Germany · renewables
Wind power in Schweinfurt
48 wind turbines with 106.0 MW of gross capacity were in operation in Schweinfurt (Bayern) as of 2026-11-05, with a further 10 units (70.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Schweinfurt (Bayern), and how large are they, as of 2026-11-05?
- 48 wind turbines with 106.0 MW of gross capacity were in operation in Schweinfurt (Bayern) as of 2026-11-05, with a further 10 units (70.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Schweinfurt?
- 48 wind turbines with 106.0 MW of gross capacity were in operation in Schweinfurt as of 2026-11-05, with a further 10 units (70.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Schweinfurt in 2025?
- 1 wind turbines with 0.00 MW went into operation in Schweinfurt in 2025; the strongest year of the last two decades was 2015 with 27.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Schweinfurt?
- JWP Jade Windpark GmbH & Co. 21. Betriebs KG operates 6 wind turbines with 43.2 MW in Schweinfurt, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Schweinfurt?
- Vestas Deutschland GmbH leads with 14 wind turbines and 64.4 MW in Schweinfurt (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Schweinfurt?
- The largest registered wind turbine in Schweinfurt has 7.20 MW of gross capacity and is operated by JWP Jade Windpark GmbH & Co. 21. Betriebs KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Schweinfurt distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 3 | 0.00 MW | 3 | 0 |
| over 100 kW | 55 | 176.8 MW | 45 | 10 |
How much wind power capacity was commissioned in Schweinfurt each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 1 | 0.00 MW |
| 2020 | 1 | 4.80 MW |
| 2016 | 3 | 6.80 MW |
| 2015 | 10 | 27.5 MW |
| 2014 | 6 | 16.9 MW |
| 2013 | 7 | 17.0 MW |
| 2012 | 6 | 11.5 MW |
| 2011 | 2 | 2.00 MW |
| 2009 | 1 | 2.00 MW |
| 2007 | 2 | 4.00 MW |
| 2006 | 4 | 8.00 MW |
How many wind turbines in Schweinfurt are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 48 | 106.0 MW |
| planned | 10 | 70.8 MW |
Which wind turbines are registered in Schweinfurt?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA Uec4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | JWP Jade Windpark GmbH & Co. 21. Betriebs KG |
| WEA Uec5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | JWP Jade Windpark GmbH & Co. 21. Betriebs KG |
| WEA Uec3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | JWP Jade Windpark GmbH & Co. 21. Betriebs KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | 3. Schraudenbacher Windlicht GmbH & Co. KG |
| WEA Uec2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | JWP Jade Windpark GmbH & Co. 21. Betriebs KG |
| WEA Uec6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | JWP Jade Windpark GmbH & Co. 21. Betriebs KG |
| WEA Uec1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | JWP Jade Windpark GmbH & Co. 21. Betriebs KG |
| ABO Energy WP Vögnitz WEA 1 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | ABO Energy Windpark 25 GmbH & Co. KG |
| ABO Energy WP Vögnitz WEA 2 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | ABO Energy Windpark 25 GmbH & Co. KG |
| ABO Energy WP Vögnitz WEA 3 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | ABO Energy Windpark 25 GmbH & Co. KG |
| GE48190168 | 4.80 MW | GE Wind Energy GmbH | in operation | 2020-01-18 | Sechste Bürgerwind GmbH |
| BNS02_300535 | 3.17 MW | Sonstige | in operation | 2014-05-17 | GGEW WP Brünnstadt GmbH & Co. KG |
| BNS03_300536 | 3.17 MW | Sonstige | in operation | 2014-05-21 | GGEW WP Brünnstadt GmbH & Co. KG |
| BNS01_300534 | 3.17 MW | Sonstige | in operation | 2014-05-07 | GGEW WP Brünnstadt GmbH & Co. KG |
| 1150288 | 3.00 MW | ENERCON GmbH | in operation | 2016-05-18 | Windpark Werneck-Eßleben GmbH & Co. KG |
| 1150055 | 3.00 MW | ENERCON GmbH | in operation | 2015-11-17 | Windpark Werneck-Eßleben GmbH & Co. KG |
| 1150053 | 3.00 MW | ENERCON GmbH | in operation | 2015-12-07 | Windpark Werneck-Eßleben GmbH & Co. KG |
| 1150056 | 3.00 MW | ENERCON GmbH | in operation | 2015-09-16 | Windpark Werneck-Eßleben GmbH & Co. KG |
| 1150057 | 3.00 MW | ENERCON GmbH | in operation | 2015-09-30 | Windpark Werneck-Eßleben GmbH & Co. KG |
| 1150054 | 3.00 MW | ENERCON GmbH | in operation | 2015-09-03 | Windpark Werneck-Eßleben GmbH & Co. KG |
| WEA Schwanfeld | 3.00 MW | ENERCON GmbH | in operation | 2016-03-30 | ÜZ Plus eG |
| Obbach WEA5 | 2.50 MW | GE Wind Energy GmbH | in operation | 2015-11-13 | Windpark Obbach GmbH & Co. KG |
| Obbach WEA4 | 2.50 MW | GE Wind Energy GmbH | in operation | 2015-11-24 | Windpark Obbach GmbH & Co. KG |
| Waldsachsen WEA2 | 2.50 MW | Nordex Energy GmbH | in operation | 2014-06-04 | Mainfranken Regenerativ GmbH |
| WEA 82899 | 2.50 MW | Nordex Energy GmbH | in operation | 2013-12-21 | Windpark Waigolshausen GmbH & Co. KG |
| Obbach WEA1 | 2.50 MW | GE Renewable Germany GmbH | in operation | 2015-11-28 | Windpark Obbach GmbH & Co. KG |
| WEA 82898 | 2.50 MW | Nordex Energy GmbH | in operation | 2013-12-21 | Windpark Waigolshausen GmbH & Co. KG |
| Obbach WEA2 | 2.50 MW | GE Wind Energy GmbH | in operation | 2015-11-17 | Windpark Obbach GmbH & Co. KG |
| Waldsachsen WEA3 | 2.50 MW | Nordex Energy GmbH | in operation | 2014-06-11 | Mainfranken Regenerativ GmbH |
| Obbach WEA3 | 2.50 MW | GE Wind Energy GmbH | in operation | 2015-11-21 | Windpark Obbach GmbH & Co. KG |
| SWF 05 | 2.40 MW | Nordex SE | in operation | 2013-11-04 | SWS Windpark Schwanfeld GmbH & Co. KG |
| Waldsachsen WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-05-28 | Mainfranken Regenerativ GmbH |
| SWF 01 | 2.40 MW | Nordex SE | in operation | 2013-10-24 | SWS Windpark Schwanfeld GmbH & Co. KG |
| SWF 04 | 2.40 MW | Nordex SE | in operation | 2013-11-18 | SWS Windpark Schwanfeld GmbH & Co. KG |
| SWF 02 | 2.40 MW | Nordex SE | in operation | 2013-11-22 | SWS Windpark Schwanfeld GmbH & Co. KG |
| SWF 03 | 2.40 MW | Nordex SE | in operation | 2013-11-30 | SWS Windpark Schwanfeld GmbH & Co. KG |
| Schonungen WEA 4 | 2.30 MW | ENERCON GmbH | in operation | 2012-04-12 | Windpark Schonungen GmbH & Co. KG |
| Schonungen WEA 1 | 2.30 MW | ENERCON GmbH | in operation | 2012-04-25 | Windpark Schonungen GmbH & Co. KG |
| Schonungen WEA 5 | 2.30 MW | ENERCON GmbH | in operation | 2012-04-11 | Windpark Schonungen GmbH & Co. KG |
| Schonungen WEA 2 | 2.30 MW | ENERCON GmbH | in operation | 2012-04-20 | Windpark Schonungen GmbH & Co. KG |
| Schonungen WEA 3 | 2.30 MW | ENERCON GmbH | in operation | 2012-04-20 | Windpark Schonungen GmbH & Co. KG |
| WK Bayerhof | 2.00 MW | ENERCON GmbH | in operation | 2011-11-18 | Windkraft Bayerhof GmbH & Co KG |
| S/N: V36014 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-11-12 | Windpark Schraudenbach ApS & Co. KG |
| V 23937-19 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-06-01 | Statkraft Windenergie GmbH & Co. KG |
| WEA Kaisten 24414 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-12-05 | SK Wind GmbH & Co. KG |
| V 24401-22 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-28 | Statkraft Windenergie GmbH & Co. KG |
| V 23936-18 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-06-12 | Statkraft Windenergie GmbH & Co. KG |
| WEA Kaisten 24415 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-12-31 | SK Wind GmbH & Co. KG |
| V 23760-12 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-28 | Statkraft Windenergie GmbH & Co. KG |
| Hesselbach WEA 23255 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-12-06 | Windpark Hesselbach A/S & Co. KG |
| WK Ohrenbach V | 1.00 MW | ENERCON GmbH | in operation | 2003-10-10 | Windkraft Ohrenbach V GmbH & Co KG |
| 2.Schraudenbacher Windlicht | 1.00 MW | ENERCON GmbH | in operation | 2003-04-28 | Windlicht Energie-GmbH |
| Schraudenbacher Windlicht | 1.00 MW | ENERCON GmbH | in operation | 2002-03-05 | Windlicht Energie-GmbH |
| Windkraft Hardberg GmbH & Co KG | 1.00 MW | ENERCON GmbH | in operation | 2003-10-10 | Windkraft Ohrenbach V GmbH & Co KG |
| Windkraftanlage | 0.80 MW | ENERCON GmbH | in operation | 2016-06-15 | Gartenbau Gernert |
| unit operated by a private individual | 0.00 MW | Home Energy International | in operation | 2011-09-13 | private individual |
| unit operated by a private individual | 0.00 MW | Sonstige | in operation | 2012-12-12 | private individual |
| FC Bayern München Fanclub Röthlein 1980 e.V. | 0.00 MW | Sonstige | in operation | 2025-03-14 | FC Bayern München Fanclub Röthlein 1980 e.V. |
Which organisations operate the most wind power capacity in Schweinfurt?
| Operator | Units | Capacity |
|---|---|---|
| JWP Jade Windpark GmbH & Co. 21. Betriebs KG | 6 | 43.2 MW |
| ABO Energy Windpark 25 GmbH & Co. KG | 3 | 20.4 MW |
| Windpark Werneck-Eßleben GmbH & Co. KG | 6 | 18.0 MW |
| Windpark Obbach GmbH & Co. KG | 5 | 12.5 MW |
| SWS Windpark Schwanfeld GmbH & Co. KG | 5 | 12.0 MW |
| Windpark Schonungen GmbH & Co. KG | 5 | 11.5 MW |
| GGEW WP Brünnstadt GmbH & Co. KG | 3 | 9.51 MW |
| Statkraft Windenergie GmbH & Co. KG | 4 | 8.00 MW |
| Mainfranken Regenerativ GmbH | 3 | 7.40 MW |
| 3. Schraudenbacher Windlicht GmbH & Co. KG | 1 | 7.20 MW |
Which manufacturer accounts for the most wind power capacity in Schweinfurt?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 14 | 64.4 MW |
| ENERCON GmbH | 18 | 39.3 MW |
| Nordex Energy GmbH | 8 | 32.8 MW |
| GE Wind Energy GmbH | 5 | 14.8 MW |
| Nordex SE | 5 | 12.0 MW |
| Sonstige | 5 | 9.51 MW |
| GE Renewable Germany GmbH | 1 | 2.50 MW |
| NEG Micon Deutschland GmbH | 1 | 1.50 MW |
| Home Energy International | 1 | 0.00 MW |
Wind power in Bayern · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Schweinfurt (Bayern), and how large are they, as can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.