Germany · renewables
Wind power in Fulda
25 wind turbines with 72.4 MW of gross capacity were in operation in Fulda (Hessen) as of 2026-11-05, with a further 24 units (163.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Fulda (Hessen), and how large are they, as of 2026-11-05?
- 25 wind turbines with 72.4 MW of gross capacity were in operation in Fulda (Hessen) as of 2026-11-05, with a further 24 units (163.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Fulda?
- 25 wind turbines with 72.4 MW of gross capacity were in operation in Fulda as of 2026-11-05, with a further 24 units (163.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Fulda in 2025?
- 1 wind turbines with 4.80 MW went into operation in Fulda in 2025; the strongest year of the last two decades was 2018 with 30.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Fulda?
- Buchenau II Wind operates 7 wind turbines with 50.4 MW in Fulda, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Fulda?
- Vestas Deutschland GmbH leads with 18 wind turbines and 95.2 MW in Fulda (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Fulda?
- The largest registered wind turbine in Fulda has 7.20 MW of gross capacity and is operated by Buchenau II Wind, commissioned 2026-11-03 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Fulda distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.04 MW | 2 | 0 |
| over 100 kW | 47 | 235.8 MW | 23 | 24 |
How much wind power capacity was commissioned in Fulda each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 7.20 MW |
| 2025 | 1 | 4.80 MW |
| 2022 | 1 | 4.20 MW |
| 2018 | 10 | 30.0 MW |
| 2016 | 8 | 24.4 MW |
| 2010 | 1 | 0.01 MW |
How many wind turbines in Fulda are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 24 | 163.4 MW |
| in operation | 25 | 72.4 MW |
Which wind turbines are registered in Fulda?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| BUC2-WEA14 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-11-03 | Buchenau II Wind |
| UFH_03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VSB Windpark Ufhausen GmbH & Co. KG |
| BUC2-WEA17 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Buchenau II Wind |
| BUC2-WEA18 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Buchenau II Wind |
| BUC2-WEA11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Buchenau II Wind |
| BUC2-WEA16 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Buchenau II Wind |
| UFH_01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VSB Windpark Ufhausen GmbH & Co. KG |
| BUC2-WEA13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Buchenau II Wind |
| BUC2-WEA15 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Buchenau II Wind |
| UFH_02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VSB Windpark Ufhausen GmbH & Co. KG |
| WP Günterswald WEA 5 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Günterswald WEA 4 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Günterswald WEA 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Günterswald WEA 3 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Günterswald WEA 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| TWG_01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | TWG-Windpark-Pool |
| Windpark Burghaun 2 WEA05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Burghaun GmbH |
| Windpark Burghaun 2 WEA06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Burghaun GmbH |
| WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Burghaun GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Burghaun GmbH & Co. KG |
| ABO Energy WP Großenlüder WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | ABO Energy Windpark 10 GmbH & Co. KG |
| Windpark Burghaun WEA 01 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Burghaun GmbH |
| Windpark Burghaun WEA 04 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Burghaun GmbH |
| Windpark Burghaun WEA 02 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Burghaun GmbH |
| Windpark Burghaun WEA 03 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Burghaun GmbH |
| ABO Wind WP Hünfeld-Michelsrombach WEA 1 | 4.80 MW | Nordex Energy GmbH | in operation | 2025-06-17 | ABO Wind WP Hünfeld-Michelsrombach GmbH & Co. KG |
| Haunetal-Stärklos WEA 06 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2022-12-16 | Mubea Windpark 2 Haunetal GmbH & Co. KG |
| Buchenau 05 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-11-30 | Trianel Windpark Buchenau GmbH & Co. KG |
| Buchenau 03 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-11-24 | Trianel Windpark Buchenau GmbH & Co. KG |
| Buchenau 04 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-11-17 | Trianel Windpark Buchenau GmbH & Co. KG |
| Buchenau 01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-12-19 | Trianel Windpark Buchenau GmbH & Co. KG |
| Buchenau 02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-12-23 | Trianel Windpark Buchenau GmbH & Co. KG |
| Buchenau Wind WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-28 | Buchenau Wind GmH & Co. KG |
| Buchenau Wind WEA 8 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-29 | Buchenau Wind GmH & Co. KG |
| Buchenau Wind WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2018-12-12 | Buchenau Wind GmH & Co. KG |
| Buchenau Wind WEA 10 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-22 | Buchenau Wind GmH & Co. KG |
| Buchenau Wind WEA 7 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-22 | Buchenau Wind GmH & Co. KG |
| Buchenau Wind WEA 4 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-19 | Buchenau Wind GmH & Co. KG |
| Buchenau Wind WEA 9 | 3.00 MW | ENERCON GmbH | in operation | 2018-08-14 | Buchenau Wind GmH & Co. KG |
| Buchenau Wind WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-22 | Buchenau Wind GmH & Co. KG |
| Buchenau Wind WEA 5 | 3.00 MW | Easywind GmbH | in operation | 2018-08-17 | Buchenau Wind GmH & Co. KG |
| Buchenau Wind WEA 6 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-22 | Buchenau Wind GmH & Co. KG |
| 03WEA84770 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-29 | WP Hofbieber GmbH & Co KG |
| 01WEA84771 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-29 | WP Hofbieber GmbH & Co KG |
| 02WEA84772 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-29 | WP Hofbieber GmbH & Co KG |
| Eiterfeld WEA 1 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2002-12-19 | RV Consulting |
| Eiterfeld WEA 2 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2002-12-23 | Eifelwind GmbH |
| unit operated by a private individual | 0.03 MW | Südwind Borsig Energy GmbH | in operation | 1994-11-10 | private individual |
| unit operated by a private individual | 0.01 MW | Uni Wind GmbH | in operation | 2010-10-07 | private individual |
Which organisations operate the most wind power capacity in Fulda?
| Operator | Units | Capacity |
|---|---|---|
| Buchenau II Wind | 7 | 50.4 MW |
| Windpark Burghaun GmbH | 6 | 36.4 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 5 | 35.0 MW |
| Buchenau Wind GmH & Co. KG | 10 | 30.0 MW |
| VSB Windpark Ufhausen GmbH & Co. KG | 3 | 21.6 MW |
| Trianel Windpark Buchenau GmbH & Co. KG | 5 | 17.2 MW |
| wpd Windpark Burghaun GmbH & Co. KG | 2 | 13.6 MW |
| WP Hofbieber GmbH & Co KG | 3 | 7.20 MW |
| TWG-Windpark-Pool | 1 | 6.80 MW |
| ABO Energy Windpark 10 GmbH & Co. KG | 1 | 6.80 MW |
Which manufacturer accounts for the most wind power capacity in Fulda?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 18 | 95.2 MW |
| Nordex Germany GmbH | 9 | 56.8 MW |
| Nordex Energy GmbH | 10 | 53.8 MW |
| ENERCON GmbH | 9 | 27.0 MW |
| Easywind GmbH | 1 | 3.00 MW |
| Südwind Borsig Energy GmbH | 1 | 0.03 MW |
| Uni Wind GmbH | 1 | 0.01 MW |
Wind power in Hessen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Fulda (Hessen), and how large are they, as of 202 can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.