Germany · renewables
Wind power in Neckar-Odenwald-Kreis
51 wind turbines with 157.0 MW of gross capacity were in operation in Neckar-Odenwald-Kreis (Baden-Württemberg) as of 2026-11-05, with a further 25 units (148.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Neckar-Odenwald-Kreis (Baden-Württemberg), and how large are they, as of 2026-11-05?
- 51 wind turbines with 157.0 MW of gross capacity were in operation in Neckar-Odenwald-Kreis (Baden-Württemberg) as of 2026-11-05, with a further 25 units (148.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Neckar-Odenwald-Kreis?
- 51 wind turbines with 157.0 MW of gross capacity were in operation in Neckar-Odenwald-Kreis as of 2026-11-05, with a further 25 units (148.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Neckar-Odenwald-Kreis in 2025?
- 5 wind turbines with 22.5 MW went into operation in Neckar-Odenwald-Kreis in 2025; the strongest year of the last two decades was 2025 with 22.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Neckar-Odenwald-Kreis?
- EE BürgerEnergie Hardheim GmbH & Co. KG operates 12 wind turbines with 68.5 MW in Neckar-Odenwald-Kreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Neckar-Odenwald-Kreis?
- ENERCON GmbH leads with 37 wind turbines and 187.7 MW in Neckar-Odenwald-Kreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Neckar-Odenwald-Kreis?
- The largest registered wind turbine in Neckar-Odenwald-Kreis has 6.80 MW of gross capacity and is operated by KS Energiesysteme GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Neckar-Odenwald-Kreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| over 100 kW | 77 | 306.6 MW | 51 | 25 |
How much wind power capacity was commissioned in Neckar-Odenwald-Kreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 4 | 22.2 MW |
| 2025 | 5 | 22.5 MW |
| 2024 | 1 | 5.56 MW |
| 2023 | 4 | 13.8 MW |
| 2021 | 2 | 7.00 MW |
| 2018 | 4 | 16.8 MW |
| 2016 | 2 | 5.56 MW |
| 2015 | 4 | 10.1 MW |
| 2013 | 5 | 15.8 MW |
| 2012 | 2 | 4.60 MW |
| 2011 | 2 | 6.15 MW |
| 2010 | 3 | 6.15 MW |
| 2007 | 4 | 7.50 MW |
How many wind turbines in Neckar-Odenwald-Kreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 51 | 157.0 MW |
| planned | 25 | 148.6 MW |
| permanently decommissioned | 1 | 1.05 MW |
Which wind turbines are registered in Neckar-Odenwald-Kreis?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WM 2 | 6.80 MW | – | planned | planned 2029 | KS Energiesysteme GmbH & Co. KG |
| WM 1 | 6.80 MW | – | planned | planned 2029 | KS Energiesysteme GmbH & Co. KG |
| WEA-10 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| WEA-2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | ZEAG Energie AG |
| WEA-3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | ZEAG Energie AG |
| Waldbrunn WEA 04 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | MVV Windenergie GmbH |
| WEA-3 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | ZEAG Energie AG |
| WEA-2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| WEA-1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| WEA-4 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| WEA-9 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| WEA-2 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | ZEAG Energie AG |
| WEA-4 | 6.00 MW | – | planned | planned 2028 | ZEAG Energie AG |
| WEA-8 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| WEA-1 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | ZEAG Energie AG |
| WEA-1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | ZEAG Energie AG |
| WEA-5 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | ZEAG Energie AG |
| WEA-5 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| WEA-7 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| WEA-3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| Waldbrunn WEA 05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | MVV Windenergie GmbH |
| WEA-4 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | ZEAG Energie AG |
| Waldbrunn WEA 03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | MVV Windenergie GmbH |
| WEA-6 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| WP10 | 5.56 MW | ENERCON GmbH | in operation | 2024-03-07 | WP10 GmbH & Co. KG |
| WPA3 Sto1 | 5.56 MW | ENERCON GmbH | in operation | 2026-01-28 | WPA3 GmbH & Co. KG |
| WPA3 Sto3 | 5.56 MW | ENERCON GmbH | in operation | 2025-12-18 | WPA3 GmbH & Co. KG |
| WPA3 Sto12a | 5.56 MW | ENERCON GmbH | in operation | 2026-03-30 | WPA3 GmbH & Co. KG |
| WPA3 Sto2a | 5.56 MW | ENERCON GmbH | in operation | 2026-01-27 | WPA3 GmbH & Co. KG |
| WPA3 Sto14 | 5.56 MW | ENERCON GmbH | in operation | 2026-01-23 | WPA3 GmbH & Co. KG |
| HAR-3 | 4.26 MW | ENERCON GmbH | in operation | 2025-09-13 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| HAR-2 | 4.26 MW | ENERCON GmbH | in operation | 2025-09-04 | EE BürgerEnergie Hardheim GmbH & Co. KG |
| HÖP-2 | 4.26 MW | ENERCON GmbH | in operation | 2025-09-13 | EE BürgerEnergie Höpfingen GmbH & Co. KG |
| WEA 05 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-22 | Bürgerwindpark Gerichtstetten EINS GmbH & Co. KG |
| WEA 09 | 4.20 MW | ENERCON GmbH | in operation | 2018-06-19 | Bürgerwindpark Gerichtstetten EINS GmbH & Co. KG |
| WEA 06 | 4.20 MW | ENERCON GmbH | in operation | 2018-06-29 | Bürgerwindpark Gerichtstetten EINS GmbH & Co. KG |
| HÖP-1 | 4.20 MW | ENERCON GmbH | in operation | 2025-09-03 | EE BürgerEnergie Höpfingen GmbH & Co. KG |
| WEA 08 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-30 | Bürgerwindpark Gerichtstetten EINS GmbH & Co. KG |
| Altheimer Höhe 91715 | 4.10 MW | REpower Systems SE | in operation | 2011-12-10 | Windpark Altheimer Höhe GmbH & Co. KG |
| WEA 01 | 3.50 MW | ENERCON GmbH | in operation | 2021-03-04 | Bürger und Wind Gerichtstetten GmbH & Co. KG |
| WEA 07 | 3.50 MW | ENERCON GmbH | in operation | 2021-03-25 | Bürger und Wind Gerichtstetten GmbH & Co. KG |
| WP Hainstadt-Buchen WEA 2 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-03-28 | CEE Windpark Hainstadt-Buchen GmbH & Co. KG |
| WP Hainstadt-Buchen WEA 4 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-03-27 | CEE Windpark Hainstadt-Buchen GmbH & Co. KG |
| WP Hainstadt-Buchen WEA 3 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-03-21 | CEE Windpark Hainstadt-Buchen GmbH & Co. KG |
| WP Hainstadt-Buchen WEA 1 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-03-20 | CEE Windpark Hainstadt-Buchen GmbH & Co. KG |
| R 300426 Windpark Großer Wald Hettingen/Rinschheim | 3.17 MW | REpower Systems SE | in operation | 2013-10-28 | Windpark Großer Wald Hettingen/Rinschheim GmbH & Co. KG |
| R 300428 Windpark Großer Wald Hettingen/Rinschheim | 3.17 MW | REpower Systems SE | in operation | 2013-11-21 | Windpark Großer Wald Hettingen/Rinschheim GmbH & Co. KG |
| R 300429 Windpark Großer Wald Hettingen/Rinschheim | 3.17 MW | REpower Systems SE | in operation | 2013-11-30 | Windpark Großer Wald Hettingen/Rinschheim GmbH & Co. KG |
| R 300425 Windpark Großer Wald Hettingen/Rinschheim | 3.17 MW | REpower Systems SE | in operation | 2013-10-25 | Windpark Großer Wald Hettingen/Rinschheim GmbH & Co. KG |
| R 300427 Windpark Großer Wald Hettingen/Rinschheim | 3.17 MW | REpower Systems SE | in operation | 2013-11-07 | Windpark Großer Wald Hettingen/Rinschheim GmbH & Co. KG |
| SEF 1 | 3.00 MW | – | planned | planned 2040 | ZEAG Energie AG |
| HSL01_27161851 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-10-21 | QE Hirschlanden Bestand GmbH & Co. KG |
| HSL02_27161850 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-10-28 | QE Hirschlanden Bestand GmbH & Co. KG |
| Windpark Ravenstein GmbH & Co. KG WEA4 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-08-28 | Windpark Ravenstein GmbH & Co. KG |
| Windpark Ravenstein GmbH & Co. KG WEA2 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-08-18 | Windpark Ravenstein GmbH & Co. KG |
| Windpark Ravenstein GmbH & Co. KG WEA3 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-08-24 | Windpark Ravenstein GmbH & Co. KG |
| Windpark Ravenstein GmbH & Co. KG WEA1 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-08-13 | Windpark Ravenstein GmbH & Co. KG |
| WP Hardheim WEA1 | 2.30 MW | ENERCON GmbH | in operation | 2012-06-18 | GSW Gemeinschaftsstadtwerke GmbH Kamen, Bönen, Bergkamen |
| WP Hardheim WEA2 | 2.30 MW | ENERCON GmbH | in operation | 2012-06-18 | GSW Gemeinschaftsstadtwerke GmbH Kamen, Bönen, Bergkamen |
| Altheimer Höhe 91716 | 2.05 MW | REpower Systems SE | in operation | 2011-12-09 | Windpark Altheimer Höhe GmbH & Co. KG |
| Steinbacher Höhe R91174 | 2.05 MW | REpower Systems SE | in operation | 2010-06-30 | Windpark Steinbacher Höhe GmbH & Co. KG |
| Steinbacher Höhe R91176 | 2.05 MW | REpower Systems SE | in operation | 2010-06-30 | Windpark Steinbacher Höhe GmbH & Co. KG |
| Steinbacher Höhe R91175 | 2.05 MW | REpower Systems SE | in operation | 2010-06-30 | Windpark Steinbacher Höhe GmbH & Co. KG |
| Hirschlanden-2 80051 | 2.00 MW | REpower Systems SE | in operation | 2004-06-03 | BW Windenergie GmbH |
| Großeichholzheim_WEA1_90193 | 2.00 MW | REpower Systems SE | in operation | 2007-12-11 | Mainova Windpark Hohenlohe GmbH & Co.KG |
| Hirschlanden-1 80050 | 2.00 MW | REpower Systems SE | in operation | 2004-06-03 | BW Windenergie GmbH |
| Großeichholzheim_WEA2_90194 | 2.00 MW | REpower Systems SE | in operation | 2007-12-11 | Mainova Windpark Hohenlohe GmbH & Co.KG |
| Ravenstein/ Erlenbach_WEA1_90143 | 2.00 MW | REpower Systems SE | in operation | 2007-08-28 | Mainova Windpark Hohenlohe GmbH & Co.KG |
| Hettinger Eulsberg FL 211 | 1.50 MW | Fuhrländer AG | in operation | 2002-10-25 | Windpark Hettinger Eulsberg GmbH & Co. KG |
| Ravensteiner Höhe 70468 | 1.50 MW | REpower Systems SE | in operation | 2004-12-04 | Windpark Ravensteiner Höhe GmbH & Co. KG |
| WEA Ravensteiner Höhe | 1.50 MW | Fuhrländer AG | in operation | 2007-08-28 | BGB Gesellschaft Ravensteiner Höhe |
| Hettinger Eulsberg FL 210 | 1.50 MW | Fuhrländer AG | in operation | 2002-10-18 | Windpark Hettinger Eulsberg GmbH & Co. KG |
| Ravensteiner Höhe 70467 | 1.50 MW | REpower Systems SE | in operation | 2004-12-02 | Windpark Ravensteiner Höhe GmbH & Co. KG |
| Altheimer Höhe FL 145 | 1.05 MW | Fuhrländer AG | in operation | 2000-12-01 | Windpark Altheimer Höhe GmbH & Co. KG |
| Altheimer Höhe FL 144 | 1.05 MW | Fuhrländer AG | in operation | 2000-12-01 | Windpark Altheimer Höhe GmbH & Co. KG |
| unit operated by a private individual | 1.05 MW | Fuhrländer AG | permanently decommissioned | 2000-11-27 | private individual |
| WKA Erfeld Wind | 1.00 MW | ENERCON GmbH | in operation | 2003-11-12 | Erfeld Wind Fürnkäs, Nefzger & Co. GbR |
Which organisations operate the most wind power capacity in Neckar-Odenwald-Kreis?
| Operator | Units | Capacity |
|---|---|---|
| EE BürgerEnergie Hardheim GmbH & Co. KG | 12 | 68.5 MW |
| ZEAG Energie AG | 10 | 57.0 MW |
| WPA3 GmbH & Co. KG | 5 | 27.8 MW |
| MVV Windenergie GmbH | 3 | 18.0 MW |
| Bürgerwindpark Gerichtstetten EINS GmbH & Co. KG | 4 | 16.8 MW |
| Windpark Großer Wald Hettingen/Rinschheim GmbH & Co. KG | 5 | 15.8 MW |
| CEE Windpark Hainstadt-Buchen GmbH & Co. KG | 4 | 13.8 MW |
| KS Energiesysteme GmbH & Co. KG | 2 | 13.6 MW |
| Windpark Ravenstein GmbH & Co. KG | 4 | 10.1 MW |
| EE BürgerEnergie Höpfingen GmbH & Co. KG | 2 | 8.46 MW |
Which manufacturer accounts for the most wind power capacity in Neckar-Odenwald-Kreis?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 37 | 187.7 MW |
| REpower Systems SE | 17 | 41.1 MW |
| Vestas Deutschland GmbH | 7 | 31.8 MW |
| GE Wind Energy GmbH | 6 | 15.7 MW |
| Fuhrländer AG | 6 | 7.65 MW |
Wind power in Baden-Württemberg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Neckar-Odenwald-Kreis (Baden-Württemberg), and ho can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.