Wind power in Neustadt a.d. Waldnaab

8 wind turbines with 10.7 MW of gross capacity were in operation in Neustadt a.d. Waldnaab (Bayern) as of 2026-11-05, with a further 10 units (66.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/wind/bayern/neustadt-a-d-waldnaab

Questions this page answers

How many wind turbines are registered in Neustadt a.d. Waldnaab (Bayern), and how large are they, as of 2026-11-05?
8 wind turbines with 10.7 MW of gross capacity were in operation in Neustadt a.d. Waldnaab (Bayern) as of 2026-11-05, with a further 10 units (66.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many wind turbines are in operation in Neustadt a.d. Waldnaab?
8 wind turbines with 10.7 MW of gross capacity were in operation in Neustadt a.d. Waldnaab as of 2026-11-05, with a further 10 units (66.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity was commissioned in Neustadt a.d. Waldnaab in 2016?
1 wind turbines with 2.40 MW went into operation in Neustadt a.d. Waldnaab in 2016; the strongest year of the last two decades was 2013 with 4.73 MW (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most wind power capacity in Neustadt a.d. Waldnaab?
Max Bögl Wind AG operates 7 wind turbines with 48.4 MW in Neustadt a.d. Waldnaab, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which manufacturer has the most wind power capacity in Neustadt a.d. Waldnaab?
Nordex SE leads with 5 wind turbines and 29.6 MW in Neustadt a.d. Waldnaab (Bundesnetzagentur, Marktstammdatenregister).
What is the largest wind turbine in Neustadt a.d. Waldnaab?
The largest registered wind turbine in Neustadt a.d. Waldnaab has 7.20 MW of gross capacity and is operated by WP Tännesberg GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).

How are the wind turbines in Neustadt a.d. Waldnaab distributed by size class?

Size classUnitsCapacityIn operationPlanned
up to 30 kW10.00 MW10
30 to 100 kW10.08 MW00
over 100 kW1777.5 MW710

How much wind power capacity was commissioned in Neustadt a.d. Waldnaab each year?

Commissioning yearUnitsCapacity added
202610.00 MW
201612.40 MW
201324.73 MW

How many wind turbines in Neustadt a.d. Waldnaab are in operation, planned or decommissioned?

StatusUnitsCapacity
planned1066.7 MW
in operation810.7 MW
permanently decommissioned10.08 MW

Which wind turbines are registered in Neustadt a.d. Waldnaab?

UnitCapacityManufacturerStatusCommissionedOperator
WP Tännesberg WEA Nord7.20 MWVestas Deutschland GmbHplannedplanned 2027WP Tännesberg GmbH & Co. KG
WP Tännesberg WEA Mitte7.20 MWVestas Deutschland GmbHplannedplanned 2027Max Bögl Wind AG
WP Tännesberg WEA Süd7.20 MWVestas Deutschland GmbHplannedplanned 2027Max Bögl Wind AG
WP Floß WEA 36.80 MW–plannedplanned 2029Max Bögl Wind AG
WP Leuchtenberg WEA 26.80 MWNordex SEplannedplanned 2028Max Bögl Wind AG
WP Leuchtenberg WEA 16.80 MWNordex SEplannedplanned 2028Max Bögl Wind AG
WP Floß WEA 26.80 MWNordex SEplannedplanned 2029Max Bögl Wind AG
WP Floß WEA 16.80 MWNordex SEplannedplanned 2029Max Bögl Wind AG
Bürgerwind Parkstein WEA25.56 MWENERCON GmbHplannedplanned 2027Bürgerwind Parkstein
Bürgerwind Parkstein WEA35.56 MWENERCON GmbHplannedplanned 2027Bürgerwind Parkstein
WEA Neuzirkendorf2.40 MWNordex SEin operation2016-03-08Windenergie Neuzirkendorf
Bürgerwindpark Ellenfeld GmbH & Co. KG WEA Nord2.37 MWSonstigein operation2013-09-20Bürgerwindpark Ellenfeld GmbH & Co. KG
Bürgerwindpark Ellenfeld GmbH & Co. KG WEA Süd2.37 MWENERCON GmbHin operation2013-09-13Bürgerwindpark Ellenfeld GmbH & Co. KG
AN-02-13002411.30 MWSiemens Wind Power GmbH & Co. KGin operation2000-09-27Einzelunternehmung Karl-Heinz Fischer
AN-01-13002341.30 MWSiemens Wind Power GmbH & Co. KGin operation2000-09-27Einzelunternehmung Karl-Heinz Fischer
Funkwind GmbH & Co. KG WEA Süd0.50 MWENERCON GmbHin operation1995-09-07Funkwind GmbH & Co. KG
Funkwind GmbH & Co. KG WEA Nord0.50 MWENERCON GmbHin operation1994-11-23Funkwind GmbH & Co. KG
unit operated by a private individual0.08 MWLagerwey GmbHpermanently decommissioned1992-11-19private individual
unit operated by a private individual0.00 MWSkyWind GmbHin operation2026-03-01private individual

Which organisations operate the most wind power capacity in Neustadt a.d. Waldnaab?

OperatorUnitsCapacity
Max Bögl Wind AG748.4 MW
Bürgerwind Parkstein211.1 MW
WP Tännesberg GmbH & Co. KG17.20 MW
Bürgerwindpark Ellenfeld GmbH & Co. KG24.73 MW
Einzelunternehmung Karl-Heinz Fischer22.60 MW
Windenergie Neuzirkendorf12.40 MW
Funkwind GmbH & Co. KG21.00 MW

Which manufacturer accounts for the most wind power capacity in Neustadt a.d. Waldnaab?

ManufacturerUnitsCapacity
Nordex SE529.6 MW
Vestas Deutschland GmbH321.6 MW
ENERCON GmbH514.5 MW
Siemens Wind Power GmbH & Co. KG22.60 MW
Sonstige12.37 MW
Lagerwey GmbH10.08 MW
SkyWind GmbH10.00 MW

Wind power in Bayern · Wind power in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many wind turbines are registered in Neustadt a.d. Waldnaab (Bayern), and how large ar can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.