Wind power in Erlangen-Höchstadt
16 wind turbines with 40.5 MW of gross capacity were in operation in Erlangen-Höchstadt (Bayern) as of 2026-11-05, with a further 19 units (122.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Erlangen-Höchstadt (Bayern), and how large are they, as of 2026-11-05?
- 16 wind turbines with 40.5 MW of gross capacity were in operation in Erlangen-Höchstadt (Bayern) as of 2026-11-05, with a further 19 units (122.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Erlangen-Höchstadt?
- 16 wind turbines with 40.5 MW of gross capacity were in operation in Erlangen-Höchstadt as of 2026-11-05, with a further 19 units (122.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Erlangen-Höchstadt in 2017?
- 5 wind turbines with 13.8 MW went into operation in Erlangen-Höchstadt in 2017; the strongest year of the last two decades was 2017 with 13.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Erlangen-Höchstadt?
- Bürgerwindenergie Birkach 2 GmbH & Co. KG operates 6 wind turbines with 40.8 MW in Erlangen-Höchstadt, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Erlangen-Höchstadt?
- Vestas Deutschland GmbH leads with 11 wind turbines and 54.9 MW in Erlangen-Höchstadt (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Erlangen-Höchstadt?
- The largest registered wind turbine in Erlangen-Höchstadt has 7.20 MW of gross capacity and is operated by Bürgerwindenergie Weisendorf GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Erlangen-Höchstadt distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.00 MW | 1 | 1 |
| over 100 kW | 33 | 162.4 MW | 15 | 18 |
How much wind power capacity was commissioned in Erlangen-Höchstadt each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2017 | 5 | 13.8 MW |
| 2015 | 5 | 12.0 MW |
| 2014 | 2 | 2.35 MW |
| 2012 | 4 | 12.3 MW |
How many wind turbines in Erlangen-Höchstadt are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 19 | 122.0 MW |
| in operation | 16 | 40.5 MW |
Which wind turbines are registered in Erlangen-Höchstadt?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Bürgerwindenergie Weisendorf GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Bürgerwindenergie Weisendorf GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindenergie Sintmann GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Bürgerwindenergie Weisendorf GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindenergie Sintmann GmbH & Co. KG |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Herzo-Windpark Süd01 GmbH & Co. KG |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Herzo-Windpark Süd01 GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindenergie Birkach 2 GmbH & Co. KG |
| WEA 5 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindenergie Birkach 2 GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex SE | planned | planned 2027 | BEG Mühlhausen 2 GmbH & Co. KG |
| WEA 4 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindenergie Birkach 2 GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindenergie Birkach 2 GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindenergie Birkach 2 GmbH & Co. KG |
| WEA 6 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwindenergie Birkach 2 GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex SE | planned | planned 2027 | BEG Mühlhausen 2 GmbH & Co. KG |
| WEA 6 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Infrastruktur Windpark Römerreuth GmbH & Co. KG |
| WEA 4 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Infrastruktur Windpark Römerreuth GmbH & Co. KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Infrastruktur Windpark Römerreuth GmbH & Co. KG |
| WEA 1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-06-29 | Bürgerwindenergie Birkach GmbH & Co. KG |
| WEA 2 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-06-22 | Bürgerwindenergie Birkach GmbH & Co. KG |
| WEA 3 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2012-12-03 | Bürgerwindenergie Mühlhausen GmbH & Co. KG |
| WEA 4 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2012-12-19 | Bürgerwindenergie Mühlhausen GmbH & Co. KG |
| WEA 1 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2012-12-05 | Bürgerwindenergie Mühlhausen GmbH & Co. KG |
| WEA 2 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2012-12-04 | Bürgerwindenergie Mühlhausen GmbH & Co. KG |
| WEA 4 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-12-01 | Bürgerwindenergie Lonnerstadt GmbH & Co. KG |
| QE Vestenbergsgreuth Bestand GmbH & Co. KG | 2.40 MW | Nordex Energy GmbH | in operation | 2017-06-12 | QE Vestenbergsgreuth Bestand GmbH & Co. KG |
| WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-12-28 | Bürgerwindenergie Lonnerstadt GmbH & Co. KG |
| QE Vestenbergsgreuth Bestand GmbH & Co. KG | 2.40 MW | Nordex Energy GmbH | in operation | 2017-06-15 | QE Vestenbergsgreuth Bestand GmbH & Co. KG |
| WEA 3 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-12-30 | Bürgerwindenergie Lonnerstadt GmbH & Co. KG |
| WEA 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-12-16 | Bürgerwindenergie Lonnerstadt GmbH & Co. KG |
| QE Vestenbergsgreuth Bestand GmbH & Co. KG | 2.40 MW | Nordex Energy GmbH | in operation | 2017-06-29 | QE Vestenbergsgreuth Bestand GmbH & Co. KG |
| WEA 5 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-12-08 | Bürgerwindenergie Lonnerstadt GmbH & Co. KG |
| Windenergieanlage Zweifelsheim | 2.35 MW | ENERCON GmbH | in operation | 2014-07-17 | Windenergieanlage Zweifelsheim |
| unit operated by a private individual | 0.00 MW | – | in operation | 2014-08-27 | private individual |
| SkyWind NG 1000 Forschermobil | 0.00 MW | SkyWind GmbH | planned | planned 2026 | Gemeinde Hemhofen |
Which organisations operate the most wind power capacity in Erlangen-Höchstadt?
| Operator | Units | Capacity |
|---|---|---|
| Bürgerwindenergie Birkach 2 GmbH & Co. KG | 6 | 40.8 MW |
| Bürgerwindenergie Weisendorf GmbH & Co. KG | 3 | 21.6 MW |
| Infrastruktur Windpark Römerreuth GmbH & Co. KG | 3 | 17.6 MW |
| Bürgerwindenergie Sintmann GmbH & Co. KG | 2 | 14.4 MW |
| Herzo-Windpark Süd01 GmbH & Co. KG | 2 | 14.0 MW |
| BEG Mühlhausen 2 GmbH & Co. KG | 2 | 13.6 MW |
| Bürgerwindenergie Mühlhausen GmbH & Co. KG | 4 | 12.3 MW |
| Bürgerwindenergie Lonnerstadt GmbH & Co. KG | 5 | 12.0 MW |
| QE Vestenbergsgreuth Bestand GmbH & Co. KG | 3 | 7.20 MW |
| Bürgerwindenergie Birkach GmbH & Co. KG | 2 | 6.60 MW |
Which manufacturer accounts for the most wind power capacity in Erlangen-Höchstadt?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 11 | 54.9 MW |
| Nordex SE | 8 | 54.4 MW |
| ENERCON GmbH | 6 | 33.9 MW |
| Nordex Energy GmbH | 8 | 19.2 MW |
| SkyWind GmbH | 1 | 0.00 MW |
Wind power in Bayern · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Erlangen-Höchstadt (Bayern), and how large are th can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.