Germany · renewables
Wind power in Hohenlohekreis
20 wind turbines with 55.6 MW of gross capacity were in operation in Hohenlohekreis (Baden-Württemberg) as of 2026-11-05, with a further 16 units (88.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Hohenlohekreis (Baden-Württemberg), and how large are they, as of 2026-11-05?
- 20 wind turbines with 55.6 MW of gross capacity were in operation in Hohenlohekreis (Baden-Württemberg) as of 2026-11-05, with a further 16 units (88.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Hohenlohekreis?
- 20 wind turbines with 55.6 MW of gross capacity were in operation in Hohenlohekreis as of 2026-11-05, with a further 16 units (88.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Hohenlohekreis in 2023?
- 1 wind turbines with 0.00 MW went into operation in Hohenlohekreis in 2023; the strongest year of the last two decades was 2016 with 16.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Hohenlohekreis?
- ABO Wind Öhringen-Karlsfurtebene GmbH & Co. KG operates 7 wind turbines with 33.6 MW in Hohenlohekreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Hohenlohekreis?
- ENERCON GmbH leads with 8 wind turbines and 34.7 MW in Hohenlohekreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Hohenlohekreis?
- The largest registered wind turbine in Hohenlohekreis has 6.80 MW of gross capacity and is operated by Bürgerwindpark Weißbach - WEA VI - GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Hohenlohekreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 35 | 144.4 MW | 19 | 16 |
How much wind power capacity was commissioned in Hohenlohekreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2023 | 1 | 0.00 MW |
| 2022 | 3 | 12.6 MW |
| 2018 | 2 | 7.20 MW |
| 2017 | 1 | 3.60 MW |
| 2016 | 5 | 16.5 MW |
| 2015 | 1 | 3.00 MW |
| 2008 | 1 | 2.05 MW |
| 2007 | 3 | 6.15 MW |
| 2006 | 1 | 2.00 MW |
How many wind turbines in Hohenlohekreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 16 | 88.8 MW |
| in operation | 20 | 55.6 MW |
Which wind turbines are registered in Hohenlohekreis?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Bürgerwindpark Weißbach WEA VI | 6.80 MW | Nordex Energy GmbH | planned | planned 2026 | Bürgerwindpark Weißbach - WEA VI - GmbH & Co. KG |
| Windpark Künsbach-Etzlinsweiler - WEA I | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Bürgerwindpark Künsbach-Etzlinsweiler GmbH & Co. KG |
| Windenergieanlage Unterheimbach | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwindpark Hohenlohe GmbH |
| ABO Energy WP Pfedelbach-Gleichen WEA 1 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | ABO Energy WP Pfedelbach-Gleichen GmbH & Co. KG |
| WEA-1 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Vento Service |
| ABO Energy WP Pfedelbach-Gleichen WEA 2 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | ABO Energy WP Pfedelbach-Gleichen GmbH & Co. KG |
| Windpark Künsbach-Etzlinsweiler - WEA II | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Bürgerwindpark Künsbach-Etzlinsweiler GmbH & Co. KG |
| Windpark Krautheim-Oberginsbach WEA III | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Krautheim-Oberginsbach GmbH & Co. KG |
| Windpark Krautheim-Oberginsbach WEA I | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwindpark Krautheim-Oberginsbach GmbH & Co. KG |
| ABO Wind WP Öhringen WEA 2 | 4.80 MW | Nordex Energy GmbH | planned | planned 2026 | ABO Wind Öhringen-Karlsfurtebene GmbH & Co. KG |
| ABO Wind WP Öhringen WEA 8 | 4.80 MW | Nordex Energy GmbH | planned | planned 2026 | ABO Wind Öhringen-Karlsfurtebene GmbH & Co. KG |
| ABO Wind WP Öhringen WEA 7 | 4.80 MW | Nordex Energy GmbH | planned | planned 2026 | ABO Wind Öhringen-Karlsfurtebene GmbH & Co. KG |
| ABO Wind WP Öhringen WEA 1 | 4.80 MW | Nordex Energy GmbH | planned | planned 2026 | ABO Wind Öhringen-Karlsfurtebene GmbH & Co. KG |
| ABO Wind WP Öhringen WEA 9 | 4.80 MW | Nordex Energy GmbH | planned | planned 2026 | ABO Wind Öhringen-Karlsfurtebene GmbH & Co. KG |
| ABO Wind WP Öhringen WEA 4 | 4.80 MW | Nordex Germany GmbH | planned | planned 2026 | ABO Wind Öhringen-Karlsfurtebene GmbH & Co. KG |
| ABO Wind WP Öhringen WEA 5 | 4.80 MW | Nordex SE | planned | planned 2026 | ABO Wind Öhringen-Karlsfurtebene GmbH & Co. KG |
| ECK-2 | 4.20 MW | ENERCON GmbH | in operation | 2022-11-29 | EE BürgerEnergie Krautheim GmbH & Co. KG |
| ECK-1 | 4.20 MW | ENERCON GmbH | in operation | 2022-11-29 | EE BürgerEnergie Krautheim GmbH & Co. KG |
| ECK-3 | 4.20 MW | ENERCON GmbH | in operation | 2022-11-24 | EE BürgerEnergie Krautheim GmbH & Co. KG |
| WEA 01 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2017-12-21 | Windpark Rote Steige GmbH & Co. KG |
| WEA 02 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2018-11-24 | Windpark Rote Steige GmbH & Co. KG |
| WEA 03 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2018-01-30 | Windpark Rote Steige GmbH & Co. KG |
| Weißbach V | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-01 | Bürgerwindpark Weißbach GmbH & Co. KG |
| Weißbach I | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-29 | Bürgerwindpark Weißbach GmbH & Co. KG |
| Weißbach II | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-15 | Bürgerwindpark Weißbach GmbH & Co. KG |
| Weißbach III | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-24 | Bürgerwindpark Weißbach GmbH & Co. KG |
| Weißbach IV | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-05-23 | Bürgerwindpark Weißbach GmbH & Co. KG |
| F-01 | 3.00 MW | ENERCON GmbH | in operation | 2015-12-08 | EE BürgerEnergie Forchtenberg GmbH & Co. KG |
| Dörrenzimmern_WEA4_90187 | 2.05 MW | REpower Systems SE | in operation | 2007-12-07 | Mainova Windpark Hohenlohe GmbH & Co.KG |
| Dörrenzimmern_WEA1_90185 | 2.05 MW | REpower Systems SE | in operation | 2007-12-07 | Mainova Windpark Hohenlohe GmbH & Co.KG |
| Dörrenzimmern_WEA3_90209 | 2.05 MW | REpower Systems SE | in operation | 2008-02-25 | Mainova Windpark Hohenlohe GmbH & Co.KG |
| Dörrenzimmern_WEA2_90186 | 2.05 MW | REpower Systems SE | in operation | 2007-12-07 | Mainova Windpark Hohenlohe GmbH & Co.KG |
| WEA RB | 2.00 MW | ENERCON GmbH | in operation | 2006-10-13 | BEERMANN Windkraft GmbH & Co. Roter Berg KG |
| Stachenhausen | 1.50 MW | Senvion Deutschland GmbH | in operation | 2003-11-13 | BW Windenergie GmbH |
| unit operated by a private individual | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2001-11-09 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2023-11-11 | private individual |
Which organisations operate the most wind power capacity in Hohenlohekreis?
| Operator | Units | Capacity |
|---|---|---|
| ABO Wind Öhringen-Karlsfurtebene GmbH & Co. KG | 7 | 33.6 MW |
| Bürgerwindpark Weißbach GmbH & Co. KG | 5 | 16.5 MW |
| EE BürgerEnergie Krautheim GmbH & Co. KG | 3 | 12.6 MW |
| Bürgerwindpark Künsbach-Etzlinsweiler GmbH & Co. KG | 2 | 12.5 MW |
| ABO Energy WP Pfedelbach-Gleichen GmbH & Co. KG | 2 | 12.0 MW |
| Bürgerwindpark Krautheim-Oberginsbach GmbH & Co. KG | 2 | 11.1 MW |
| Windpark Rote Steige GmbH & Co. KG | 3 | 10.8 MW |
| Mainova Windpark Hohenlohe GmbH & Co.KG | 4 | 8.20 MW |
| Bürgerwindpark Hohenlohe GmbH | 1 | 6.80 MW |
| Bürgerwindpark Weißbach - WEA VI - GmbH & Co. KG | 1 | 6.80 MW |
Which manufacturer accounts for the most wind power capacity in Hohenlohekreis?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 8 | 34.7 MW |
| Nordex Energy GmbH | 6 | 30.8 MW |
| Vestas Deutschland GmbH | 8 | 27.3 MW |
| Nordex Germany GmbH | 4 | 24.1 MW |
| GE Renewable Germany GmbH | 2 | 12.0 MW |
| REpower Systems SE | 4 | 8.20 MW |
| Nordex SE | 1 | 4.80 MW |
| Senvion Deutschland GmbH | 1 | 1.50 MW |
| NEG Micon Deutschland GmbH | 1 | 1.00 MW |
| SkyWind GmbH | 1 | 0.00 MW |
Wind power in Baden-Württemberg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Hohenlohekreis (Baden-Württemberg), and how large can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.