Germany · renewables
Wind power in Gießen
20 wind turbines with 49.4 MW of gross capacity were in operation in Gießen (Hessen) as of 2026-11-05, with a further 10 units (59.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Gießen (Hessen), and how large are they, as of 2026-11-05?
- 20 wind turbines with 49.4 MW of gross capacity were in operation in Gießen (Hessen) as of 2026-11-05, with a further 10 units (59.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Gießen?
- 20 wind turbines with 49.4 MW of gross capacity were in operation in Gießen as of 2026-11-05, with a further 10 units (59.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Gießen in 2022?
- 3 wind turbines with 18.0 MW went into operation in Gießen in 2022; the strongest year of the last two decades was 2022 with 18.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Gießen?
- Trianel Onshore Windkraftwerk Rabenau GmbH & Co. KG operates 7 wind turbines with 20.9 MW in Gießen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Gießen?
- Vestas Deutschland GmbH leads with 7 wind turbines and 41.0 MW in Gießen (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Gießen?
- The largest registered wind turbine in Gießen has 7.00 MW of gross capacity and is operated by JUWI GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Gießen distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 29 | 109.2 MW | 19 | 10 |
How much wind power capacity was commissioned in Gießen each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2022 | 3 | 18.0 MW |
| 2021 | 1 | 0.00 MW |
| 2017 | 3 | 8.34 MW |
| 2015 | 6 | 15.2 MW |
| 2011 | 2 | 3.00 MW |
| 2010 | 1 | 1.50 MW |
| 2008 | 4 | 3.40 MW |
How many wind turbines in Gießen are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 10 | 59.8 MW |
| in operation | 20 | 49.4 MW |
Which wind turbines are registered in Gießen?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Rabenau R WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | JUWI GmbH |
| Rabenau R WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | JUWI GmbH |
| WP Leidenhofen - WEA 01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | wpd Windpark Nr. 694 GmbH & Co. KG |
| WPS WEA 3 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2022-10-25 | Windpark Lumdatal GmbH |
| WPS WEA 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2022-10-21 | Windpark Lumdatal GmbH |
| WPS WEA 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2022-10-19 | Windpark Lumdatal GmbH |
| Trianel WP Rabenau II WEA 1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | Trianel Onshore Windkraftwerk Rabenau GmbH & Co. KG |
| Windenergiepark Höhlerberg GmbH WEA 2 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | Windenergiepark Höhlerberg GmbH & Co. KG |
| Windenergiepark Höhlerberg GmbH WEA 1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | Windenergiepark Höhlerberg GmbH & Co. KG |
| WEA 1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2025 | ATE Windpark Fernwald GmbH & Co. KG |
| WEA 05 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | wpd Windpark Dreihausen GmbH & Co. KG |
| WEA 03 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | wpd Windpark Dreihausen GmbH & Co. KG |
| WEA 04 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | wpd Windpark Dreihausen GmbH & Co. KG |
| Grünberg 02 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-08-30 | Trianel Windpark Grünberg GmbH & Co. KG |
| Grünberg 01 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-08-29 | Trianel Windpark Grünberg GmbH & Co. KG |
| Grünberg 03 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-08-31 | Trianel Windpark Grünberg GmbH & Co. KG |
| Rabenau 06 | 2.53 MW | General Electric Deutschland Holding GmbH | in operation | 2015-06-15 | Trianel Onshore Windkraftwerk Rabenau GmbH & Co. KG |
| Rabenau 04 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-06-16 | Trianel Onshore Windkraftwerk Rabenau GmbH & Co. KG |
| Rabenau 05 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-06-18 | Trianel Onshore Windkraftwerk Rabenau GmbH & Co. KG |
| Rabenau 03 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-07-14 | Trianel Onshore Windkraftwerk Rabenau GmbH & Co. KG |
| Rabenau 02 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-07-16 | Trianel Onshore Windkraftwerk Rabenau GmbH & Co. KG |
| Rabenau 01 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-07-17 | Trianel Onshore Windkraftwerk Rabenau GmbH & Co. KG |
| Rabenau 03 | 1.50 MW | Fuhrländer AG | in operation | 2011-01-20 | Windpark Rabenau GmbH & Co. KG |
| Rabenau 01 | 1.50 MW | Fuhrländer AG | in operation | 2010-12-23 | Windpark Rabenau GmbH & Co. KG |
| Rabenau 02 | 1.50 MW | Fuhrländer AG | in operation | 2011-01-19 | Windpark Rabenau GmbH & Co. KG |
| RB04 GA3775 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2008-03-11 | MVV Windenergie GmbH |
| RB05 GA3776 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2008-03-12 | MVV Windenergie GmbH |
| RB02 GA3777 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2008-03-04 | MVV Windenergie GmbH |
| RB03 GA3774 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2008-03-07 | MVV Windenergie GmbH |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2021-12-22 | private individual |
Which organisations operate the most wind power capacity in Gießen?
| Operator | Units | Capacity |
|---|---|---|
| Trianel Onshore Windkraftwerk Rabenau GmbH & Co. KG | 7 | 20.9 MW |
| Windpark Lumdatal GmbH | 3 | 18.0 MW |
| wpd Windpark Dreihausen GmbH & Co. KG | 3 | 16.8 MW |
| JUWI GmbH | 2 | 14.0 MW |
| Windenergiepark Höhlerberg GmbH & Co. KG | 2 | 11.4 MW |
| Trianel Windpark Grünberg GmbH & Co. KG | 3 | 8.34 MW |
| wpd Windpark Nr. 694 GmbH & Co. KG | 1 | 6.20 MW |
| ATE Windpark Fernwald GmbH & Co. KG | 1 | 5.70 MW |
| Windpark Rabenau GmbH & Co. KG | 3 | 4.50 MW |
| MVV Windenergie GmbH | 4 | 3.40 MW |
Which manufacturer accounts for the most wind power capacity in Gießen?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 7 | 41.0 MW |
| Nordex Energy GmbH | 4 | 22.8 MW |
| GE Wind Energy GmbH | 8 | 21.0 MW |
| ENERCON GmbH | 2 | 14.0 MW |
| Fuhrländer AG | 3 | 4.50 MW |
| Gamesa Corporación Tecnológica S.A. | 4 | 3.40 MW |
| General Electric Deutschland Holding GmbH | 1 | 2.53 MW |
| SkyWind GmbH | 1 | 0.00 MW |
Wind power in Hessen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Gießen (Hessen), and how large are they, as of 20 can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.