Solar PV in Groß-Gerau
16,747 solar installations with 241.4 MW of gross capacity were in operation in Groß-Gerau (Hessen) as of 2026-11-05, with a further 193 units (21.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many solar installations are registered in Groß-Gerau (Hessen), and how large are they, as of 2026-11-05?
- 16,747 solar installations with 241.4 MW of gross capacity were in operation in Groß-Gerau (Hessen) as of 2026-11-05, with a further 193 units (21.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many solar installations are in operation in Groß-Gerau?
- 16,747 solar installations with 241.4 MW of gross capacity were in operation in Groß-Gerau as of 2026-11-05, with a further 193 units (21.8 MW) registered as planned; the count includes every registered unit down to balcony systems (Bundesnetzagentur, Marktstammdatenregister).
- How much solar PV capacity was commissioned in Groß-Gerau in 2025?
- 2,554 solar installations with 38.5 MW went into operation in Groß-Gerau in 2025; the strongest year of the last two decades was 2025 with 38.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- What share of Groß-Gerau's solar installations are larger than 100 kW?
- 169 of 17,208 registered solar installations in Groß-Gerau (1.0 percent) exceed 100 kW, but they hold 118.8 MW of the 264.4 MW total capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most solar PV capacity in Groß-Gerau?
- Sonnen Solarpark 20241 GmbH operates 1 solar installations over 100 kW with 18.8 MW in Groß-Gerau, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which installation type has the most solar PV capacity in Groß-Gerau?
- Gebäudesolaranlage leads with 155 solar installations and 80.6 MW in Groß-Gerau (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest solar installation in Groß-Gerau?
- The largest registered solar installation in Groß-Gerau has 18.8 MW of gross capacity and is operated by Sonnen Solarpark 20241 GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the solar installations in Groß-Gerau distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 16,575 | 118.5 MW | 16,128 | 186 |
| 30 to 100 kW | 464 | 27.1 MW | 458 | 2 |
| over 100 kW | 169 | 118.8 MW | 161 | 5 |
How much solar PV capacity was commissioned in Groß-Gerau each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 2,201 | 35.2 MW |
| 2025 | 2,554 | 38.5 MW |
| 2024 | 3,121 | 33.7 MW |
| 2023 | 3,365 | 27.5 MW |
| 2022 | 1,101 | 9.46 MW |
| 2021 | 562 | 8.84 MW |
| 2020 | 414 | 8.53 MW |
| 2019 | 238 | 6.97 MW |
| 2018 | 157 | 3.30 MW |
| 2017 | 175 | 3.52 MW |
| 2016 | 115 | 2.56 MW |
| 2015 | 103 | 1.22 MW |
| 2014 | 155 | 3.27 MW |
| 2013 | 250 | 5.20 MW |
| 2012 | 316 | 7.42 MW |
| 2011 | 377 | 18.1 MW |
| 2010 | 418 | 9.75 MW |
| 2009 | 306 | 4.45 MW |
| 2008 | 280 | 6.61 MW |
| 2007 | 236 | 2.83 MW |
| 2006 | 198 | 1.70 MW |
How many solar installations in Groß-Gerau are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 16,747 | 241.4 MW |
| planned | 193 | 21.8 MW |
| permanently decommissioned | 242 | 1.19 MW |
| temporarily shut down | 26 | 0.05 MW |
Which solar installations over 100 kW are registered in Groß-Gerau?
| Unit | Capacity | Type | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Photovoltaik-Kraftwerk Büttelborn | 18.8 MW | Freiflächensolaranlage | planned | planned 2027 | Sonnen Solarpark 20241 GmbH |
| PV-Carports-Riedstadt | 16.8 MW | Gebäudesolaranlage | in operation | 2026-01-23 | AD Riedstadt GmbH |
| GE_PV_02 | 7.01 MW | Freiflächensolaranlage | in operation | 2024-05-14 | Merck Site Management GmbH |
| PV-Anlage 18 West, Station D | 6.02 MW | Freiflächensolaranlage | in operation | 2025-04-23 | Fraport AG |
| PVSM_Gernsheim | 3.90 MW | Gebäudesolaranlage | in operation | 2025-12-16 | PamSun |
| K65 | 3.06 MW | Gebäudesolaranlage | in operation | 2011-12-28 | Solarpark Heretsried GmbH |
| Opel M55 | 2.22 MW | Gebäudesolaranlage | in operation | 2011-12-28 | Sonnendach M55 GmbH & Co KG |
| Gernsheim DC1 | 2.00 MW | Gebäudesolaranlage | in operation | 2025-12-18 | Prologis Germany Solar IV GmbH |
| Riedstadt Leeheim FFA | 1.95 MW | Freiflächensolaranlage | in operation | 2008-12-18 | Mainzer Erneuerbare Energien GmbH |
| Opel Rüsselsheim K170 | 1.52 MW | Gebäudesolaranlage | in operation | 2010-06-30 | Obton Solenergi Hessen GmbH & Co. KG |
| K40 | 1.38 MW | Gebäudesolaranlage | in operation | 2011-12-28 | Solarpark Heretsried GmbH |
| Segro Bischofsheim | 1.14 MW | Gebäudesolaranlage | in operation | 2024-07-30 | SELP Fixtures GmbH |
| PV Hattersheim | 1.00 MW | Gebäudesolaranlage | in operation | 2025-06-25 | Poly-clip System GmbH & Co. KG |
| PV Raunheim | 1.00 MW | Gebäudesolaranlage | in operation | 2011-08-26 | EHA Energie-Handelsgesellschaft mbH & Co. KG |
| GGV - Wasserweg 2 984,74 | 0.98 MW | Freiflächensolaranlage | in operation | 2012-06-28 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| GG_PV | 0.96 MW | Gebäudesolaranlage | in operation | 2011-12-06 | GG-Energie GmbH& Co. KG |
| Biebesheim Spedition | 0.95 MW | Gebäudesolaranlage | in operation | 2004-01-19 | juwi Beteiligungs GmbH & Co NaturPower 15 KG |
| PVA Mörfelden | 0.95 MW | Gebäudesolaranlage | in operation | 2025-12-08 | Spring Hill Clean Energy GmbH |
| PV Floating WKW Crumstadt | 0.94 MW | Freiflächensolaranlage | in operation | 2024-01-29 | Waschkieswerk Crumstadt GmbH & Co. KG |
| Solaranlage BVA-Kompostlager | 0.85 MW | Gebäudesolaranlage | in operation | 2026-01-20 | AWS Abfall-Wirtschafts-Service GmbH |
| PV Anlage Meilo | 0.84 MW | Gebäudesolaranlage | in operation | 2023-05-10 | MEILO Gesellschaft zur Rückgewinnung sortierter Werkstoffe mbH & Co. KG |
| unit operated by a private individual | 0.82 MW | Gebäudesolaranlage | in operation | 2025-10-08 | private individual |
| PV NGL Groß-Gerau | 0.82 MW | Gebäudesolaranlage | planned | planned 2026 | Nagel-Group Logistics SE |
| PV Raunheim | 0.75 MW | Gebäudesolaranlage | in operation | 2019-08-30 | GREIWING logistics for you GmbH |
| PV-Anlage Kelsterbach | 0.75 MW | Gebäudesolaranlage | in operation | 2018-08-20 | GROUP7 |
| Silicium B2 | 0.75 MW | Gebäudesolaranlage | in operation | 2020-05-27 | Silicium GmbH |
| PV-Anlage Meinhardt GiGu | 0.75 MW | Gebäudesolaranlage | in operation | 2026-07-30 | Meinhardt Städtereinigung GmbH & Co. KG |
| 200611_VGP_GER-GINSHEIM_PV | 0.75 MW | Gebäudesolaranlage | in operation | 2020-11-06 | VGP Park Renewable Energy Deutschland GmbH |
| DachScholl | 0.75 MW | Gebäudesolaranlage | in operation | 2019-07-01 | Schollmayer-Holz GmbH |
| PV_Anlage FAL Biebesheim - An der Flurscheide | 0.75 MW | Gebäudesolaranlage | in operation | 2025-07-03 | Frankenbach Verwaltungs GmbH & Co. KG |
| Silicium PV B3 | 0.75 MW | Gebäudesolaranlage | in operation | 2019-03-12 | Silicium GmbH |
| VBP PV A2 | 0.75 MW | Gebäudesolaranlage | in operation | 2019-05-27 | Van Baerle & Co. Projekt GmbH |
| GGV-Lieken Stockstadt | 0.75 MW | Freiflächensolaranlage | in operation | 2017-05-17 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| VBP PV A1 (richtig) | 0.73 MW | Gebäudesolaranlage | in operation | 2020-07-02 | Van Baerle & Co. Projekt GmbH |
| PV-Anlage Hausdach | 0.73 MW | Gebäudesolaranlage | in operation | 2011-12-15 | IntReal International Real Estate Kapitalverwaltungsgesellschaft mbH |
| Rüsselsheim DRM | 0.69 MW | Gebäudesolaranlage | in operation | 2011-12-22 | Mainzer Erneuerbare Energien GmbH |
| KMW | 0.68 MW | Gebäudesolaranlage | in operation | 2012-06-29 | Kiesel GmbH |
| Hof BodenGut BA1-BA4 | 0.68 MW | Gebäudesolaranlage | in operation | 2026-01-30 | Hof BodenGut Agrar GmbH & Co. KG |
| Stockstadt 1 | 0.61 MW | Gebäudesolaranlage | in operation | 2025-02-21 | FW Dienstleistung und Service GmbH |
| PV-Anlage | 0.61 MW | Gebäudesolaranlage | in operation | 2021-01-11 | Flach Rhein-Main GmbH |
| PV-Erlenbacher | 0.60 MW | Gebäudesolaranlage | in operation | 2020-04-30 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| Flach Rhein-Main GmbH 1 in Büttelborn | 0.53 MW | Gebäudesolaranlage | in operation | 2014-05-28 | Flach Rhein-Main GmbH |
| Stockstadt 2 Stall | 0.53 MW | Gebäudesolaranlage | in operation | 2025-12-22 | FW Dienstleistung und Service GmbH |
| WVV Kelsterbach | 0.52 MW | Gebäudesolaranlage | in operation | 2025-01-30 | WVV Objekt Kelsterbach |
| PV-Anlage FAL Am Kupferwerk 42, Ginsheim-Gustavsburg | 0.50 MW | Gebäudesolaranlage | planned | planned 2025 | Frankenbach Verwaltungs GmbH & Co. KG |
| ABR924555022334 | 0.50 MW | Gebäudesolaranlage | in operation | 2016-03-31 | Hegro Eichler GmbH |
| PV TG Riedstadt | 0.50 MW | Gebäudesolaranlage | in operation | 2012-05-10 | Transgourmet Deutschland GmbH & CO. OHG |
| Logistik, 64546 Mörfelden-Walldorf, Hessenring | 0.49 MW | Gebäudesolaranlage | in operation | 2014-06-06 | ALDI SE & Co. KG |
| SCM MOE | 0.49 MW | Gebäudesolaranlage | in operation | 2025-01-08 | ALDI SÜD Supply Chain SE & Co. KG |
| Riedstadt | 0.48 MW | Gebäudesolaranlage | in operation | 2019-02-28 | Sun Contracting Germany 3 GmbH & Co.KG |
| Gernsheim | 0.48 MW | Gebäudesolaranlage | in operation | 2011-11-08 | Merkt Solar Invest GmbH |
| NL901; Anlage B.1 | 0.47 MW | Gebäudesolaranlage | in operation | 2020-12-01 | Sonepar Deutschland/Region West GmbH |
| PV-Anlage Gärreste | 0.45 MW | Gebäudesolaranlage | in operation | 2020-05-29 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| PVA Leonard Moll - Biebesheim (2576) | 0.43 MW | Gebäudesolaranlage | in operation | 2025-05-30 | Faber Solartechnik GmbH |
| GSP Riedstadt | 0.42 MW | Gebäudesolaranlage | in operation | 2021-03-29 | GSP Service und Verwaltung GmbH |
| GGV - Wasserweg 2 422,675 | 0.42 MW | Freiflächensolaranlage | in operation | 2016-07-29 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| 3244_Merkur SolarPark_Büttelborn | 0.41 MW | Gebäudesolaranlage | in operation | 2023-06-24 | Merkur SolarPark und Immobilienprojektentwicklungs GmbH |
| Bonn / Riedtadt | 0.41 MW | Gebäudesolaranlage | in operation | 2019-10-31 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| 3242_Merkur Solarpark_Ginsheim-Gustavsburg | 0.40 MW | Gebäudesolaranlage | in operation | 2023-07-15 | Merkur SolarPark und Immobilienprojektentwicklungs GmbH |
| Spreestraße 3 Kelsterbach Geb. A | 0.40 MW | Freiflächensolaranlage | in operation | 2022-03-24 | Aviapharm GmbH |
| Halle West Neu | 0.39 MW | Gebäudesolaranlage | in operation | 2024-07-09 | AWS Abfall-Wirtschafts-Service GmbH |
| PV_Am Bornbruch 10_64546-Mörfelden-Walldorf | 0.38 MW | Gebäudesolaranlage | in operation | 2022-08-26 | Hessisches Bausteinwerk Dr. Blasberg GmbH & Co. KG |
| PV-Anlage Schule Karl-Treutel-Schule Kelsterbach | 0.38 MW | Gebäudesolaranlage | in operation | 2025-12-16 | Bürgerenergie Untermain eG |
| GGV - Wasserweg 2 377 | 0.38 MW | Freiflächensolaranlage | in operation | 2012-10-29 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| AV-Stockstadt | 0.36 MW | Gebäudesolaranlage | in operation | 2023-10-10 | teknihall Service GmbH |
| Wetropa, Mörfelden | 0.35 MW | Gebäudesolaranlage | in operation | 2021-03-29 | WETROPA, Kunststoffverarbeitung GmbH & Co. KG |
| PVA Mörfelden | 0.35 MW | Gebäudesolaranlage | in operation | 2013-11-28 | Brenner GbR |
| PV-Anlage Wendel, Bischofsheim | 0.33 MW | Gebäudesolaranlage | in operation | 2019-05-20 | Wendel Energie UG |
| PV-Anlage AMA Büttelborn | 0.33 MW | Gebäudesolaranlage | in operation | 2023-06-28 | RM Asphalt GmbH & Co. KG |
| Stauffer Hrzan-Moeller GbR c/o Hrzan | 0.33 MW | Gebäudesolaranlage | in operation | 2011-12-29 | Stauffer Hrzan-Moeller GbR c/o Hrzan |
| LOGOSYS Logistik | 0.32 MW | Gebäudesolaranlage | in operation | 2020-03-23 | LOGOSYS Logistik GmbH |
| GGV - Wasserweg 2 313,49 | 0.31 MW | Freiflächensolaranlage | in operation | 2010-12-10 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| GRBS 67-69 | 0.31 MW | Gebäudesolaranlage | in operation | 2011-12-22 | KM Clean Power GbR |
| unit operated by a private individual | 0.30 MW | Gebäudesolaranlage | in operation | 2025-02-26 | private individual |
| Photovoltaik-Anlage Januar 2025 | 0.30 MW | Gebäudesolaranlage | in operation | 2025-01-14 | Mjko GmbH |
| Welsch Trebur | 0.30 MW | Gebäudesolaranlage | in operation | 2021-09-28 | Motivatier Solar One UG & Co. KG |
| SP-TV-1886-Trebur-GbR-2049-c/o-inek-GmbH | 0.29 MW | Gebäudesolaranlage | in operation | 2011-12-30 | SP-TV-1886-Trebur-GbR-2049-c/o-inek-GmbH |
| LL-Halle-01 | 0.29 MW | Gebäudesolaranlage | in operation | 2010-12-14 | Jürgen Schild + Dieter Schaffner Grundbesitz |
| GGV - Agrimed | 0.28 MW | Gebäudesolaranlage | in operation | 2011-12-22 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| Leeheim | 0.28 MW | Gebäudesolaranlage | in operation | 2007-06-22 | Haxel und Haxel GmbH |
| ANMO Mörfelden Anlage 2 | 0.27 MW | Gebäudesolaranlage | in operation | 2018-05-16 | Vacuflex GmbH |
| Helmut und Elke Funk GbR | 0.27 MW | Gebäudesolaranlage | in operation | 2013-02-18 | Elke und Helmut Funk GbR |
| Raiffeisen Waren-Zentrale Rhein-Main AG Riedstadt | 0.27 MW | Gebäudesolaranlage | in operation | 2025-12-18 | Raiffeisen Waren-Zentrale Rhein-Main AG |
| Solarpark Mörfelden GmbH & Co. KG Teilanlage 2 | 0.27 MW | Gebäudesolaranlage | in operation | 2008-02-29 | Solarpark Mörfelden GmbH & Co. KG |
| 142 - BePo | 0.27 MW | Gebäudesolaranlage | in operation | 2010-06-30 | Tauber-Solar Management GmbH |
| Bischofsheim Georg-Mangold-Schule | 0.26 MW | Gebäudesolaranlage | in operation | 2010-06-25 | Mainzer Erneuerbare Energien GmbH |
| Groß-Gerau Parkhaus Kreisklinik | 0.24 MW | Gebäudesolaranlage | in operation | 2018-02-06 | Mainzer Erneuerbare Energien GmbH |
| RISe | 0.24 MW | Gebäudesolaranlage | in operation | 2021-01-31 | Sun Contracting Germany 3 GmbH & Co.KG |
| FFM - Halle | 0.24 MW | Gebäudesolaranlage | in operation | 2025-01-15 | Doka Deutschland GmbH |
| PVA Stockstadt | 0.24 MW | Gebäudesolaranlage | in operation | 2011-12-23 | Otto Roth Landesproduktengroßhandel GmbH |
| ANMO Mörfelden Anlage 1 | 0.24 MW | Gebäudesolaranlage | in operation | 2010-12-22 | M.A.M.A. Stiftung |
| unit operated by a private individual | 0.23 MW | Gebäudesolaranlage | in operation | 2021-09-03 | private individual |
| Nalco Biebesheim | 0.22 MW | Gebäudesolaranlage | in operation | 2026-02-03 | Nalco Deutschland Manufacturing GmbH |
| Groß-Gerau Martin-Buber-Schule | 0.22 MW | Gebäudesolaranlage | in operation | 2008-12-18 | Mainzer Erneuerbare Energien GmbH |
| Mörfelden-Walldorf Bertha-von-Suttner-Schule | 0.22 MW | Gebäudesolaranlage | in operation | 2008-12-28 | Mainzer Erneuerbare Energien GmbH |
| Raunheim Anne-Frank-Schule | 0.22 MW | Gebäudesolaranlage | in operation | 2008-11-20 | Mainzer Erneuerbare Energien GmbH |
| PV Anlage PHS | 0.22 MW | Gebäudesolaranlage | in operation | 2024-06-27 | Sohoco Energy GmbH |
| Ginsheim-Gustavsburg IGS Mainspitze | 0.21 MW | Gebäudesolaranlage | in operation | 2008-12-28 | Mainzer Erneuerbare Energien GmbH |
| VZ Gernsheim | 0.21 MW | Gebäudesolaranlage | in operation | 2008-12-29 | FEMA Vermögensverwaltungs GmbH & Co. KG |
| Gebäudedach + Freifläche | 0.20 MW | Gebäudesolaranlage | in operation | 2021-03-25 | Wasserwerk Gerauer Land |
| Coreum GmbH "Hotel" | 0.20 MW | Gebäudesolaranlage | in operation | 2023-06-21 | Kiesel GmbH |
| unit operated by a private individual | 0.20 MW | Gebäudesolaranlage | permanently decommissioned | 2013-07-30 | private individual |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2011-07-15 | private individual |
| RUE PV FMZ | 0.19 MW | Gebäudesolaranlage | in operation | 2016-09-28 | GLOBUS Handelshof St. Wendel GmbH & Co. KG |
| B64572 | 0.19 MW | Gebäudesolaranlage | in operation | 2011-10-21 | RBS 3 Büttelborn GmbH |
| PV Kelsterbach | 0.19 MW | Gebäudesolaranlage | in operation | 2024-10-02 | Johann Georg Helfrich |
| PV-Anlage BFM Rüsselsheim | 0.19 MW | Gebäudesolaranlage | in operation | 2017-06-20 | Globus Fachmärkte GmbH & Co. KG |
| unit operated by a private individual | 0.18 MW | Gebäudesolaranlage | in operation | 2013-03-30 | private individual |
| Gebäude Forum | 0.18 MW | Gebäudesolaranlage | in operation | 2018-11-30 | Kiesel GmbH |
| Filiale, 64579, Gernsheim, Bensheimer Strasse 2 | 0.18 MW | Gebäudesolaranlage | in operation | 2015-12-18 | ALDI SE & Co. KG |
| PVA-Mörfelden-Walldorf | 0.18 MW | Gebäudesolaranlage | in operation | 2021-11-25 | Barbican Logistics GmbH |
| Mörfelden-Walldorf | 0.18 MW | Gebäudesolaranlage | in operation | 2012-06-19 | Gollenstede GmbH Steuerberatungsgesellschaft |
| PH Solar GbR. | 0.17 MW | Gebäudesolaranlage | in operation | 2017-06-19 | PH Solar |
| PVA Gleich - Fahrzeugbau | 0.17 MW | Gebäudesolaranlage | in operation | 2025-10-01 | Gleich Fahrzeugbau |
| Halle-Bübo-1 | 0.17 MW | Gebäudesolaranlage | in operation | 2021-03-24 | Stromeskort Andreas Dörr und Uwe Bergsträßer Gbr |
| Erzeugungsanlage_Cargo Marketing Spedition GmbH | 0.17 MW | Gebäudesolaranlage | in operation | 2021-12-20 | Cargo Marketing Spedition |
| PV-Anlage FAL Landdammstraße 55, Ginsheim-Gustavsburg | 0.17 MW | Gebäudesolaranlage | in operation | 2024-06-13 | Frankenbach Verwaltungs GmbH & Co. KG |
| Riedstadt-Leeheim Martin-Niemöller-Schule 2.BA | 0.17 MW | Gebäudesolaranlage | in operation | 2010-09-29 | Mainzer Erneuerbare Energien GmbH |
| RUE PV SBW | 0.17 MW | Gebäudesolaranlage | in operation | 2016-09-28 | GLOBUS Handelshof St. Wendel GmbH & Co. KG |
| Anlage 1 Riedstadt | 0.17 MW | Gebäudesolaranlage | in operation | 2013-05-29 | NeiLo Invest GbR |
| PV Anlage PHL | 0.16 MW | Gebäudesolaranlage | in operation | 2023-07-12 | Sohoco Energy GmbH |
| Raunheim - Am Messeplatz 1 | 0.16 MW | Gebäudesolaranlage | in operation | 2024-04-11 | Voltaro Power GmbH & Co. KG |
| Halle 7 | 0.16 MW | Gebäudesolaranlage | in operation | 2022-12-01 | Hofmann GmbH & Co. KG |
| Starkenburgstraße 1, 4001053255 | 0.16 MW | Gebäudesolaranlage | in operation | 2017-08-11 | FRANK GmbH |
| Solarpark Mörfelden GmbH & Co. KG Teilanlage 1 | 0.16 MW | Gebäudesolaranlage | in operation | 2007-12-20 | Solarpark Mörfelden GmbH & Co. KG |
| unit operated by a private individual | 0.16 MW | Gebäudesolaranlage | in operation | 2020-02-28 | private individual |
| ABR976625022805 | 0.16 MW | Gebäudesolaranlage | in operation | 2024-05-08 | Integrated Dynamics Engineering GmbH |
| GFL GG | 0.16 MW | Gebäudesolaranlage | in operation | 2024-04-16 | Gilde Beteiligungs AG |
| Anlage 2 Riedstadt | 0.15 MW | Gebäudesolaranlage | in operation | 2013-05-29 | NeiLo Invest GbR |
| 6066_Lidl_Mörfelden-Walldorf | 0.15 MW | Gebäudesolaranlage | in operation | 2020-08-27 | Lidl Vertriebs GmbH & Co. KG |
| Trebur, Birkenhof 24, #15 | 0.15 MW | Gebäudesolaranlage | in operation | 2011-12-31 | PHOTAIK Consulting GmbH |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2013-02-06 | private individual |
| Dachanlage | 0.15 MW | Gebäudesolaranlage | in operation | 2024-09-25 | August Fichter GmbH & Co.KG |
| Büttelborn Biolog | 0.14 MW | Gebäudesolaranlage | in operation | 2010-09-27 | Mainzer Erneuerbare Energien GmbH |
| PV-Logistik (Astheim) | 0.14 MW | Gebäudesolaranlage | in operation | 2025-07-14 | Finder GmbH |
| PV_Stockstraße_65479 Raunheim | 0.14 MW | Gebäudesolaranlage | in operation | 2022-08-10 | Raunheimer Sand- und Kiesgewinnung Blasberg GmbH & Co. KG |
| PV/WFS/Mörfelden-Walldorf | 0.14 MW | Gebäudesolaranlage | planned | planned 2024 | WFS Vertriebsgesellschaft mbH |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2025-08-15 | private individual |
| GE_PV_01 | 0.13 MW | Freiflächensolaranlage | in operation | 2021-05-31 | Merck Site Management GmbH |
| Tran Soan Büttelborn | 0.13 MW | Gebäudesolaranlage | planned | planned 2025 | Tran Soan Fleisch-, Geflügel- & Seafoodhandel GmbH |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2024-02-29 | private individual |
| Biwer Trebur | 0.13 MW | Gebäudesolaranlage | in operation | 2022-12-06 | Motivatier Solar One UG & Co. KG |
| Helmut und Elke Funk GbR | 0.13 MW | Gebäudesolaranlage | in operation | 2009-09-09 | Helmut und Elke Funk GbR |
| SP-TGS-Walldorf-GBR-1744 | 0.13 MW | Gebäudesolaranlage | in operation | 2009-03-30 | Solarpark-TGS-Walldorf-GBR-1744-c/o inek-GmbH |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2007-03-21 | private individual |
| PV DEHASS01 | 0.13 MW | Gebäudesolaranlage | in operation | 2025-03-27 | Hessenwasser GmbH & Co. KG |
| Solar 129 kWp | 0.13 MW | Gebäudesolaranlage | in operation | 2012-06-28 | Jens und Sven Sauerborn GbR |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2012-08-30 | private individual |
| IGS Kelsterbach | 0.13 MW | Gebäudesolaranlage | in operation | 2014-07-17 | Stadt Kelsterbach |
| PV-Anlage Büttelborn | 0.12 MW | Gebäudesolaranlage | in operation | 2023-11-21 | Robert Kunzmann GmbH & Co. KG |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2013-02-20 | private individual |
| Mörfelden-Walldorf | 0.12 MW | Gebäudesolaranlage | in operation | 2011-12-29 | PV Walldorf GbR |
| PV Breslauer Straße | 0.12 MW | Gebäudesolaranlage | in operation | 2017-04-28 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| Anlage 2 Evb. | 0.12 MW | Gebäudesolaranlage | in operation | 2013-06-28 | Rheintal Solar GbR |
| Anlage 1 | 0.12 MW | Gebäudesolaranlage | in operation | 2011-12-21 | Rheintal Solar GbR |
| Freifläche 117,45kW | 0.12 MW | Freiflächensolaranlage | in operation | 2024-10-14 | Wasserwerk Gerauer Land |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2010-06-25 | private individual |
| PV-Anlage Turnhalle KTS | 0.12 MW | Gebäudesolaranlage | in operation | 2025-12-16 | Bürgerenergie Untermain eG |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | permanently decommissioned | 2013-08-30 | private individual |
| unit operated by a private individual | 0.11 MW | Gebäudesolaranlage | in operation | 2014-07-24 | private individual |
| Filiale, 65451, Kelsterbach, Am-Graf-de-Chardonnet-Pl. 3 | 0.11 MW | Gebäudesolaranlage | in operation | 2013-09-06 | ALDI SE & Co. KG |
| PV Anlage Berufliche Schulen (GG) | 0.11 MW | Gebäudesolaranlage | in operation | 2010-06-17 | Mainzer Erneuerbare Energien GmbH |
| GE_PV_03 | 0.11 MW | Gebäudesolaranlage | in operation | 2024-11-22 | Merck Site Management GmbH |
| GGV - Nordring 45 | 0.11 MW | Freiflächensolaranlage | in operation | 2012-06-29 | Stadtwerke Groß-Gerau Versorgungs GmbH |
| Riedstadt-Leeheim Martin-Niemöller-Schule 1. BA Turnhalle | 0.11 MW | Gebäudesolaranlage | in operation | 2010-06-28 | Mainzer Erneuerbare Energien GmbH |
| unit operated by a private individual | 0.11 MW | Gebäudesolaranlage | in operation | 2011-06-27 | private individual |
| Trebur Außerhalb 44 - 1 | 0.10 MW | Gebäudesolaranlage | in operation | 2009-12-30 | BR Ried Energie GmbH & Co. KG |
| Hochschule RheinMain, Rüsselsheim, Gebäude B | 0.10 MW | Gebäudesolaranlage | in operation | 2014-08-18 | Hochschule RheinMain |
| unit operated by a private individual | 0.10 MW | Gebäudesolaranlage | permanently decommissioned | 2014-07-31 | private individual |
Which organisations operate the most solar PV capacity in Groß-Gerau?
| Operator | Units | Capacity |
|---|---|---|
| Sonnen Solarpark 20241 GmbH | 1 | 18.8 MW |
| AD Riedstadt GmbH | 1 | 16.8 MW |
| Merck Site Management GmbH | 3 | 7.25 MW |
| Fraport AG | 1 | 6.02 MW |
| Stadtwerke Groß-Gerau Versorgungs GmbH | 11 | 4.81 MW |
| Mainzer Erneuerbare Energien GmbH | 12 | 4.52 MW |
| Solarpark Heretsried GmbH | 2 | 4.45 MW |
| PamSun | 1 | 3.90 MW |
| Sonnendach M55 GmbH & Co KG | 1 | 2.22 MW |
| Prologis Germany Solar IV GmbH | 1 | 2.00 MW |
Which installation type accounts for the most solar PV capacity in Groß-Gerau?
| Installation type | Units | Capacity |
|---|---|---|
| Gebäudesolaranlage | 155 | 80.6 MW |
| Freiflächensolaranlage | 14 | 38.3 MW |
Solar PV in Hessen · Solar PV in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many solar installations are registered in Groß-Gerau (Hessen), and how large are they can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.