Wind power in Ortenaukreis

55 wind turbines with 170.1 MW of gross capacity were in operation in Ortenaukreis (Baden-Württemberg) as of 2026-11-05, with a further 15 units (66.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/wind/baden-wuerttemberg/ortenaukreis

Questions this page answers

How many wind turbines are registered in Ortenaukreis (Baden-Württemberg), and how large are they, as of 2026-11-05?
55 wind turbines with 170.1 MW of gross capacity were in operation in Ortenaukreis (Baden-Württemberg) as of 2026-11-05, with a further 15 units (66.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many wind turbines are in operation in Ortenaukreis?
55 wind turbines with 170.1 MW of gross capacity were in operation in Ortenaukreis as of 2026-11-05, with a further 15 units (66.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity was commissioned in Ortenaukreis in 2025?
3 wind turbines with 16.7 MW went into operation in Ortenaukreis in 2025; the strongest year of the last two decades was 2016 with 40.5 MW (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most wind power capacity in Ortenaukreis?
Windstrom Schwarzwaldhochstraße GmbH & CO.KG operates 4 wind turbines with 24.0 MW in Ortenaukreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which manufacturer has the most wind power capacity in Ortenaukreis?
ENERCON GmbH leads with 46 wind turbines and 182.5 MW in Ortenaukreis (Bundesnetzagentur, Marktstammdatenregister).
What is the largest wind turbine in Ortenaukreis?
The largest registered wind turbine in Ortenaukreis has 7.20 MW of gross capacity and is operated by Windpark Hummelsebene GmbH & Co. KG, commissioned 2026-10-01 (Bundesnetzagentur, Marktstammdatenregister).

How are the wind turbines in Ortenaukreis distributed by size class?

Size classUnitsCapacityIn operationPlanned
up to 30 kW90.03 MW53
over 100 kW70249.0 MW5012

How much wind power capacity was commissioned in Ortenaukreis each year?

Commissioning yearUnitsCapacity added
2026738.4 MW
2025316.7 MW
202424.20 MW
202210.00 MW
2021625.2 MW
202023.05 MW
201826.00 MW
2017412.0 MW
20161540.5 MW
2015411.4 MW
201410.01 MW
201313.05 MW
201122.00 MW
200924.00 MW

How many wind turbines in Ortenaukreis are in operation, planned or decommissioned?

StatusUnitsCapacity
in operation55170.1 MW
planned1566.5 MW
permanently decommissioned912.4 MW

Which wind turbines are registered in Ortenaukreis?

UnitCapacityManufacturerStatusCommissionedOperator
Hummelsebene WEA 37.20 MWVestas Deutschland GmbHin operation2026-10-01Windpark Hummelsebene GmbH & Co. KG
Hummelsebene WEA 17.20 MWVestas Deutschland GmbHin operation2026-10-09Windpark Hummelsebene GmbH & Co. KG
Hummelsebene WEA 27.20 MWVestas Deutschland GmbHin operation2026-10-07Windpark Hummelsebene GmbH & Co. KG
WEA fischer 17.00 MWENERCON GmbHplannedplanned 2027fischer Energiepark GmbH & Co. KG
WEA fischer 27.00 MWENERCON GmbHplannedplanned 2027fischer Energiepark GmbH & Co. KG
WEA Hornisgrinde II6.00 MWENERCON GmbHplannedplanned 2027Windstrom Schwarzwaldhochstraße GmbH & CO.KG
Windpark Bustertkopf WEA 26.00 MWENERCON GmbHplannedplanned 2028Windstrom Schwarzwaldhochstraße GmbH & CO.KG
WEA Kempfenbühl Repowering Süd6.00 MWENERCON GmbHplannedplanned 2026FHE Windkraft GmbH & Co. KG
Windenergieanlage Lauf6.00 MWENERCON GmbHplannedplanned 2028Windstrom Schwarzwaldhochstraße GmbH & CO.KG
Windpark Bustertkopf WEA 16.00 MWENERCON GmbHplannedplanned 2028Windstrom Schwarzwaldhochstraße GmbH & CO.KG
Ettenheim WEA035.56 MWENERCON GmbHin operation2025-10-24FHE Windkraft GmbH & Co. KG
Ettenheim WEA 015.56 MWENERCON GmbHin operation2025-10-24Bürgerwind Ettenheim GmbH
WEA Weissmoos 25.56 MWENERCON GmbHplannedplanned 2028Ökostrom Erzeugung Freiburg GmbH
16050955.56 MWENERCON GmbHin operation2025-11-24Alterric Windpark Ettenheim GmbH & Co. KG
Windpark Mooshof II WEA24.26 MWENERCON GmbHplannedplanned 2028Energiepark Windkapf
Windpark Mooshof II WEA14.26 MWENERCON GmbHplannedplanned 2026Energiepark Windkapf
Windpark Prechtaler Schanze III, WEA 104.20 MWENERCON GmbHin operation2026-02-20Windpark Prechtaler Schanze GmbH & Co.KG
Windpark Prechtaler Schanze III, WEA 84.20 MWENERCON GmbHin operation2026-03-11Windpark Prechtaler Schanze GmbH & Co.KG
WEA 1 Hohenlochen4.20 MWENERCON GmbHin operation2021-03-17Windpark Hohenlochen GmbH & Co. KG
WEA 3 Hohenlochen4.20 MWENERCON GmbHin operation2021-05-25Windpark Hohenlochen GmbH & Co. KG
WEA 4 Hohenlochen4.20 MWENERCON GmbHin operation2021-06-01Windpark Hohenlochen GmbH & Co. KG
Wind Lahr24.20 MWENERCON GmbHin operation2021-10-01Bürgerwind Lahr 2 GmbH & Co. KG
Windpark Nillkopf WEA 34.20 MWENERCON GmbHplannedplanned 2026Windpark Prechtaler Schanze GmbH & Co.KG
Falkenhoehe WEA014.20 MWVestas Deutschland GmbHin operation2026-03-30Windpark Falkenhöhe GmbH & Co. KG
WEA 2 Hohenlochen4.20 MWENERCON GmbHin operation2021-04-29Windpark Hohenlochen GmbH & Co. KG
Windpark Kallenwald4.20 MWENERCON GmbHin operation2024-02-07Windpark Kallenwald GmbH & Co. KG
Windpark Falkenhöhe WEA44.20 MWVestas Deutschland GmbHin operation2021-06-14Windpark Falkenhöhe GmbH & Co. KG
Windpark Prechtaler Schanze III, WEA 94.20 MWENERCON GmbHin operation2026-02-17Windpark Prechtaler Schanze GmbH & Co.KG
WEA Steigleskopf 14.20 MWENERCON GmbHplannedplanned 2026Windpark Prechtaler Schanze GmbH & Co.KG
Windpark Prechtaler Schanze I, WEA 23.05 MWENERCON GmbHin operation2015-10-06Windenergie Gutach GmbH & Co. KG
Windpark Prechtaler Schanze I, WEA I3.05 MWENERCON GmbHin operation2015-10-09Windenergie Mühlenbach GmbH & Co. KG
ecovision SWEBürgerwind3.05 MWENERCON GmbHin operation2013-11-08SWE Bürgerwind I GmbH&Co KG
Windpark Prechtaler Schanze I, WEA 33.05 MWENERCON GmbHin operation2015-10-22Windenergie Gutach GmbH & Co. KG
WEA Pilfer3.05 MWENERCON GmbHin operation2020-02-13Elektrizitätswerk Mittelbaden AG & Co. KG
Windpark Prechtaler Schanze II, WEA 63.00 MWENERCON GmbHin operation2016-09-16Elektrizitätswerk Mittelbaden AG & Co. KG
WEA 2 Kambacher Eck3.00 MWENERCON GmbHin operation2016-05-19Windpark Kambacher Eck GmbH & Co. KG
WEA 4 Kambacher Eck3.00 MWENERCON GmbHin operation2016-03-23Windpark Kambacher Eck GmbH & Co. KG
11506543.00 MWENERCON GmbHin operation2017-05-31Windpark GmbH & Co. Rauhkasten-Steinfirst KG
WEA 1 Kambacher Eck3.00 MWENERCON GmbHin operation2016-06-14Windpark Kambacher Eck GmbH & Co. KG
WEA2 11506533.00 MWENERCON GmbHin operation2017-06-30Windenergie Gengenbach GmbH
WEA 3 Kambacher Eck3.00 MWENERCON GmbHin operation2016-03-29Windpark Kambacher Eck GmbH & Co. KG
Windpark Nillkopf WEA 23.00 MWENERCON GmbHin operation2018-09-28Elektrizitätswerk Mittelbaden AG & Co. KG
11506523.00 MWENERCON GmbHin operation2017-05-18Windpark GmbH & Co. Rauhkasten-Steinfirst KG
Windpark Prechtaler Schanze II, WEA 43.00 MWENERCON GmbHin operation2016-06-24Elektrizitätswerk Mittelbaden AG & Co. KG
Windpark Nillkopf WEA 13.00 MWENERCON GmbHin operation2018-09-21Elektrizitätswerk Mittelbaden AG & Co. KG
OEKOGENO KG10 Lahr3.00 MWENERCON GmbHin operation2016-06-27Zehnte OekoGeno Regenerative GmbH & Co. KG
WEA4 11506553.00 MWENERCON GmbHin operation2017-05-31Windenergie Gengenbach GmbH
Bürgerwindpark Südliche Ortenau GmbH SOR WEA042.78 MWGE Wind Energy GmbHin operation2016-05-23Bürgerwindpark Südliche Ortenau GmbH
Bürgerwindpark Südliche Ortenau GmbH SOR WEA022.78 MWGE Wind Energy GmbHin operation2016-05-07Bürgerwindpark Südliche Ortenau GmbH
Bürgerwindpark Südliche Ortenau GmbH SOR WEA052.78 MWGE Wind Energy GmbHin operation2016-05-25Bürgerwindpark Südliche Ortenau GmbH
Bürgerwindpark Südliche Ortenau GmbH SOR WEA062.78 MWGE Wind Energy GmbHin operation2016-06-02Bürgerwindpark Südliche Ortenau GmbH
Bürgerwindpark Südliche Ortenau GmbH SOR WEA032.78 MWGE Wind Energy GmbHin operation2016-06-03Bürgerwindpark Südliche Ortenau GmbH
Bürgerwindpark Südliche Ortenau GmbH SOR WEA012.78 MWGE Wind Energy GmbHin operation2016-05-09Bürgerwindpark Südliche Ortenau GmbH
Bürgerwindpark Südliche Ortenau GmbH SOR WEA072.78 MWGE Wind Energy GmbHin operation2016-06-13Bürgerwindpark Südliche Ortenau GmbH
unit operated by a private individual2.50 MWNordex Energy GmbHpermanently decommissioned2000-12-30private individual
Hornisgrinde 12.30 MWENERCON GmbHin operation2015-11-06Windpark Hornisgrinde
Hornberg WEA 22.00 MWENERCON GmbHin operation2009-07-20regiomix 2030 GmbH & Co. KG
Hornberg WEA 12.00 MWENERCON GmbHin operation2009-08-06regiomix 2030 GmbH & Co. KG
WP Steigers Eck WEA 1/12.00 MWVestas Deutschland GmbHin operation2011-06-16WEA Steigers Eck GmbH & Co.KG
unit operated by a private individual1.50 MWSüdwind Borsig Energy GmbHpermanently decommissioned2005-07-15private individual
unit operated by a private individual1.50 MWSüdwind Borsig Energy GmbHpermanently decommissioned2005-07-15private individual
WEA 3 Lahr/Seelbach1.50 MWSüdwind Borsig Energy GmbHpermanently decommissioned2005-07-15FHE Windkraft GmbH & Co. KG
unit operated by a private individual1.50 MWSüdwind Borsig Energy GmbHpermanently decommissioned2001-12-28private individual
unit operated by a private individual1.30 MWNordex Energy GmbHpermanently decommissioned2000-08-01private individual
unit operated by a private individual1.30 MWNordex SEpermanently decommissioned2000-07-24private individual
unit operated by a private individual1.30 MWNordex SEpermanently decommissioned2000-07-22private individual
Fl 1000 Nr. 2551.00 MWFuhrländer AGin operation2002-12-20GMA-Energy Hohenlohe GmbH Marius Mulawka
Bürgerwindrad Brandenkopf1.00 MWENERCON GmbHin operation2002-07-15Brandenkopf Wind GmbH &Co. Beteiligungs KG
FL1000 Nr.:2541.00 MWFuhrländer AGin operation2002-12-20GMA-Energy Hohenlohe GmbH Marius Mulawka
Jalbo0.60 MWTacke GmbH & Co. KGin operation1997-09-05Elektrizitätswerk Mittelbaden AG & Co. KG
unit operated by a private individual0.01 MWLely Aircon B.V. Niederlassung Leerin operation2016-06-23private individual
unit operated by a private individual0.01 MWBRAUN Windturbinen GmbHin operation2014-10-31private individual
unit operated by a private individual0.00 MWLuvSide GmbHin operation2020-09-18private individual
Windkraftanlage Skystream0.00 MWSonstigein operation2011-05-25TISCH - Visuelle Kompetenz GmbH
unit operated by a private individual0.00 MWSkyWind GmbHpermanently decommissioned2022-02-09private individual
unit operated by a private individual0.00 MWSkyWind GmbHin operation2024-01-05private individual
Windrad0.00 MWSkyWind GmbHplannedplanned 2024Sigel Dental GmbH
Windrad0.00 MWSkyWind GmbHplannedplanned 2024IFP2 Hangs GmbH
unit operated by a private individual0.00 MWSonstigeplannedplanned 2026private individual

Which organisations operate the most wind power capacity in Ortenaukreis?

OperatorUnitsCapacity
Windstrom Schwarzwaldhochstraße GmbH & CO.KG424.0 MW
Windpark Hummelsebene GmbH & Co. KG321.6 MW
Windpark Prechtaler Schanze GmbH & Co.KG521.0 MW
Bürgerwindpark Südliche Ortenau GmbH719.5 MW
Windpark Hohenlochen GmbH & Co. KG416.8 MW
Elektrizitätswerk Mittelbaden AG & Co. KG615.7 MW
fischer Energiepark GmbH & Co. KG214.0 MW
FHE Windkraft GmbH & Co. KG313.1 MW
Windpark Kambacher Eck GmbH & Co. KG412.0 MW
Energiepark Windkapf28.52 MW

Which manufacturer accounts for the most wind power capacity in Ortenaukreis?

ManufacturerUnitsCapacity
ENERCON GmbH46182.5 MW
Vestas Deutschland GmbH632.0 MW
GE Wind Energy GmbH719.5 MW
Südwind Borsig Energy GmbH46.00 MW
Nordex Energy GmbH23.80 MW
Nordex SE22.60 MW
Fuhrländer AG22.00 MW
Tacke GmbH & Co. KG10.60 MW
Lely Aircon B.V. Niederlassung Leer10.01 MW
BRAUN Windturbinen GmbH10.01 MW

Wind power in Baden-Württemberg · Wind power in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many wind turbines are registered in Ortenaukreis (Baden-Württemberg), and how large a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.