Germany · renewables
Solar PV in Roth
17,255 solar installations with 436.8 MW of gross capacity were in operation in Roth (Bayern) as of 2026-11-05, with a further 158 units (18.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many solar installations are registered in Roth (Bayern), and how large are they, as of 2026-11-05?
- 17,255 solar installations with 436.8 MW of gross capacity were in operation in Roth (Bayern) as of 2026-11-05, with a further 158 units (18.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many solar installations are in operation in Roth?
- 17,255 solar installations with 436.8 MW of gross capacity were in operation in Roth as of 2026-11-05, with a further 158 units (18.5 MW) registered as planned; the count includes every registered unit down to balcony systems (Bundesnetzagentur, Marktstammdatenregister).
- How much solar PV capacity was commissioned in Roth in 2025?
- 2,137 solar installations with 95.7 MW went into operation in Roth in 2025; the strongest year of the last two decades was 2025 with 95.7 MW (Bundesnetzagentur, Marktstammdatenregister).
- What share of Roth's solar installations are larger than 100 kW?
- 206 of 17,727 registered solar installations in Roth (1.2 percent) exceed 100 kW, but they hold 284.2 MW of the 456.2 MW total capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most solar PV capacity in Roth?
- N-ERGIE Sonne und Wind GmbH & Co. KG operates 5 solar installations over 100 kW with 24.1 MW in Roth, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which installation type has the most solar PV capacity in Roth?
- Freiflächensolaranlage leads with 77 solar installations and 247.2 MW in Roth (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest solar installation in Roth?
- The largest registered solar installation in Roth has 16.9 MW of gross capacity and is operated by Anumar Solarpark Greding VIII GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the solar installations in Roth distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 17,014 | 141.6 MW | 16,546 | 156 |
| 30 to 100 kW | 507 | 30.4 MW | 505 | 0 |
| over 100 kW | 206 | 284.2 MW | 204 | 2 |
How much solar PV capacity was commissioned in Roth each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1,858 | 30.6 MW |
| 2025 | 2,137 | 95.7 MW |
| 2024 | 2,790 | 48.5 MW |
| 2023 | 2,655 | 43.4 MW |
| 2022 | 937 | 26.1 MW |
| 2021 | 675 | 12.0 MW |
| 2020 | 633 | 30.9 MW |
| 2019 | 418 | 8.72 MW |
| 2018 | 257 | 23.2 MW |
| 2017 | 258 | 20.5 MW |
| 2016 | 215 | 1.75 MW |
| 2015 | 222 | 2.12 MW |
| 2014 | 263 | 3.73 MW |
| 2013 | 350 | 6.70 MW |
| 2012 | 521 | 13.2 MW |
| 2011 | 736 | 13.8 MW |
| 2010 | 665 | 18.1 MW |
| 2009 | 579 | 16.4 MW |
| 2008 | 323 | 6.38 MW |
| 2007 | 169 | 5.91 MW |
| 2006 | 191 | 3.24 MW |
How many solar installations in Roth are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 17,255 | 436.8 MW |
| planned | 158 | 18.5 MW |
| permanently decommissioned | 291 | 0.77 MW |
| temporarily shut down | 23 | 0.07 MW |
Which solar installations over 100 kW are registered in Roth?
| Unit | Capacity | Type | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Solarpark Greding VIII - P24-320 | 16.9 MW | Freiflächensolaranlage | planned | planned 2028 | Anumar Solarpark Greding VIII GmbH & Co. KG |
| Hilpoltstein Solar | 10.5 MW | Freiflächensolaranlage | in operation | 2024-07-17 | SÜDWERK Solar Portfolio 3 GmbH |
| Solarpark Kammerstein | 9.92 MW | Freiflächensolaranlage | in operation | 2022-05-12 | SPV Solarpark 106. GmbH & Co. KG |
| Solarpark Greding III (ASP Greding-Landerzhofen II) - P23-077 - Teil EEG-Zuschlag 9.501 kWp | 9.50 MW | Freiflächensolaranlage | in operation | 2025-07-29 | Anumar Solarpark Greding-Landerzhofen II GmbH & Co. KG |
| PV Abenberg | 9.30 MW | Freiflächensolaranlage | in operation | 2026-07-01 | N-ERGIE Sonne und Wind GmbH & Co. KG |
| Solarpark Großhöbing - P21-093 - Teil 8.976,00 kWp SOL23-2/307 | 8.98 MW | Freiflächensolaranlage | in operation | 2025-08-15 | Anumar Solarpark Greding-Großhöbing GmbH & Co. KG |
| Solarpark Landerzhofen - P21-427 - Teil 4 | 8.50 MW | Freiflächensolaranlage | in operation | 2025-02-26 | Anumar Solarpark Greding-Landerzhofen GmbH & Co. KG |
| PVA Mindorf | 8.34 MW | Freiflächensolaranlage | in operation | 2018-12-06 | ENERPARC Solar Invest 121 GmbH |
| Solarpark Schutzendorf | 7.69 MW | Freiflächensolaranlage | in operation | 2018-12-13 | Energiebauern GmbH & Co. Kraftwerke KG |
| SE_2025_Schloßberg | 7.00 MW | Freiflächensolaranlage | in operation | 2025-04-02 | LSE GmbH |
| PV Mindorf | 6.64 MW | Freiflächensolaranlage | in operation | 2025-03-01 | N-ERGIE Sonne und Wind GmbH & Co. KG |
| MFS PV | 6.38 MW | Freiflächensolaranlage | in operation | 2020-05-05 | MFS PV GmbH & Co. KG |
| Bürgersolaranlage Röttenbach GmbH & Co. KG 2 | 6.20 MW | Freiflächensolaranlage | in operation | 2025-05-20 | Bürgersolar Röttenbach GmbH & Co. KG |
| LHI SolarWind Euerwang GmbH & Co. KG (Erweiterung) | 5.99 MW | Freiflächensolaranlage | in operation | 2020-08-31 | LHI SolarWind PV Euerwang 2290 GmbH & Co. KG |
| Solarpark Euerwang I | 5.36 MW | Freiflächensolaranlage | in operation | 2017-10-18 | LHI SolarWind PV Euerwang 2290 GmbH & Co. KG |
| Solarpark Großhöbing | 5.14 MW | Freiflächensolaranlage | in operation | 2017-02-08 | Solarpark Großhöbing GmbH & Co. KG |
| unit operated by a private individual | 5.00 MW | Freiflächensolaranlage | in operation | 2023-05-08 | private individual |
| Walp PV Teil 1 | 5.00 MW | Freiflächensolaranlage | in operation | 2023-12-22 | Walp PV GmbH |
| BrEiSch Beerbach GmbH & Co. KG | 4.99 MW | Freiflächensolaranlage | in operation | 2025-05-15 | BrEiSch Beerbach GmbH & Co. KG |
| PV Allersberg | 4.87 MW | Freiflächensolaranlage | in operation | 2025-12-19 | PV Allersberg GmbH |
| Solarpark Euerwang II | 4.63 MW | Freiflächensolaranlage | in operation | 2017-10-18 | LHI SolarWind PV Euerwang 2290 GmbH & Co. KG |
| Hilpoltstein Nord | 4.07 MW | Freiflächensolaranlage | in operation | 2020-12-03 | N-ERGIE Sonne und Wind GmbH & Co. KG |
| Solarpark Landerzhofen - P21-427 - Teil 1 | 4.00 MW | Freiflächensolaranlage | in operation | 2025-02-26 | Anumar Solarpark Greding-Landerzhofen GmbH & Co. KG |
| Solarpark Landerzhofen - P21-427 - Teil 2 | 4.00 MW | Freiflächensolaranlage | in operation | 2025-02-26 | Anumar Solarpark Greding-Landerzhofen GmbH & Co. KG |
| Solarpark Großhöbing - P21-093 - Teil 4.000 kWp SOL23-2/075 | 4.00 MW | Freiflächensolaranlage | in operation | 2025-08-07 | Anumar Solarpark Greding-Großhöbing GmbH & Co. KG |
| Solarpark Albersreuth | 3.69 MW | Freiflächensolaranlage | in operation | 2010-12-31 | Solarpark Albersreuth GmbH & Co. KG |
| unit operated by a private individual | 3.50 MW | Freiflächensolaranlage | in operation | 2022-02-24 | private individual |
| Hilpoltstein Süd | 3.30 MW | Freiflächensolaranlage | in operation | 2020-12-03 | N-ERGIE Sonne und Wind GmbH & Co. KG |
| unit operated by a private individual | 3.00 MW | Freiflächensolaranlage | in operation | 2026-05-28 | private individual |
| Pierheim 4 | 3.00 MW | Freiflächensolaranlage | in operation | 2025-08-06 | Kohles Immobilien GmbH & Co. KG |
| PV Anlage 2023 - Südanlage | 3.00 MW | Freiflächensolaranlage | in operation | 2023-08-21 | Solarpark Hoy GmbH & Co. KG |
| PV Anlage 2023 - Ost-West Anlage | 3.00 MW | Freiflächensolaranlage | in operation | 2023-10-06 | Solarpark Hoy GmbH & Co. KG |
| Solarpark Kammerstein-Unterreichenbach | 2.60 MW | Freiflächensolaranlage | in operation | 2022-01-18 | Greeno Solarprojekt 21 GmbH & Co. KG |
| Greding 1 | 2.58 MW | Freiflächensolaranlage | in operation | 2007-12-21 | Breisgau Power I GmbH & Co. KG |
| PV Dürrenmungenau 2497,36 kWp | 2.50 MW | Freiflächensolaranlage | in operation | 2026-06-11 | Solarenergie Bayern Plus GmbH & Co. KG |
| Solarpark Greding II | 2.45 MW | Freiflächensolaranlage | in operation | 2009-09-28 | Solarpark Greding II GmbH & Co. KG |
| Wassermungenau | 2.41 MW | Gebäudesolaranlage | in operation | 2012-06-29 | Energiegenossenschaft KlarModul eG |
| Solarpark Untermässing | 2.30 MW | Freiflächensolaranlage | in operation | 2017-02-08 | Solarpark Großhöbing GmbH & Co. KG |
| Solarpark Greding I | 2.05 MW | Freiflächensolaranlage | in operation | 2009-09-28 | Solarpark Greding I GmbH & Co. KG |
| Ebenried 03 PV2 | 2.00 MW | Freiflächensolaranlage | in operation | 2024-06-29 | SRE PV Ebenried GmbH & Co. KG |
| PV Freiflächenanlage Lay | 2.00 MW | Freiflächensolaranlage | in operation | 2024-01-24 | Kirschner GbR |
| Kirchsteig 2 | 2.00 MW | Freiflächensolaranlage | in operation | 2024-12-17 | Solarpark Kirchsteig GmbH & Co.KG |
| Photovoltaikanlage Abenberg Bechhofen BA IV | 1.90 MW | Freiflächensolaranlage | in operation | 2021-05-05 | BrEiSch Solar GmbH & Co. KG |
| Walp PV Teil 2 | 1.89 MW | Freiflächensolaranlage | in operation | 2024-02-21 | Walp PV GmbH |
| Solarpark Greding 2 | 1.39 MW | Freiflächensolaranlage | in operation | 2009-12-21 | Solarparc Deutschland I GmbH & Co. KG |
| Solarpark Mörlach - P18-095_2 | 1.31 MW | Freiflächensolaranlage | in operation | 2019-12-20 | Anumar Solarpark Hilpoltstein GmbH & Co. KG |
| PBG | 1.17 MW | Freiflächensolaranlage | in operation | 2013-08-31 | PBG – Photovoltaik Bauschuttdeponie Georgensgmünd UG & Co. KG |
| unit operated by a private individual | 1.14 MW | Freiflächensolaranlage | in operation | 2013-08-31 | private individual |
| PV-Greding | 1.12 MW | Freiflächensolaranlage | in operation | 2006-12-20 | Dr. Ing. E. h. Frank Asbeck Ingenieurbüro für Industrieanlagen e. K. |
| Solarpark Roth GmbH & Co. KG | 1.04 MW | Gebäudesolaranlage | in operation | 2007-05-29 | Solarpark Roth GmbH & Co. KG |
| Solarpark Großhöbing - P21-093 - Teil MPM 1.000 kWp | 1.00 MW | Freiflächensolaranlage | in operation | 2025-07-28 | Anumar Solarpark Greding-Großhöbing GmbH & Co. KG |
| Solarpark Landerzhofen - P21-427 - Teil 6 | 1.00 MW | Freiflächensolaranlage | in operation | 2025-02-25 | Anumar Solarpark Greding-Landerzhofen GmbH & Co. KG |
| Kirchsteig 1 | 1.00 MW | Freiflächensolaranlage | in operation | 2024-12-17 | Solarpark Kirchsteig GmbH & Co.KG |
| Pierheim 3 | 1.00 MW | Freiflächensolaranlage | in operation | 2024-12-17 | Kohles Immobilien GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | Freiflächensolaranlage | in operation | 2025-12-22 | private individual |
| PV Dürrenmungenau 999,44 kWp | 1.00 MW | Freiflächensolaranlage | in operation | 2026-02-19 | Solarenergie Bayern Plus GmbH & Co. KG |
| Bürgersolaranlage Röttenbach GmbH & Co. KG 1 | 1.00 MW | Freiflächensolaranlage | in operation | 2024-07-30 | Bürgersolar Röttenbach GmbH & Co. KG |
| Ebenried 03 PV1 | 1.00 MW | Freiflächensolaranlage | in operation | 2024-06-28 | SRE PV Ebenried GmbH & Co. KG |
| Allersberg 991,995kWp Teil | 0.99 MW | Freiflächensolaranlage | in operation | 2025-12-18 | PV Allersberg GmbH |
| PV Hausmüll Deponie Gmünd | 0.99 MW | Freiflächensolaranlage | in operation | 2012-06-29 | Bürgersolaranlage Deponie Georgensgmünd 2012 UG & Co. KG |
| Greding 1a | 0.99 MW | Freiflächensolaranlage | in operation | 2008-01-23 | Breisgau Power I GmbH & Co. KG |
| Bayka R 981,68 kWp Dach | 0.98 MW | Gebäudesolaranlage | in operation | 2011-01-03 | Bayrische Kabelwerke AG |
| PVA Werk 4 | 0.83 MW | Gebäudesolaranlage | in operation | 2023-07-14 | Planet A Solarprojekt |
| PV Anlage UGL Dach | 0.76 MW | Gebäudesolaranlage | in operation | 2024-03-25 | UVEX GROUP Logistics GmbH |
| Spalt II | 0.75 MW | Freiflächensolaranlage | in operation | 2025-07-23 | BrEiSch GmbH |
| Hilpoltstein Süd 750 | 0.75 MW | Freiflächensolaranlage | in operation | 2020-01-22 | N-ERGIE Sonne und Wind GmbH & Co. KG |
| Photovoltfreiflächenanlage Spalt | 0.75 MW | Freiflächensolaranlage | in operation | 2020-01-31 | BrEiSch GmbH |
| Solarpark Dechendorf | 0.75 MW | Freiflächensolaranlage | in operation | 2019-01-30 | Greeno Solarprojekt 4 GmbH & Co. KG |
| PV II Halle 17/19 | 0.75 MW | Gebäudesolaranlage | in operation | 2021-09-30 | Hans Henglein & Sohn GmbH |
| Omega Sorg Rednitzhembach | 0.75 MW | Gebäudesolaranlage | in operation | 2020-08-31 | OMEGA SORG GmbH |
| PVA Hilpoltstein Pierheim 1 | 0.75 MW | Freiflächensolaranlage | in operation | 2018-12-10 | Kohles Immobilien GmbH & Co. KG |
| PVA Hilpoltstein Pierheim 2 | 0.75 MW | Freiflächensolaranlage | in operation | 2018-12-12 | Kohles Immobilien GmbH & Co. KG |
| unit operated by a private individual | 0.75 MW | Gebäudesolaranlage | in operation | 2023-12-27 | private individual |
| Photovoltaikanlage Deponie Neumühle BA II | 0.75 MW | Freiflächensolaranlage | in operation | 2019-02-04 | BrEiSch GmbH |
| Photovoltaikanlage Deponie Neumühle BA I | 0.75 MW | Freiflächensolaranlage | in operation | 2018-01-31 | BrEiSch GmbH |
| Solarpark Mörlach - P18-095 | 0.73 MW | Freiflächensolaranlage | in operation | 2019-12-18 | Anumar Solarpark Hilpoltstein GmbH & Co. KG |
| PV G4 | 0.67 MW | Gebäudesolaranlage | in operation | 2020-09-16 | Saal Digital Fotoservice GmbH |
| Memmert | 0.65 MW | Gebäudesolaranlage | in operation | 2011-04-19 | Dr. Peter und Dr.Jutta Hofbauer |
| Produktionshalle 6 | 0.65 MW | Gebäudesolaranlage | in operation | 2024-06-04 | Brautsch/Krüger-Steindorf GbR |
| PV Hilpoltstein | 0.64 MW | Gebäudesolaranlage | in operation | 2020-10-28 | Held-Lankes & Friends Drei UG (haftungsbeschränkt) & Co. KG |
| PV SFG Roth | 0.64 MW | Gebäudesolaranlage | in operation | 2022-08-03 | Schulz Holding GmbH & Co.KG |
| unit operated by a private individual | 0.61 MW | Freiflächensolaranlage | in operation | 2024-08-12 | private individual |
| Photovoltaikanlage Deponie Neumühle BA III | 0.61 MW | Freiflächensolaranlage | in operation | 2021-01-31 | BrEiSch GmbH |
| Freiflächen PV-Anlage | 0.56 MW | Freiflächensolaranlage | in operation | 2014-06-26 | Pyraser Landbrauerei GmbH & Co KG |
| Solarpark Greding III (ASP Greding-Landerzhofen II) - P23-077 - Teil MPM 545,64 kWp | 0.55 MW | Freiflächensolaranlage | in operation | 2025-07-28 | Anumar Solarpark Greding-Landerzhofen II GmbH & Co. KG |
| PVA Zentrallager Hilpoltstein Dachanlage | 0.53 MW | Gebäudesolaranlage | in operation | 2023-02-10 | Keller & Kalmbach GmbH & Co. KG |
| Solarpark Landerzhofen - P21-427 - Teil 5 | 0.52 MW | Freiflächensolaranlage | in operation | 2025-02-26 | Anumar Solarpark Greding-Großhöbing GmbH & Co. KG |
| PV I Halle 12/13 | 0.52 MW | Gebäudesolaranlage | in operation | 2012-10-24 | Hans Henglein & Sohn GmbH |
| PV III Halle 13a | 0.51 MW | Gebäudesolaranlage | in operation | 2025-06-11 | Hans Henglein & Sohn GmbH |
| SPP1 | 0.46 MW | Gebäudesolaranlage | in operation | 2008-11-27 | Solarpark Pohlen 1 |
| PV Anlage Backstube, Rambacher Str. | 0.45 MW | Gebäudesolaranlage | in operation | 2026-04-23 | Bäckerei Schmidt KG |
| PV Anlage 448kWp | 0.45 MW | Gebäudesolaranlage | in operation | 2025-01-20 | IVT GmbH & Co. KG |
| Photovoltaik Hilpoltstein | 0.45 MW | Gebäudesolaranlage | in operation | 2023-09-01 | Klingele Paper & Packaging SE & Co. KG |
| Flachdach | 0.44 MW | Gebäudesolaranlage | in operation | 2023-06-07 | Rudolph Kunststofftechnik und Metallwaren |
| PV 5021 GGM | 0.44 MW | Gebäudesolaranlage | in operation | 2010-03-09 | SOL 6 GmbH & Co. KG |
| PV-Anlage Wendelstein | 0.42 MW | Gebäudesolaranlage | in operation | 2023-11-16 | DeWert Deutsche Wertinvestment GmbH Sondervermögen HAHN German Retail Fund II Objekt Wendelstein |
| Produktionshalle | 0.40 MW | Gebäudesolaranlage | in operation | 2010-06-25 | Brautsch/Krüger-Steindorf GbR |
| PV-D Röttenbach 1 | 0.40 MW | Gebäudesolaranlage | in operation | 2021-03-22 | Buschheuer GmbH |
| Röckenhofen-Dach2 Kuhstall | 0.38 MW | Gebäudesolaranlage | in operation | 2020-01-02 | Innotech GmbH |
| PV Büchenbach- Gauchsdorf | 0.36 MW | Freiflächensolaranlage | in operation | 2012-03-31 | Erbengemeinschaft Eva, Antonia und Kilian Meitinger |
| unit operated by a private individual | 0.36 MW | Gebäudesolaranlage | in operation | 2020-01-31 | private individual |
| unit operated by a private individual | 0.34 MW | Gebäudesolaranlage | in operation | 2009-10-05 | private individual |
| PV IV Halle 16 | 0.34 MW | Gebäudesolaranlage | in operation | 2025-05-21 | Hans Henglein & Sohn GmbH |
| PV Neubau | 0.33 MW | Gebäudesolaranlage | in operation | 2023-06-14 | Bizlink elocab |
| Carport Neubau Spalt | 0.32 MW | Gebäudesolaranlage | in operation | 2018-10-31 | FATH GmbH |
| PV_Herzog | 0.31 MW | Gebäudesolaranlage | in operation | 2023-03-30 | Herzog Logistik GmbH&Co. KG |
| ABR989845338120 | 0.31 MW | Gebäudesolaranlage | in operation | 2013-04-30 | P.C.S. Handelsgesellschaft m.b.H. |
| PV Anlage Halle 3 Werk Röttenbach | 0.30 MW | Gebäudesolaranlage | in operation | 2025-01-01 | FUCHS Fertigteilwerke Süd GmbH |
| unit operated by a private individual | 0.30 MW | Gebäudesolaranlage | in operation | 2020-05-15 | private individual |
| unit operated by a private individual | 0.30 MW | Gebäudesolaranlage | in operation | 2022-08-29 | private individual |
| PV Anlage 297kWp | 0.30 MW | Gebäudesolaranlage | in operation | 2021-10-04 | IVT GmbH & Co. KG |
| PVPQ-Georgensgmünd-1 | 0.27 MW | Gebäudesolaranlage | in operation | 2026-04-07 | Pleinfelder Quarzsand GmbH & Co. KG |
| 102 - Aichinger GmbH | 0.27 MW | Gebäudesolaranlage | in operation | 2006-12-21 | Tauber-Solar 8 GmbH |
| MPC Solar GbR | 0.26 MW | Gebäudesolaranlage | in operation | 2011-12-08 | MPC Solar GbR |
| PV-Anlage BDF-3; 256 kWp | 0.26 MW | Gebäudesolaranlage | in operation | 2012-12-06 | Schlenk-Barnsdorf´sche Forstverwaltungs GmbH & Co.KG |
| Ruppmannsburg 2025 | 0.25 MW | Gebäudesolaranlage | in operation | 2025-01-22 | Röttenbacher GmbH |
| unit operated by a private individual | 0.25 MW | Gebäudesolaranlage | in operation | 2025-08-29 | private individual |
| unit operated by a private individual | 0.24 MW | Gebäudesolaranlage | in operation | 2018-08-31 | private individual |
| Gienger & Funk - Wendelstein | 0.24 MW | Gebäudesolaranlage | in operation | 2024-02-29 | Gienger & Funk KG |
| Produktionshalle | 0.24 MW | Gebäudesolaranlage | in operation | 2017-04-30 | Brautsch/Krüger-Steindorf GbR |
| PV Anlage | 0.24 MW | Gebäudesolaranlage | in operation | 2010-09-10 | DEMA Präzisionsteile |
| PV-Anlage 3 | 0.24 MW | Gebäudesolaranlage | in operation | 2019-07-02 | Nürnberg Gummi Babyartikel GmbH & Co. KG |
| Heibad GmbH PV, Heideck | 0.23 MW | Gebäudesolaranlage | in operation | 2022-10-14 | heibad Badmöbel Vertriebs GmbH |
| unit operated by a private individual | 0.23 MW | Gebäudesolaranlage | in operation | 2009-11-13 | private individual |
| PVA Spalt Bestand | 0.23 MW | Gebäudesolaranlage | in operation | 2010-12-31 | Fath Solar Group Holding GmbH |
| PVA Wendelstein | 0.23 MW | Gebäudesolaranlage | in operation | 2024-01-30 | Abraham Hans Metallbau GmbH |
| Solaranlage Wendelstein | 0.23 MW | Gebäudesolaranlage | in operation | 2021-04-26 | Strubl GmbH & Co. KG |
| Dach Neubau Spalt | 0.22 MW | Gebäudesolaranlage | in operation | 2018-10-31 | FATH GmbH |
| unit operated by a private individual | 0.22 MW | Gebäudesolaranlage | in operation | 2019-05-26 | private individual |
| Bauhof Georgensgmünd | 0.22 MW | Gebäudesolaranlage | in operation | 2013-01-31 | R-neuerbar eG |
| unit operated by a private individual | 0.22 MW | Gebäudesolaranlage | in operation | 2023-01-01 | private individual |
| Milchwerk Thalmässing | 0.21 MW | Gebäudesolaranlage | in operation | 2022-05-02 | Milchwerke Ingolstadt-Thalmässing eG |
| unit operated by a private individual | 0.21 MW | Gebäudesolaranlage | in operation | 2010-09-30 | private individual |
| unit operated by a private individual | 0.21 MW | Gebäudesolaranlage | in operation | 2018-02-15 | private individual |
| PV 2023 | 0.21 MW | Gebäudesolaranlage | in operation | 2023-05-17 | Hölzel Bioenergie GbR |
| PV STEIFENSAND Energy GMBH | 0.20 MW | Gebäudesolaranlage | in operation | 2014-07-29 | STEIFENSAND Energy GmbH |
| unit operated by a private individual | 0.20 MW | Gebäudesolaranlage | in operation | 2012-01-02 | private individual |
| Firmendach Betriebserweiterung | 0.20 MW | Gebäudesolaranlage | in operation | 2018-12-20 | Altfettentsorgung & Recycling Lesch GmbH & CO. KG |
| PV-Anlage, Büro/Lagerhalle | 0.20 MW | Gebäudesolaranlage | in operation | 2010-07-02 | Hossner-Hossner Solar-Energy eGbR |
| unit operated by a private individual | 0.20 MW | Gebäudesolaranlage | in operation | 2023-02-22 | private individual |
| ZieglerPV | 0.20 MW | Freiflächensolaranlage | in operation | 2023-05-19 | Ziegler Präzisionsteile GmbH |
| unit operated by a private individual | 0.20 MW | Gebäudesolaranlage | in operation | 2011-12-20 | private individual |
| PV-Anlage BDF-2; 195,5 kWp | 0.20 MW | Gebäudesolaranlage | in operation | 2012-03-30 | Schlenk-Barnsdorf´sche Forstverwaltungs GmbH & Co.KG |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2018-02-15 | private individual |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2018-07-17 | private individual |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2022-06-29 | private individual |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2009-12-23 | private individual |
| Filiale, 91166, Georgensgmünd, Pleinfelder Str. 66e | 0.19 MW | Gebäudesolaranlage | in operation | 2013-11-15 | Aldi SE & Co.KG Geisenfeld |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2010-12-15 | private individual |
| unit operated by a private individual | 0.19 MW | Gebäudesolaranlage | in operation | 2018-09-29 | private individual |
| Produktionshalle | 0.19 MW | Gebäudesolaranlage | in operation | 2009-11-16 | Brautsch/Krüger-Steindorf GbR |
| Dach - Bauabschnitt I-III | 0.18 MW | Gebäudesolaranlage | in operation | 2012-10-02 | WILAmed GmbH |
| PV-Anlage 2 | 0.18 MW | Gebäudesolaranlage | in operation | 2011-11-09 | Nürnberg Gummi Babyartikel GmbH & Co. KG |
| Röckenhofen-Dach4 Kälberstall | 0.18 MW | Gebäudesolaranlage | in operation | 2020-01-02 | Innotech GmbH |
| PV Greding | 0.18 MW | Gebäudesolaranlage | in operation | 2014-07-28 | Bundeswehr-Dienstleistungszentrum Ingolstadt |
| unit operated by a private individual | 0.18 MW | Gebäudesolaranlage | in operation | 2014-07-30 | private individual |
| unit operated by a private individual | 0.17 MW | Gebäudesolaranlage | in operation | 2011-12-21 | private individual |
| Dach - Bauabschnitt IV und V | 0.17 MW | Gebäudesolaranlage | in operation | 2023-04-12 | WILAmed GmbH |
| Dachanlage Edeka | 0.17 MW | Gebäudesolaranlage | in operation | 2022-10-13 | Reithelshöfer Energie GdbR |
| PV-Anlage Otto Oehme GmbH | 0.17 MW | Gebäudesolaranlage | in operation | 2020-06-26 | Otto Oehme GmbH |
| LMT1 | 0.17 MW | Gebäudesolaranlage | in operation | 2014-07-22 | LMT - GmbH Mike Otterpohl |
| Solardach | 0.16 MW | Gebäudesolaranlage | in operation | 2010-05-06 | Wolfgang + Verena Opitz GdbR |
| PV Anlage 162,4 kwp | 0.16 MW | Gebäudesolaranlage | in operation | 2017-05-08 | Hopfenverwertungsgenossenschaft Spalt e.G. |
| unit operated by a private individual | 0.16 MW | Gebäudesolaranlage | in operation | 2011-11-08 | private individual |
| PV-Anlage Hauptdach | 0.16 MW | Gebäudesolaranlage | in operation | 2009-12-19 | M&K Filze GmbH |
| unit operated by a private individual | 0.16 MW | Gebäudesolaranlage | in operation | 2010-06-28 | private individual |
| unit operated by a private individual | 0.16 MW | Gebäudesolaranlage | in operation | 2010-04-23 | private individual |
| Filiale , 90530, Wendelstein, Heinrich-Wich-Straße 1 | 0.16 MW | Gebäudesolaranlage | in operation | 2015-11-30 | Aldi SE & Co.KG Geisenfeld |
| Dach Lager Bellagarda | 0.16 MW | Gebäudesolaranlage | in operation | 2012-03-08 | Reithelshöfer Energie GdbR |
| PV-Anlage 2 | 0.15 MW | Gebäudesolaranlage | in operation | 2017-08-04 | DEWE-Brünofix GmbH |
| Ohm8-10 | 0.15 MW | Gebäudesolaranlage | in operation | 2011-12-22 | Karl Kerling Grundstücksverwaltung |
| PV-Anlage Käpple Neubau Hilpoltstein | 0.15 MW | Gebäudesolaranlage | in operation | 2023-10-15 | Käpple Qualitätsleister GmbH & Co.KG |
| Schmidler GbR | 0.15 MW | Gebäudesolaranlage | in operation | 2011-12-19 | Schmidler GbR |
| greenovative - PV Anlage | 0.15 MW | Gebäudesolaranlage | in operation | 2021-03-31 | alfatec GmbH & Co. KG |
| Büchenbach | 0.15 MW | Gebäudesolaranlage | in operation | 2011-09-13 | Solar Power GbR Johannes und Christa Englert |
| PV 5012 Georgensgmünd | 0.15 MW | Gebäudesolaranlage | in operation | 2009-07-01 | SOL 6 GmbH & Co. KG |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2023-01-01 | private individual |
| PV-Fabrikgebäude 144,18 kWp | 0.14 MW | Gebäudesolaranlage | in operation | 2024-11-19 | Altmühltaler Teigwaren GmbH |
| Solarpark Großhöbing - P21-093 - Teil 143,95 kWp SOL23-2/437 | 0.14 MW | Freiflächensolaranlage | in operation | 2025-08-15 | Anumar Solarpark Ludwigsmoos II GmbH & Co. KG |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2010-12-31 | private individual |
| PV-Anlage 1 | 0.14 MW | Gebäudesolaranlage | in operation | 2011-05-01 | Nürnberg Gummi Babyartikel GmbH & Co. KG |
| 31910000 | 0.14 MW | Gebäudesolaranlage | in operation | 2008-12-19 | S & P Solarfonds ZWEI GmbH & Co.KG Sebastianstraße 31, 91058 Erlangen |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2010-06-30 | private individual |
| Kreisklinik Roth Bauteil A | 0.14 MW | Gebäudesolaranlage | planned | planned 2027 | Kreisklinik Roth |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2023-04-21 | private individual |
| Maschinenhalle | 0.14 MW | Gebäudesolaranlage | in operation | 2012-03-09 | Grabenreinigung und Futterernte Flock GbR |
| unit operated by a private individual | 0.14 MW | Gebäudesolaranlage | in operation | 2022-09-12 | private individual |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2022-08-04 | private individual |
| Stall | 0.13 MW | Gebäudesolaranlage | in operation | 2024-01-29 | Grießmeier PV GbR |
| Milchwerk Thalmässing 2 | 0.13 MW | Gebäudesolaranlage | in operation | 2023-06-01 | Milchwerke Ingolstadt-Thalmässing eG |
| unit operated by a private individual | 0.13 MW | Freiflächensolaranlage | in operation | 2010-11-24 | private individual |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2021-03-26 | private individual |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2010-09-09 | private individual |
| PV HIP 2 - Schule | 0.12 MW | Gebäudesolaranlage | in operation | 2011-12-29 | PV GbR Hilpolststein II |
| PV_Anlage_2 | 0.12 MW | Gebäudesolaranlage | in operation | 2013-06-27 | Strobel AG |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2025-07-10 | private individual |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2012-06-27 | private individual |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2011-12-31 | private individual |
| unit operated by a private individual | 0.11 MW | Gebäudesolaranlage | in operation | 2012-11-02 | private individual |
| Geo Solar Anlage 1 | 0.11 MW | Gebäudesolaranlage | in operation | 2012-06-18 | Geo Solar GbR _ Karlheinz Nüßlein und Katharina Krebs |
| Getränkemarkt | 0.11 MW | Gebäudesolaranlage | in operation | 2010-03-10 | Innotech GmbH |
| Röckenhofen-Dach3 Stall | 0.11 MW | Gebäudesolaranlage | in operation | 2020-01-02 | Innotech GmbH |
| Photovoltaik Anlage | 0.11 MW | Gebäudesolaranlage | in operation | 2008-12-10 | Walter&Pilhofer |
| Anlage: Kießling LZK Roth Kupferschmiedstr. | 0.11 MW | Gebäudesolaranlage | in operation | 2012-09-30 | Kießling LZK Roth |
| unit operated by a private individual | 0.10 MW | Gebäudesolaranlage | in operation | 2009-10-22 | private individual |
| GGP TR | 0.10 MW | Gebäudesolaranlage | in operation | 2012-06-12 | GGP Metal Powder AG |
Which organisations operate the most solar PV capacity in Roth?
| Operator | Units | Capacity |
|---|---|---|
| N-ERGIE Sonne und Wind GmbH & Co. KG | 5 | 24.1 MW |
| Anumar Solarpark Greding-Landerzhofen GmbH & Co. KG | 4 | 17.5 MW |
| Anumar Solarpark Greding VIII GmbH & Co. KG | 1 | 16.9 MW |
| LHI SolarWind PV Euerwang 2290 GmbH & Co. KG | 3 | 16.0 MW |
| Anumar Solarpark Greding-Großhöbing GmbH & Co. KG | 4 | 14.5 MW |
| SÜDWERK Solar Portfolio 3 GmbH | 1 | 10.5 MW |
| Anumar Solarpark Greding-Landerzhofen II GmbH & Co. KG | 2 | 10.0 MW |
| SPV Solarpark 106. GmbH & Co. KG | 1 | 9.92 MW |
| ENERPARC Solar Invest 121 GmbH | 1 | 8.34 MW |
| Energiebauern GmbH & Co. Kraftwerke KG | 1 | 7.69 MW |
Which installation type accounts for the most solar PV capacity in Roth?
| Installation type | Units | Capacity |
|---|---|---|
| Freiflächensolaranlage | 77 | 247.2 MW |
| Gebäudesolaranlage | 129 | 37.0 MW |
Solar PV in Bayern · Solar PV in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many solar installations are registered in Roth (Bayern), and how large are they, as o can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.