Germany · renewables
Wind power in Göppingen
56 wind turbines with 121.4 MW of gross capacity were in operation in Göppingen (Baden-Württemberg) as of 2026-11-05, with a further 3 units (13.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Göppingen (Baden-Württemberg), and how large are they, as of 2026-11-05?
- 56 wind turbines with 121.4 MW of gross capacity were in operation in Göppingen (Baden-Württemberg) as of 2026-11-05, with a further 3 units (13.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Göppingen?
- 56 wind turbines with 121.4 MW of gross capacity were in operation in Göppingen as of 2026-11-05, with a further 3 units (13.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Göppingen in 2024?
- 5 wind turbines with 10.5 MW went into operation in Göppingen in 2024; the strongest year of the last two decades was 2016 with 44.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Göppingen?
- Windpark Lauterstein GmbH & Co. KG operates 13 wind turbines with 36.1 MW in Göppingen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Göppingen?
- GE Wind Energy GmbH leads with 16 wind turbines and 44.5 MW in Göppingen (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Göppingen?
- The largest registered wind turbine in Göppingen has 6.80 MW of gross capacity and is operated by KS Energiesysteme GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Göppingen distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.00 MW | 1 | 1 |
| over 100 kW | 58 | 137.7 MW | 55 | 2 |
How much wind power capacity was commissioned in Göppingen each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2024 | 5 | 10.5 MW |
| 2023 | 3 | 12.6 MW |
| 2020 | 5 | 16.5 MW |
| 2018 | 1 | 2.78 MW |
| 2017 | 2 | 5.56 MW |
| 2016 | 16 | 44.5 MW |
| 2011 | 1 | 2.70 MW |
| 2007 | 1 | 1.50 MW |
| 2006 | 4 | 8.00 MW |
How many wind turbines in Göppingen are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 56 | 121.4 MW |
| planned | 3 | 13.6 MW |
| temporarily shut down | 1 | 2.70 MW |
Which wind turbines are registered in Göppingen?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WS 1 | 6.80 MW | Nordex SE | planned | planned 2028 | KS Energiesysteme GmbH & Co. KG |
| WS 2 | 6.80 MW | Nordex SE | planned | planned 2028 | KS Energiesysteme GmbH & Co. KG |
| Königseiche WEA 1 | 4.50 MW | Nordex Energy GmbH | in operation | 2024-12-20 | Uhl Windkraft GmbH & Co. Objekt LXXXIII KG |
| Hohenstadt GP-27 W2 | 4.50 MW | Nordex Energy GmbH | in operation | 2023-05-04 | EnBW Windkraftprojekte GmbH |
| Königseiche WEA 2 | 4.50 MW | Nordex Energy GmbH | in operation | 2024-12-20 | Uhl Windkraft GmbH & Co. Objekt LXXXIII KG |
| Hohenstadt GP-27 W8 | 4.50 MW | Nordex Energy GmbH | in operation | 2023-05-06 | EnBW Windkraftprojekte GmbH |
| Hohenstadt GP-27 W4 | 3.60 MW | Nordex Energy GmbH | in operation | 2023-05-04 | EnBW Windkraftprojekte GmbH |
| WEA 01 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-08-21 | Albwerk Regenerative Energien GmbH |
| GPE Windpark Drackenstein GmbH & Co. KG - WEA 9 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-08-21 | GPE Windpark Drackenstein GmbH & Co. KG |
| GPE Windpark Drackenstein GmbH & Co. KG - WEA 7 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-08-21 | GPE Windpark Drackenstein GmbH & Co. KG |
| GPE Windpark Drackenstein GmbH & Co. KG - WEA 6 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-08-21 | GPE Windpark Drackenstein GmbH & Co. KG |
| WEA 04 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-08-21 | Albwerk Regenerative Energien GmbH |
| GE 28150157-15 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-07-05 | Windpark Lauterstein GmbH & Co. KG |
| GE 28150161-12 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-09-10 | Windpark Lauterstein GmbH & Co. KG |
| WEA 24 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2016-08-05 | Albwerk Regenerative Energien GmbH |
| WEA 22 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2016-07-21 | Bürgerenergie Windpark Lauterstein eG |
| GE 28150150-04 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-09-02 | Windpark Lauterstein GmbH & Co. KG |
| GE 28150152-08 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-09-27 | Windpark Lauterstein GmbH & Co. KG |
| GE 28150159-20 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-06-21 | Windpark Lauterstein GmbH & Co. KG |
| WEA 01 | 2.78 MW | GE Wind Energy GmbH | in operation | 2018-01-19 | Windpark Tegelberg-Donzdorf GmbH |
| GE 28150162-18 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-06-29 | Windpark Lauterstein GmbH & Co. KG |
| GE 28150160-21 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-08-17 | Windpark Lauterstein GmbH & Co. KG |
| GE 28150153-09 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-09-28 | Windpark Lauterstein GmbH & Co. KG |
| GE 28150155-13 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-09-02 | Windpark Lauterstein GmbH & Co. KG |
| GE 28150151-06 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-10-24 | Windpark Lauterstein GmbH & Co. KG |
| GE 28150156-14 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-09-10 | Windpark Lauterstein GmbH & Co. KG |
| WEA 02 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-12-14 | Windpark Tegelberg-Donzdorf GmbH |
| WEA 03 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-12-22 | Windpark Tegelberg-Donzdorf GmbH |
| WEA 23 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2016-08-05 | Albwerk Regenerative Energien GmbH |
| GE 28150158-19 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-06-20 | Windpark Lauterstein GmbH & Co. KG |
| GE 28150154-11 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-10-28 | Windpark Lauterstein GmbH & Co. KG |
| 759447221 | 2.70 MW | Schuler Aktiengesellschaft | temporarily shut down | 2011-04-11 | WP Stöttener Berg GmbH&Co.KG |
| V90 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-07-03 | Megawatt Gesellschaft für regenerative Energiesysteme mbH |
| V90-2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-07-05 | Megawatt Gesellschaft für regenerative Energiesysteme mbH |
| V80 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-09-11 | Megawatt Gesellschaft für regenerative Energiesysteme mbH |
| V80-2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-09-24 | Megawatt Gesellschaft für regenerative Energiesysteme mbH |
| V 23870 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-06-24 | NaturStromQuelle Zwei GmbH & Co. KG |
| V 23869 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-06-29 | NaturStromQuelle Zwei GmbH & Co. KG |
| AWF | 1.50 MW | Fuhrländer AG | in operation | 2007-07-01 | Alb-Windfarm GmbH & Co.KG |
| Windkraft 778807448 | 1.50 MW | Nordex SE | in operation | 2001-11-08 | Alb-Windkraft GmbH & Co. KG |
| Windkraft 931993719 | 1.50 MW | Nordex SE | in operation | 2001-11-08 | Alb-Windkraft GmbH & Co. KG |
| Windkraft 778807412 | 1.50 MW | Nordex SE | in operation | 2001-11-08 | Alb-Windkraft GmbH & Co. KG |
| Schnittlingen WEA 1 | 1.00 MW | DeWind GmbH | in operation | 2002-01-01 | EnBW Windkraftprojekte GmbH |
| Windkraftanlage Stötten 14533 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2002-04-24 | Windpark Stötten Infrastruktur UG |
| Windkraftanlage Stötten 14153 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-11-24 | Windpark Stötten Infrastruktur UG |
| V52-3 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2002-09-25 | Megawatt Gesellschaft für regenerative Energiesysteme mbH |
| Windkraftanlage Stötten 14152 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-11-24 | Windpark Stötten Infrastruktur UG |
| V52 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2002-09-15 | Megawatt Gesellschaft für regenerative Energiesysteme mbH |
| Windkraftanlage Stötten 14151 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-11-24 | Windpark Stötten Infrastruktur UG |
| V52-2 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2002-09-17 | Megawatt Gesellschaft für regenerative Energiesysteme mbH |
| Wiesensteig 15065 | 0.75 MW | – | in operation | 1999-12-20 | Windpark Wiesensteig GbR |
| Wiesensteig WEA15344 | 0.75 MW | – | in operation | 2000-06-01 | Windpark Wiesensteig GbR |
| FWEA Nord | 0.75 MW | Zentrum für Sonnenenergie- und Wasserstoff-Forschung Baden-Württemberg (ZSW) | in operation | 2024-08-01 | Zentrum für Sonnenenergie- und Wasserstoff-Forschung Baden-Württemberg |
| FWEA Süd | 0.75 MW | Zentrum für Sonnenenergie- und Wasserstoff-Forschung Baden-Württemberg (ZSW) | in operation | 2024-08-01 | Zentrum für Sonnenenergie- und Wasserstoff-Forschung Baden-Württemberg |
| Wiesensteig 15064 | 0.75 MW | – | in operation | 1999-12-20 | Windpark Wiesensteig GbR |
| V_2529, WE05 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-06-15 | juwi Bestandsanlagen GmbH |
| Windpark Nellingen TW600a- 2 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 2000-04-01 | Schwabenwind GbR |
| Windpark Nellingen TW600a- 1 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 2000-04-01 | Schwabenwind GbR |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | planned | planned 2026 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2024-01-24 | private individual |
Which organisations operate the most wind power capacity in Göppingen?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Lauterstein GmbH & Co. KG | 13 | 36.1 MW |
| KS Energiesysteme GmbH & Co. KG | 2 | 13.6 MW |
| EnBW Windkraftprojekte GmbH | 4 | 13.6 MW |
| Albwerk Regenerative Energien GmbH | 4 | 12.2 MW |
| Megawatt Gesellschaft für regenerative Energiesysteme mbH | 7 | 10.6 MW |
| GPE Windpark Drackenstein GmbH & Co. KG | 3 | 9.90 MW |
| Uhl Windkraft GmbH & Co. Objekt LXXXIII KG | 2 | 9.00 MW |
| Windpark Tegelberg-Donzdorf GmbH | 3 | 8.34 MW |
| Alb-Windkraft GmbH & Co. KG | 3 | 4.50 MW |
| NaturStromQuelle Zwei GmbH & Co. KG | 2 | 4.00 MW |
Which manufacturer accounts for the most wind power capacity in Göppingen?
| Manufacturer | Units | Capacity |
|---|---|---|
| GE Wind Energy GmbH | 16 | 44.5 MW |
| Nordex Energy GmbH | 10 | 38.1 MW |
| Vestas Deutschland GmbH | 14 | 18.6 MW |
| Nordex SE | 5 | 18.1 MW |
| General Electric Deutschland Holding GmbH | 3 | 8.34 MW |
| Schuler Aktiengesellschaft | 1 | 2.70 MW |
| Zentrum für Sonnenenergie- und Wasserstoff-Forschung Baden-Württemberg (ZSW) | 2 | 1.50 MW |
| Fuhrländer AG | 1 | 1.50 MW |
| Tacke GmbH & Co. KG | 2 | 1.20 MW |
| DeWind GmbH | 1 | 1.00 MW |
Wind power in Baden-Württemberg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Göppingen (Baden-Württemberg), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.