Germany · renewables
Solar PV in Schwandorf
23,959 solar installations with 639.5 MW of gross capacity were in operation in Schwandorf (Bayern) as of 2026-11-05, with a further 119 units (16.9 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many solar installations are registered in Schwandorf (Bayern), and how large are they, as of 2026-11-05?
- 23,959 solar installations with 639.5 MW of gross capacity were in operation in Schwandorf (Bayern) as of 2026-11-05, with a further 119 units (16.9 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many solar installations are in operation in Schwandorf?
- 23,959 solar installations with 639.5 MW of gross capacity were in operation in Schwandorf as of 2026-11-05, with a further 119 units (16.9 MW) registered as planned; the count includes every registered unit down to balcony systems (Bundesnetzagentur, Marktstammdatenregister).
- How much solar PV capacity was commissioned in Schwandorf in 2025?
- 2,432 solar installations with 84.0 MW went into operation in Schwandorf in 2025; the strongest year of the last two decades was 2023 with 99.1 MW (Bundesnetzagentur, Marktstammdatenregister).
- What share of Schwandorf's solar installations are larger than 100 kW?
- 326 of 24,368 registered solar installations in Schwandorf (1.3 percent) exceed 100 kW, but they hold 372.3 MW of the 658.0 MW total capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most solar PV capacity in Schwandorf?
- Bürgerenergie Mappach-Silberberg GmbH & Co. KG operates 2 solar installations over 100 kW with 20.8 MW in Schwandorf, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which installation type has the most solar PV capacity in Schwandorf?
- Freiflächensolaranlage leads with 103 solar installations and 301.7 MW in Schwandorf (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest solar installation in Schwandorf?
- The largest registered solar installation in Schwandorf has 14.7 MW of gross capacity and is operated by EB Solar GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the solar installations in Schwandorf distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 23,089 | 230.2 MW | 22,694 | 111 |
| 30 to 100 kW | 953 | 55.4 MW | 944 | 5 |
| over 100 kW | 326 | 372.3 MW | 321 | 3 |
How much solar PV capacity was commissioned in Schwandorf each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1,948 | 44.9 MW |
| 2025 | 2,432 | 84.0 MW |
| 2024 | 3,228 | 55.9 MW |
| 2023 | 3,222 | 99.1 MW |
| 2022 | 1,236 | 54.2 MW |
| 2021 | 782 | 34.2 MW |
| 2020 | 802 | 28.3 MW |
| 2019 | 459 | 24.1 MW |
| 2018 | 327 | 11.2 MW |
| 2017 | 253 | 11.8 MW |
| 2016 | 189 | 2.30 MW |
| 2015 | 149 | 2.52 MW |
| 2014 | 236 | 5.54 MW |
| 2013 | 572 | 12.9 MW |
| 2012 | 928 | 28.3 MW |
| 2011 | 1,466 | 31.3 MW |
| 2010 | 1,681 | 38.8 MW |
| 2009 | 1,374 | 33.6 MW |
| 2008 | 705 | 10.4 MW |
| 2007 | 406 | 6.44 MW |
| 2006 | 533 | 6.43 MW |
How many solar installations in Schwandorf are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 23,959 | 639.5 MW |
| planned | 119 | 16.9 MW |
| permanently decommissioned | 267 | 1.49 MW |
| temporarily shut down | 23 | 0.05 MW |
Which solar installations over 100 kW are registered in Schwandorf?
| Unit | Capacity | Type | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Solarpark Altenschwand | 14.7 MW | Freiflächensolaranlage | planned | planned 2026 | EB Solar GmbH & Co. KG |
| SP Mappach | 12.6 MW | Freiflächensolaranlage | in operation | 2023-04-17 | Bürgerenergie Mappach-Silberberg GmbH & Co. KG |
| SP Kronstetten 2 | 10.5 MW | Freiflächensolaranlage | in operation | 2025-12-11 | Bayernwerk Natur GmbH |
| Solarpark Wernberg-Köblitz II - P24-130 - 10.485,48 kWp - Inn24-2/128 | 10.5 MW | Freiflächensolaranlage | in operation | 2026-05-21 | Anumar Solarpark Wernberg-Köblitz GmbH & Co. KG |
| Solarpark Altenschwand | 10.4 MW | Freiflächensolaranlage | in operation | 2022-10-26 | Solarpark Altenschwand GmbH & Co. KG |
| Solarpark Wernberg-Köblitz II | 10.3 MW | Freiflächensolaranlage | in operation | 2025-09-18 | Solarpark Wernberg-Köblitz II GmbH & Co. KG |
| PVA Fensterbach | 10.00 MW | Freiflächensolaranlage | in operation | 2019-08-31 | Unien Engineering |
| Solarpark Neunburg | 9.99 MW | Freiflächensolaranlage | in operation | 2020-10-22 | Solarpark Neunburg GmbH & Co. KG |
| Solarpark Oberviechtach I | 9.65 MW | Freiflächensolaranlage | in operation | 2022-03-23 | Solarpark Oberviechtach GmbH & Co. KG |
| Solarpark Fronberg BA 1 | 8.83 MW | Freiflächensolaranlage | in operation | 2017-12-19 | Solarpark Fronberg GmbH & Co. KG |
| SP Silberberg | 8.17 MW | Freiflächensolaranlage | in operation | 2023-04-17 | Bürgerenergie Mappach-Silberberg GmbH & Co. KG |
| SP Richthof | 8.10 MW | Freiflächensolaranlage | in operation | 2023-02-15 | Grüner Elefant GmbH & Co. KG |
| Fensterbach 2 | 8.00 MW | Freiflächensolaranlage | in operation | 2024-08-01 | SPF Solarpark Fensterbach GmbH |
| SP Wernberg | 7.00 MW | Freiflächensolaranlage | in operation | 2022-05-27 | Bürgersolarpark Degelhof-Wernberg GmbH & Co. KG |
| SP Roding | 6.60 MW | Freiflächensolaranlage | in operation | 2023-09-19 | Solarpark Roding-Käsbreite |
| I. + II. Sol Schwarzhof | 6.41 MW | Freiflächensolaranlage | in operation | 2009-12-21 | Sol Schwarzhof Netz GbR |
| PV Freiflächenanlage 6175,8 kWp Burglengenfeld | 6.18 MW | Freiflächensolaranlage | in operation | 2025-12-02 | GSt 67. Solarpark GmbH & Co. KG |
| Solarpark Oberaich | 5.92 MW | Freiflächensolaranlage | in operation | 2021-06-10 | LHI EE Invest PV Oberaich 2656 GmbH & Co. KG |
| 23116 SP Maxhütte | 5.74 MW | Freiflächensolaranlage | in operation | 2023-10-31 | Altus EnValue Solarpark Maxhütte GmbH & Co. KG |
| PVDLBOVI | 5.51 MW | Gebäudesolaranlage | in operation | 2023-10-25 | DLB Oberviechtach GmbH & Co. KG Albin Dickert |
| Solarpark Niedermurach Wagnern | 5.29 MW | Freiflächensolaranlage | in operation | 2023-09-27 | Greeno Solarprojekt 50 GmbH |
| Solarpark Oberviechtach II BA 2 | 5.20 MW | Freiflächensolaranlage | in operation | 2022-06-02 | Solarpark Oberviechtach GmbH & Co. KG |
| Solarpark Stulln | 4.42 MW | Freiflächensolaranlage | in operation | 2012-09-21 | Solarpark Stulln GmbH & co. KG |
| Solarpark Mitterfeld | 4.28 MW | Freiflächensolaranlage | in operation | 2012-06-29 | F.EE BG11 PV-Anlagen |
| Solarpark Mitterfeld II - 4.083,75 kWp | 4.08 MW | Freiflächensolaranlage | in operation | 2025-12-17 | Greeno Solarprojekt 76 GmbH & Co. KG |
| FLA Maxhütte, Calvarienberg | 3.96 MW | Freiflächensolaranlage | in operation | 2022-08-11 | Stadtwerke Maxhütte-Haidhof Ludwig Haslbeck |
| Freiflächenanlage Pottenhof | 3.90 MW | Freiflächensolaranlage | in operation | 2025-08-01 | P+S Energie eGbR |
| Solarpark Niedermurach Rottendorf 3.820 kWp | 3.81 MW | Freiflächensolaranlage | in operation | 2023-08-02 | Greeno Solarprojekt 51 GmbH |
| Solarpark Wackersdorf | 3.36 MW | Freiflächensolaranlage | in operation | 2024-08-09 | Solarpark Wackersdorf GmbH & Co. KG |
| Photovoltaikanlage Perschen | 3.35 MW | Freiflächensolaranlage | in operation | 2021-11-08 | neoVIS-Solar 1 GmbH &Co.KG |
| Solaranlage Altenschwand | 3.17 MW | Freiflächensolaranlage | in operation | 2021-04-12 | Solaranlage Altenschwand GmbH & Co. KG |
| Solarpark Teunz - 3.144 kWp | 3.14 MW | Freiflächensolaranlage | in operation | 2025-04-08 | Greeno Solarprojekt 64 GmbH & Co. KG |
| Solarpark | 3.00 MW | Freiflächensolaranlage | in operation | 2023-02-15 | JKR Energie |
| Solarpark Mitterfeld III - 2.835 kWp | 2.83 MW | Freiflächensolaranlage | in operation | 2025-12-17 | Greeno Solarprojekt 76 GmbH & Co. KG |
| Sonnenfeld | 2.47 MW | Freiflächensolaranlage | in operation | 2021-12-01 | WKA Rauch KG |
| Perschen Solarpark | 2.47 MW | Freiflächensolaranlage | in operation | 2013-07-31 | Bürgerenergie Mittlere Oberpfalz eG |
| Solarpark Wackersdorf - Zuschlag Katzwang 2360,34kWp | 2.36 MW | Freiflächensolaranlage | in operation | 2026-07-27 | Greeno Solarprojekt 78 GmbH & Co.KG |
| PV Ovi Freifläche 2350,8 | 2.35 MW | Freiflächensolaranlage | in operation | 2012-06-29 | Malisol GmbH |
| unit operated by a private individual | 2.35 MW | Freiflächensolaranlage | in operation | 2022-04-28 | private individual |
| FPV Trichenricht 2 | 2.32 MW | Freiflächensolaranlage | in operation | 2025-11-26 | WP Trichenricht GmbH & Co. KG |
| Hartenricht 3 | 2.15 MW | Freiflächensolaranlage | in operation | 2026-01-03 | Piehler Photovoltaik eGbR |
| unit operated by a private individual | 2.10 MW | Freiflächensolaranlage | in operation | 2021-07-15 | private individual |
| PV-Park Mappenberg Nord | 2.10 MW | Freiflächensolaranlage | in operation | 2021-07-15 | Fritsch Biostrom Inh. Klaus Fritsch e.K. |
| Große PV-Anlage | 1.96 MW | Gebäudesolaranlage | in operation | 2023-04-01 | Irlbacher Blickpunkt Glas GmbH |
| Solarpark Wernberg-Köblitz II - P24-130 - 1.900 kWp - SOL23-3/269 | 1.90 MW | Freiflächensolaranlage | in operation | 2026-01-21 | Anumar Solarpark Ingolstadt-Zuchering GmbH & Co. KG |
| Solarpark Nabburg (FFAV) | 1.88 MW | Freiflächensolaranlage | in operation | 2020-06-02 | SÜDWERK Kraftwerke GmbH |
| Solarpark Wackersdorf - Zuschlag Seukendorf | 1.87 MW | Freiflächensolaranlage | in operation | 2026-07-27 | Greeno Solarprojekt 109 GmbH & Co. KG |
| SP Kronstetten 1 | 1.73 MW | Freiflächensolaranlage | in operation | 2025-12-11 | Bayernwerk Natur GmbH |
| Deponie Mathiasgrube | 1.71 MW | Freiflächensolaranlage | in operation | 2011-08-31 | Ostbayerische Verwertungs- und Energieerzeugungsgesellschaft mbH |
| PV Freiflächenanlage 1701,165 kWp Alberndorf | 1.70 MW | Freiflächensolaranlage | in operation | 2025-08-13 | GSt 7. Solarpark GmbH & Co. KG |
| Solarpark Eckendorf | 1.62 MW | Freiflächensolaranlage | in operation | 2009-08-13 | Bustouristik Wild Hans Wild |
| Solarpark Wackersdorf - Zuschlag Katzwang 1566,14kWp | 1.57 MW | Freiflächensolaranlage | in operation | 2026-07-27 | Greeno Solarprojekt 78 GmbH & Co.KG |
| unit operated by a private individual | 1.51 MW | Freiflächensolaranlage | in operation | 2024-06-06 | private individual |
| PV Freiflächanlage 1.497,02kWp | 1.50 MW | Freiflächensolaranlage | in operation | 2024-06-06 | Vollberg Urbas Jung Solarpark GbR |
| Solarfreifläche 1 Industriestraße | 1.28 MW | Freiflächensolaranlage | in operation | 2011-12-29 | F.EE BG11 PV-Anlagen |
| Freiflächenanlage Weiherfeld Süd | 1.25 MW | Freiflächensolaranlage | in operation | 2021-11-08 | Scheuerer Landenergie GmbH & Co. KG |
| PV Halle Neu | 1.22 MW | Gebäudesolaranlage | in operation | 2023-05-04 | G. Schönek GmbH & Co. KG Markus Riegelsberger |
| Solarpark Fronberg BA 2 | 1.16 MW | Freiflächensolaranlage | in operation | 2018-07-23 | Solarpark Fronberg GmbH & Co. KG |
| PV_NEN_Step 1 | 1.16 MW | Gebäudesolaranlage | in operation | 2025-08-01 | Lorenz Snacks GmbH & Co KG |
| Solarfreifläche 2 Industriestraße | 1.01 MW | Freiflächensolaranlage | in operation | 2011-12-29 | F.EE BG11 PV-Anlagen |
| N1010 | 1.01 MW | Gebäudesolaranlage | in operation | 2013-01-07 | Max Schierer Grundbesitz GmbH&Co.KG |
| PV Freiflächenanlage 1000,395 kWp Alberndorf | 1.00 MW | Freiflächensolaranlage | in operation | 2025-12-19 | GSt 33. Solarpark GmbH & Co. KG |
| Solarpark Wernberg-Köblitz II - P24-130 - 1.000 kWp - MPM | 1.00 MW | Freiflächensolaranlage | in operation | 2026-01-20 | Anumar Solarpark Wernberg-Köblitz GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | Freiflächensolaranlage | in operation | 2026-07-25 | private individual |
| Solarpark Hirschberg | 1.00 MW | Freiflächensolaranlage | in operation | 2026-10-30 | Solarpark Hirschberg GmbH & Co. KG |
| PV Freiflächenanlage 999,69 kWp EEG | 1.00 MW | Freiflächensolaranlage | in operation | 2025-11-10 | GSt 67. Solarpark GmbH & Co. KG |
| PV Freiflächenanlage 999,69 kWp Alberndorf | 1.00 MW | Freiflächensolaranlage | in operation | 2025-08-12 | GSt 33. Solarpark GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | Freiflächensolaranlage | in operation | 2024-07-22 | private individual |
| PV-Park_Owh_Interkommunal | 1.00 MW | Freiflächensolaranlage | in operation | 2024-02-17 | Marco Mulzer Energie |
| unit operated by a private individual | 1.00 MW | Gebäudesolaranlage | in operation | 2024-01-24 | private individual |
| ANKA-Draht PV-Anlage 2023 | 1.00 MW | Gebäudesolaranlage | in operation | 2024-01-15 | ANKA-Draht Andreas Insinger GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | Freiflächensolaranlage | in operation | 2024-03-05 | private individual |
| unit operated by a private individual | 1.00 MW | Freiflächensolaranlage | in operation | 2014-02-28 | private individual |
| 2024 Hartenricht 1 | 1.00 MW | Freiflächensolaranlage | in operation | 2024-01-01 | Piehler Photovoltaik eGbR |
| unit operated by a private individual | 1.00 MW | Gebäudesolaranlage | in operation | 2011-12-28 | private individual |
| Solarpark Mitterfeld II - EEG§48 - 991,98 kWp | 1.00 MW | Freiflächensolaranlage | in operation | 2025-12-16 | Greeno Solarprojekt 76 GmbH & Co. KG |
| FPV Trichenricht 1 | 0.99 MW | Freiflächensolaranlage | in operation | 2025-11-25 | WP Trichenricht GmbH & Co. KG |
| Solarpark Niedermurach Sallach 1 - §48 - 994,41kWp | 0.99 MW | Freiflächensolaranlage | in operation | 2026-07-31 | Greeno Solarprojekt 93 GmbH & Co. KG |
| Hartenricht 2 | 0.99 MW | Freiflächensolaranlage | in operation | 2026-01-02 | Piehler Photovoltaik eGbR |
| PV-Park JS Ni | 0.99 MW | Freiflächensolaranlage | in operation | 2024-11-06 | JS-Energy |
| Solarpark Teunz - §48 - 988,2 kWp | 0.99 MW | Freiflächensolaranlage | in operation | 2025-01-15 | Greeno Solarprojekt 64 GmbH & Co. KG |
| Solarpark Irrenlohe | 0.99 MW | Freiflächensolaranlage | in operation | 2013-10-31 | Solarpark Irrenlohe |
| PV Anlage 2024 auf den großen Hallen | 0.97 MW | Gebäudesolaranlage | in operation | 2025-01-14 | Wirts Bioenergie GmbH |
| SP Kronstetten 3 | 0.95 MW | Freiflächensolaranlage | in operation | 2025-12-10 | Bayernwerk Natur GmbH |
| PV Freiflächenanlage 872,79 kWp Alberndorf | 0.87 MW | Freiflächensolaranlage | in operation | 2025-08-13 | M + M Kreuzer Solarpark GbR |
| Photovoltaikanlage 820 KWp 01/25 | 0.82 MW | Gebäudesolaranlage | in operation | 2025-01-09 | Stahl Wild, Pilz und Waldfrüchte GmbH |
| Solarpark Schwandorf 810 kWp | 0.81 MW | Freiflächensolaranlage | in operation | 2014-03-31 | Suntec Energiesysteme GmbH |
| Neukirchen/Balbini GbR | 0.80 MW | Freiflächensolaranlage | in operation | 2010-09-30 | Neukirchen/Balbini GbR |
| PV Anlage | 0.75 MW | Gebäudesolaranlage | in operation | 2021-10-27 | Integral Metalltechnik |
| unit operated by a private individual | 0.75 MW | Freiflächensolaranlage | in operation | 2025-06-17 | private individual |
| PV-Park_Owh_Steinberg am See I | 0.75 MW | Freiflächensolaranlage | in operation | 2019-03-29 | Marco Mulzer Energie |
| Solarpark Nabburg | 0.75 MW | Freiflächensolaranlage | in operation | 2019-09-30 | Solarpark Nabburg GmbH & Co. KG |
| PV-Anlage Halle 15/16/19 | 0.75 MW | Gebäudesolaranlage | in operation | 2023-05-09 | Godelmann GmbH & Co. KG |
| Suntec Werk 3 | 0.75 MW | Gebäudesolaranlage | in operation | 2019-01-31 | Suntec e.K. Wolfgang Meier |
| PV Plewa Klardorf | 0.75 MW | Gebäudesolaranlage | in operation | 2025-01-30 | Suntec e.K. Wolfgang Meier |
| PV-Anlage Halle 18 | 0.75 MW | Gebäudesolaranlage | in operation | 2018-12-13 | Godelmann GmbH & Co. KG |
| SP Loisnitz | 0.75 MW | Freiflächensolaranlage | in operation | 2019-05-29 | Voltgrün Solar |
| unit operated by a private individual | 0.75 MW | Freiflächensolaranlage | in operation | 2020-01-24 | private individual |
| Solarpark Nabburg (749kWp) | 0.75 MW | Freiflächensolaranlage | in operation | 2020-01-17 | SÜDWERK Kraftwerke GmbH |
| unit operated by a private individual | 0.75 MW | Freiflächensolaranlage | in operation | 2019-06-25 | private individual |
| SP Kellerhof II | 0.75 MW | Freiflächensolaranlage | in operation | 2019-10-30 | Voltgrün Solar |
| PV-Park_Owh_Schwandorf I | 0.75 MW | Freiflächensolaranlage | in operation | 2020-04-01 | Marco Mulzer Energie |
| SP Kellerhof | 0.75 MW | Freiflächensolaranlage | in operation | 2018-09-30 | Voltgrün Solar |
| Stocker Holz | 0.75 MW | Freiflächensolaranlage | in operation | 2018-10-30 | Bürgerenergie Mittlere Oberpfalz eG |
| Photovoltaik Schwandorf Waldfabrik 1 | 0.75 MW | Gebäudesolaranlage | in operation | 2019-10-30 | Horsch Maschinen SE & Co. KG |
| PV-Anlage Halle 16/17 | 0.75 MW | Gebäudesolaranlage | in operation | 2019-12-30 | Godelmann GmbH & Co. KG |
| SP Frotzersricht I | 0.75 MW | Freiflächensolaranlage | in operation | 2020-01-21 | Voltgrün Solar |
| Energiepark Dirnau | 0.74 MW | Gebäudesolaranlage | in operation | 2023-07-06 | Energiepark Dirnau GbR |
| Waldfabrik 2 | 0.73 MW | Gebäudesolaranlage | in operation | 2020-12-21 | Horsch Maschinen SE & Co. KG |
| unit operated by a private individual | 0.71 MW | Gebäudesolaranlage | in operation | 2021-03-08 | private individual |
| unit operated by a private individual | 0.69 MW | Freiflächensolaranlage | in operation | 2010-03-25 | private individual |
| unit operated by a private individual | 0.68 MW | Gebäudesolaranlage | in operation | 2012-06-28 | private individual |
| BG11 Anlage 1 | 0.65 MW | Gebäudesolaranlage | in operation | 2010-12-27 | F.EE BG11 PV-Anlagen |
| B932831 | 0.65 MW | Gebäudesolaranlage | in operation | 2026-07-31 | Thanner Frischei |
| Gebäude 30 | 0.64 MW | Gebäudesolaranlage | in operation | 2009-12-30 | Fleischmann 20 GmbH & Co. KG |
| Solarpark Wernberg-Köblitz II - P24-130 - 640,00 kWp - SOL24-2/424 | 0.64 MW | Freiflächensolaranlage | in operation | 2026-03-30 | Anumar Solarpark Seckach III GmbH & Co. KG |
| unit operated by a private individual | 0.64 MW | Gebäudesolaranlage | in operation | 2018-07-18 | private individual |
| SP Frotzersricht II | 0.61 MW | Freiflächensolaranlage | in operation | 2020-04-07 | Voltgrün Solar |
| PVA Oberviechtach | 0.59 MW | Freiflächensolaranlage | in operation | 2010-03-25 | Stromunion AG |
| Werk1 579,6 | 0.58 MW | Gebäudesolaranlage | in operation | 2010-06-30 | Suntec e.K. Wolfgang Meier |
| unit operated by a private individual | 0.57 MW | Gebäudesolaranlage | in operation | 2018-03-29 | private individual |
| Nittenau | 0.56 MW | Gebäudesolaranlage | in operation | 2010-06-28 | Impulsgeber Stromfabrik 8 GmbH & Co. KG |
| Gerresheimer Pfreimd 551kWp | 0.55 MW | Gebäudesolaranlage | planned | planned 2025 | EDV- und Elektrotechnik Hardy Barth |
| Schönsee | 0.53 MW | Gebäudesolaranlage | in operation | 2013-04-26 | BSPTK 1UG |
| Am Kalvarienberg 30 - Halle 2 | 0.52 MW | Gebäudesolaranlage | in operation | 2024-06-06 | P. Schwandner Logistik und Transport GmbH |
| Solarpark Wernberg-Köblitz | 0.52 MW | Freiflächensolaranlage | in operation | 2015-07-31 | Solarpark Wernberg-Köblitz GmbH & Co. KG |
| PV Hallendach | 0.50 MW | Gebäudesolaranlage | in operation | 2019-06-28 | FischerHaus GmbH & Co. KG |
| unit operated by a private individual | 0.50 MW | Gebäudesolaranlage | in operation | 2010-09-30 | private individual |
| PV-Anlage 499,200 | 0.50 MW | Gebäudesolaranlage | in operation | 2020-03-23 | Stahl Lasertechnik GmbH&Co.KG |
| unit operated by a private individual | 0.50 MW | Gebäudesolaranlage | in operation | 2011-06-24 | private individual |
| Freiflächenanlage Weiherfeld Nord | 0.50 MW | Freiflächensolaranlage | in operation | 2021-10-06 | Scheuerer Landenergie GmbH & Co. KG |
| PV Freifläche 484,56 kWp | 0.48 MW | Freiflächensolaranlage | in operation | 2021-01-29 | Teublitzer Ton GmbH |
| Suntec Werk 3.2 | 0.48 MW | Gebäudesolaranlage | in operation | 2021-03-29 | Suntec e.K. Wolfgang Meier |
| Wernberg 2 (BA4) - Teil 1 | 0.46 MW | Gebäudesolaranlage | in operation | 2013-07-18 | Conrad Electronic SE |
| Wernberg 2 (BA4) - Teil 2 | 0.46 MW | Gebäudesolaranlage | in operation | 2013-07-18 | Conrad Electronic SE |
| PVA Bahnhof OVI | 0.45 MW | Gebäudesolaranlage | in operation | 2023-07-17 | P+S Energie eGbR |
| PV-Anlage H1 | 0.44 MW | Gebäudesolaranlage | in operation | 2025-04-09 | Weinisch GmbH & Co. KG |
| PV-Anlage Industriestraße 2 | 0.44 MW | Gebäudesolaranlage | in operation | 2012-06-26 | MMC Verwaltungs GmbH u. Co. KG |
| Solaranlage Nabburg | 0.44 MW | Gebäudesolaranlage | in operation | 2022-06-10 | Strubl GmbH & Co. KG |
| PVA MMC Verwaltungs GmbH & Co. KG | 0.43 MW | Gebäudesolaranlage | in operation | 2023-01-02 | MMC Verwaltungs GmbH u. Co. KG |
| Gebäude 20, Anlage 1 | 0.43 MW | Gebäudesolaranlage | in operation | 2009-12-23 | Fleischmann 20 GmbH & Co. KG |
| Am Kalvarienberg 30 - Halle 2 - Erweiterung 2025 | 0.42 MW | Gebäudesolaranlage | in operation | 2025-06-30 | P. Schwandner Logistik und Transport GmbH |
| Werk 1 411,52 | 0.41 MW | Gebäudesolaranlage | in operation | 2009-12-30 | Suntec e.K. Wolfgang Meier |
| unit operated by a private individual | 0.41 MW | Gebäudesolaranlage | in operation | 2011-12-22 | private individual |
| unit operated by a private individual | 0.41 MW | Gebäudesolaranlage | in operation | 2010-09-29 | private individual |
| W3_ OvM1-5_2024 | 0.40 MW | Gebäudesolaranlage | in operation | 2024-08-14 | Sennebogen Maschinentechnik GmbH & Co. KG |
| Solar Okis | 0.40 MW | Gebäudesolaranlage | in operation | 2019-01-02 | Erlöspool Windpark Dübrichen |
| unit operated by a private individual | 0.38 MW | Gebäudesolaranlage | in operation | 2023-10-11 | private individual |
| 92431 Neunburg v.Wald, Richard-Wagner-Straße 7, 373,56 kWp | 0.37 MW | Gebäudesolaranlage | in operation | 2026-01-16 | Bauer-Fredrich Photovoltaikanlagen GbR |
| Dach Gewerbepark | 0.36 MW | Gebäudesolaranlage | in operation | 2014-10-27 | Autohaus Widmann GmbH & Co. KG |
| Photovoltaik Werksstr. 3 | 0.35 MW | Gebäudesolaranlage | in operation | 2018-10-10 | Pharma Stulln GmbH |
| Halle 3 | 0.35 MW | Gebäudesolaranlage | in operation | 2012-06-29 | ACenerG |
| Solarpark Oberviechtach II BA 1 | 0.35 MW | Freiflächensolaranlage | in operation | 2022-03-24 | Solarpark Oberviechtach GmbH & Co. KG |
| PVA Halle 9 | 0.34 MW | Gebäudesolaranlage | in operation | 2010-05-18 | ACenerG |
| Gebäude 20, Halle Neubau | 0.34 MW | Gebäudesolaranlage | in operation | 2013-10-31 | Fleischmann 20 GmbH & Co. KG |
| unit operated by a private individual | 0.33 MW | Gebäudesolaranlage | in operation | 2024-12-20 | private individual |
| Halle A, Halle Bwest und Halle C | 0.33 MW | Gebäudesolaranlage | in operation | 2011-12-30 | Wenisch PV1 |
| Hallendächer | 0.33 MW | Gebäudesolaranlage | in operation | 2018-01-31 | emz-Hanauer GmbH&CoKGaA |
| Schwandorf | 0.33 MW | Gebäudesolaranlage | in operation | 2010-09-30 | Reich PV GbR |
| Photovoltaik OFZ 1 | 0.32 MW | Gebäudesolaranlage | in operation | 2025-06-30 | Horsch Maschinen SE & Co. KG |
| unit operated by a private individual | 0.32 MW | Gebäudesolaranlage | in operation | 2025-01-29 | private individual |
| Volleinspeiser Wernberg-Köblitz | 0.32 MW | Gebäudesolaranlage | planned | planned 2026 | KSP-Energy-Green GmbH |
| Werk 1 304,39 | 0.30 MW | Gebäudesolaranlage | in operation | 2007-06-15 | Suntec e.K. Wolfgang Meier |
| Kirchsteig 5 | 0.30 MW | Gebäudesolaranlage | in operation | 2022-06-30 | Metall Hanauer Josef Hana |
| Immosad-PV Anlage Schwandorf | 0.30 MW | Gebäudesolaranlage | in operation | 2020-09-30 | Immosad Immobilien GmbH |
| unit operated by a private individual | 0.30 MW | Freiflächensolaranlage | in operation | 2026-07-31 | private individual |
| TH Schwandorf | 0.30 MW | Gebäudesolaranlage | in operation | 2023-12-08 | Held-Lankes & Friends Vier UG & Co. Harald Held |
| Paa Haustechnik Halle 2011 - 296,70 kWp (19.12.2011) | 0.30 MW | Gebäudesolaranlage | in operation | 2011-12-19 | Paa Haustechnik GmBh |
| MetSc_PV-Anlage | 0.29 MW | Gebäudesolaranlage | in operation | 2021-08-18 | Meindl Metzgerei GmbH |
| PV Freiflächenanlage 287,64 kWp Alberndorf | 0.29 MW | Freiflächensolaranlage | in operation | 2025-08-13 | GSt 7. Solarpark GmbH & Co. KG |
| PV Anlage Max-Planck-Straße | 0.28 MW | Gebäudesolaranlage | in operation | 2024-01-30 | Metallbau Eckert GmbH Franz Eckert |
| Schwarz PV GbR Volleinspeiseranlage | 0.28 MW | Gebäudesolaranlage | in operation | 2025-01-20 | Schwarz PV GbR |
| unit operated by a private individual | 0.28 MW | Gebäudesolaranlage | in operation | 2025-02-05 | private individual |
| 000 PV 367 | 0.28 MW | Gebäudesolaranlage | in operation | 2010-06-30 | Biopark Gut Siegenthann GmbH |
| Solarente 2 Tannhof | 0.27 MW | Gebäudesolaranlage | in operation | 2011-12-08 | Eco Invest Solarrente 2 GmbH & Co. KG |
| unit operated by a private individual | 0.27 MW | Gebäudesolaranlage | in operation | 2010-12-28 | private individual |
| Sonnenstrom-Oberpfalz | 0.27 MW | Gebäudesolaranlage | in operation | 2015-01-21 | Ruffsolar UG (hb) & Co. Sonnenstrom5.KG |
| unit operated by a private individual | 0.27 MW | Gebäudesolaranlage | in operation | 2023-09-15 | private individual |
| unit operated by a private individual | 0.26 MW | Gebäudesolaranlage | in operation | 2012-06-29 | private individual |
| PV Halle 5+11 | 0.26 MW | Gebäudesolaranlage | in operation | 2010-05-10 | ACenerG |
| Halle_2 | 0.26 MW | Gebäudesolaranlage | in operation | 2009-12-22 | LMT PV GbR |
| Halle 12+14 | 0.26 MW | Gebäudesolaranlage | in operation | 2012-06-29 | ACenerG |
| Carport | 0.26 MW | Gebäudesolaranlage | in operation | 2012-07-31 | LMT PV GbR |
| 6897_Lidl_Maxhütte-Haidhof | 0.25 MW | Gebäudesolaranlage | in operation | 2025-07-30 | Lidl Vertriebs-GmbH & Co. KG |
| Halle 4+10 | 0.25 MW | Gebäudesolaranlage | in operation | 2012-06-29 | ACenerG |
| Mehrfachsporthalle | 0.25 MW | Gebäudesolaranlage | in operation | 2025-09-09 | Markt Wernberg-Köblitz |
| LKW-Einstellhalle + Werkstatt II | 0.24 MW | Gebäudesolaranlage | in operation | 2019-01-25 | P. Schwandner Logistik und Transport GmbH |
| PV Hühnerstall | 0.24 MW | Gebäudesolaranlage | in operation | 2014-02-18 | Florian Werner |
| Mühlweg 241,600 | 0.24 MW | Gebäudesolaranlage | in operation | 2020-10-19 | Labor Kneißler GmbH & Co. KG |
| unit operated by a private individual | 0.24 MW | Gebäudesolaranlage | in operation | 2010-05-12 | private individual |
| Photovoltaik OFZ 2 | 0.24 MW | Gebäudesolaranlage | in operation | 2025-06-30 | Horsch Maschinen SE & Co. KG |
| Birkhof grosse Anlage | 0.23 MW | Gebäudesolaranlage | in operation | 2010-06-28 | Erwin und Achim Dirnhofer BG Photovoltaikanlage GbR |
| unit operated by a private individual | 0.23 MW | Gebäudesolaranlage | in operation | 2024-07-23 | private individual |
| unit operated by a private individual | 0.23 MW | Gebäudesolaranlage | in operation | 2012-11-30 | private individual |
| Am Kalvarienberg | 0.23 MW | Gebäudesolaranlage | in operation | 2018-05-29 | JP Anlagen GmbH |
| unit operated by a private individual | 0.22 MW | Gebäudesolaranlage | in operation | 2024-12-09 | private individual |
| PV-Anlage | 0.22 MW | Gebäudesolaranlage | in operation | 2010-12-29 | Koll & Cie. GmbH & Co. KG |
| Topkauf | 0.22 MW | Gebäudesolaranlage | in operation | 2019-01-24 | Suntec e.K. |
| PV-Anlage maturo GmbH | 0.22 MW | Gebäudesolaranlage | in operation | 2023-01-04 | Maturo |
| Boschstr. 3 / Inotech Kunststofftechnik / Halle E und F | 0.22 MW | Gebäudesolaranlage | in operation | 2026-08-07 | Inotech Kunststofftechnik GmbH |
| HWS | 0.21 MW | Gebäudesolaranlage | in operation | 2024-12-05 | Naabwerkstätten GmbH |
| unit operated by a private individual | 0.21 MW | Gebäudesolaranlage | in operation | 2024-11-01 | private individual |
| 147213 | 0.21 MW | Gebäudesolaranlage | in operation | 2013-02-15 | Stuber Energie & Sonnen GmbH |
| Egelseerstraße | 0.21 MW | Gebäudesolaranlage | in operation | 2016-11-30 | Alternative Power & E-Mobile GmbH |
| PV Ovi Dach 206,0 | 0.21 MW | Gebäudesolaranlage | in operation | 2011-12-27 | Malisol GmbH |
| 204,98kW | 0.20 MW | Gebäudesolaranlage | in operation | 2011-12-07 | Thomas Schlegel und Michael Raß GdbR |
| unit operated by a private individual | 0.20 MW | Gebäudesolaranlage | in operation | 2018-09-19 | private individual |
| 92431 Neunburg v.Wald, Richard-Wagner-Straße 7, 203,52 kWp | 0.20 MW | Gebäudesolaranlage | in operation | 2019-05-29 | Bauer-Fredrich Photovoltaikanlagen GbR |
| LOC Wernberg BA2 | 0.20 MW | Gebäudesolaranlage | in operation | 2005-07-29 | Conrad Electronic SE |
| PVA Burglengenfeld_Teil_1 | 0.20 MW | Gebäudesolaranlage | in operation | 2010-06-30 | Sun-Q UG (haftungsbeschränkt) & Co. KG |
| Ohm202 | 0.20 MW | Gebäudesolaranlage | in operation | 2010-12-30 | Suntec e.K. |
| Pultdachhalle/Bullenstall 200,91kWp | 0.20 MW | Gebäudesolaranlage | in operation | 2010-06-28 | Ziegler Energie GbR |
| PV-Anlage Logistikzentrum | 0.20 MW | Gebäudesolaranlage | in operation | 2011-12-22 | Horsch Solar OHG |
| unit operated by a private individual | 0.20 MW | Gebäudesolaranlage | in operation | 2012-03-27 | private individual |
| unit operated by a private individual | 0.20 MW | Gebäudesolaranlage | in operation | 2020-01-07 | private individual |
| Paa Haustechnik GmbH 199,64 kWp - Nissl Salzhotel (03.11.2011) | 0.20 MW | Gebäudesolaranlage | in operation | 2011-11-03 | Paa Haustechnik GmBh |
| PV Tiefenhof 1 | 0.20 MW | Gebäudesolaranlage | in operation | 2010-06-29 | PV-Sonne |
| Solarpark Oberviechtach II BA 3 | 0.20 MW | Freiflächensolaranlage | in operation | 2022-07-01 | Solarpark Oberviechtach GmbH & Co. KG |
| W3_OvM1-5_2015 | 0.20 MW | Gebäudesolaranlage | in operation | 2015-08-03 | Sennebogen Maschinentechnik GmbH & Co. KG |
| PV ZV NOG | 0.19 MW | Freiflächensolaranlage | in operation | 2023-09-14 | Zweckverband zur Wasserversorgung |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2023-08-11 | private individual |
| Schwandorf, 189 kWp | 0.19 MW | Freiflächensolaranlage | in operation | 2014-04-30 | Suntec Energiesysteme GmbH |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2011-12-14 | private individual |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2025-01-29 | private individual |
| PV-Anlage Depot | 0.19 MW | Gebäudesolaranlage | in operation | 2025-06-02 | Bezirk Oberpfalz |
| unit operated by a private individual | 0.18 MW | Gebäudesolaranlage | in operation | 2019-02-28 | private individual |
| Trisching Halle 4 | 0.18 MW | Gebäudesolaranlage | in operation | 2023-04-25 | Särve Holding GmbH |
| 7454_Lidl_Nabburg | 0.18 MW | Gebäudesolaranlage | in operation | 2026-09-30 | Lidl Vertriebs-GmbH & Co. KG |
| unit operated by a private individual | 0.18 MW | Gebäudesolaranlage | in operation | 2009-10-02 | private individual |
| unit operated by a private individual | 0.18 MW | Gebäudesolaranlage | permanently decommissioned | 2005-11-24 | private individual |
| Natur Energieanlagen Projekt GmbH & Co. Solarpark Nittenau KG Jahn20 | 0.18 MW | Gebäudesolaranlage | in operation | 2011-08-19 | Natur Energieanlagen Projekt GmbH & Co. Solarpark Nittenau KG |
| 6830_Lidl_Nittenau | 0.18 MW | Gebäudesolaranlage | in operation | 2022-01-22 | Lidl Vertriebs-GmbH & Co. KG |
| Schule Schwarzenfeld | 0.18 MW | Gebäudesolaranlage | in operation | 2021-04-29 | Bürgerenergie Mittlere Oberpfalz eG |
| Filiale, 93142, Maxhütte-Haidhof , Nordgaustraße 2 | 0.18 MW | Gebäudesolaranlage | in operation | 2014-08-20 | ALDI SE & Co. KG |
| Parkplatz | 0.18 MW | Gebäudesolaranlage | in operation | 2021-05-12 | Hotel Wolfringmühle GmbH |
| unit operated by a private individual | 0.18 MW | Gebäudesolaranlage | in operation | 2012-06-30 | private individual |
| 92526 Oberviechtach am Sandradl 26a, 176,32kWp | 0.18 MW | Gebäudesolaranlage | in operation | 2011-07-01 | Bauer-Fredrich Photovoltaikanlagen GbR |
| PV Ovi Industriestr. 2 175,11 | 0.18 MW | Gebäudesolaranlage | in operation | 2012-03-08 | Malisol GmbH |
| Vollgutlager neu | 0.18 MW | Gebäudesolaranlage | in operation | 2025-12-15 | Schlossbrauerei Fuchsberg |
| unit operated by a private individual | 0.17 MW | Gebäudesolaranlage | in operation | 2018-12-20 | private individual |
| unit operated by a private individual | 0.17 MW | Gebäudesolaranlage | in operation | 2011-12-21 | private individual |
| Photovoltaik180 | 0.17 MW | Gebäudesolaranlage | in operation | 2023-07-27 | Siegmund & Robert Süß Grundstücks |
| PV - Gewerbepark 4 | 0.17 MW | Gebäudesolaranlage | in operation | 2023-08-28 | Maschek Automobile GmbH & Co. KG |
| unit operated by a private individual | 0.17 MW | Gebäudesolaranlage | in operation | 2023-06-19 | private individual |
| PV VW 2 | 0.17 MW | Gebäudesolaranlage | in operation | 2025-10-14 | Maschek Automobile GmbH & Co. KG |
| unit operated by a private individual | 0.17 MW | Gebäudesolaranlage | in operation | 2019-04-30 | private individual |
| Irlbacher Blickpunkt Glas Parkplatz | 0.16 MW | Gebäudesolaranlage | in operation | 2010-12-20 | Irlbacher Blickpunkt Glas GmbH |
| Reisach | 0.16 MW | Gebäudesolaranlage | in operation | 2011-09-12 | PV Hubert GbR |
| Nittenau1c | 0.16 MW | Gebäudesolaranlage | in operation | 2026-07-16 | Impulsgeber Stromfabrik 8 GmbH & Co. KG |
| unit operated by a private individual | 0.16 MW | Gebäudesolaranlage | in operation | 2009-10-22 | private individual |
| Neue Reinigung 2017 | 0.16 MW | Gebäudesolaranlage | in operation | 2020-06-29 | Rudolf Bauer |
| PV Sonnenschein Oberviechtach 2025 | 0.16 MW | Gebäudesolaranlage | in operation | 2025-05-26 | Sonnenschein Energie GbR |
| NORMA PV-Anlage Schönsee | 0.16 MW | Gebäudesolaranlage | in operation | 2025-04-14 | NORMA Lebensmittelfilialbetrieb Stiftung & Co. KG |
| PV auf Hallendach | 0.15 MW | Gebäudesolaranlage | in operation | 2018-08-31 | Florian Werner |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2009-12-29 | private individual |
| 150 kW | 0.15 MW | Gebäudesolaranlage | in operation | 2024-03-21 | Werner Schönberger |
| PV Netto Bruck | 0.15 MW | Gebäudesolaranlage | in operation | 2024-06-12 | VR Burglengenfeld Immobilien-Verwaltungs-GmbH |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2010-06-12 | private individual |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2024-02-27 | private individual |
| PV Wackersdorf | 0.15 MW | Gebäudesolaranlage | in operation | 2011-12-21 | Krones Holding GmbH |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2010-06-15 | private individual |
| PV-Anlage BBZ | 0.15 MW | Gebäudesolaranlage | in operation | 2011-08-04 | Werner Rädlinger Holding GmbH & Co. KG |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2009-11-02 | private individual |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2026-05-12 | private individual |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2010-06-04 | private individual |
| 84036 - Fahrzeugbau Schlegl Schwarzenfeld | 0.14 MW | Gebäudesolaranlage | in operation | 2008-12-03 | MR Solar GmbH und Co. KG |
| KÖWA-Dach 1 | 0.14 MW | Gebäudesolaranlage | in operation | 2021-03-31 | KÖWA Isolierglas Produktion- und Vertriebs GmbH |
| PV-Anlage | 0.14 MW | Gebäudesolaranlage | in operation | 2010-06-17 | DU + I Schönberger GbR |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2013-08-30 | private individual |
| Wertstoffzentrum-Schwandorf GmbH | 0.14 MW | Gebäudesolaranlage | in operation | 2011-09-07 | Wertstoffzentrum - Schwandorf |
| Büro unten | 0.14 MW | Gebäudesolaranlage | in operation | 2019-01-25 | P. Schwandner Logistik und Transport GmbH |
| Schule | 0.14 MW | Gebäudesolaranlage | in operation | 2009-12-30 | Markt Wernberg-Köblitz |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2009-12-04 | private individual |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2011-05-04 | private individual |
| Filiale, 92421, Schwandorf , Am Brunnfeld 1 | 0.14 MW | Gebäudesolaranlage | in operation | 2014-08-14 | ALDI SE & Co. KG |
| Ohm25,14 | 0.14 MW | Gebäudesolaranlage | in operation | 2010-10-10 | Suntec e.K. |
| PV-Anlage 135 kWp | 0.14 MW | Gebäudesolaranlage | in operation | 2022-05-18 | KNUR Fertigungstechnik GmbH |
| Photovoltaik Produktionshalle Weidachstraße 1 | 0.13 MW | Gebäudesolaranlage | in operation | 2024-04-26 | Bucher Municipal Wernberg GmbH |
| PV-Anlage 134,68 kWp | 0.13 MW | Gebäudesolaranlage | in operation | 2022-06-23 | BES Brunold Holz und Design Manufaktur GmbH Fabian Kraus |
| PV-Anlage 134,68 kWp | 0.13 MW | Gebäudesolaranlage | in operation | 2021-10-28 | ROFA-LEHMER Förderanlagen GmbH |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2023-01-01 | private individual |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2011-10-10 | private individual |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2022-07-29 | private individual |
| 001 PV 518 | 0.13 MW | Gebäudesolaranlage | in operation | 2007-06-28 | Biopark Gut Siegenthann GmbH |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2010-06-09 | private individual |
| Halle 1a*132kwp | 0.13 MW | Gebäudesolaranlage | in operation | 2011-10-14 | Fleischmann Photovoltaik GdR |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2011-12-15 | private individual |
| Wernberg-Köblitz | 0.13 MW | Gebäudesolaranlage | in operation | 2011-12-27 | Schmolli Solarpark UG |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2018-12-10 | private individual |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2008-02-08 | private individual |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2008-02-08 | private individual |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2009-10-29 | private individual |
| PV Geratshofen | 0.12 MW | Gebäudesolaranlage | in operation | 2010-06-22 | Schikora-Meixner-Dütsch GbR |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2024-07-30 | private individual |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2009-12-07 | private individual |
| PV2018IGE | 0.12 MW | Gebäudesolaranlage | in operation | 2018-12-11 | IGE Beteiligungs GmbH |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2024-03-28 | private individual |
| 002 PV 518 | 0.12 MW | Gebäudesolaranlage | in operation | 2007-06-28 | Biopark Gut Siegenthann GmbH |
| PV Ovi Pultdach 119,34 - S | 0.12 MW | Gebäudesolaranlage | in operation | 2010-06-29 | Malisol GmbH |
| PV Ovi Pultdach 119,34 | 0.12 MW | Gebäudesolaranlage | in operation | 2010-06-30 | Malisol GmbH |
The 300 largest units are listed.
Which organisations operate the most solar PV capacity in Schwandorf?
| Operator | Units | Capacity |
|---|---|---|
| Bürgerenergie Mappach-Silberberg GmbH & Co. KG | 2 | 20.8 MW |
| Solarpark Oberviechtach GmbH & Co. KG | 4 | 15.4 MW |
| EB Solar GmbH & Co. KG | 1 | 14.7 MW |
| Bayernwerk Natur GmbH | 3 | 13.2 MW |
| Anumar Solarpark Wernberg-Köblitz GmbH & Co. KG | 2 | 11.5 MW |
| Solarpark Altenschwand GmbH & Co. KG | 1 | 10.4 MW |
| Solarpark Wernberg-Köblitz II GmbH & Co. KG | 1 | 10.3 MW |
| Unien Engineering | 1 | 10.00 MW |
| Solarpark Neunburg GmbH & Co. KG | 1 | 9.99 MW |
| Solarpark Fronberg GmbH & Co. KG | 2 | 9.99 MW |
Which installation type accounts for the most solar PV capacity in Schwandorf?
| Installation type | Units | Capacity |
|---|---|---|
| Freiflächensolaranlage | 103 | 301.7 MW |
| Gebäudesolaranlage | 223 | 70.6 MW |
Solar PV in Bayern · Solar PV in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many solar installations are registered in Schwandorf (Bayern), and how large are they can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.