Germany · renewables
Solar PV in Westerwaldkreis
23,019 solar installations with 380.7 MW of gross capacity were in operation in Westerwaldkreis (Rheinland-Pfalz) as of 2026-11-05, with a further 245 units (13.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many solar installations are registered in Westerwaldkreis (Rheinland-Pfalz), and how large are they, as of 2026-11-05?
- 23,019 solar installations with 380.7 MW of gross capacity were in operation in Westerwaldkreis (Rheinland-Pfalz) as of 2026-11-05, with a further 245 units (13.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many solar installations are in operation in Westerwaldkreis?
- 23,019 solar installations with 380.7 MW of gross capacity were in operation in Westerwaldkreis as of 2026-11-05, with a further 245 units (13.1 MW) registered as planned; the count includes every registered unit down to balcony systems (Bundesnetzagentur, Marktstammdatenregister).
- How much solar PV capacity was commissioned in Westerwaldkreis in 2025?
- 3,371 solar installations with 53.7 MW went into operation in Westerwaldkreis in 2025; the strongest year of the last two decades was 2025 with 53.7 MW (Bundesnetzagentur, Marktstammdatenregister).
- What share of Westerwaldkreis's solar installations are larger than 100 kW?
- 256 of 23,628 registered solar installations in Westerwaldkreis (1.1 percent) exceed 100 kW, but they hold 190.6 MW of the 394.7 MW total capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most solar PV capacity in Westerwaldkreis?
- GSP International GmbH operates 2 solar installations over 100 kW with 17.6 MW in Westerwaldkreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which installation type has the most solar PV capacity in Westerwaldkreis?
- Freiflächensolaranlage leads with 70 solar installations and 133.0 MW in Westerwaldkreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest solar installation in Westerwaldkreis?
- The largest registered solar installation in Westerwaldkreis has 11.5 MW of gross capacity and is operated by GSP International GmbH, commissioned 2025-11-03 (Bundesnetzagentur, Marktstammdatenregister).
How are the solar installations in Westerwaldkreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 22,806 | 167.9 MW | 22,211 | 233 |
| 30 to 100 kW | 566 | 36.2 MW | 558 | 6 |
| over 100 kW | 256 | 190.6 MW | 250 | 6 |
How much solar PV capacity was commissioned in Westerwaldkreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 2,719 | 55.9 MW |
| 2025 | 3,371 | 53.7 MW |
| 2024 | 4,458 | 46.9 MW |
| 2023 | 4,472 | 45.3 MW |
| 2022 | 1,518 | 19.7 MW |
| 2021 | 973 | 13.4 MW |
| 2020 | 718 | 14.2 MW |
| 2019 | 407 | 7.74 MW |
| 2018 | 201 | 7.38 MW |
| 2017 | 198 | 3.05 MW |
| 2016 | 153 | 6.16 MW |
| 2015 | 130 | 10.2 MW |
| 2014 | 224 | 8.74 MW |
| 2013 | 458 | 19.0 MW |
| 2012 | 543 | 24.1 MW |
| 2011 | 745 | 12.9 MW |
| 2010 | 587 | 12.1 MW |
| 2009 | 472 | 10.1 MW |
| 2008 | 318 | 3.45 MW |
| 2007 | 242 | 3.01 MW |
| 2006 | 200 | 2.78 MW |
How many solar installations in Westerwaldkreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 23,019 | 380.7 MW |
| planned | 245 | 13.1 MW |
| permanently decommissioned | 333 | 0.78 MW |
| temporarily shut down | 31 | 0.05 MW |
Which solar installations over 100 kW are registered in Westerwaldkreis?
| Unit | Capacity | Type | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| GSP Hof Witzelbach FF 11,5MW | 11.5 MW | Freiflächensolaranlage | in operation | 2025-11-03 | GSP International GmbH |
| Solarpark Nomborn II | 8.45 MW | Freiflächensolaranlage | in operation | 2025-08-19 | Solarpark Nomborn GmbH & Co. KG |
| Solarpark Hachenburg | 8.25 MW | Freiflächensolaranlage | in operation | 2015-08-29 | HSP Hachenburger Solar Park GmbH |
| FF Härtlingen BA1 | 6.78 MW | Freiflächensolaranlage | in operation | 2025-09-04 | GSP Service und Verwaltung GmbH |
| FF-PV GSP Lochum 6MWp | 6.01 MW | Freiflächensolaranlage | in operation | 2026-06-22 | GSP International GmbH |
| Hof Winterroth 2 | 5.99 MW | Freiflächensolaranlage | in operation | 2026-09-11 | PV-Oberhaid GmbH & Co. KG |
| PVA Oberhaid | 5.46 MW | Freiflächensolaranlage | planned | planned 2026 | SolNeos Solarporfolio 5 |
| PV FFA Solarpark Deesen | 4.42 MW | Freiflächensolaranlage | in operation | 2026-03-23 | Solarpark Deesen |
| PV-Anlage Hergenroth | 4.26 MW | Freiflächensolaranlage | in operation | 2012-06-26 | Solarpark Ha&He Betriebs GmbH & Co. KG |
| PV-Anlage Halbs | 4.23 MW | Freiflächensolaranlage | in operation | 2012-06-26 | Solarpark Ha&He Betriebs GmbH & Co. KG |
| Solarpark Görgeshausen III | 4.14 MW | Freiflächensolaranlage | in operation | 2026-05-20 | Energiegesellschaft Görgeshausen mbH |
| FF Härtlingen BA2/3 | 4.12 MW | Freiflächensolaranlage | in operation | 2026-10-01 | GSP Service und Verwaltung GmbH |
| Solarkraftwerk Deesen | 4.10 MW | Freiflächensolaranlage | in operation | 2013-06-28 | Südeifel Strom e.G. |
| 3,7MWp Höhr-Grenzhausen | 3.69 MW | Freiflächensolaranlage | in operation | 2023-04-29 | Steuler-KCH Materials GmbH |
| SP Solarpark Langenhahn GmbH & Co. KG | 3.56 MW | Freiflächensolaranlage | in operation | 2013-01-31 | SP Solarpark Langenhahn GmbH & Co. KG |
| Auf dem Strang | 3.20 MW | Freiflächensolaranlage | in operation | 2022-09-07 | MTTB Solar GmbH |
| Oberhaid 3 MW | 3.00 MW | Freiflächensolaranlage | in operation | 2024-12-21 | PV-Oberhaid GmbH & Co. KG |
| PV-Dachanlage | 1.94 MW | Gebäudesolaranlage | in operation | 2026-07-10 | SMP Solarkraftwerk Project 20 |
| Anlage 1875 | 1.88 MW | Freiflächensolaranlage | planned | planned 2024 | PV-Oberhaid GmbH & Co. KG |
| SP Solarpark Langenhahn GmbH & Co. KG | 1.78 MW | Freiflächensolaranlage | in operation | 2012-12-31 | SP Solarpark Langenhahn GmbH & Co. KG |
| Anlage 1725 | 1.73 MW | Freiflächensolaranlage | planned | planned 2024 | PV-Oberhaid GmbH & Co. KG |
| Solarpark Höhn | 1.59 MW | Freiflächensolaranlage | in operation | 2014-05-31 | Naturstrom Rheinland-Pfalz GmbH |
| Anlage1500 | 1.50 MW | Freiflächensolaranlage | planned | planned 2024 | PV-Oberhaid GmbH & Co. KG |
| Hof Welterstein, Alpenrod | 1.43 MW | Gebäudesolaranlage | in operation | 2013-03-31 | EEA Erneuerbare Energien Alpenrod GmbH & Co. KG |
| Solarpark Freirachdorf | 1.41 MW | Freiflächensolaranlage | in operation | 2020-05-14 | Ortsgemeinde Freirachdorf |
| Solarpark Görgeshausen I | 1.33 MW | Freiflächensolaranlage | in operation | 2013-05-29 | Energiegesellschaft Görgeshausen mbH |
| Solarpark Brandscheid | 1.26 MW | Freiflächensolaranlage | in operation | 2013-04-30 | FGD Solarpark Brandscheid UG & Co. KG |
| unit operated by a private individual | 1.19 MW | Freiflächensolaranlage | in operation | 2016-08-25 | private individual |
| Solarpark Siershahn | 1.19 MW | Freiflächensolaranlage | in operation | 2016-08-25 | D.K. GbR |
| Solarpark Siershahn | 1.19 MW | Freiflächensolaranlage | in operation | 2016-08-25 | Duck Energieprojekte |
| Bannberscheid I | 1.17 MW | Gebäudesolaranlage | in operation | 2014-01-17 | Röben Tonbaustoffe GmbH |
| Bannberscheid II | 1.17 MW | Gebäudesolaranlage | in operation | 2014-01-17 | Röben Tonbaustoffe GmbH |
| Solarpark Boden 1 | 1.12 MW | Freiflächensolaranlage | in operation | 2013-04-30 | Maxwäll Energiegenossenschaft eG. |
| Solarpark Boden 2 | 1.02 MW | Freiflächensolaranlage | in operation | 2013-04-30 | Maxwäll Energiegenossenschaft eG. |
| Solarpark Pletschmorgen II | 1.01 MW | Freiflächensolaranlage | in operation | 2026-10-09 | Maxwäll Energiegenossenschaft eG. |
| Solarpark Montabaur GmbH &Co. KG | 1.01 MW | Gebäudesolaranlage | in operation | 2006-12-05 | Solarpark Montabaur GmbH & Co. KG |
| Altanlage Salow | 1.00 MW | Freiflächensolaranlage | in operation | 2012-09-29 | PV-Oberhaid GmbH & Co. KG |
| Hof Winterroth 1 | 1.00 MW | Freiflächensolaranlage | in operation | 2026-01-27 | PV-Oberhaid GmbH & Co. KG |
| Solarpark Nomborn I | 1.00 MW | Freiflächensolaranlage | in operation | 2024-12-30 | Solarpark Nomborn GmbH & Co. KG |
| PV CRACO Streithausen | 0.99 MW | Gebäudesolaranlage | in operation | 2024-07-01 | CRACO |
| Solarpark Unnau | 0.99 MW | Freiflächensolaranlage | in operation | 2026-07-16 | Ernst Wenzelmann Schilderfabrik GmbH |
| Solarpark Pletschmorgen I | 0.98 MW | Freiflächensolaranlage | in operation | 2026-01-15 | Maxwäll Energiegenossenschaft eG. |
| GSP Hof Witzelbach FF 1MW | 0.97 MW | Freiflächensolaranlage | in operation | 2025-07-23 | GSP Service und Verwaltung GmbH |
| PV GSP Lochum 972,16kWp | 0.97 MW | Freiflächensolaranlage | in operation | 2026-01-02 | GSP Service und Verwaltung GmbH |
| FF Härtlingen | 0.96 MW | Freiflächensolaranlage | in operation | 2024-12-30 | GSP Service und Verwaltung GmbH |
| PV - Anlage 2 | 0.96 MW | Gebäudesolaranlage | in operation | 2016-12-23 | SOPREMA GmbH |
| Solarpark Mogendorf Krugbäckerstraße | 0.95 MW | Freiflächensolaranlage | in operation | 2026-01-16 | CPM |
| PV-Hallen | 0.94 MW | Gebäudesolaranlage | in operation | 2024-01-31 | Karl Michels GmbH & Co KG |
| Energiepark II, Wirges | 0.86 MW | Freiflächensolaranlage | in operation | 2011-12-19 | Koch Solarstrom GbR |
| FFPV-Anlage BWH Wetzstein | 0.86 MW | Freiflächensolaranlage | in operation | 2026-08-28 | Werhahn & Nauen SE & Co. OHG |
| unit operated by a private individual | 0.86 MW | Gebäudesolaranlage | in operation | 2009-12-22 | private individual |
| Solarpark Rennerod | 0.81 MW | Freiflächensolaranlage | in operation | 2012-06-30 | Maxwäll Energiegenossenschaft eG. |
| HachenFreiland | 0.77 MW | Freiflächensolaranlage | in operation | 2012-06-26 | Solarpark Kroppach UG&Co.Kg |
| Photovoltaikanlage 749,89kWp | 0.75 MW | Gebäudesolaranlage | in operation | 2023-03-16 | Bernhard Link GmbH & Co. KG |
| 750 Werk 1 | 0.75 MW | Gebäudesolaranlage | in operation | 2019-04-25 | Vecoplan AG |
| Feld-PV-Anlage | 0.75 MW | Freiflächensolaranlage | in operation | 2021-09-02 | Rudnick & Enners Maschinen-und Anlagenbau GmbH |
| Weroth Greentec | 0.75 MW | Gebäudesolaranlage | in operation | 2010-05-20 | Greentec GbR |
| unit operated by a private individual | 0.75 MW | Freiflächensolaranlage | in operation | 2022-02-28 | private individual |
| Ferderer | 0.75 MW | Gebäudesolaranlage | in operation | 2020-01-30 | Ferderer GmbH & Co. KG |
| PV Anlage Freiflaeche Friedrichstr. | 0.75 MW | Freiflächensolaranlage | in operation | 2018-06-29 | Theis EDL GmbH & Co. KG |
| Solarpark Wölferlingen 1 | 0.75 MW | Freiflächensolaranlage | in operation | 2018-01-29 | Maxwäll Energiegenossenschaft eG. |
| Solarpark Neunkhausen | 0.75 MW | Freiflächensolaranlage | in operation | 2020-01-23 | WerteService GmbH |
| Ransbach-Baumbach-738-25.06.24-PV | 0.74 MW | Gebäudesolaranlage | in operation | 2024-06-25 | Peter Gelhard Naturdärme KG |
| Logistik, 56410 Montabaur, Am Alten Galgen 21 | 0.71 MW | Gebäudesolaranlage | in operation | 2014-07-31 | ALDI Grundstückgesellschaft mbH & Co. KG |
| PV Anlage Werk 1 | 0.68 MW | Gebäudesolaranlage | in operation | 2022-06-03 | DECO-GLAS |
| Solaranlage | 0.67 MW | Gebäudesolaranlage | in operation | 2024-01-24 | Lebek International Fashion GmbH & Co. KG |
| PV Anlage Mogendorf | 0.67 MW | Gebäudesolaranlage | in operation | 2014-07-30 | Steuler Holding GmbH |
| PV Spang Halle 1-3 607,5kWp | 0.61 MW | Gebäudesolaranlage | in operation | 2009-06-17 | Westerwälder Blumentopf-Fabrik Spang GmbH & Co. KG |
| unit operated by a private individual | 0.59 MW | Gebäudesolaranlage | in operation | 2025-04-25 | private individual |
| Solaranlage | 0.58 MW | Gebäudesolaranlage | in operation | 2023-11-03 | Fahrzeugbau KEMPF GmbH |
| Ransbach-Baumbach I | 0.58 MW | Gebäudesolaranlage | in operation | 2024-01-08 | KBSolar III GbR |
| PV Gestamp, Westerburg | 0.55 MW | Gebäudesolaranlage | planned | planned 2026 | EDF Distributed Solutions Deutschland GmbH |
| Freqcon PV-Felder | 0.54 MW | Gebäudesolaranlage | in operation | 2025-06-01 | Güldenkron J.A.Aug.Müller Nachf. GmbH & Co. KG |
| Energiepark III Wirges | 0.54 MW | Freiflächensolaranlage | in operation | 2012-03-29 | Koch Solarstrom GbR |
| A37_Siershahn | 0.54 MW | Gebäudesolaranlage | in operation | 2026-02-11 | Schütz GmbH & Co. KGaA |
| Photovoltaikanlage 537,92kWp | 0.54 MW | Gebäudesolaranlage | in operation | 2023-08-04 | Alois Korzilius INTERBAU Fabrikation für moderne Baukeramik GmbH & Co. KG |
| Photovoltaikanlage 530,4kWp | 0.53 MW | Gebäudesolaranlage | in operation | 2024-11-19 | Sahm GmbH & Co. KG |
| Energiepark IV Staudt | 0.53 MW | Freiflächensolaranlage | in operation | 2018-06-29 | Koch Solarstrom GbR |
| Frei-Kropp | 0.50 MW | Freiflächensolaranlage | in operation | 2012-06-06 | Solarpark Kroppach UG&Co.Kg |
| unit operated by a private individual | 0.50 MW | Gebäudesolaranlage | in operation | 2021-03-31 | private individual |
| unit operated by a private individual | 0.50 MW | Gebäudesolaranlage | in operation | 2020-08-26 | private individual |
| unit operated by a private individual | 0.49 MW | Freiflächensolaranlage | in operation | 2020-05-14 | private individual |
| Solarpark Freirachdorf | 0.49 MW | Freiflächensolaranlage | in operation | 2020-05-14 | Duck Energieprojekte |
| unit operated by a private individual | 0.49 MW | Freiflächensolaranlage | in operation | 2020-05-14 | private individual |
| PV - Anlage 1 | 0.49 MW | Gebäudesolaranlage | in operation | 2014-07-21 | SOPREMA GmbH |
| unit operated by a private individual | 0.48 MW | Gebäudesolaranlage | in operation | 2017-04-03 | private individual |
| unit operated by a private individual | 0.48 MW | Gebäudesolaranlage | in operation | 2023-07-26 | private individual |
| PV Anlage Hahn am See | 0.47 MW | Gebäudesolaranlage | in operation | 2021-09-30 | Markus Mühle |
| HRL 200 148 360 000 1 | 0.46 MW | Gebäudesolaranlage | in operation | 2010-09-29 | Güldenkron J.A.Aug.Müller Nachf. GmbH & Co. KG |
| Mies PV ZW2 | 0.45 MW | Gebäudesolaranlage | in operation | 2024-02-27 | Friedrich Mies |
| Halle 1 | 0.43 MW | Gebäudesolaranlage | in operation | 2024-10-21 | Massfeller Eneregie GBr |
| PV-Anlage / MM | 0.42 MW | Gebäudesolaranlage | in operation | 2024-01-10 | Ursa-Chemie GmbH |
| HUF HAUS Leimholzhalle, Halle 10 | 0.42 MW | Gebäudesolaranlage | in operation | 2018-09-14 | Huf Haus GmbH & Co. KG |
| unit operated by a private individual | 0.41 MW | Gebäudesolaranlage | in operation | 2026-05-01 | private individual |
| Werkhalle neu | 0.41 MW | Gebäudesolaranlage | in operation | 2023-06-30 | ABUS August Bremicker Söhne KG |
| unit operated by a private individual | 0.41 MW | Gebäudesolaranlage | in operation | 2018-07-12 | private individual |
| unit operated by a private individual | 0.41 MW | Gebäudesolaranlage | in operation | 2025-01-24 | private individual |
| unit operated by a private individual | 0.40 MW | Gebäudesolaranlage | in operation | 2025-01-30 | private individual |
| PV Möbel Neust | 0.39 MW | Gebäudesolaranlage | in operation | 2022-07-29 | Möbel Neust GmbH |
| PV-Anlage Parkplatz Kreishaus | 0.38 MW | Sonstige Solaranlage | in operation | 2026-05-26 | Kreisverwaltung des Westerwaldkreises Solarstrom Westerwald Ref. 1-10 |
| Boerkamp | 0.38 MW | Gebäudesolaranlage | in operation | 2011-12-27 | Geschwister Stiens GmbH&Co.KG |
| Sessenbach | 0.37 MW | Freiflächensolaranlage | in operation | 2020-03-21 | Reusch Energieanlagen UG |
| unit operated by a private individual | 0.37 MW | Freiflächensolaranlage | in operation | 2012-06-28 | private individual |
| GMO 073 - See-Cafe Höhr-Grenzhausen | 0.37 MW | Gebäudesolaranlage | in operation | 2024-07-15 | Greenman Energy GmbH & Co. KG |
| GMO 073 - Aldi Höhr-Grenzhausen | 0.37 MW | Gebäudesolaranlage | in operation | 2024-12-20 | Greenman Energy GmbH & Co. KG |
| PV-Anlage Grube Meudt | 0.36 MW | Gebäudesolaranlage | in operation | 2024-06-25 | Stephan Schmidt |
| Ruß GmbH 2023 | 0.36 MW | Gebäudesolaranlage | in operation | 2023-06-01 | Ruß |
| Halle 1+2 | 0.36 MW | Gebäudesolaranlage | in operation | 2023-09-18 | Bio-Gen Milchserum Marketing GmbH |
| unit operated by a private individual | 0.36 MW | Gebäudesolaranlage | in operation | 2019-03-28 | private individual |
| Photovoltaikanlage 349,73kWp | 0.35 MW | Gebäudesolaranlage | in operation | 2023-08-02 | Hörter Holding GmbH & Co. KG |
| Photovoltaik | 0.35 MW | Gebäudesolaranlage | in operation | 2011-12-30 | systemceram GmbH & Co KG |
| unit operated by a private individual | 0.35 MW | Gebäudesolaranlage | in operation | 2025-04-25 | private individual |
| PVA-Lesch & Sünderhauf, Neunkirchen | 0.35 MW | Gebäudesolaranlage | in operation | 2009-12-30 | Schneiderhöhn & Leukel Steuerberater PartGmbB |
| Solaranlage | 0.34 MW | Gebäudesolaranlage | in operation | 2023-09-06 | Picco Bello GmbH |
| unit operated by a private individual | 0.34 MW | Gebäudesolaranlage | in operation | 2019-01-24 | private individual |
| Energiepark I Wirges | 0.34 MW | Freiflächensolaranlage | in operation | 2009-11-09 | Klaus u Claudia Koch GbR |
| Solarpark Görgeshausen II | 0.34 MW | Freiflächensolaranlage | in operation | 2018-01-30 | Energiegesellschaft Görgeshausen mbH |
| Oberahr 1 | 0.34 MW | Gebäudesolaranlage | in operation | 2012-06-28 | Sep 82 PV GmbH |
| Oberahr 2 | 0.34 MW | Gebäudesolaranlage | in operation | 2012-06-28 | Sep 82 PV GmbH |
| unit operated by a private individual | 0.34 MW | Gebäudesolaranlage | in operation | 2023-12-08 | private individual |
| Photovoltaikanlage 2024 | 0.34 MW | Gebäudesolaranlage | in operation | 2024-11-22 | Zeno-GmbH |
| unit operated by a private individual | 0.33 MW | Freiflächensolaranlage | in operation | 2024-12-21 | private individual |
| PV-325,55-kWp | 0.33 MW | Gebäudesolaranlage | in operation | 2024-09-11 | Volkmann Strassen- und Verkehrstechnik GmbH |
| PV-Anlage Nr. 2 | 0.32 MW | Gebäudesolaranlage | in operation | 2025-05-14 | Arno Witgert, Inh. Dipl.-Ing. (FH) Michael Liebig |
| PV Spang Ceramano 301,320 kWp | 0.30 MW | Gebäudesolaranlage | in operation | 2019-08-09 | Westerwälder Blumentopf-Fabrik Spang GmbH & Co. KG |
| Photovoltaikanlage 301,32kWp | 0.30 MW | Gebäudesolaranlage | in operation | 2020-04-15 | Katholische Klinikum Koblenz Montabaur |
| STAMO Solar Rehe | 0.30 MW | Gebäudesolaranlage | in operation | 2022-07-28 | Stamo Immobilien- und Vermögensverwaltung |
| GSP - 56459 Härtlingen | 0.30 MW | Gebäudesolaranlage | in operation | 2022-01-20 | GSP Service und Verwaltung GmbH |
| GFW PV Tracker | 0.30 MW | Freiflächensolaranlage | in operation | 2011-07-12 | GFW Energy e.K. Inh. Jürgen Fuhrländer |
| Photovoltaikanlage 294,1kWp | 0.29 MW | Gebäudesolaranlage | in operation | 2024-07-31 | GKF Invest GmbH |
| PV-Anlage ZILONIS Campus Müschenbach | 0.29 MW | Gebäudesolaranlage | in operation | 2025-03-22 | ZILONIS Stromerzeugungs GbR |
| Baumarkt | 0.29 MW | Gebäudesolaranlage | in operation | 2017-03-07 | GMK Baustoffe GmbH |
| unit operated by a private individual | 0.29 MW | Gebäudesolaranlage | in operation | 2024-07-29 | private individual |
| unit operated by a private individual | 0.28 MW | Gebäudesolaranlage | in operation | 2018-03-31 | private individual |
| unit operated by a private individual | 0.25 MW | Gebäudesolaranlage | in operation | 2026-06-09 | private individual |
| Solaranlage | 0.25 MW | Gebäudesolaranlage | in operation | 2023-09-12 | WEPA Apothekenbedarf GmbH & Co. KG |
| GSP Elsoff | 0.25 MW | Gebäudesolaranlage | in operation | 2023-03-14 | GSP Service und Verwaltung GmbH |
| Dr. Ludwig_Ransbach-Baumbach | 0.25 MW | Gebäudesolaranlage | in operation | 2024-06-17 | Dr. Ludwig GmbH |
| PVA Hartenfels | 0.24 MW | Gebäudesolaranlage | in operation | 2018-11-28 | GCS Invest GmbH & Co. KG |
| Solaranlage Lager Hillscheid | 0.24 MW | Gebäudesolaranlage | in operation | 2022-01-13 | GP Bau GbR |
| PV Werk 1 | 0.24 MW | Gebäudesolaranlage | in operation | 2019-05-31 | Ebener GmbH |
| unit operated by a private individual | 0.24 MW | Gebäudesolaranlage | in operation | 2024-01-19 | private individual |
| unit operated by a private individual | 0.24 MW | Gebäudesolaranlage | in operation | 2024-01-19 | private individual |
| Rennerod_DAWG | 0.23 MW | Gebäudesolaranlage | in operation | 2010-06-18 | SB Thalheim GmbH |
| Photovoltaikanlage 231,2kWp | 0.23 MW | Gebäudesolaranlage | in operation | 2024-05-22 | Bernhard Link GmbH & Co. KG |
| Halle unten | 0.23 MW | Gebäudesolaranlage | in operation | 2009-11-26 | Reinhard&Christian Born GbR |
| Solaranlage Erweiterung | 0.23 MW | Gebäudesolaranlage | in operation | 2026-01-29 | D & M KG |
| unit operated by a private individual | 0.22 MW | Gebäudesolaranlage | in operation | 2021-11-30 | private individual |
| PV-Anlage 220,78 kWp | 0.22 MW | Gebäudesolaranlage | in operation | 2022-07-06 | Dokasch GmbH Air Cargo Equipment & Repair |
| Halle oben | 0.22 MW | Gebäudesolaranlage | in operation | 2009-10-12 | Reinhard&Christian Born GbR |
| unit operated by a private individual | 0.22 MW | Gebäudesolaranlage | in operation | 2025-07-25 | private individual |
| Wallm | 0.22 MW | Gebäudesolaranlage | in operation | 2011-06-17 | Beth Photovoltaik GbR |
| PVA Günther | 0.22 MW | Gebäudesolaranlage | in operation | 2024-05-21 | Ralph Günther GmbH & Co. KG |
| unit operated by a private individual | 0.21 MW | Gebäudesolaranlage | in operation | 2024-12-09 | private individual |
| Halle Neu | 0.21 MW | Gebäudesolaranlage | in operation | 2012-03-05 | Reinhard&Christian Born GbR |
| ILH, Hausdach | 0.21 MW | Gebäudesolaranlage | in operation | 2015-12-09 | Ignatius-Lötschert-Haus GmbH |
| PV Zinhainer Weg 15, groß | 0.21 MW | Gebäudesolaranlage | in operation | 2010-12-23 | Vermögensverwaltung Schneider GbR |
| Ruß GmbH 2018 | 0.20 MW | Gebäudesolaranlage | in operation | 2018-03-27 | Ruß |
| Am Fichtenstrauch 20 | 0.20 MW | Gebäudesolaranlage | in operation | 2020-04-20 | WEPA Apothekenbedarf GmbH & Co. KG |
| PVA Simmern 4728 | 0.20 MW | Gebäudesolaranlage | in operation | 2021-05-31 | Proinvesta GmbH |
| MSW_PV_1 | 0.19 MW | Freiflächensolaranlage | in operation | 2021-04-22 | Metallguss Seifert GmbH |
| PVA Ideal Beton I | 0.19 MW | Gebäudesolaranlage | in operation | 2019-03-31 | Ideal Beton GmbH & Co. KG |
| PV Anlage MWF Siershahn | 0.19 MW | Gebäudesolaranlage | in operation | 2020-02-20 | MWF Technik GmbH & Co KG |
| Hofgut Grenzau 4 | 0.19 MW | Gebäudesolaranlage | in operation | 2010-12-13 | Meyer GbR |
| PV Scheune | 0.19 MW | Gebäudesolaranlage | in operation | 2024-10-29 | ReCo GbR |
| Solarpark Ebernhahn JD | 0.19 MW | Freiflächensolaranlage | in operation | 2019-04-18 | Duck Energieprojekte |
| unit operated by a private individual | 0.19 MW | Freiflächensolaranlage | in operation | 2019-04-18 | private individual |
| Solarpark Ebernhahn | 0.19 MW | Freiflächensolaranlage | in operation | 2019-04-18 | D.K. GbR |
| unit operated by a private individual | 0.19 MW | Freiflächensolaranlage | in operation | 2019-04-24 | private individual |
| unit operated by a private individual | 0.19 MW | Freiflächensolaranlage | in operation | 2020-03-21 | private individual |
| unit operated by a private individual | 0.19 MW | Freiflächensolaranlage | in operation | 2020-03-21 | private individual |
| Lagerhallendächer Osterfeld | 0.19 MW | Gebäudesolaranlage | in operation | 2023-09-20 | Joh. Jac. Letschert Sohn GmbH & Co. KG |
| FB-WE 184,68 kWp | 0.18 MW | Gebäudesolaranlage | in operation | 2024-04-26 | Finger Beton Westerburg GmbH & Co. KG |
| Hofgut Grenzau 3 | 0.18 MW | Gebäudesolaranlage | in operation | 2010-12-13 | Meyer GbR |
| Siershahn-184,46-01.07.26-PV | 0.18 MW | Gebäudesolaranlage | in operation | 2026-07-01 | T.Tu.T Solutions GbR |
| Solar Dies | 0.18 MW | Gebäudesolaranlage | in operation | 2012-07-31 | Holzbau Kappler GmbH & Co. KG |
| Boenig Präzisionswerkzeugbau GmbH | 0.18 MW | Gebäudesolaranlage | in operation | 2014-07-29 | ChipTec Zerspanungstechnik GmbH |
| Halle Maschinenbau | 0.18 MW | Gebäudesolaranlage | in operation | 2011-06-25 | Zeno-GmbH |
| Langenbach Kraftwerk | 0.17 MW | Gebäudesolaranlage | in operation | 2012-10-26 | Westerwälder Holzwerke GmbH |
| PV Spang Halle 4 174,42kWp | 0.17 MW | Gebäudesolaranlage | in operation | 2007-09-14 | Westerwälder Blumentopf-Fabrik Spang GmbH & Co. KG |
| PV Spang Halle 5 174,42kWp | 0.17 MW | Gebäudesolaranlage | in operation | 2007-09-14 | Westerwälder Blumentopf-Fabrik Spang GmbH & Co. KG |
| PV Spang Halle 6 174,42kWp | 0.17 MW | Gebäudesolaranlage | in operation | 2007-09-14 | Westerwälder Blumentopf-Fabrik Spang GmbH & Co. KG |
| PV Anlage Grube Ruppach | 0.17 MW | Gebäudesolaranlage | in operation | 2026-01-20 | Stephan Schmidt |
| PV-Dach | 0.17 MW | Gebäudesolaranlage | in operation | 2024-02-14 | Kreisverwaltung des Westerwaldkreises Solarstrom Westerwald Ref. 1-10 |
| PV 167,58kWp Lichtenthäler-Wahlrod | 0.17 MW | Gebäudesolaranlage | in operation | 2024-01-15 | ReCoGbR |
| PV-Anlage Dach Scheune | 0.17 MW | Gebäudesolaranlage | in operation | 2024-02-15 | ReCo GbR |
| Solaranlage | 0.17 MW | Gebäudesolaranlage | in operation | 2024-07-31 | KEMPF-Fahrzeug Reparatur-GmbH |
| PV GSP Hof Witzelbach Dach | 0.16 MW | Gebäudesolaranlage | in operation | 2026-01-02 | GSP Service und Verwaltung GmbH |
| Filiale, 56457, Westerburg, Günther-Koch-Str. 27 | 0.16 MW | Gebäudesolaranlage | in operation | 2014-08-07 | ALDI SE & Co. KG |
| RaBa - d-Esterstr. 9 - 162 KwP Volleinspeiser | 0.16 MW | Gebäudesolaranlage | in operation | 2024-01-24 | MD PV-Betriebs GbR 1 |
| Solaranlage | 0.16 MW | Gebäudesolaranlage | in operation | 2023-07-21 | ARALON COLOR GmbH |
| PV WAB | 0.16 MW | Gebäudesolaranlage | in operation | 2016-12-19 | Westerwaldkreis-AbfallwirtschaftsBetrieb (WAB) |
| PG157,5 | 0.16 MW | Gebäudesolaranlage | in operation | 2009-11-13 | Gomber Photovoltaik GmbH |
| Birkenhof Lagerhalle 2023 | 0.16 MW | Gebäudesolaranlage | in operation | 2023-06-30 | Birkenhof-Brennerei GmbH |
| PV ehemals Freifläche Nord | 0.16 MW | Freiflächensolaranlage | in operation | 2012-10-07 | Westerwälder Holzwerke GmbH |
| PV_Halle 4 | 0.16 MW | Gebäudesolaranlage | in operation | 2024-11-08 | ETA Asset |
| Flugplatz | 0.16 MW | Gebäudesolaranlage | in operation | 2011-07-19 | Luftsportclub Marienberg e.V. |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2024-11-14 | private individual |
| PV "Dach SEO" | 0.15 MW | Gebäudesolaranlage | in operation | 2021-12-06 | Westerwälder Holzwerke GmbH |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2012-09-28 | private individual |
| PV Werkstatt | 0.15 MW | Gebäudesolaranlage | in operation | 2022-11-23 | Karl Michels GmbH & Co KG |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2014-11-20 | private individual |
| Solarpark Wölferlingen 2 | 0.15 MW | Freiflächensolaranlage | in operation | 2020-03-27 | Maxwäll Energiegenossenschaft eG. |
| Anlage 2018 | 0.15 MW | Gebäudesolaranlage | in operation | 2018-12-21 | P&P Dienstleistungs GmbH & Co. KG |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2026-02-25 | private individual |
| Filiale, 57627, Hachenburg, Kleeberger Weg 35 | 0.14 MW | Gebäudesolaranlage | in operation | 2015-07-14 | ALDI SE & Co. KG |
| Filiale, 56235, Ransbach-Baumbach, Ghaselstr. 26 | 0.14 MW | Gebäudesolaranlage | in operation | 2015-11-12 | ALDI SE & Co. KG |
| PV Produktionshalle | 0.14 MW | Gebäudesolaranlage | in operation | 2024-07-05 | Sägewerk Martschauske |
| 6535_Lidl_Bad Marienberg | 0.14 MW | Gebäudesolaranlage | in operation | 2025-02-14 | Lidl Vertriebs-GmbH & Co. KG |
| PV Anlage-Cine West | 0.14 MW | Gebäudesolaranlage | in operation | 2023-12-01 | Cine West |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2021-01-15 | private individual |
| 56470 Bad Marienberg, An der Lehmkaute 1 | 0.14 MW | Gebäudesolaranlage | in operation | 2015-12-03 | ALDI SE & Co. KG |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2024-09-23 | private individual |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2011-12-02 | private individual |
| Anlage Pressenhalle BJ2024 | 0.14 MW | Gebäudesolaranlage | in operation | 2024-03-05 | GDH Metallverarbeitung GmbH |
| PV Anlage Halle Hof - Industriestrasse 16 | 0.14 MW | Gebäudesolaranlage | in operation | 2012-03-30 | Theis EDL GmbH & Co. KG |
| PV "Fassade Silos" (Silo 3+4) | 0.14 MW | Gebäudesolaranlage | in operation | 2021-12-06 | Westerwälder Holzwerke GmbH |
| PV OE Fassade Halle 6 | 0.14 MW | Gebäudesolaranlage | planned | planned 2026 | Deutsche Steinzeug Solar Ceramics GmbH |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2009-07-10 | private individual |
| Hausdach_Fahrzeuglackierung | 0.14 MW | Gebäudesolaranlage | in operation | 2024-03-04 | Arthur Fahrzeuglackierung |
| PV Özen Halle Röntgenstraße 1a | 0.14 MW | Gebäudesolaranlage | in operation | 2025-01-24 | Özen |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2012-04-01 | private individual |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2026-05-29 | private individual |
| Westerwälder Hof Welschneudorf | 0.13 MW | Gebäudesolaranlage | in operation | 2026-03-03 | Westerwälder Hof Welschneudorf eGbR |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2013-04-30 | private individual |
| PV E27c | 0.13 MW | Gebäudesolaranlage | in operation | 2025-12-04 | GKF Invest GmbH |
| PV Anlage | 0.13 MW | Gebäudesolaranlage | in operation | 2024-10-31 | Heuser & Scherer Energie GBR |
| STOV Aufstockung Dach | 0.13 MW | Gebäudesolaranlage | in operation | 2024-05-01 | Ferdinand & Schmidt GbR |
| PVA-Sünderhauf, Neunkirchen | 0.13 MW | Gebäudesolaranlage | in operation | 2009-12-30 | Schneiderhöhn & Leukel Steuerberater PartGmbB |
| PV-Wahlrod | 0.13 MW | Gebäudesolaranlage | in operation | 2026-06-03 | Kanal-Service Gebr. Dineiger & Co. GmbH |
| Hüsch_Hachenburg | 0.13 MW | Gebäudesolaranlage | in operation | 2026-09-30 | Hüsch GmbH print technology |
| 6678_Lidl_Ransbach | 0.13 MW | Gebäudesolaranlage | in operation | 2024-09-06 | Lidl Vertriebs GmbH & Co.KG |
| Produktionsgebäude-Dach | 0.13 MW | Gebäudesolaranlage | in operation | 2009-12-16 | Joh. Jac. Letschert Sohn GmbH & Co. KG |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2010-09-28 | private individual |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2026-05-29 | private individual |
| Solaranlage | 0.12 MW | Gebäudesolaranlage | in operation | 2023-04-03 | Niveau Fenster Westerburg GmbH |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2010-06-14 | private individual |
| Stahlbauhalle | 0.12 MW | Gebäudesolaranlage | in operation | 2010-11-17 | Zoth GmbH & Co. KG |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2009-12-29 | private individual |
| Photovoltaik 1 | 0.12 MW | Gebäudesolaranlage | in operation | 2012-10-30 | Friedtec GmbH &Co.KG |
| Photovoltaikanlage 121,36kWp | 0.12 MW | Gebäudesolaranlage | in operation | 2024-01-17 | Munsch Chemie-Pumpen |
| PV Alpenrod | 0.12 MW | Gebäudesolaranlage | in operation | 2010-09-29 | Reif Energy GmbH |
| Filiale, 56422, Wirges, Auf der Klaus 7 | 0.12 MW | Gebäudesolaranlage | in operation | 2014-09-01 | ALDI SE & Co. KG |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2018-04-06 | private individual |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2012-03-30 | private individual |
| Anlage 2 | 0.12 MW | Gebäudesolaranlage | in operation | 2023-04-20 | Pelger GmbH |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2023-08-18 | private individual |
| Photovoltaik Heiligenroth | 0.12 MW | Gebäudesolaranlage | in operation | 2012-03-28 | Lease + Earn GmbH & Co. KG |
| PV Spänehalle/ SEO ex PV Freifläche | 0.12 MW | Gebäudesolaranlage | in operation | 2012-10-07 | Westerwälder Holzwerke GmbH |
| KrausGuHoEW23 | 0.11 MW | Gebäudesolaranlage | in operation | 2023-05-25 | Krause Gussprodukte GmbH+ Co. KG |
| Haas_104,50kwp | 0.10 MW | Gebäudesolaranlage | in operation | 2015-12-17 | Haas Kloft Holding eGbR |
| PV2_ETT | 0.10 MW | Gebäudesolaranlage | in operation | 2024-11-01 | ABO Kraft & Wärme Ettinghausen GmbH & Co. KG |
| PV Stundenstein 1 Eitelborn | 0.10 MW | Gebäudesolaranlage | in operation | 2009-10-19 | EPA Gewerbe |
| Halle 1 | 0.10 MW | Gebäudesolaranlage | in operation | 2011-12-21 | Stefan Neuhaus Vermietungen |
| Westerwald Bank eG - Ransbach-Baumbach 1 | 0.10 MW | Gebäudesolaranlage | in operation | 2024-02-15 | Westerwald Bank eG |
| Solaranlage | 0.10 MW | Gebäudesolaranlage | in operation | 2023-01-02 | SWW Stahlbau Westerwald GmbH |
Which organisations operate the most solar PV capacity in Westerwaldkreis?
| Operator | Units | Capacity |
|---|---|---|
| GSP International GmbH | 2 | 17.6 MW |
| PV-Oberhaid GmbH & Co. KG | 7 | 16.1 MW |
| GSP Service und Verwaltung GmbH | 8 | 14.5 MW |
| Solarpark Nomborn GmbH & Co. KG | 2 | 9.45 MW |
| Solarpark Ha&He Betriebs GmbH & Co. KG | 2 | 8.50 MW |
| HSP Hachenburger Solar Park GmbH | 1 | 8.25 MW |
| Maxwäll Energiegenossenschaft eG. | 7 | 5.84 MW |
| Energiegesellschaft Görgeshausen mbH | 3 | 5.81 MW |
| SolNeos Solarporfolio 5 | 1 | 5.46 MW |
| SP Solarpark Langenhahn GmbH & Co. KG | 2 | 5.34 MW |
Which installation type accounts for the most solar PV capacity in Westerwaldkreis?
| Installation type | Units | Capacity |
|---|---|---|
| Freiflächensolaranlage | 70 | 133.0 MW |
| Gebäudesolaranlage | 185 | 57.2 MW |
| Sonstige Solaranlage | 1 | 0.38 MW |
Solar PV in Rheinland-Pfalz · Solar PV in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many solar installations are registered in Westerwaldkreis (Rheinland-Pfalz), and how can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.