16 wind turbines with 40.5 MW of gross capacity were in operation in Erlangen-Höchstadt (Bayern) as of 2026-11-05, with a further 19 units (122.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/wind/bayern/erlangen-hoechstadt

Questions this page answers

How many wind turbines are registered in Erlangen-Höchstadt (Bayern), and how large are they, as of 2026-11-05?
16 wind turbines with 40.5 MW of gross capacity were in operation in Erlangen-Höchstadt (Bayern) as of 2026-11-05, with a further 19 units (122.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many wind turbines are in operation in Erlangen-Höchstadt?
16 wind turbines with 40.5 MW of gross capacity were in operation in Erlangen-Höchstadt as of 2026-11-05, with a further 19 units (122.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity was commissioned in Erlangen-Höchstadt in 2017?
5 wind turbines with 13.8 MW went into operation in Erlangen-Höchstadt in 2017; the strongest year of the last two decades was 2017 with 13.8 MW (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most wind power capacity in Erlangen-Höchstadt?
Bürgerwindenergie Birkach 2 GmbH & Co. KG operates 6 wind turbines with 40.8 MW in Erlangen-Höchstadt, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which manufacturer has the most wind power capacity in Erlangen-Höchstadt?
Vestas Deutschland GmbH leads with 11 wind turbines and 54.9 MW in Erlangen-Höchstadt (Bundesnetzagentur, Marktstammdatenregister).
What is the largest wind turbine in Erlangen-Höchstadt?
The largest registered wind turbine in Erlangen-Höchstadt has 7.20 MW of gross capacity and is operated by Bürgerwindenergie Weisendorf GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).

How are the wind turbines in Erlangen-Höchstadt distributed by size class?

Size classUnitsCapacityIn operationPlanned
up to 30 kW20.00 MW11
over 100 kW33162.4 MW1518

How much wind power capacity was commissioned in Erlangen-Höchstadt each year?

Commissioning yearUnitsCapacity added
2017513.8 MW
2015512.0 MW
201422.35 MW
2012412.3 MW

How many wind turbines in Erlangen-Höchstadt are in operation, planned or decommissioned?

StatusUnitsCapacity
planned19122.0 MW
in operation1640.5 MW

Which wind turbines are registered in Erlangen-Höchstadt?

UnitCapacityManufacturerStatusCommissionedOperator
WEA 27.20 MWVestas Deutschland GmbHplannedplanned 2026Bürgerwindenergie Weisendorf GmbH & Co. KG
WEA 37.20 MWVestas Deutschland GmbHplannedplanned 2026Bürgerwindenergie Weisendorf GmbH & Co. KG
WEA 17.20 MWVestas Deutschland GmbHplannedplanned 2027Bürgerwindenergie Sintmann GmbH & Co. KG
WEA 17.20 MWVestas Deutschland GmbHplannedplanned 2026Bürgerwindenergie Weisendorf GmbH & Co. KG
WEA 27.20 MWVestas Deutschland GmbHplannedplanned 2027Bürgerwindenergie Sintmann GmbH & Co. KG
WEA 17.00 MWENERCON GmbHplannedplanned 2026Herzo-Windpark Süd01 GmbH & Co. KG
WEA 27.00 MWENERCON GmbHplannedplanned 2026Herzo-Windpark Süd01 GmbH & Co. KG
WEA 16.80 MWNordex SEplannedplanned 2028Bürgerwindenergie Birkach 2 GmbH & Co. KG
WEA 56.80 MWNordex SEplannedplanned 2028Bürgerwindenergie Birkach 2 GmbH & Co. KG
WEA 26.80 MWNordex SEplannedplanned 2027BEG Mühlhausen 2 GmbH & Co. KG
WEA 46.80 MWNordex SEplannedplanned 2028Bürgerwindenergie Birkach 2 GmbH & Co. KG
WEA 26.80 MWNordex SEplannedplanned 2028Bürgerwindenergie Birkach 2 GmbH & Co. KG
WEA 36.80 MWNordex SEplannedplanned 2028Bürgerwindenergie Birkach 2 GmbH & Co. KG
WEA 66.80 MWNordex SEplannedplanned 2028Bürgerwindenergie Birkach 2 GmbH & Co. KG
WEA 16.80 MWNordex SEplannedplanned 2027BEG Mühlhausen 2 GmbH & Co. KG
WEA 66.00 MWENERCON GmbHplannedplanned 2028Infrastruktur Windpark Römerreuth GmbH & Co. KG
WEA 46.00 MWENERCON GmbHplannedplanned 2028Infrastruktur Windpark Römerreuth GmbH & Co. KG
WEA 55.56 MWENERCON GmbHplannedplanned 2028Infrastruktur Windpark Römerreuth GmbH & Co. KG
WEA 13.30 MWVestas Deutschland GmbHin operation2017-06-29Bürgerwindenergie Birkach GmbH & Co. KG
WEA 23.30 MWVestas Deutschland GmbHin operation2017-06-22Bürgerwindenergie Birkach GmbH & Co. KG
WEA 33.08 MWVestas Deutschland GmbHin operation2012-12-03Bürgerwindenergie Mühlhausen GmbH & Co. KG
WEA 43.08 MWVestas Deutschland GmbHin operation2012-12-19Bürgerwindenergie Mühlhausen GmbH & Co. KG
WEA 13.08 MWVestas Deutschland GmbHin operation2012-12-05Bürgerwindenergie Mühlhausen GmbH & Co. KG
WEA 23.08 MWVestas Deutschland GmbHin operation2012-12-04Bürgerwindenergie Mühlhausen GmbH & Co. KG
WEA 42.40 MWNordex Energy GmbHin operation2015-12-01Bürgerwindenergie Lonnerstadt GmbH & Co. KG
QE Vestenbergsgreuth Bestand GmbH & Co. KG2.40 MWNordex Energy GmbHin operation2017-06-12QE Vestenbergsgreuth Bestand GmbH & Co. KG
WEA 12.40 MWNordex Energy GmbHin operation2015-12-28Bürgerwindenergie Lonnerstadt GmbH & Co. KG
QE Vestenbergsgreuth Bestand GmbH & Co. KG2.40 MWNordex Energy GmbHin operation2017-06-15QE Vestenbergsgreuth Bestand GmbH & Co. KG
WEA 32.40 MWNordex Energy GmbHin operation2015-12-30Bürgerwindenergie Lonnerstadt GmbH & Co. KG
WEA 22.40 MWNordex Energy GmbHin operation2015-12-16Bürgerwindenergie Lonnerstadt GmbH & Co. KG
QE Vestenbergsgreuth Bestand GmbH & Co. KG2.40 MWNordex Energy GmbHin operation2017-06-29QE Vestenbergsgreuth Bestand GmbH & Co. KG
WEA 52.40 MWNordex Energy GmbHin operation2015-12-08Bürgerwindenergie Lonnerstadt GmbH & Co. KG
Windenergieanlage Zweifelsheim2.35 MWENERCON GmbHin operation2014-07-17Windenergieanlage Zweifelsheim
unit operated by a private individual0.00 MW–in operation2014-08-27private individual
SkyWind NG 1000 Forschermobil0.00 MWSkyWind GmbHplannedplanned 2026Gemeinde Hemhofen

Which organisations operate the most wind power capacity in Erlangen-Höchstadt?

OperatorUnitsCapacity
Bürgerwindenergie Birkach 2 GmbH & Co. KG640.8 MW
Bürgerwindenergie Weisendorf GmbH & Co. KG321.6 MW
Infrastruktur Windpark Römerreuth GmbH & Co. KG317.6 MW
Bürgerwindenergie Sintmann GmbH & Co. KG214.4 MW
Herzo-Windpark Süd01 GmbH & Co. KG214.0 MW
BEG Mühlhausen 2 GmbH & Co. KG213.6 MW
Bürgerwindenergie Mühlhausen GmbH & Co. KG412.3 MW
Bürgerwindenergie Lonnerstadt GmbH & Co. KG512.0 MW
QE Vestenbergsgreuth Bestand GmbH & Co. KG37.20 MW
Bürgerwindenergie Birkach GmbH & Co. KG26.60 MW

Which manufacturer accounts for the most wind power capacity in Erlangen-Höchstadt?

ManufacturerUnitsCapacity
Vestas Deutschland GmbH1154.9 MW
Nordex SE854.4 MW
ENERCON GmbH633.9 MW
Nordex Energy GmbH819.2 MW
SkyWind GmbH10.00 MW

Wind power in Bayern · Wind power in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many wind turbines are registered in Erlangen-Höchstadt (Bayern), and how large are th can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.