Germany · renewables
Wind power in Aichach-Friedberg
13 wind turbines with 27.6 MW of gross capacity were in operation in Aichach-Friedberg (Bayern) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Aichach-Friedberg (Bayern), and how large are they, as of 2026-11-05?
- 13 wind turbines with 27.6 MW of gross capacity were in operation in Aichach-Friedberg (Bayern) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Aichach-Friedberg?
- 13 wind turbines with 27.6 MW of gross capacity were in operation in Aichach-Friedberg as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Aichach-Friedberg in 2017?
- 2 wind turbines with 6.00 MW went into operation in Aichach-Friedberg in 2017; the strongest year of the last two decades was 2016 with 14.4 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Aichach-Friedberg?
- Onshore Wind Erlauholz GmbH & Co. KG operates 3 wind turbines with 7.20 MW in Aichach-Friedberg, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Aichach-Friedberg?
- Nordex Energy GmbH leads with 9 wind turbines and 22.2 MW in Aichach-Friedberg (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Aichach-Friedberg?
- The largest registered wind turbine in Aichach-Friedberg has 3.00 MW of gross capacity and is operated by Windpark Baar GmbH & Co. KG, commissioned 2017-11-30 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Aichach-Friedberg distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.01 MW | 2 | 0 |
| over 100 kW | 11 | 27.6 MW | 11 | 0 |
How much wind power capacity was commissioned in Aichach-Friedberg each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2017 | 2 | 6.00 MW |
| 2016 | 7 | 14.4 MW |
| 2015 | 3 | 7.20 MW |
| 2011 | 1 | 0.00 MW |
How many wind turbines in Aichach-Friedberg are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 13 | 27.6 MW |
Which wind turbines are registered in Aichach-Friedberg?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Windpark Baar GmbH & Co. KG | 3.00 MW | Nordex SE | in operation | 2017-11-30 | Windpark Baar GmbH & Co. KG |
| Windpark Baar GmbH & Co. KG | 3.00 MW | Nordex Energy GmbH | in operation | 2017-11-23 | Windpark Baar GmbH & Co. KG |
| Erlauholz 83919 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-09-29 | Onshore Wind Erlauholz GmbH & Co. KG |
| AIC 6 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-04-20 | Windkraft Blumenthal GmbH & Co. KG |
| AIC 1 | 2.40 MW | Nordex SE | in operation | 2016-03-10 | Windkraft Sielenbach GmbH & Co. KG |
| Erlauholz 83920 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-09-28 | Onshore Wind Erlauholz GmbH & Co. KG |
| AIC 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-02-11 | Windkraft Sielenbach GmbH & Co. KG |
| Erlauholz 83921 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-10-07 | Onshore Wind Erlauholz GmbH & Co. KG |
| AIC 3 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-03-29 | Windkraft Dasing GmbH & Co. KG |
| AIC 5 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-04-27 | Windkraft Blumenthal GmbH & Co. KG |
| AIC 4 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-04-21 | Windkraft Blumenthal GmbH & Co. KG |
| Windkraftanlage Gildemeister | 0.01 MW | Kessler Energy GmbH | in operation | 2016-06-30 | DECKERFORM Produktionssysteme GmbH |
| unit operated by a private individual | 0.00 MW | Sonstige | in operation | 2011-09-27 | private individual |
Which organisations operate the most wind power capacity in Aichach-Friedberg?
| Operator | Units | Capacity |
|---|---|---|
| Onshore Wind Erlauholz GmbH & Co. KG | 3 | 7.20 MW |
| Windkraft Blumenthal GmbH & Co. KG | 3 | 7.20 MW |
| Windpark Baar GmbH & Co. KG | 2 | 6.00 MW |
| Windkraft Sielenbach GmbH & Co. KG | 2 | 4.80 MW |
| Windkraft Dasing GmbH & Co. KG | 1 | 2.40 MW |
| DECKERFORM Produktionssysteme GmbH | 1 | 0.01 MW |
Which manufacturer accounts for the most wind power capacity in Aichach-Friedberg?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Energy GmbH | 9 | 22.2 MW |
| Nordex SE | 2 | 5.40 MW |
| Kessler Energy GmbH | 1 | 0.01 MW |
| Sonstige | 1 | 0.00 MW |
Wind power in Bayern · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Aichach-Friedberg (Bayern), and how large are the can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.