GmbH &Co. KG |
| WP-Gaishecke 07 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-09-13 | BürgerWind Gaishecke GmbH & Co. Betriebs KG |
| WEA 5 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-26 | Infrastruktur Ludwigsau GmbH & Co. KG |
| WEA 6 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-25 | Infrastruktur Ludwigsau GmbH & Co. KG |
| WEA 1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-23 | Infrastruktur Ludwigsau GmbH & Co. KG |
| WEA 3 (85504) | 3.30 MW | Nordex SE | in operation | 2017-11-29 | R67 WP Kirchheim GmbH & Co. KG |
| WEA 2 (85502) | 3.30 MW | Nordex SE | in operation | 2017-09-06 | R67 WP Kirchheim GmbH & Co. KG |
| WEA 4 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-23 | Infrastruktur Ludwigsau GmbH & Co. KG |
| WEA 7 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-24 | Infrastruktur Ludwigsau GmbH & Co. KG |
| WEA 3 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-29 | Infrastruktur Ludwigsau GmbH & Co. KG |
| WEA 2 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-17 | Infrastruktur Ludwigsau GmbH & Co. KG |
| WEA 1 (85503) | 3.30 MW | Nordex SE | in operation | 2017-09-26 | R67 WP Kirchheim GmbH & Co. KG |
| 1011550 | 3.05 MW | ENERCON GmbH | in operation | 2021-11-04 | Windpark GmbH & Co. Heringen-Waltersberg KG |
| 1011551 | 3.05 MW | ENERCON GmbH | in operation | 2021-11-03 | Windpark GmbH & Co. Heringen-Waltersberg KG |
| 1011545 | 3.05 MW | ENERCON GmbH | in operation | 2021-11-30 | Windpark GmbH & Co. Heringen-Waltersberg KG |
| 1011547 | 3.05 MW | ENERCON GmbH | in operation | 2021-12-27 | Windpark GmbH & Co. Heringen-Waltersberg KG |
| 1011549 | 3.05 MW | ENERCON GmbH | in operation | 2021-12-07 | Windpark GmbH & Co. Heringen-Waltersberg KG |
| 1011548 | 3.05 MW | ENERCON GmbH | in operation | 2021-12-23 | Windpark GmbH & Co. Heringen-Waltersberg KG |
| 1011546 | 3.05 MW | ENERCON GmbH | in operation | 2021-11-19 | Windpark GmbH & Co. Heringen-Waltersberg KG |
| BBH WEA3 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2017-12-29 | Windpark Breitenbach GmbH |
| BBH WEA1 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2018-01-06 | Windpark Breitenbach GmbH |
| BBH WEA2 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2017-12-09 | Windpark Breitenbach GmbH |
| BHW 01 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-12-22 | SWS Windpark Bad Hersfeld GmbH & Co. KG |
| BHW 03 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-12-04 | SWS Windpark Bad Hersfeld GmbH & Co. KG |
| BHW 04 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-12-11 | SWS Windpark Bad Hersfeld GmbH & Co. KG |
| BHW 05 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-12-06 | SWS Windpark Bad Hersfeld GmbH & Co. KG |
| BHW 06 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-12-08 | SWS Windpark Bad Hersfeld GmbH & Co. KG |
| BHW 02 | 2.75 MW | GE Wind Energy GmbH | in operation | 2014-12-17 | SWS Windpark Bad Hersfeld GmbH & Co. KG |
| WP Friedewald - WEA 4 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-13 | Windenergie Friedewalder Hute GbR |
| WP Friedewald - WEA 3 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-17 | Windenergie Friedewald GbR |
| WEA 04, WP Hattenbach | 2.05 MW | REpower Systems SE | in operation | 2013-12-13 | Windpark Hattenbach GmbH & Co. KG |
| WEA 03, WP Hattenbach | 2.05 MW | REpower Systems SE | in operation | 2013-12-19 | Windpark Hattenbach GmbH & Co. KG |
| WEA 01, WP Hattenbach | 2.05 MW | REpower Systems SE | in operation | 2013-12-18 | Windpark Hattenbach GmbH & Co. KG |
| WEA 02, WP Hattenbach | 2.05 MW | REpower Systems SE | in operation | 2013-12-16 | Windpark Hattenbach GmbH & Co. KG |
| EC702623 | 2.00 MW | ENERCON GmbH | in operation | 2005-11-16 | Windkraft Eichberg Park II GmbH & Co. KG |
| 82944 | 2.00 MW | ENERCON GmbH | in operation | 2009-03-10 | Windpark GmbH & Co. Kirchheim KG |
| EC78043 | 2.00 MW | ENERCON GmbH | in operation | 2005-11-30 | Windkraft Eichberg Park II GmbH & Co. KG |
| EC78042 | 2.00 MW | ENERCON GmbH | in operation | 2005-11-22 | Windkraft Eichberg Park II GmbH & Co. KG |
| 82943 | 2.00 MW | ENERCON GmbH | in operation | 2009-03-12 | Windpark GmbH & Co. Kirchheim KG |
| WP Friedewald - WEA 1 | 1.80 MW | ENERCON GmbH | in operation | 2004-03-25 | Windenergie Friedewald GbR |
| 70519_Gethsemane | 1.80 MW | ENERCON GmbH | in operation | 2001-11-29 | RWE Wind Onshore & PV Deutschland GmbH |
| 70520_Gethsemane | 1.80 MW | ENERCON GmbH | in operation | 2001-12-18 | RWE Wind Onshore & PV Deutschland GmbH |
| 70521_Gethsemane | 1.80 MW | ENERCON GmbH | in operation | 2001-12-20 | RWE Wind Onshore & PV Deutschland GmbH |
| 70518_Gethsemane | 1.80 MW | ENERCON GmbH | in operation | 2001-11-23 | RWE Wind Onshore & PV Deutschland GmbH |
| LE 01 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-12-29 | Energiekontor Windinvest GmbH & Co. ÜWP LE KG |
| LE 02 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-12-27 | Energiekontor Windinvest GmbH & Co. ÜWP LE KG |
| LE 03 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-12-18 | Energiekontor Windinvest GmbH & Co. ÜWP LE KG |
| WP Friedewald - WEA 2 | 1.00 MW | ENERCON GmbH | in operation | 2003-11-28 | Windenergie Friedewald GbR |
| unit operated by a private individual | 0.60 MW | Nordex SE | permanently decommissioned | 1998-06-11 | private individual |
| Windrad II | 0.60 MW | – | in operation | 1998-02-27 | L+W Windkraft GmbH und Co Windpark Solz KG |
| Windrad IV | 0.60 MW | – | in operation | 1998-02-27 | L+W Windkraft GmbH und Co Windpark Solz KG |
| unit operated by a private individual | 0.60 MW | Nordex SE | permanently decommissioned | 1998-06-11 | private individual |
| unit operated by a private individual | 0.60 MW | Nordex SE | permanently decommissioned | 1998-06-11 | private individual |
| unit operated by a private individual | 0.60 MW | Nordex SE | permanently decommissioned | 1998-06-11 | private individual |
| Windrad III | 0.60 MW | – | in operation | 1998-02-27 | L+W Windkraft GmbH und Co Windpark Solz KG |
| Windkraft Friedewald GbR | 0.60 MW | ENERCON GmbH | in operation | 2002-04-12 | Windkraft Friedewald GbR |
| Windrad I | 0.60 MW | – | in operation | 1998-02-27 | L+W Windkraft GmbH und Co Windpark Solz KG |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2024-05-14 | private individual |
Which organisations operate the most wind power capacity in Hersfeld-Rotenburg?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Wippershainer Höhe I GmbH | 8 | 56.0 MW |
| JUWI GmbH | 8 | 55.6 MW |
| BürgerWind Gaishecke 2 GmbH & Co. Betriebs KG | 6 | 42.0 MW |
| BürgerWind Gaishecke GmbH & Co. Betriebs KG | 10 | 34.5 MW |
| ABO Energy WP Rotenburg Fulda GmbH & Co. KG | 6 | 33.4 MW |
| PNE WIND Park XXV GmbH & Co.KG | 5 | 28.5 MW |
| PNE AG | 4 | 26.4 MW |
| Infrastruktur Ludwigsau GmbH & Co. KG | 7 | 23.1 MW |
| Windpark GmbH & Co. Heringen-Monte Kali KG | 4 | 22.2 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 7 | 21.6 MW |
Which manufacturer accounts for the most wind power capacity in Hersfeld-Rotenburg?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 40 | 161.7 MW |
| Vestas Deutschland GmbH | 35 | 138.4 MW |
| Nordex Germany GmbH | 17 | 110.1 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 8 | 52.8 MW |
| Nordex SE | 12 | 40.8 MW |
| GE Wind Energy GmbH | 6 | 16.5 MW |
| Nordex Energy GmbH | 2 | 11.4 MW |
| GE Renewable Germany GmbH | 3 | 8.34 MW |
| REpower Systems SE | 4 | 8.20 MW |
| Südwind Borsig Energy GmbH | 3 | 4.50 MW |
Wind power in Hessen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Hersfeld-Rotenburg (Hessen), and how large are th can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.