Germany · renewables
Wind power in Freudenstadt
24 wind turbines with 76.2 MW of gross capacity were in operation in Freudenstadt (Baden-Württemberg) as of 2026-11-05, with a further 12 units (81.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Freudenstadt (Baden-Württemberg), and how large are they, as of 2026-11-05?
- 24 wind turbines with 76.2 MW of gross capacity were in operation in Freudenstadt (Baden-Württemberg) as of 2026-11-05, with a further 12 units (81.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Freudenstadt?
- 24 wind turbines with 76.2 MW of gross capacity were in operation in Freudenstadt as of 2026-11-05, with a further 12 units (81.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Freudenstadt in 2025?
- 4 wind turbines with 11.4 MW went into operation in Freudenstadt in 2025; the strongest year of the last two decades was 2025 with 11.4 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Freudenstadt?
- Windpark Seewald GmbH & Co. KG operates 8 wind turbines with 44.7 MW in Freudenstadt, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Freudenstadt?
- Nordex Germany GmbH leads with 9 wind turbines and 51.5 MW in Freudenstadt (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Freudenstadt?
- The largest registered wind turbine in Freudenstadt has 7.00 MW of gross capacity and is operated by ATE Windpark Seewald II, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Freudenstadt distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 0 | 0 |
| over 100 kW | 37 | 158.1 MW | 24 | 12 |
How much wind power capacity was commissioned in Freudenstadt each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 8 | 44.7 MW |
| 2025 | 4 | 11.4 MW |
| 2015 | 1 | 2.35 MW |
| 2013 | 1 | 2.30 MW |
| 2012 | 1 | 2.00 MW |
| 2006 | 3 | 6.00 MW |
How many wind turbines in Freudenstadt are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 12 | 81.1 MW |
| in operation | 24 | 76.2 MW |
| permanently decommissioned | 1 | 0.85 MW |
| temporarily shut down | 1 | 0.00 MW |
Which wind turbines are registered in Freudenstadt?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA N5 | 7.00 MW | – | planned | planned 2028 | ATE Windpark Seewald II |
| WEA2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Green Wind Energy GmbH |
| WEA 2 | 7.00 MW | – | planned | planned 2028 | ATE Windpark Trischelwald |
| WEA 4 | 7.00 MW | – | planned | planned 2028 | ATE Windpark Trischelwald |
| WEA N2 | 7.00 MW | – | planned | planned 2028 | ATE Windpark Seewald II |
| WEA 1 | 7.00 MW | – | planned | planned 2028 | ATE Windpark Trischelwald |
| WEA1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Green Wind Energy GmbH |
| WEA N1 | 7.00 MW | – | planned | planned 2028 | ATE Windpark Seewald II |
| WEA N4 | 7.00 MW | – | planned | planned 2028 | ATE Windpark Seewald II |
| WEA 3 | 7.00 MW | – | planned | planned 2028 | ATE Windpark Trischelwald |
| WEA 06 Loßburg II | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Alterric Deutschland GmbH |
| WEA 5 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-10-07 | Windpark Seewald GmbH & Co. KG |
| WEA 4 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-09-16 | Windpark Seewald GmbH & Co. KG |
| WEA 3 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-09-16 | Windpark Seewald GmbH & Co. KG |
| WEA 1 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-09-16 | Windpark Seewald GmbH & Co. KG |
| WEA 2 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-09-16 | Windpark Seewald GmbH & Co. KG |
| WEA 7 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-10-14 | Windpark Seewald GmbH & Co. KG |
| WEA 6 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-10-07 | Windpark Seewald GmbH & Co. KG |
| WEA 8 | 4.80 MW | Nordex Germany GmbH | in operation | 2026-10-14 | Windpark Seewald GmbH & Co. KG |
| Windpark Reutin | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Stadtwerke Stuttgart GmbH |
| Windkraft Füllebel E 138 | 4.20 MW | ENERCON GmbH | in operation | 2025-01-30 | Windkraft Füllebel UG (haftungsbeschränkt) & Co. KG |
| WP Grömbach WEA2 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2025-01-29 | EnBW Windkraftprojekte GmbH |
| WP Grömbach WEA1 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2025-01-29 | EnBW Windkraftprojekte GmbH |
| unit operated by a private individual | 2.35 MW | ENERCON GmbH | in operation | 2015-11-27 | private individual |
| Windkraft Römlinsdorf KG | 2.30 MW | ENERCON GmbH | in operation | 2013-12-13 | Windkraft Römlinsdorf KG |
| WP Bad Rippoldsau WEA 3/3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-11-20 | Linda Bechthold |
| WP Bad Rippoldsau WEA 1/3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-11-20 | Linda Bechthold |
| WP Bad Rippoldsau WEA 2/3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-11-20 | Linda Bechthold |
| Schopfloch WEA 1 | 2.00 MW | ENERCON GmbH | in operation | 2012-02-01 | EnBW Onshore Portfolio GmbH |
| unit operated by a private individual | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-01-01 | private individual |
| unit operated by a private individual | 1.50 MW | Nordex SE | in operation | 2002-10-29 | private individual |
| V67808 Dornhan "Manfred" | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2003-02-22 | Ventrion Projektpartner GmbH |
| Windkraftanlage 11885 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-05-16 | ARBURG GmbH & Co. KG |
| Windkraftanlage 11886 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-05-16 | ARBURG GmbH & Co. KG |
| unit operated by a private individual | 0.85 MW | Vestas Deutschland GmbH | permanently decommissioned | 2001-11-01 | private individual |
| NORDEX N43 | 0.60 MW | Nordex Energy GmbH | in operation | 1998-10-15 | Bitzer Kühlmaschinenbau GmbH |
| Windkraftanlage Glatten Lichthof, Gewann 1659 | 0.60 MW | – | in operation | 2000-11-22 | Schmalz Energieerzeugung GbR |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | temporarily shut down | 2025-02-01 | private individual |
Which organisations operate the most wind power capacity in Freudenstadt?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Seewald GmbH & Co. KG | 8 | 44.7 MW |
| ATE Windpark Trischelwald | 4 | 28.0 MW |
| ATE Windpark Seewald II | 4 | 28.0 MW |
| Green Wind Energy GmbH | 2 | 14.0 MW |
| EnBW Windkraftprojekte GmbH | 2 | 7.20 MW |
| Alterric Deutschland GmbH | 1 | 6.80 MW |
| Linda Bechthold | 3 | 6.00 MW |
| Stadtwerke Stuttgart GmbH | 1 | 4.26 MW |
| Windkraft Füllebel UG (haftungsbeschränkt) & Co. KG | 1 | 4.20 MW |
| Windkraft Römlinsdorf KG | 1 | 2.30 MW |
Which manufacturer accounts for the most wind power capacity in Freudenstadt?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Germany GmbH | 9 | 51.5 MW |
| Vestas Deutschland GmbH | 8 | 15.8 MW |
| ENERCON GmbH | 5 | 15.1 MW |
| Nordex Energy GmbH | 3 | 14.6 MW |
| Nordex SE | 1 | 1.50 MW |
| Südwind Borsig Energy GmbH | 1 | 1.50 MW |
| NEG Micon Deutschland GmbH | 1 | 1.50 MW |
| SkyWind GmbH | 1 | 0.00 MW |
Wind power in Baden-Württemberg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Freudenstadt (Baden-Württemberg), and how large a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.