Germany · renewables
Solar PV in Vorpommern-Greifswald
13,813 solar installations with 939.6 MW of gross capacity were in operation in Vorpommern-Greifswald (Mecklenburg-Vorpommern) as of 2026-11-05, with a further 217 units (111.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many solar installations are registered in Vorpommern-Greifswald (Mecklenburg-Vorpommern), and how large are they, as of 2026-11-05?
- 13,813 solar installations with 939.6 MW of gross capacity were in operation in Vorpommern-Greifswald (Mecklenburg-Vorpommern) as of 2026-11-05, with a further 217 units (111.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many solar installations are in operation in Vorpommern-Greifswald?
- 13,813 solar installations with 939.6 MW of gross capacity were in operation in Vorpommern-Greifswald as of 2026-11-05, with a further 217 units (111.7 MW) registered as planned; the count includes every registered unit down to balcony systems (Bundesnetzagentur, Marktstammdatenregister).
- How much solar PV capacity was commissioned in Vorpommern-Greifswald in 2025?
- 2,036 solar installations with 118.7 MW went into operation in Vorpommern-Greifswald in 2025; the strongest year of the last two decades was 2025 with 118.7 MW (Bundesnetzagentur, Marktstammdatenregister).
- What share of Vorpommern-Greifswald's solar installations are larger than 100 kW?
- 707 of 14,301 registered solar installations in Vorpommern-Greifswald (4.9 percent) exceed 100 kW, but they hold 928.9 MW of the 1.05 GW total capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most solar PV capacity in Vorpommern-Greifswald?
- Anumar Solarpark Neuendorf A GmbH & Co. KG operates 5 solar installations over 100 kW with 58.8 MW in Vorpommern-Greifswald, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which installation type has the most solar PV capacity in Vorpommern-Greifswald?
- Freiflächensolaranlage leads with 189 solar installations and 729.4 MW in Vorpommern-Greifswald (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest solar installation in Vorpommern-Greifswald?
- The largest registered solar installation in Vorpommern-Greifswald has 57.8 MW of gross capacity and is operated by AD Bergholz GmbH, commissioned 2026-09-02 (Bundesnetzagentur, Marktstammdatenregister).
How are the solar installations in Vorpommern-Greifswald distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 13,078 | 91.0 MW | 12,618 | 197 |
| 30 to 100 kW | 516 | 33.5 MW | 508 | 4 |
| over 100 kW | 707 | 928.9 MW | 687 | 16 |
How much solar PV capacity was commissioned in Vorpommern-Greifswald each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1,688 | 133.4 MW |
| 2025 | 2,036 | 118.7 MW |
| 2024 | 2,488 | 57.2 MW |
| 2023 | 2,926 | 30.8 MW |
| 2022 | 1,043 | 72.6 MW |
| 2021 | 468 | 28.6 MW |
| 2020 | 371 | 51.0 MW |
| 2019 | 277 | 47.4 MW |
| 2018 | 172 | 48.7 MW |
| 2017 | 124 | 29.0 MW |
| 2016 | 72 | 32.9 MW |
| 2015 | 77 | 19.6 MW |
| 2014 | 124 | 29.7 MW |
| 2013 | 239 | 35.6 MW |
| 2012 | 376 | 69.7 MW |
| 2011 | 498 | 67.6 MW |
| 2010 | 377 | 45.5 MW |
| 2009 | 174 | 11.9 MW |
| 2008 | 137 | 2.49 MW |
| 2007 | 110 | 2.43 MW |
| 2006 | 110 | 1.38 MW |
How many solar installations in Vorpommern-Greifswald are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 13,813 | 939.6 MW |
| planned | 217 | 111.7 MW |
| permanently decommissioned | 247 | 1.66 MW |
| temporarily shut down | 24 | 0.53 MW |
Which solar installations over 100 kW are registered in Vorpommern-Greifswald?
| Unit | Capacity | Type | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| PVA Bergholz | 57.8 MW | Freiflächensolaranlage | in operation | 2026-09-02 | AD Bergholz GmbH |
| Solarpark Boldekow | 56.1 MW | Freiflächensolaranlage | in operation | 2025-05-13 | Solarpark Boldekow GmbH & Co. KG |
| SP Lauenhagen 2 | 25.4 MW | Freiflächensolaranlage | in operation | 2026-03-26 | EnBW Solarpark Lauenhagen GmbH & Co. KG |
| Solarpark Neuendorf A - P20-074 Teil 5 | 23.4 MW | Freiflächensolaranlage | planned | planned 2025 | Anumar Solarpark Neuendorf A GmbH & Co. KG |
| Papendorf | 20.0 MW | Freiflächensolaranlage | planned | planned 2026 | ENERPARC Solar Invest 230 TU 32 GmbH & Co. KG |
| Ramin 1 | 20.0 MW | Freiflächensolaranlage | planned | planned 2026 | ENERPARC Solar Invest 211 TU 3 GmbH |
| SP Lauenhagen 1 | 20.0 MW | Freiflächensolaranlage | in operation | 2026-03-26 | EnBW Solarpark Lauenhagen GmbH & Co. KG |
| Klein Schönwalde | 14.4 MW | Freiflächensolaranlage | planned | planned 2026 | ENERPARC Solar Invest 192 GmbH |
| Ramin 1.1 | 13.3 MW | Freiflächensolaranlage | in operation | 2025-02-20 | ENERPARC Solar Invest 211 TU 3 GmbH |
| Energiepark Eggesin | 13.1 MW | Freiflächensolaranlage | planned | planned 2026 | Energiepark Ulm GmbH & Co. KG |
| Tutow II FFA (2) | 12.7 MW | Freiflächensolaranlage | in operation | 2010-11-24 | Solarpark Tutow II GmbH & Co. KG |
| Tutow II FFA (1) | 12.7 MW | Freiflächensolaranlage | in operation | 2010-11-24 | Solarpark Tutow II GmbH & Co. KG |
| PVA Wusseken1 | 10.0 MW | Freiflächensolaranlage | in operation | 2018-08-27 | ENERPARC Solar Invest 114 GmbH |
| Solarpark Neuendorf A - P20-074 Teil 1 | 10.0 MW | Freiflächensolaranlage | in operation | 2024-12-18 | Anumar Solarpark Neuendorf A GmbH & Co. KG |
| Solarpark Neuendorf A - P20-074 Teil 3 | 10.0 MW | Freiflächensolaranlage | in operation | 2025-02-13 | Anumar Solarpark Neuendorf A GmbH & Co. KG |
| Kemnitz 1.1 | 10.00 MW | Freiflächensolaranlage | in operation | 2022-10-06 | Solarpark KMN GmbH & Co. KG |
| Solarpark Rossow | 10.00 MW | Freiflächensolaranlage | in operation | 2020-11-26 | Solarpark Rossow GmbH & Co. KG |
| Solarpark Wackerow I | 10.00 MW | Freiflächensolaranlage | in operation | 2022-07-28 | Solarpark Wackerow GmbH & Co. KG |
| Solarpark Tutow | 9.97 MW | Freiflächensolaranlage | in operation | 2017-06-07 | Sonnenenergie Osterhof 11 GmbH & Co. KG |
| PVA Löcknitz | 9.91 MW | Freiflächensolaranlage | in operation | 2014-01-31 | LSSI Leadership Solar Invest 5 GmbH & Co. KG |
| Eggesin 1.1 | 9.88 MW | Freiflächensolaranlage | in operation | 2022-07-21 | ENERPARC Solar Invest 168 GmbH |
| Bergholz | 9.77 MW | Freiflächensolaranlage | in operation | 2015-01-30 | SP Bergholz ApS & Co. KG |
| Solarpark Neuendorf A - P20-074 Teil 4 | 9.51 MW | Freiflächensolaranlage | in operation | 2025-02-13 | Anumar Solarpark Neuendorf A GmbH & Co. KG |
| PV2 Eggesin | 9.23 MW | Freiflächensolaranlage | in operation | 2017-12-05 | EnBW SunInvest GmbH & Co. KG |
| Solarpark Nadrensee | 8.93 MW | Freiflächensolaranlage | in operation | 2016-08-29 | Solarpark Nadrensee GmbH & Co. KG |
| PV Strasburg Exergy T1 | 8.73 MW | Freiflächensolaranlage | in operation | 2024-06-13 | SE Sustainable Exergy GmbH |
| PVA 2- Müssentin | 8.35 MW | Freiflächensolaranlage | in operation | 2018-07-28 | EnBW SunInvest GmbH & Co. KG |
| Leussin [26] | 8.00 MW | Freiflächensolaranlage | in operation | 2012-06-15 | ST Solarinvestitionsgesellschaft Mecklenburg 2 mbH |
| Wolgast | 7.85 MW | Freiflächensolaranlage | in operation | 2013-11-30 | WG Projektmanagement Inh. Wolfgang Gehrlicher e. K. |
| Peenemünde Polder 1 und 2 | 7.80 MW | Freiflächensolaranlage | in operation | 2022-01-27 | 7C Solarentwicklung GmbH |
| SP TutowV 10022.01 | 7.67 MW | Freiflächensolaranlage | in operation | 2011-08-17 | Solarpark Tutow V GmbH & Co. KG |
| PVA Kammin | 7.51 MW | Freiflächensolaranlage | in operation | 2018-08-27 | SPP 1 Solar Invest 2 GmbH & Co. KG |
| Wusseken 2 | 7.14 MW | Freiflächensolaranlage | in operation | 2019-05-15 | ENERPARC Solar Invest 114 GmbH |
| Tutow I Solarpark Freiflächenanlage | 6.78 MW | Freiflächensolaranlage | in operation | 2009-07-14 | Mainzer Erneuerbare Energien GmbH |
| PVA Müssentin | 6.44 MW | Freiflächensolaranlage | in operation | 2012-12-20 | Wattner SunAsset Solarkraftwerk 059 GmbH |
| Jarmen | 5.95 MW | Freiflächensolaranlage | in operation | 2020-05-30 | ENERPARC Solar Invest 138 GmbH |
| Solarpark Neuendorf A - P20-074 Teil 2 | 5.84 MW | Freiflächensolaranlage | in operation | 2024-12-18 | Anumar Solarpark Neuendorf A GmbH & Co. KG |
| Solarpark Pasewalk 2 | 5.61 MW | Freiflächensolaranlage | in operation | 2022-08-16 | NaturStromQuelle Fünf GmbH & Co. KG |
| SP TutowV 10022.02 | 5.42 MW | Freiflächensolaranlage | in operation | 2011-08-30 | Solarpark Tutow V GmbH & Co. KG |
| Relzow_5MW | 5.31 MW | Freiflächensolaranlage | in operation | 2011-12-31 | Solarland GmbH |
| PVA Neppermin 2016 | 5.28 MW | Freiflächensolaranlage | in operation | 2016-10-27 | LEVISol Service GmbH |
| PV Eggesin | 5.01 MW | Freiflächensolaranlage | planned | planned 2023 | Sonneberg Solar GmbH & Co.KG |
| Peenemünde Polder 4 | 5.00 MW | Freiflächensolaranlage | in operation | 2026-10-22 | Projekt OS8 GmbH & Co. KG |
| Solarpark Ramin Süd | 4.98 MW | Freiflächensolaranlage | in operation | 2013-03-28 | Solarpark Ramin GmbH |
| Solarpark Diedrichshagen | 4.90 MW | Freiflächensolaranlage | in operation | 2013-05-29 | Solarpark Diedrichshagen GmbH & Co. KG |
| PVA Pasewalk | 4.87 MW | Freiflächensolaranlage | in operation | 2014-06-27 | ENERPARC Solar Invest 94 GmbH |
| Eggesin 1.2 | 4.82 MW | Freiflächensolaranlage | in operation | 2022-09-21 | ENERPARC Solar Invest 181 GmbH |
| SP Boock | 4.78 MW | Freiflächensolaranlage | in operation | 2016-10-29 | Pro Solar GmbH |
| Relzow Dach NEU | 4.52 MW | Gebäudesolaranlage | in operation | 2011-06-30 | Mewako GmbH |
| SP Voßberg | 4.47 MW | Freiflächensolaranlage | in operation | 2026-05-05 | Voßberg Drei GmbH & Co. KG |
| Solarpark Polzow Ib | 4.46 MW | Freiflächensolaranlage | in operation | 2021-09-03 | Sonnenenergie Osterhof 21 GmbH & Co. KG |
| PVA Loitz 1 | 4.31 MW | Freiflächensolaranlage | in operation | 2012-06-25 | Wattner SunAsset Solarkraftwerk 010 GmbH |
| PV Krugsdorf 1/1 | 4.31 MW | Freiflächensolaranlage | in operation | 2015-03-27 | Freiflächenanlage Dinkelscherben GmbH & Co. KG |
| Solarpark Ramin Nord | 4.02 MW | Freiflächensolaranlage | in operation | 2013-03-28 | Solarpark Ramin GmbH |
| Solarpark Pasewalk 1 | 3.90 MW | Freiflächensolaranlage | in operation | 2022-08-22 | NaturStromQuelle Fünf GmbH & Co. KG |
| Ueckermünde 1 SUNgart [303] | 3.68 MW | Freiflächensolaranlage | in operation | 2012-09-30 | SUNgart Ueckermünde GmbH |
| PVA-Wolgast | 3.52 MW | Freiflächensolaranlage | in operation | 2025-07-31 | Energie Vorpommern GmbH |
| Mando 62 - PVA Löcknitz 2. BA | 3.38 MW | Gebäudesolaranlage | in operation | 2016-12-23 | Mando Solarkraftwerke Nr. 62 GmbH & Co. KG |
| PVA Peenemünde IV.2 | 3.10 MW | Freiflächensolaranlage | in operation | 2026-04-01 | MHB Invest 4 GmbH & Co. KG |
| SP TutowV 10022.04 | 3.09 MW | Freiflächensolaranlage | in operation | 2011-10-15 | Solarpark Tutow V GmbH & Co. KG |
| Leussin NM BNA [321] | 3.09 MW | Freiflächensolaranlage | in operation | 2022-05-12 | ST Solarinvestitionsgesellschaft Mecklenburg 2 mbH |
| PV Jarmen | 3.07 MW | Freiflächensolaranlage | in operation | 2014-12-19 | PV Jarmen GmbH & Co KG |
| SP Z III | 3.01 MW | Freiflächensolaranlage | in operation | 2020-12-09 | Zemitz Solar UG (haftungsbeschränkt) & Co. KG |
| Solarpark Tutow IIB | 2.89 MW | Freiflächensolaranlage | in operation | 2019-07-17 | Sonnenenergie Osterhof 11 GmbH & Co. KG |
| Jarmen | 2.86 MW | Freiflächensolaranlage | in operation | 2011-12-21 | Jarmen Solar GmbH & Co. KG |
| Solarpark am Haff | 2.80 MW | Freiflächensolaranlage | in operation | 2011-05-20 | Solarpark am Haff GmbH & Co.KG |
| Solarpark Pasewalk | 2.77 MW | Freiflächensolaranlage | in operation | 2010-06-28 | CHORUS CleanTech GmbH & Co. Solarpark Pasewalk KG |
| PVA Jatznick | 2.76 MW | Freiflächensolaranlage | in operation | 2012-12-19 | Enerparc Solar Invest 48 GmbH |
| Solarpark | 2.75 MW | Freiflächensolaranlage | in operation | 2012-03-08 | Solarpark Pasewalk GmbH&Co.KG |
| Solarpark Jatznick | 2.67 MW | Freiflächensolaranlage | planned | planned 2026 | Sonnenblume Solar I GmbH |
| PVA Blumenthal 1 | 2.52 MW | Freiflächensolaranlage | in operation | 2012-06-30 | KKE Sonnenberg GmbH & Co.KG |
| SP Sprengersfelde | 2.46 MW | Freiflächensolaranlage | in operation | 2014-08-28 | G+W PV Park Sprengersfelde GmbH & Co.KG c/o BDO AG |
| PV-Anlage Birkenstock Injections | 2.40 MW | Gebäudesolaranlage | in operation | 2024-02-01 | Birkenstock Injections GmbH |
| Einspeisung 2 Anklam UG | 2.29 MW | Freiflächensolaranlage | in operation | 2016-12-11 | Einspeisung 2 Anklam UG |
| SP Torgelow | 2.28 MW | Freiflächensolaranlage | in operation | 2011-12-31 | SPR Beteiligung |
| PVA Eggesin | 2.20 MW | Freiflächensolaranlage | in operation | 2012-06-22 | Wattner SunAsset Solarkraftwerk 055 GmbH |
| Flugplatz Peenemünde Bauabschnitt V | 2.20 MW | Freiflächensolaranlage | planned | planned 2025 | SUN-ISLAND EnergiePark Peenemünde GmbH |
| Flugplatz Peenemünde Bauabschnitt 2,2 MW Freifläche | 2.20 MW | Freiflächensolaranlage | planned | planned 2027 | SUN-ISLAND EnergiePark Peenemünde GmbH |
| Wusseken 3B | 2.09 MW | Freiflächensolaranlage | in operation | 2019-08-28 | ENERPARC Solar Invest 114 GmbH |
| Wusseken 3A | 2.09 MW | Freiflächensolaranlage | in operation | 2019-05-15 | ENERPARC Solar Invest 114 GmbH |
| Einspeisung 1 Anklam UG | 2.04 MW | Freiflächensolaranlage | in operation | 2016-12-11 | Einspeisung 1 Anklam UG |
| PV Strasburg Exergy T2 | 2.00 MW | Freiflächensolaranlage | in operation | 2026-03-12 | SE Sustainable Exergy GmbH |
| Labömitz | 1.96 MW | Gebäudesolaranlage | in operation | 2011-08-01 | Usedom Photovoltaik |
| BeBa Solarpark - Strasburg 1891,89 kWp | 1.89 MW | Freiflächensolaranlage | in operation | 2012-06-30 | BeBa Solarpark Uckermark UG u. Co KG |
| U. H Solarpark Gützkow GmbH & Co. KG | 1.85 MW | Freiflächensolaranlage | in operation | 2013-04-30 | U.H.Solarpark Gützkow GmbH & Co.KG |
| Lubmin | 1.77 MW | Freiflächensolaranlage | in operation | 2004-12-15 | Solaranlage Lubmin GmbH & Co. KG |
| PEC V Behrenhoff Lindenallee 4a | 1.75 MW | Gebäudesolaranlage | in operation | 2023-01-10 | P.E.C. Sun Verwaltungs GmbH |
| BeBa Solarpark Ostseeblick - Berndshof - 1715 kWp | 1.72 MW | Freiflächensolaranlage | in operation | 2011-12-31 | BeBa Solarpark Ostseeblick UG u. Co. KG |
| LoecknitzFrei2026-1 | 1.68 MW | Freiflächensolaranlage | planned | planned 2026 | Smart Solar Verwaltung eG |
| Solarpark Alt Tellin | 1.66 MW | Freiflächensolaranlage | in operation | 2012-06-19 | Sonnenenergie Alt Tellin Betriebs GmbH & Co. KG |
| PVA-Wolgast | 1.65 MW | Gebäudesolaranlage | planned | planned 2027 | Kommunalwind Nord |
| Solarpark Jatznick Teil 1 | 1.60 MW | Freiflächensolaranlage | in operation | 2012-09-28 | Solarpark Jatznick UG (haftungsbeschränkt) & Co. KG |
| unit operated by a private individual | 1.60 MW | Gebäudesolaranlage | in operation | 2025-11-01 | private individual |
| PV-Topregal_2-4 | 1.60 MW | Gebäudesolaranlage | in operation | 2025-07-01 | GDM Solar GmbH |
| SP TutowV 10022.05 | 1.56 MW | Freiflächensolaranlage | in operation | 2011-11-16 | Solarpark Tutow V GmbH & Co. KG |
| SP TutowV 10022.03 | 1.55 MW | Freiflächensolaranlage | in operation | 2011-09-15 | Solarpark Tutow V GmbH & Co. KG |
| PV Eggesin Batteriespeicher | 1.50 MW | Freiflächensolaranlage | planned | planned 2023 | Sonneberg Solar GmbH & Co.KG |
| PVA Loitz 2 | 1.44 MW | Freiflächensolaranlage | in operation | 2012-12-20 | Wattner SunAsset Solarkraftwerk 010 GmbH |
| PVA Vierow | 1.32 MW | Freiflächensolaranlage | in operation | 2013-07-31 | Sun Projekt alpha GmbH |
| FFA Anklam | 1.29 MW | Freiflächensolaranlage | in operation | 2022-09-23 | Anklam Sonne GbR |
| SP Wolgast | 1.27 MW | Freiflächensolaranlage | in operation | 2015-06-26 | 2. WestWind Solarpark GmbH & Co. KG |
| Bannemin | 1.27 MW | Gebäudesolaranlage | in operation | 2013-10-31 | Helga und Hans-Siegfried Brandes |
| PVA Anklam | 1.26 MW | Freiflächensolaranlage | in operation | 2015-04-29 | ENERPARC Solar Invest 103 GmbH |
| Bootslager Marina Lubmin | 1.25 MW | Gebäudesolaranlage | in operation | 2024-09-02 | Werle Pecunia Solaris GmbH |
| YEL01 | 1.22 MW | Gebäudesolaranlage | in operation | 2014-08-01 | Better Energy Gul GmbH & Co. KG |
| RED01 | 1.22 MW | Freiflächensolaranlage | in operation | 2014-08-01 | Better Energy Red GmbH & Co. KG |
| AZU01 | 1.22 MW | Freiflächensolaranlage | in operation | 2014-08-01 | Better Energy Azur GmbH & Co. KG |
| CYA01 | 1.19 MW | Freiflächensolaranlage | in operation | 2014-08-01 | Better Energy Cyan GmbH & Co. KG |
| PUR01 | 1.19 MW | Freiflächensolaranlage | in operation | 2014-08-01 | Better Energy Purple GmbH & Co. KG |
| AMB01 | 1.19 MW | Freiflächensolaranlage | in operation | 2014-02-28 | Better Energy Amber GmbH & Co. KG |
| Energiepark Eggesin Dach Teil I | 1.16 MW | Gebäudesolaranlage | in operation | 2026-01-29 | Energiepark Ulm GmbH & Co. KG |
| Solarpark Strasburg | 1.10 MW | Freiflächensolaranlage | planned | planned 2026 | Solarpark Strasburg UG |
| PV-Anlage RM 02_1080 | 1.08 MW | Gebäudesolaranlage | in operation | 2020-03-30 | Agrar GmbH Gut Ferdinandshof |
| PV-Topregal_5-6 | 1.08 MW | Gebäudesolaranlage | in operation | 2026-10-01 | GDM Solar GmbH |
| Chausseestr. Gribow | 1.08 MW | Freiflächensolaranlage | in operation | 2012-09-30 | COG Solar GmbH & Co. KG |
| Hallendach | 1.07 MW | Gebäudesolaranlage | in operation | 2010-06-21 | Schweinemast Oschätzchen GmbH |
| Eggesin 3 | 1.05 MW | Freiflächensolaranlage | in operation | 2022-10-04 | ENERPARC Solar Invest 181 GmbH |
| PVA Bandelin | 1.00 MW | Gebäudesolaranlage | in operation | 2016-12-27 | JH PV23 GmbH & Co. KG |
| PVA Wolgast Werft | 1.00 MW | Gebäudesolaranlage | in operation | 2016-12-30 | SUNLIFE-Service GmbH |
| Mando 62 - PVA Löcknitz 1. BA | 1.00 MW | Gebäudesolaranlage | in operation | 2016-12-23 | Mando Solarkraftwerke Nr. 62 GmbH & Co. KG |
| LoecknitzFrei2024-1 | 1.00 MW | Freiflächensolaranlage | in operation | 2024-12-30 | Smart Solar Verwaltung eG |
| SP Liepgarten | 1.00 MW | Freiflächensolaranlage | in operation | 2010-10-31 | SPR Beteiligung |
| PVA Borkenstraße | 1.00 MW | Gebäudesolaranlage | in operation | 2025-05-13 | PVA 140 Stahl Sonnenenergie GmbH & Co. KG |
| PVA Dersekow | 1.00 MW | Gebäudesolaranlage | in operation | 2016-12-27 | JH PV24 GmbH & Co. KG |
| PVA Neu Boltenhagen | 0.98 MW | Gebäudesolaranlage | in operation | 2016-12-27 | JH PV17 GmbH & Co. KG |
| unit operated by a private individual | 0.97 MW | Gebäudesolaranlage | in operation | 2024-10-25 | private individual |
| PVA Peenemünde IV.I | 0.97 MW | Freiflächensolaranlage | in operation | 2024-05-16 | MHB Invest 4 GmbH & Co. KG |
| ABR930171231715 | 0.95 MW | Gebäudesolaranlage | in operation | 2023-12-28 | Rüschoff PV Projekt 1 GbR |
| 0214-003-01 | 0.89 MW | Gebäudesolaranlage | in operation | 2012-06-29 | pv-b Photovoltaik Verwaltungs- und Betreuungs-GmbH |
| Solarpark Ducherow | 0.88 MW | Freiflächensolaranlage | in operation | 2012-06-19 | Sonnenenergie Ducherow Betriebs GmbH & Co. KG |
| Mando 51 - PVA Ückermünde | 0.87 MW | Gebäudesolaranlage | in operation | 2012-03-31 | Mando Solarkraftwerke Nr. 51 GmbH & Co. KG |
| PV 2009 969,56 | 0.87 MW | Gebäudesolaranlage | in operation | 2009-06-08 | Solarpark Altwarp GmbH & Co. KG |
| Bandelin 2025 | 0.86 MW | Gebäudesolaranlage | in operation | 2025-04-14 | Sunfriend Solar 3 GmbH & Co. KG |
| Flugplatz Peenemünde Bauabschnitt II+III | 0.85 MW | Freiflächensolaranlage | in operation | 2018-10-31 | SUN-ISLAND EnergiePark Peenemünde GmbH |
| PVA Löcknitz | 0.84 MW | Gebäudesolaranlage | in operation | 2025-01-31 | PVA 133 Stahl Sonnenenergie GmbH & Co. KG |
| Butzow-DirektEnergieGmbH | 0.77 MW | Gebäudesolaranlage | in operation | 2024-05-29 | Direkt Energie |
| Wrangelsburg 2021 Ausschreibung | 0.77 MW | Freiflächensolaranlage | in operation | 2021-08-19 | LEVISol Service GmbH |
| Solarpark Sonnenberg Grambow, Anlagenteil 2 | 0.76 MW | Freiflächensolaranlage | in operation | 2021-09-07 | EEPRO 12. Solarpark Deutschland GmbH & Co. KG |
| Löcknitz | 0.75 MW | Gebäudesolaranlage | in operation | 2018-11-30 | Sun Contracting Germany 3 GmbH & Co.KG |
| Relzow Dach ALT | 0.75 MW | Gebäudesolaranlage | in operation | 2002-04-10 | Mewako GmbH |
| Relzow Alt 2 | 0.75 MW | Gebäudesolaranlage | in operation | 2001-12-17 | Mewako GmbH |
| Kemnitz750 | 0.75 MW | Gebäudesolaranlage | in operation | 2018-06-21 | Kropf & Grieger Treuhand GbR |
| PVA Zinnowitz | 0.75 MW | Freiflächensolaranlage | in operation | 2019-03-27 | Hoch 3 PV-Invest GmbH & Co. KG |
| unit operated by a private individual | 0.75 MW | Freiflächensolaranlage | in operation | 2021-05-31 | private individual |
| PVA-Löcknitz-1.BA | 0.75 MW | Freiflächensolaranlage | in operation | 2021-07-31 | 3.DGS Energie Projekt UG & Co. KG |
| PVA Anklam Wertstoffhof | 0.75 MW | Freiflächensolaranlage | in operation | 2021-03-31 | Hoch 3 PV-Invest GmbH & Co. KG |
| Zemitzmodule in Bandelin | 0.75 MW | Gebäudesolaranlage | in operation | 2022-06-09 | Sunfriend Solar 3 GmbH & Co. KG |
| PVA Wolfradshof, Schmatzin | 0.75 MW | Gebäudesolaranlage | in operation | 2024-05-30 | Direkt Energie |
| PVA Janow | 0.75 MW | Gebäudesolaranlage | in operation | 2019-03-30 | ILIOGY GmbH |
| 005-Kronsberg | 0.75 MW | Gebäudesolaranlage | in operation | 2018-01-09 | WI Energy Verwaltungs GmbH |
| Solarpark-1 | 0.75 MW | Freiflächensolaranlage | in operation | 2022-05-19 | ml&s GmbH Co.KG |
| PV Jarmen | 0.75 MW | Freiflächensolaranlage | in operation | 2019-06-27 | Unternehmensberatungsgesellschaft Dr. Hack mbH |
| PVA Anklam BA 1 | 0.75 MW | Gebäudesolaranlage | in operation | 2018-09-29 | PP Invest IV |
| PV Luckow | 0.75 MW | Freiflächensolaranlage | in operation | 2022-02-07 | Biogasverwertung Luckow GmbH |
| PVA Pasewalk | 0.75 MW | Gebäudesolaranlage | in operation | 2020-07-31 | Energiedach Räpitz |
| PV Anklam, Pasewalker Allee | 0.75 MW | Gebäudesolaranlage | in operation | 2024-07-23 | H + S Photovoltaikbetreibergesellschaft 2 GbR |
| unit operated by a private individual | 0.75 MW | Gebäudesolaranlage | in operation | 2020-06-29 | private individual |
| NMB AS PEENEMUENDE | 0.75 MW | Gebäudesolaranlage | in operation | 2020-08-30 | NMB Star Power Plants GmbH |
| BV Dambeck | 0.75 MW | Gebäudesolaranlage | in operation | 2020-08-31 | Münchner Solarkraftwerk 2 GmbH &. Co. KG |
| PVA Anklam BA 2 | 0.75 MW | Gebäudesolaranlage | in operation | 2018-09-29 | PP Invest IV |
| NMB AS PEENEMÜNDE BA2 | 0.75 MW | Gebäudesolaranlage | in operation | 2022-03-07 | NMB Star Power Plants GmbH |
| PVA Wrangelsburg 2020 | 0.75 MW | Freiflächensolaranlage | in operation | 2020-06-30 | LEVISol Service GmbH |
| Luckow | 0.75 MW | Gebäudesolaranlage | in operation | 2020-01-14 | Solarpark Bernsdorf GmbH & Co. KG |
| Zemitz 750 Sol | 0.75 MW | Freiflächensolaranlage | in operation | 2020-12-09 | Zemitz Solar UG (haftungsbeschränkt) & Co. KG |
| Am Gorzberg | 0.75 MW | Gebäudesolaranlage | in operation | 2019-05-31 | Sunfriend Solar 3 GmbH & Co. KG |
| Grünhof 2 | 0.75 MW | Gebäudesolaranlage | in operation | 2020-02-28 | sunnexus 8 GmbH |
| 3066_Torgelow | 0.75 MW | Gebäudesolaranlage | in operation | 2020-02-28 | valuteo Performance Services GmbH |
| PVA Max-Planck-Straße | 0.75 MW | Freiflächensolaranlage | in operation | 2019-02-28 | suncollect Wesenberg GmbH & Co. KG |
| Zarrentin Eising BA2 [316] | 0.75 MW | Gebäudesolaranlage | in operation | 2021-03-01 | ST Solarinvestitionsgesellschaft Gewerbe mbH & Co. KG |
| Brietzig Agrar MVA BA1 [175] | 0.75 MW | Gebäudesolaranlage | in operation | 2020-11-30 | ST Solarinvestitionsgesellschaft Gewerbe mbH & Co. KG |
| PVA Halberstadt in Bandelin | 0.75 MW | Gebäudesolaranlage | permanently decommissioned | 2015-07-27 | Sunfriend Solar 3 GmbH & Co. KG |
| Energiepark Bargischow | 0.75 MW | Gebäudesolaranlage | in operation | 2021-05-31 | Anklamer Agrar AG |
| Leussin NM EEG [429] | 0.75 MW | Freiflächensolaranlage | in operation | 2022-05-11 | ST Solarinvestitionsgesellschaft Mecklenburg 2 mbH |
| Grünhof 3 | 0.75 MW | Gebäudesolaranlage | in operation | 2021-03-31 | sunnexus 8 GmbH |
| Solarpark Wilhelmsburg | 0.75 MW | Freiflächensolaranlage | in operation | 2018-06-29 | BeBa Solarenergie GmbH & Co. KG |
| Flugplatz Peenemünde Bauabschnitt IV | 0.75 MW | Freiflächensolaranlage | in operation | 2020-09-15 | SUN-ISLAND EnergiePark Peenemünde GmbH |
| unit operated by a private individual | 0.75 MW | Gebäudesolaranlage | in operation | 2025-07-10 | private individual |
| PV-Dachanlage Liepen | 0.75 MW | Gebäudesolaranlage | in operation | 2020-09-29 | Baltic-Agrar Peenetal GmbH & Co. KG |
| PV-Anlage RH 02_750 | 0.75 MW | Gebäudesolaranlage | in operation | 2020-09-30 | Agrar GmbH Gut Ferdinandshof |
| Schmuggerow Wiedemann Dach [201] | 0.75 MW | Gebäudesolaranlage | in operation | 2020-08-30 | ST Solarinvestitionsgesellschaft Gewerbe mbH & Co. KG |
| PVA Ramin BA2 | 0.75 MW | Gebäudesolaranlage | in operation | 2022-01-28 | Biogas Ramin GmbH |
| 17321 Plöwen, Springweg | 0.75 MW | Gebäudesolaranlage | in operation | 2019-01-15 | NIMA PVA Plöwen GbR |
| PV-Anlage RM 01_750 | 0.75 MW | Gebäudesolaranlage | in operation | 2020-03-28 | Agrar GmbH Gut Ferdinandshof |
| P&L Bioenergie OHG Freifläche Luckow | 0.75 MW | Freiflächensolaranlage | in operation | 2022-02-07 | Biogasverwertung Luckow GmbH |
| Energiepark Daugzin | 0.75 MW | Gebäudesolaranlage | in operation | 2023-09-11 | Energiepark Ulm GmbH & Co. KG |
| PVA Wrangelsburg 2021 | 0.75 MW | Freiflächensolaranlage | in operation | 2021-07-09 | LEVISol Service GmbH |
| PV-Anlage RM 03_750 | 0.75 MW | Gebäudesolaranlage | in operation | 2021-03-31 | Agrar GmbH Gut Ferdinandshof |
| PV Luckow | 0.75 MW | Gebäudesolaranlage | in operation | 2019-01-28 | Kunz Energy Group |
| PVA Strasburg | 0.75 MW | Freiflächensolaranlage | in operation | 2020-07-31 | EVH Grüne Energie - Projekt 3 GmbH & Co. KG |
| PVA Greifswald | 0.75 MW | Freiflächensolaranlage | in operation | 2020-07-31 | EVH Grüne Energie-Projekt 2 GmbH&CO.KG |
| Solarpark Tutow IIa | 0.75 MW | Freiflächensolaranlage | in operation | 2019-06-21 | Sonnenenergie Osterhof 11 GmbH & Co. KG |
| Solarpark Helmshagen | 0.75 MW | Freiflächensolaranlage | in operation | 2011-12-31 | Solarpark Helmshagen GmbH & Co. KG |
| Energiepark Lüssow | 0.75 MW | Gebäudesolaranlage | in operation | 2020-07-31 | Energiepark Ulm GmbH & Co. KG |
| Gent07 | 0.75 MW | Gebäudesolaranlage | in operation | 2012-06-30 | Socra Solar GbR |
| Putzar II | 0.75 MW | Gebäudesolaranlage | in operation | 2018-11-30 | Sonnenenergie Putzar |
| Energiepark Neetzow | 0.75 MW | Gebäudesolaranlage | in operation | 2020-07-31 | Energiepark Ulm GmbH & Co. KG |
| PVA Wilhelmsburg | 0.75 MW | Freiflächensolaranlage | in operation | 2019-04-25 | alrai UG (haftungsbeschränkt) & Co. KG |
| PV1 Eggesin | 0.75 MW | Freiflächensolaranlage | in operation | 2017-11-28 | EnBW SunInvest GmbH & Co. KG |
| PV090_Krackow | 0.74 MW | Gebäudesolaranlage | in operation | 2017-11-22 | FEH Solarpark 24 GmbH & Co. KG |
| PVA Auerose | 0.74 MW | Freiflächensolaranlage | in operation | 2019-08-28 | EVH Grüne Energie-Projekt 2 GmbH&CO.KG |
| Ramin Agrar | 0.74 MW | Gebäudesolaranlage | in operation | 2020-06-27 | Biogas Ramin GmbH |
| PVA Kröslin BA 2 | 0.74 MW | Gebäudesolaranlage | in operation | 2021-08-27 | Pro Solar GmbH |
| Solarpark Sonnenberg Grambow, Anlagenteil 1 | 0.74 MW | Freiflächensolaranlage | in operation | 2021-05-27 | EEPRO 12. Solarpark Deutschland GmbH & Co. KG |
| unit operated by a private individual | 0.74 MW | Gebäudesolaranlage | in operation | 2021-03-31 | private individual |
| PVA Rossow | 0.74 MW | Gebäudesolaranlage | in operation | 2019-01-11 | Energiepark Linstsow GmbH |
| Solarpark Polzow Ia | 0.74 MW | Freiflächensolaranlage | in operation | 2021-07-15 | Sonnenenergie Osterhof 21 GmbH & Co. KG |
| PVA Wolgast Netzebander | 0.74 MW | Gebäudesolaranlage | in operation | 2019-01-07 | S+S Solar MV GbR |
| Alt Plestlin FFL [64] | 0.74 MW | Freiflächensolaranlage | in operation | 2018-09-24 | ST Solarinvestitionsgesellschaft Brandenburg 5 mbH&Co. KG |
| ZÜS1 | 0.73 MW | Gebäudesolaranlage | in operation | 2018-01-16 | Zukunftsenergie Deutschland 4 Betriebsgesellschaft mbH & Co. KG |
| Krannich Solarpark 19 Gut Loitz | 0.73 MW | Gebäudesolaranlage | in operation | 2012-03-31 | Krannich Solarpark 19 GmbH & Co KG |
| Energiepark Gützkow | 0.73 MW | Gebäudesolaranlage | in operation | 2020-04-30 | Energiepark Ulm GmbH & Co. KG |
| PVA Kröslin | 0.73 MW | Gebäudesolaranlage | in operation | 2020-08-27 | Pro Solar GmbH |
| PVA 1- Müssentin | 0.73 MW | Freiflächensolaranlage | in operation | 2018-07-13 | EnBW SunInvest GmbH & Co. KG |
| PVA Anklam 3 | 0.72 MW | Freiflächensolaranlage | in operation | 2024-01-09 | Siebert Energie 19 GmbH & Co KG |
| unit operated by a private individual | 0.72 MW | Gebäudesolaranlage | in operation | 2018-01-17 | private individual |
| unit operated by a private individual | 0.71 MW | Freiflächensolaranlage | in operation | 2025-11-18 | private individual |
| PVA Wolgast | 0.71 MW | Gebäudesolaranlage | in operation | 2019-01-30 | VODASUN Projekt-Entwicklungs GmbH & Co. KG |
| PV HanseYachts Ladebower Chaussee - Ausbaustufe 1 Dachanlage Halle A3 2022 | 0.71 MW | Gebäudesolaranlage | in operation | 2022-05-05 | HanseYachts AG |
| PVA Wolgast I | 0.71 MW | Gebäudesolaranlage | in operation | 2017-03-01 | JH PV22 GmbH & Co. KG |
| Solarpark Jarmen GmbH & Co. KG | 0.69 MW | Gebäudesolaranlage | in operation | 2010-06-29 | Solarpark Jarmen GmbH & Co. Kg |
| PVA Anklam | 0.69 MW | Gebäudesolaranlage | in operation | 2018-10-31 | PV Projekt Kornum GmbH & Co. KG |
| Solarpark Zemitz I | 0.69 MW | Freiflächensolaranlage | in operation | 2017-12-15 | Zemitz Solar UG (haftungsbeschränkt) & Co. KG |
| PVA Kamp84 Löcknitz | 0.68 MW | Gebäudesolaranlage | in operation | 2019-07-30 | Unternehmensberatungsgesellschaft Dr. Hack mbH |
| Leussin 3 [32] | 0.68 MW | Freiflächensolaranlage | in operation | 2013-04-25 | ST Solarinvestitionsgesellschaft Mecklenburg 2 mbH |
| Solarpark Zerrenthin | 0.67 MW | Freiflächensolaranlage | in operation | 2011-08-01 | Green Management 3000 GmbH |
| Iven II | 0.67 MW | Gebäudesolaranlage | in operation | 2021-03-31 | IvenSonne GbR |
| MAG01 | 0.67 MW | Freiflächensolaranlage | in operation | 2014-08-01 | Better Energy Magenta GmbH & Co. KG |
| Katschow | 0.66 MW | Gebäudesolaranlage | in operation | 2011-08-04 | Usedom Photovoltaik |
| PVA Viereck | 0.66 MW | Gebäudesolaranlage | in operation | 2019-01-31 | Energiepark Linstsow GmbH |
| Putzar I | 0.66 MW | Gebäudesolaranlage | in operation | 2011-12-29 | Sonnenenergie Putzar |
| Jarmen Kronsberg | 0.66 MW | Gebäudesolaranlage | in operation | 2011-11-17 | HAMBURG ENERGIE Solar Betriebs GmbH |
| Groß Luckow Nord | 0.65 MW | Gebäudesolaranlage | in operation | 2019-01-30 | Thomas Rehe Solartechnik |
| Solarpark Zemitz II | 0.65 MW | Freiflächensolaranlage | in operation | 2017-12-18 | Greifensolar |
| Kruckow 3 [12] | 0.65 MW | Gebäudesolaranlage | in operation | 2011-07-06 | ST Solarinvestitionsgesellschaft Vorpommern 1 mbH |
| NMB AS MILCHHOF SALKO | 0.65 MW | Gebäudesolaranlage | in operation | 2020-01-31 | NMB Star Asset Sun Kiel GmbH & Co KG |
| PVA Neu Boltenhagen II | 0.65 MW | Gebäudesolaranlage | in operation | 2017-04-30 | JH PV18 GmbH & Co. KG |
| PVA-Putzar-Vollein | 0.64 MW | Gebäudesolaranlage | in operation | 2023-06-26 | JEW Energie GmbH |
| Löcknitz H 8 | 0.63 MW | Gebäudesolaranlage | in operation | 2019-01-30 | Mando Solarkraftwerke Nr. 62 GmbH & Co. KG |
| PV Blankensee 1b | 0.63 MW | Gebäudesolaranlage | in operation | 2011-09-05 | Agrar GmbH Pampow Blankensee & Co. KG |
| Sarnow 2 | 0.63 MW | Gebäudesolaranlage | in operation | 2012-03-30 | Solardach 7 GmbH & Co. KG |
| unit operated by a private individual | 0.63 MW | Gebäudesolaranlage | in operation | 2019-01-10 | private individual |
| Luckow BA 1 | 0.63 MW | Gebäudesolaranlage | in operation | 2018-04-25 | NHB2 |
| PVA Rubenow | 0.62 MW | Gebäudesolaranlage | in operation | 2018-02-14 | JH PV29 GmbH & Co. KG |
| PVA Treuen | 0.62 MW | Gebäudesolaranlage | in operation | 2020-09-21 | MES Solar XXIV GmbH & Co. KG |
| Anklam LäDiHa [538] | 0.61 MW | Gebäudesolaranlage | in operation | 2025-01-30 | ST Solarinvestitionsgesellschaft Gewerbe mbH & Co. KG |
| DE029000 - Jarmen Zentrallager | 0.61 MW | Gebäudesolaranlage | in operation | 2023-03-21 | ALDI GmbH & Co. KG Jarmen |
| Neuenkirchen HGW | 0.61 MW | Gebäudesolaranlage | in operation | 2021-02-25 | Umwelt und Energie GmbH & Co KG |
| Grünhof 4 | 0.60 MW | Gebäudesolaranlage | in operation | 2023-02-06 | sunnexus 8 GmbH |
| PVA Blumenthal 2 | 0.60 MW | Freiflächensolaranlage | in operation | 2013-04-30 | KKE Sonnenberg GmbH & Co.KG |
| Zarrentin Eising BA1 [157] | 0.60 MW | Gebäudesolaranlage | in operation | 2020-03-16 | ST Solarinvestitionsgesellschaft Gewerbe mbH & Co. KG |
| Photovoltaikanlage Borken | 0.59 MW | Gebäudesolaranlage | in operation | 2009-12-30 | Friedberger Grünland GmbH |
| Löcknitz II | 0.59 MW | Gebäudesolaranlage | in operation | 2020-12-29 | SEN PV1 GmbH & Co.KG |
| unit operated by a private individual | 0.59 MW | Gebäudesolaranlage | in operation | 2017-09-04 | private individual |
| ABR923090203550 | 0.59 MW | Gebäudesolaranlage | in operation | 2019-01-24 | Bligenthal RE GbR |
| Kruckow 1a | 0.58 MW | Gebäudesolaranlage | in operation | 2010-06-29 | Böhm Invest GmbH&Co.KG |
| Consilium Solardach Neu Plötz | 0.58 MW | Gebäudesolaranlage | in operation | 2018-07-31 | Consilium Erneuerbare Energien eG |
| unit operated by a private individual | 0.57 MW | Gebäudesolaranlage | in operation | 2012-06-29 | private individual |
| Farm-Solar | 0.57 MW | Freiflächensolaranlage | in operation | 2011-12-30 | Farm-Solar GmbH & Co. KG |
| unit operated by a private individual | 0.57 MW | Freiflächensolaranlage | in operation | 2020-05-31 | private individual |
| PV FMZ Wolgast Edeka | 0.56 MW | Gebäudesolaranlage | in operation | 2023-04-12 | B. Schaefer GmbH |
| PV-Anlage Pasewalk 1 | 0.55 MW | Gebäudesolaranlage | in operation | 2022-08-09 | TOPREGAL GmbH |
| PV Solarfeld 1 | 0.55 MW | Freiflächensolaranlage | in operation | 2010-06-30 | Stadtwerke Pasewalk GmbH |
| Solaranlage Greifswald | 0.55 MW | Gebäudesolaranlage | in operation | 2019-02-28 | nawes Invest VIII GmbH & Co. KG |
| unit operated by a private individual | 0.55 MW | Freiflächensolaranlage | in operation | 2011-08-01 | private individual |
| PV HanseYachts Jungfernwiese - Ausbaustufe 1 Dachanlage Halle HHB 2022 | 0.54 MW | Gebäudesolaranlage | in operation | 2022-05-18 | HanseYachts AG |
| Solaranlage Krien | 0.54 MW | Gebäudesolaranlage | in operation | 2019-03-31 | nawes Invest VIII GmbH & Co. KG |
| FuT Photovoltaik 1 | 0.54 MW | Gebäudesolaranlage | in operation | 2017-06-30 | Feldfrucht- und Tierproduktions GmbH |
| Ahlbeck II | 0.54 MW | Gebäudesolaranlage | in operation | 2018-07-17 | RFSS Ahlbeck II GbR |
| Alt Tellin Melkhaus 1 [17] | 0.54 MW | Gebäudesolaranlage | in operation | 2011-09-08 | ST Solarinvestitionsgesellschaft Vorpommern 1 mbH |
| PVA Greifswald Brandteichstraße | 0.53 MW | Gebäudesolaranlage | in operation | 2020-08-31 | Pro Solar GmbH |
| PVA II 512,77 kWp | 0.51 MW | Gebäudesolaranlage | in operation | 2012-06-28 | Biokraft Strasburg GmbH |
| unit operated by a private individual | 0.50 MW | Gebäudesolaranlage | in operation | 2012-06-29 | private individual |
| Grünhof | 0.50 MW | Gebäudesolaranlage | in operation | 2019-01-03 | sunnexus 8 GmbH |
| PVA-Labömitz | 0.50 MW | Gebäudesolaranlage | in operation | 2017-05-30 | IMS GmbH & Co. Sonnenstrom 4 KG |
| unit operated by a private individual | 0.50 MW | Gebäudesolaranlage | in operation | 2018-08-01 | private individual |
| 17391 Medow | 0.50 MW | Gebäudesolaranlage | in operation | 2012-03-31 | ENVIRIA Aufdachportfolio 7 GmbH & Co. KG |
| PVA Wilhelmsburg BA2 | 0.50 MW | Freiflächensolaranlage | in operation | 2023-12-14 | alrai sechste solar invest |
| PVA Wilhelmsburg BA2 | 0.50 MW | Freiflächensolaranlage | in operation | 2023-12-14 | alrai fünfte solar invest |
| Klein Bünzow | 0.49 MW | Gebäudesolaranlage | in operation | 2019-01-01 | Obton Solenergi Vela GmbH & Co. KG |
| Photovoltaikanlage | 0.49 MW | Gebäudesolaranlage | in operation | 2011-12-31 | Brüchert + Kärner GmbH |
| PV-Lubmin | 0.48 MW | Gebäudesolaranlage | in operation | 2024-12-20 | SB PV-Anlagen GbR |
| MES | 0.48 MW | Gebäudesolaranlage | in operation | 2020-01-30 | inovergy A GmbH |
| PV Löcknitz | 0.47 MW | Gebäudesolaranlage | in operation | 2012-06-26 | Salzburg AG für Energie, Verkehr und Telekommunikation |
| PVA Rubkow, Anklamer Chaussee | 0.46 MW | Gebäudesolaranlage | in operation | 2018-01-05 | Sebastian Fuchs Bad und Heizung GmbH&Co.KG |
| Löcknitz2 | 0.46 MW | Gebäudesolaranlage | in operation | 2018-04-03 | Smart Solar Verwaltung eG |
| Sonnenkolonie GbR | 0.45 MW | Gebäudesolaranlage | in operation | 2011-12-21 | Sonnenkolonie GbR c/o BIOTEEG Verwaltungs GmbH |
| PVA Ziegelhof 2+3+4 | 0.45 MW | Gebäudesolaranlage | in operation | 2020-10-31 | Pro Solar GmbH |
| unit operated by a private individual | 0.45 MW | Gebäudesolaranlage | in operation | 2012-03-08 | private individual |
| Luckow II | 0.44 MW | Gebäudesolaranlage | planned | planned 2026 | Biogasverwertung Luckow GmbH |
| PVA Klein Bünzow FK | 0.44 MW | Gebäudesolaranlage | in operation | 2023-08-02 | Kahn Erneuerbare Energien eGbR |
| unit operated by a private individual | 0.44 MW | Gebäudesolaranlage | in operation | 2008-12-18 | private individual |
| Energiepark Rubkow | 0.44 MW | Gebäudesolaranlage | in operation | 2021-01-28 | Energiepark Ulm GmbH & Co. KG |
| Boldekow Teilanlage I | 0.44 MW | Gebäudesolaranlage | in operation | 2018-10-30 | Sabine Klinger Photovoltaik Unternehmensberatung |
| Energiepark Greifswald | 0.43 MW | Gebäudesolaranlage | in operation | 2021-03-31 | Energiepark Ulm GmbH & Co. KG |
| unit operated by a private individual | 0.42 MW | Gebäudesolaranlage | in operation | 2019-01-31 | private individual |
| Ducherow | 0.42 MW | Gebäudesolaranlage | in operation | 2011-12-19 | MaBen UG (haftungsbeschränkt) & Co. KG |
| Kruckow 2 | 0.42 MW | Gebäudesolaranlage | in operation | 2010-06-29 | Kartoffelzucht Böhm GmbH & Co. KG |
| SID V | 0.42 MW | Gebäudesolaranlage | in operation | 2011-12-28 | Zerberus Invest GmbH |
| DEB Krugsdorf | 0.42 MW | Gebäudesolaranlage | in operation | 2018-12-20 | SPR Energie GmbH |
| PVA Jatznick | 0.41 MW | Gebäudesolaranlage | in operation | 2012-06-29 | ingenia Energiedach GmbH & Co. KG |
The 300 largest units are listed.
Which organisations operate the most solar PV capacity in Vorpommern-Greifswald?
| Operator | Units | Capacity |
|---|---|---|
| Anumar Solarpark Neuendorf A GmbH & Co. KG | 5 | 58.8 MW |
| AD Bergholz GmbH | 1 | 57.8 MW |
| Solarpark Boldekow GmbH & Co. KG | 1 | 56.1 MW |
| EnBW Solarpark Lauenhagen GmbH & Co. KG | 2 | 45.4 MW |
| ENERPARC Solar Invest 211 TU 3 GmbH | 2 | 33.3 MW |
| Solarpark Tutow II GmbH & Co. KG | 2 | 25.5 MW |
| ENERPARC Solar Invest 114 GmbH | 4 | 21.3 MW |
| ENERPARC Solar Invest 230 TU 32 GmbH & Co. KG | 1 | 20.0 MW |
| Energiepark Ulm GmbH & Co. KG | 16 | 19.5 MW |
| Solarpark Tutow V GmbH & Co. KG | 5 | 19.3 MW |
Which installation type accounts for the most solar PV capacity in Vorpommern-Greifswald?
| Installation type | Units | Capacity |
|---|---|---|
| Freiflächensolaranlage | 189 | 729.4 MW |
| Gebäudesolaranlage | 518 | 199.5 MW |
Solar PV in Mecklenburg-Vorpommern · Solar PV in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many solar installations are registered in Vorpommern-Greifswald (Mecklenburg-Vorpomme can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.