Wind power in Eichstätt
53 wind turbines with 125.2 MW of gross capacity were in operation in Eichstätt (Bayern) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Eichstätt (Bayern), and how large are they, as of 2026-11-05?
- 53 wind turbines with 125.2 MW of gross capacity were in operation in Eichstätt (Bayern) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Eichstätt?
- 53 wind turbines with 125.2 MW of gross capacity were in operation in Eichstätt as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Eichstätt in 2017?
- 7 wind turbines with 19.5 MW went into operation in Eichstätt in 2017; the strongest year of the last two decades was 2015 with 26.6 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Eichstätt?
- WindStrom Titting GmbH & Co. KG operates 8 wind turbines with 21.5 MW in Eichstätt, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Eichstätt?
- ENERCON GmbH leads with 19 wind turbines and 41.4 MW in Eichstätt (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Eichstätt?
- The largest registered wind turbine in Eichstätt has 6.00 MW of gross capacity and is operated by NEW Bürgerwind Walting Nord GmbH & Co. KG, commissioned 2026-04-22 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Eichstätt distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 54 | 127.7 MW | 52 | 0 |
How much wind power capacity was commissioned in Eichstätt each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 6.00 MW |
| 2017 | 7 | 19.5 MW |
| 2016 | 3 | 8.34 MW |
| 2015 | 10 | 26.6 MW |
| 2014 | 5 | 13.8 MW |
| 2013 | 10 | 23.6 MW |
| 2012 | 6 | 14.0 MW |
| 2011 | 2 | 1.50 MW |
How many wind turbines in Eichstätt are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 53 | 125.2 MW |
| permanently decommissioned | 2 | 2.50 MW |
Which wind turbines are registered in Eichstätt?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| NEW Walting Nord | 6.00 MW | ENERCON GmbH | in operation | 2026-04-22 | NEW Bürgerwind Walting Nord GmbH & Co. KG |
| WEA Großnottersdorf 2 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-12-17 | SL Windenergie Großnottersdorf 2 GmbH & Co. KG |
| WP Workerszeller Forst WEA05 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-08-10 | Windpark Notos GmbH & Co. KG |
| WEA Großnottersdorf 1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-12-17 | SL Windenergie Großnottersdorf 1 GmbH & Co. KG |
| WP Workerszeller Forst WEA04 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-07-28 | Windpark Notos GmbH & Co. KG |
| WP Workerszeller Forst WEA03 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-08-31 | Windpark Notos GmbH & Co. KG |
| WEA 1 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2015-11-23 | WindStrom Titting GmbH & Co. KG |
| WEA 10 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2015-12-02 | WindStrom Titting GmbH & Co. KG |
| WEA 2 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2015-11-25 | WindStrom Titting GmbH & Co. KG |
| WEA3 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-12-28 | NEW Bürgerwind Walting GmbH & Co. KG |
| WEA2 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2016-12-28 | NEW Bürgerwind Walting GmbH & Co. KG |
| WEA1 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-12-28 | NEW Bürgerwind Walting GmbH & Co. KG |
| WEA 2 Pollenfeld 28150137 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-12-09 | Neue Energie Dollnstein eG |
| WEA 1 Pollenfeld 28150119 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-12-15 | Neue Energie Dollnstein eG |
| Titting 2 | 2.50 MW | VENSYS Energy AG | in operation | 2013-09-20 | SRE GmbH & Co. - WP MST KG |
| Titting 3 | 2.50 MW | VENSYS Energy AG | in operation | 2013-09-26 | SRE GmbH & Co. - WP MST KG |
| WEA S4 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-08-10 | Windpark Stadelhofen-Titting GmbH & Co. KG |
| WEA OB5 (NX 83208) | 2.40 MW | Nordex Energy GmbH | in operation | 2014-09-12 | Limes Windpark GmbH |
| WP Denkendorf WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-12-30 | WP Denkendorf GmbH & Co. KG |
| WEA OB4 (NX 83209) | 2.40 MW | Nordex Energy GmbH | in operation | 2014-09-03 | Limes Windpark GmbH |
| WEA S1 | 2.40 MW | Nordex SE | in operation | 2017-08-17 | Windpark Stadelhofen-Titting GmbH & Co. KG |
| WEA 6 | 2.40 MW | Nordex SE | in operation | 2015-12-30 | WindStrom Titting GmbH & Co. KG |
| WP Denkendorf WEA 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-12-19 | WP Denkendorf GmbH & Co. KG |
| WEA S2 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-08-16 | Windpark Stadelhofen-Titting GmbH & Co. KG |
| WEA 7 | 2.40 MW | Nordex SE | in operation | 2015-12-30 | WindStrom Titting GmbH & Co. KG |
| WEA S3 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-08-24 | Windpark Stadelhofen-Titting GmbH & Co. KG |
| WEA 3 | 2.40 MW | Nordex SE | in operation | 2015-12-04 | WindStrom Titting GmbH & Co. KG |
| WEA 8 | 2.40 MW | Nordex SE | in operation | 2015-12-17 | WindStrom Titting GmbH & Co. KG |
| WEA 9 | 2.40 MW | Nordex SE | in operation | 2015-12-22 | WindStrom Titting GmbH & Co. KG |
| WEA Denkendorf | 2.35 MW | ENERCON GmbH | in operation | 2013-12-04 | SL Windenergie GmbH & Co. KG |
| BWPD WEA 920025 | 2.35 MW | ENERCON GmbH | in operation | 2013-12-23 | Bürgerwindpark Denkendorf GmbH & Co. KG |
| BWPD WEA 920026 | 2.35 MW | ENERCON GmbH | in operation | 2013-12-23 | Bürgerwindpark Denkendorf GmbH & Co. KG |
| BWPD WEA 920027 | 2.35 MW | ENERCON GmbH | in operation | 2014-02-07 | Bürgerwindpark Denkendorf GmbH & Co. KG |
| BWPD WEA 920024 | 2.35 MW | ENERCON GmbH | in operation | 2013-12-23 | Bürgerwindpark Denkendorf GmbH & Co. KG |
| BWPD WEA 920023 | 2.35 MW | ENERCON GmbH | in operation | 2013-12-30 | Bürgerwindpark Denkendorf GmbH & Co. KG |
| WEA MAI1 | 2.34 MW | ENERCON GmbH | in operation | 2012-08-01 | Beermann Windkraft GmbH & Co. Maierfeld KG |
| WEA MAI4 | 2.34 MW | ENERCON GmbH | in operation | 2012-08-01 | Beermann Windkraft GmbH & Co. Maierfeld KG |
| WEA MAI2 | 2.34 MW | ENERCON GmbH | in operation | 2012-08-01 | Beermann Windkraft GmbH & Co. Maierfeld KG |
| WEA MAI3 | 2.34 MW | ENERCON GmbH | in operation | 2012-08-01 | Beermann Windkraft GmbH & Co. Maierfeld KG |
| WEA 1 824462 | 2.34 MW | ENERCON GmbH | in operation | 2012-07-04 | Stadtwerke Weißenburg GmbH |
| WEA 2 824463 | 2.34 MW | ENERCON GmbH | in operation | 2012-07-11 | Stadtwerke Weißenburg GmbH |
| WEA GND1 | 2.00 MW | ENERCON GmbH | in operation | 2004-12-15 | BEERMANN Windkraft GmbH & Co. Großnottersdorf KG |
| Windrad 201032 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-15 | Windkraft Kernl |
| WEA GND2 | 2.00 MW | ENERCON GmbH | in operation | 2004-12-15 | BEERMANN Windkraft GmbH & Co. Großnottersdorf KG |
| VE-03-21418 | 1.55 MW | NEG Micon Deutschland GmbH | in operation | 2005-10-12 | Momentum Energy Germany GmbH & Co.KG |
| VE-02-21428 | 1.55 MW | NEG Micon Deutschland GmbH | in operation | 2005-10-12 | Momentum Energy Germany GmbH & Co.KG |
| Titting 1 | 1.50 MW | VENSYS Energy AG | in operation | 2011-12-30 | SRE GmbH & Co. - WP MST KG |
| Pollenfeld 1 | 1.50 MW | Vestas Deutschland GmbH | in operation | 2004-11-08 | Jura-Energie GmbH & Co. - Windpark Pollenfeld KG |
| Windkraft Riedelshof | 1.50 MW | ENERCON GmbH | in operation | 1999-12-31 | WP9 Hohenlohe GmbH |
| unit operated by a private individual | 1.50 MW | Tacke GmbH & Co. KG | permanently decommissioned | 1999-12-31 | private individual |
| unit operated by a private individual | 1.00 MW | AN Windenergie GmbH | permanently decommissioned | 2001-07-20 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2001-09-14 | private individual |
| E44977 | 0.60 MW | ENERCON GmbH | in operation | 2001-09-14 | FUCHS WEA Deining Litterzhofen GmbH & Co. KG |
| WEA OB3 (E-40/6.44 Oberhochstatt) | 0.60 MW | ENERCON GmbH | in operation | 2002-09-23 | Bavaria Windpark GmbH & Co. KG |
| unit operated by a private individual | 0.00 MW | FuSystems SkyWind GmbH | in operation | 2011-11-21 | private individual |
Which organisations operate the most wind power capacity in Eichstätt?
| Operator | Units | Capacity |
|---|---|---|
| WindStrom Titting GmbH & Co. KG | 8 | 21.5 MW |
| Bürgerwindpark Denkendorf GmbH & Co. KG | 5 | 11.8 MW |
| Windpark Notos GmbH & Co. KG | 3 | 9.90 MW |
| Windpark Stadelhofen-Titting GmbH & Co. KG | 4 | 9.60 MW |
| Beermann Windkraft GmbH & Co. Maierfeld KG | 4 | 9.36 MW |
| NEW Bürgerwind Walting GmbH & Co. KG | 3 | 8.34 MW |
| SRE GmbH & Co. - WP MST KG | 3 | 6.50 MW |
| NEW Bürgerwind Walting Nord GmbH & Co. KG | 1 | 6.00 MW |
| Neue Energie Dollnstein eG | 2 | 5.06 MW |
| Limes Windpark GmbH | 2 | 4.80 MW |
Which manufacturer accounts for the most wind power capacity in Eichstätt?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 19 | 41.4 MW |
| Nordex Energy GmbH | 10 | 26.7 MW |
| Nordex SE | 6 | 14.4 MW |
| GE Wind Energy GmbH | 4 | 10.6 MW |
| Vestas Deutschland GmbH | 4 | 10.1 MW |
| Senvion Deutschland GmbH | 3 | 9.51 MW |
| VENSYS Energy AG | 3 | 6.50 MW |
| NEG Micon Deutschland GmbH | 2 | 3.11 MW |
| GE Renewable Germany GmbH | 1 | 2.78 MW |
| Tacke GmbH & Co. KG | 1 | 1.50 MW |
Wind power in Bayern · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Eichstätt (Bayern), and how large are they, as of can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.