Germany · renewables
Wind power in Tuttlingen
17 wind turbines with 40.8 MW of gross capacity were in operation in Tuttlingen (Baden-Württemberg) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Tuttlingen (Baden-Württemberg), and how large are they, as of 2026-11-05?
- 17 wind turbines with 40.8 MW of gross capacity were in operation in Tuttlingen (Baden-Württemberg) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Tuttlingen?
- 17 wind turbines with 40.8 MW of gross capacity were in operation in Tuttlingen as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Tuttlingen in 2024?
- 1 wind turbines with 0.00 MW went into operation in Tuttlingen in 2024; the strongest year of the last two decades was 2023 with 21.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Tuttlingen?
- Windpark Junge Donau GmbH & Co. KG operates 5 wind turbines with 21.0 MW in Tuttlingen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Tuttlingen?
- Vestas Deutschland GmbH leads with 13 wind turbines and 39.3 MW in Tuttlingen (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Tuttlingen?
- The largest registered wind turbine in Tuttlingen has 4.20 MW of gross capacity and is operated by Windpark Junge Donau GmbH & Co. KG, commissioned 2023-07-14 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Tuttlingen distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.01 MW | 1 | 0 |
| over 100 kW | 16 | 40.8 MW | 16 | 0 |
How much wind power capacity was commissioned in Tuttlingen each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2024 | 1 | 0.00 MW |
| 2023 | 5 | 21.0 MW |
| 2017 | 5 | 16.5 MW |
| 2011 | 1 | 0.01 MW |
How many wind turbines in Tuttlingen are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 17 | 40.8 MW |
| temporarily shut down | 1 | 0.01 MW |
Which wind turbines are registered in Tuttlingen?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Junge Donau WEA 05 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-07-14 | Windpark Junge Donau GmbH & Co. KG |
| Junge Donau WEA 01 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-07-26 | Windpark Junge Donau GmbH & Co. KG |
| Junge Donau WEA 04 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-06-30 | Windpark Junge Donau GmbH & Co. KG |
| Junge Donau WEA 02 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-06-22 | Windpark Junge Donau GmbH & Co. KG |
| Junge Donau WEA 03 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-06-22 | Windpark Junge Donau GmbH & Co. KG |
| Windpark Amtenhauser Berg WEA04 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-10-11 | Windpark Amtenhauser Berg GmbH & Co. KG |
| Windpark Amtenhauser Berg WEA01 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-11-04 | Windpark Amtenhauser Berg GmbH & Co. KG |
| Windpark Amtenhauser Berg WEA05 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-10-19 | Windpark Amtenhauser Berg GmbH & Co. KG |
| Windpark Amtenhauser Berg WEA03 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-10-19 | Windpark Amtenhauser Berg GmbH & Co. KG |
| Windpark Amtenhauser Berg WEA02 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-10-27 | Windpark Amtenhauser Berg GmbH & Co. KG |
| Leipferdingen WEA 3 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1998-01-01 | EXPEC Windstrom UG |
| Leipferdingen WEA 1 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-12-31 | EXPEC Windstrom UG |
| Leipferdingen WEA 2 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-12-31 | Klarer und Klarer GbR |
| Kalyke Renquishausen | 0.50 MW | ENERCON GmbH | in operation | 2000-04-01 | VenSol Windpark Renquishausen GmbH & Co. KG |
| WEA 2 – Renquishausen | 0.50 MW | ENERCON GmbH | in operation | 1996-10-01 | solarcomplex AG |
| WEA 1 – Renquishausen | 0.50 MW | ENERCON GmbH | in operation | 1996-10-01 | solarcomplex AG |
| Windkraftanlage | 0.01 MW | Sonstige | temporarily shut down | 2011-12-01 | Rudolf Storz GmbH |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2024-05-03 | private individual |
Which organisations operate the most wind power capacity in Tuttlingen?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Junge Donau GmbH & Co. KG | 5 | 21.0 MW |
| Windpark Amtenhauser Berg GmbH & Co. KG | 5 | 16.5 MW |
| EXPEC Windstrom UG | 2 | 1.20 MW |
| solarcomplex AG | 2 | 1.00 MW |
| Klarer und Klarer GbR | 1 | 0.60 MW |
| VenSol Windpark Renquishausen GmbH & Co. KG | 1 | 0.50 MW |
| Rudolf Storz GmbH | 1 | 0.01 MW |
Which manufacturer accounts for the most wind power capacity in Tuttlingen?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 13 | 39.3 MW |
| ENERCON GmbH | 3 | 1.50 MW |
| Sonstige | 1 | 0.01 MW |
| SkyWind GmbH | 1 | 0.00 MW |
Wind power in Baden-Württemberg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Tuttlingen (Baden-Württemberg), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.