Germany · renewables
Solar PV in Rhön-Grabfeld
12,142 solar installations with 433.4 MW of gross capacity were in operation in Rhön-Grabfeld (Bayern) as of 2026-11-05, with a further 88 units (92.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many solar installations are registered in Rhön-Grabfeld (Bayern), and how large are they, as of 2026-11-05?
- 12,142 solar installations with 433.4 MW of gross capacity were in operation in Rhön-Grabfeld (Bayern) as of 2026-11-05, with a further 88 units (92.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many solar installations are in operation in Rhön-Grabfeld?
- 12,142 solar installations with 433.4 MW of gross capacity were in operation in Rhön-Grabfeld as of 2026-11-05, with a further 88 units (92.4 MW) registered as planned; the count includes every registered unit down to balcony systems (Bundesnetzagentur, Marktstammdatenregister).
- How much solar PV capacity was commissioned in Rhön-Grabfeld in 2025?
- 1,389 solar installations with 15.1 MW went into operation in Rhön-Grabfeld in 2025; the strongest year of the last two decades was 2024 with 101.6 MW (Bundesnetzagentur, Marktstammdatenregister).
- What share of Rhön-Grabfeld's solar installations are larger than 100 kW?
- 168 of 12,435 registered solar installations in Rhön-Grabfeld (1.4 percent) exceed 100 kW, but they hold 389.7 MW of the 527.1 MW total capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most solar PV capacity in Rhön-Grabfeld?
- Bürgersolarpark Herbstadt-Ottelmannshausen GmbH & Co. KG operates 3 solar installations over 100 kW with 39.9 MW in Rhön-Grabfeld, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which installation type has the most solar PV capacity in Rhön-Grabfeld?
- Freiflächensolaranlage leads with 74 solar installations and 364.8 MW in Rhön-Grabfeld (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest solar installation in Rhön-Grabfeld?
- The largest registered solar installation in Rhön-Grabfeld has 30.3 MW of gross capacity and is operated by Solarkraftwerk Großbardorf GmbH & Co. KG, commissioned 2024-03-14 (Bundesnetzagentur, Marktstammdatenregister).
How are the solar installations in Rhön-Grabfeld distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 11,826 | 111.9 MW | 11,547 | 79 |
| 30 to 100 kW | 441 | 25.4 MW | 437 | 1 |
| over 100 kW | 168 | 389.7 MW | 158 | 8 |
How much solar PV capacity was commissioned in Rhön-Grabfeld each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1,102 | 162.8 MW |
| 2025 | 1,389 | 15.1 MW |
| 2024 | 1,826 | 101.6 MW |
| 2023 | 1,721 | 29.4 MW |
| 2022 | 913 | 20.4 MW |
| 2021 | 649 | 8.42 MW |
| 2020 | 445 | 9.65 MW |
| 2019 | 282 | 7.92 MW |
| 2018 | 220 | 5.76 MW |
| 2017 | 158 | 2.63 MW |
| 2016 | 126 | 2.47 MW |
| 2015 | 110 | 2.74 MW |
| 2014 | 167 | 2.14 MW |
| 2013 | 315 | 4.66 MW |
| 2012 | 381 | 8.44 MW |
| 2011 | 618 | 12.3 MW |
| 2010 | 644 | 15.5 MW |
| 2009 | 389 | 8.05 MW |
| 2008 | 188 | 5.13 MW |
| 2007 | 125 | 3.05 MW |
| 2006 | 99 | 1.11 MW |
How many solar installations in Rhön-Grabfeld are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 12,142 | 433.4 MW |
| planned | 88 | 92.4 MW |
| temporarily shut down | 25 | 0.68 MW |
| permanently decommissioned | 180 | 0.65 MW |
Which solar installations over 100 kW are registered in Rhön-Grabfeld?
| Unit | Capacity | Type | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| PV Großbardorf | 30.3 MW | Freiflächensolaranlage | in operation | 2024-03-14 | Solarkraftwerk Großbardorf GmbH & Co. KG |
| Bürgersolar Lerchenleite | 20.6 MW | Freiflächensolaranlage | in operation | 2024-04-15 | Bürgersolar Lerchenleite |
| Herbstadt-Ottelmannshausen BA2 | 19.9 MW | Freiflächensolaranlage | planned | planned 2027 | Bürgersolarpark Herbstadt-Ottelmannshausen GmbH & Co. KG |
| Anlagenteil 2 Ausschreibung | 19.0 MW | Freiflächensolaranlage | in operation | 2026-04-01 | Könergie GmbH & Co. KG |
| Trappstadt-Alsleben West 1.2 | 19.0 MW | Freiflächensolaranlage | planned | planned 2026 | Bürgersolarpark Alsleben West GmbH & Co. KG |
| Sulzfeld-Kleinbardorf 1.2 | 19.0 MW | Freiflächensolaranlage | in operation | 2026-07-14 | Bürgersolarpark Sulzfeld Kleinbardorf GmbH & Co. KG |
| Aubstadt-Nord 1.2 | 19.0 MW | Freiflächensolaranlage | planned | planned 2026 | Bürgersolarpark Aubstadt Nord GmbH & Co. KG |
| Herbstadt-Ottelmannshausen 1.2 | 19.0 MW | Freiflächensolaranlage | in operation | 2026-08-14 | Bürgersolarpark Herbstadt-Ottelmannshausen GmbH & Co. KG |
| Solarkraftwerk Großbardorf II Teil II | 17.8 MW | Freiflächensolaranlage | planned | planned 2026 | Solarkraftwerk Großbardorf II GmbH & Co. KG |
| Trappstadt-Nord 1.3 | 15.7 MW | Freiflächensolaranlage | in operation | 2026-08-17 | Bürgersolarpark Trappstadt Nord GmbH & Co. KG |
| Sulzfeld-Sandhof 1.3 | 14.0 MW | Freiflächensolaranlage | in operation | 2026-06-01 | Bürgersolarpark Sulzfeld Sandhof GmbH & Co. KG |
| Solarpark Unsleben 2 | 11.5 MW | Freiflächensolaranlage | in operation | 2024-06-06 | Lohnunternehmen Hesselbach GmbH |
| Solarpark Unsleben 1 | 11.4 MW | Freiflächensolaranlage | in operation | 2024-06-06 | Bürgersonnenenergie Unsleben GmbH & Co. KG |
| Solarpark Saaletal 2 | 10.7 MW | Freiflächensolaranlage | in operation | 2026-06-18 | Bürgersonnenenergie Saaletal GmbH & Co. KG |
| Solarpark I - Anlagenteil 2 Ausschreibung | 9.50 MW | Freiflächensolaranlage | in operation | 2026-04-07 | ÜWR Solarpark Stetten GmbH & Co. KG |
| Solarpark I - Anlagenteil 3 Ausschreibung | 9.50 MW | Freiflächensolaranlage | in operation | 2026-04-07 | ÜWR Solarpark Stetten GmbH & Co. KG |
| ABO Wind PVA Leutershausen | 8.70 MW | Freiflächensolaranlage | in operation | 2023-05-17 | Bayernwerk Natur GmbH |
| Solarpark Saaletal Klärwerk | 8.35 MW | Freiflächensolaranlage | planned | planned 2027 | Bürgersonnenenergie Saaletal GmbH & Co. KG |
| Solarpark II | 7.09 MW | Freiflächensolaranlage | in operation | 2026-04-07 | ÜWR Solarpark Stetten GmbH & Co. KG |
| Solarpark Oberstreu | 5.99 MW | Freiflächensolaranlage | in operation | 2022-02-01 | Bürgersonnenenergie Oberstreu GmbH & Co. KG |
| Trappstadt-Alsleben Ost 1.4 | 5.70 MW | Freiflächensolaranlage | planned | planned 2026 | Bürgersolarpark Alsleben Ost GmbH & Co. KG |
| Solarpark Höchheim 5.3935 kWp | 5.39 MW | Freiflächensolaranlage | in operation | 2024-01-31 | Greeno Solarprojekt 32 GmbH |
| Trappstadt-Alsleben Ost 1.3 | 5.08 MW | Freiflächensolaranlage | in operation | 2026-08-17 | Bürgersolarpark Alsleben Ost GmbH & Co. KG |
| FEETT GmbH Brendlorenzen | 5.00 MW | Freiflächensolaranlage | in operation | 2026-07-23 | FEETT |
| FEETT GmbH Lebenhan 4MW | 4.00 MW | Freiflächensolaranlage | in operation | 2026-07-23 | FEETT |
| PV-Anlage Freifläche | 2.46 MW | Freiflächensolaranlage | in operation | 2024-10-25 | Hermann Benkert Werkzeug- und Formenbau GmbH |
| Friedrich-Wilhelm Raiffeisen Energie e.G. Münnerstadt | 2.20 MW | Freiflächensolaranlage | in operation | 2022-04-04 | Friedrich-Wilhelm Raiffeisen Energie eG Münnerstadt |
| P001 Freiflächenanlage Grabigter Weg | 1.81 MW | Freiflächensolaranlage | in operation | 2010-06-18 | Friedrich-Wilhelm Raiffeisen Energie eG Hohenroth |
| Sulzfeld-Sandhof 1.2 | 1.70 MW | Freiflächensolaranlage | in operation | 2026-06-03 | Bürgersolarpark Sulzfeld Sandhof GmbH & Co. KG |
| Bürgersolarkraftwerk Rhön-Grabfeld ; Höchheim | 1.40 MW | Freiflächensolaranlage | in operation | 2009-06-26 | Bürgersolarkraftwerk Rhön-Grabfeld GmbH & Co. KG |
| Gardner Denver Deutschland GmbH - NES-PV1125 | 1.13 MW | Gebäudesolaranlage | in operation | 2024-02-15 | Gardner Denver Deutschland GmbH |
| Anlage 2 Ehem. BW Schießgelände | 1.05 MW | Freiflächensolaranlage | in operation | 2011-10-06 | Photovoltaik Mellrichstadt GmbH & Co. KG |
| Anlage 1 Ehem. BW-Schießgelände | 1.04 MW | Freiflächensolaranlage | in operation | 2010-12-31 | Photovoltaik Mellrichstadt GmbH & Co. KG |
| Erstes Bürgersolarkraftwerk Großbardorf GmbH & Co. KG - Siedlerstr. 31 | 1.00 MW | Freiflächensolaranlage | in operation | 2005-10-10 | Erstes Bürgersolarkraftwerk Großbardorf GmbH & Co. KG |
| Trappstadt-Alsleben West 1.1 | 1.00 MW | Freiflächensolaranlage | in operation | 2026-07-31 | Bürgersolarpark Alsleben West GmbH & Co. KG |
| Trappstadt-Alsleben Ost 1.1 | 1.00 MW | Freiflächensolaranlage | in operation | 2026-07-31 | Bürgersolarpark Alsleben Ost GmbH & Co. KG |
| Photovoltaikanlage Bad Neustadt/Salz | 1.00 MW | Gebäudesolaranlage | in operation | 2016-08-30 | Becker-Viljevac-Solar Park GbR |
| Anlagenteil 1 EEG | 1.00 MW | Freiflächensolaranlage | in operation | 2026-01-20 | Könergie GmbH & Co. KG |
| FEETT GmbH Lebenhan 1MW | 1.00 MW | Freiflächensolaranlage | in operation | 2026-07-22 | FEETT |
| AGRI-PV I Ostheim | 1.00 MW | Freiflächensolaranlage | in operation | 2026-07-29 | Bauer & Schöpplein GbR |
| Sulzfeld-Kleinbardorf 1.3 | 1.00 MW | Freiflächensolaranlage | planned | planned 2027 | Bürgersolarpark Sulzfeld Kleinbardorf GmbH & Co. KG |
| Sulzfeld-Kleinbardorf 1.1 | 1.00 MW | Freiflächensolaranlage | in operation | 2026-01-30 | Bürgersolarpark Sulzfeld Kleinbardorf GmbH & Co. KG |
| Solarkraftwerk Großbardorf II Teil I | 1.00 MW | Freiflächensolaranlage | planned | planned 2026 | Solarkraftwerk Großbardorf II GmbH & Co. KG |
| Aubstadt-Nord 1.1 | 1.00 MW | Freiflächensolaranlage | in operation | 2026-07-31 | Bürgersolarpark Aubstadt Nord GmbH & Co. KG |
| Herbstadt-Ottelmannshausen 1.1 | 1.00 MW | Freiflächensolaranlage | in operation | 2026-07-31 | Bürgersolarpark Herbstadt-Ottelmannshausen GmbH & Co. KG |
| Trappstadt-Nord 1.1 | 1.00 MW | Freiflächensolaranlage | in operation | 2026-07-31 | Bürgersolarpark Trappstadt Nord GmbH & Co. KG |
| Solarpark I - Anlagenteil 1 EEG | 1.00 MW | Freiflächensolaranlage | in operation | 2026-01-22 | ÜWR Solarpark Stetten GmbH & Co. KG |
| Eyrich | 1.00 MW | Freiflächensolaranlage | in operation | 2015-08-23 | Rüth und Schwarz Photovoltaik GbR |
| Solarpark Saaletal 1 | 0.99 MW | Freiflächensolaranlage | in operation | 2026-06-01 | Bürgersonnenenergie Saaletal GmbH & Co. KG |
| Sulzfeld-Sandhof 1.1 | 0.98 MW | Freiflächensolaranlage | in operation | 2026-01-30 | Bürgersolarpark Sulzfeld Sandhof GmbH & Co. KG |
| Anlage 1 Ehem. BW Sportplatz | 0.94 MW | Freiflächensolaranlage | in operation | 2010-12-31 | Photovoltaik Mellrichstadt GmbH & Co. KG |
| Bürgersolarkraftwerk Rhön-Grabfeld ; Hollstadt | 0.93 MW | Freiflächensolaranlage | in operation | 2008-06-18 | Bürgersolarkraftwerk Rhön-Grabfeld GmbH & Co. KG |
| BR-Wue-970-9-4-2025 | 0.86 MW | Gebäudesolaranlage | in operation | 2025-01-07 | Bienen Ruck GmbH |
| Erstes Bürgersolarkraftwerk Großbardorf GmbH & Co. KG - Jahnstr. | 0.86 MW | Freiflächensolaranlage | in operation | 2007-07-25 | Erstes Bürgersolarkraftwerk Großbardorf GmbH & Co. KG |
| Jopp Werk 1, 810 kWp | 0.81 MW | Gebäudesolaranlage | in operation | 2023-05-08 | Jopp Automotive GmbH |
| PV-Anlage Bad Neustadt (RDR 24) | 0.79 MW | Gebäudesolaranlage | in operation | 2024-06-07 | Geis Green Energy GmbH |
| Bürgersolarkraftwerk Rhön-Grabfeld ; Kleinbardorf | 0.77 MW | Freiflächensolaranlage | in operation | 2008-10-29 | Bürgersolarkraftwerk Rhön-Grabfeld GmbH & Co. KG |
| PV Freiland Stockheim 2.1 | 0.76 MW | Freiflächensolaranlage | in operation | 2025-01-08 | Bauer & Schöpplein GbR |
| PV Anlage Unslebener Berg | 0.75 MW | Freiflächensolaranlage | in operation | 2019-02-26 | Zwierlein Energie |
| Gemarkung Mittelstreu Fl. 650, 749,76 kWp | 0.75 MW | Freiflächensolaranlage | in operation | 2020-06-30 | Bioenergie Roter Berg I |
| Anlage 1 | 0.75 MW | Gebäudesolaranlage | in operation | 2018-06-21 | Münch fornature GmbH & Co. KG |
| PV-Freiland Stockheim 1.0 | 0.75 MW | Freiflächensolaranlage | in operation | 2022-01-20 | Bauer & Schöpplein GbR |
| PV Hollstadt Südfeld | 0.75 MW | Freiflächensolaranlage | in operation | 2018-06-15 | TB Agrar GbR |
| PV Hollstadt Nordfläche | 0.75 MW | Freiflächensolaranlage | in operation | 2018-06-13 | TB Agrar GbR |
| Solarpark Bahn | 0.75 MW | Freiflächensolaranlage | in operation | 2019-04-30 | TB Agrar GbR |
| PV-Anlage Freifläche Lisi Automotive Mellrichstadt | 0.75 MW | Freiflächensolaranlage | in operation | 2023-07-13 | LISI Automotive KKP GmbH & Co. KG |
| PV Trappstadt I | 0.75 MW | Freiflächensolaranlage | in operation | 2019-02-28 | Christian Löb Solarenergie GmbH & Co. KG |
| PV Trappstadt II | 0.74 MW | Freiflächensolaranlage | in operation | 2020-06-30 | Christian Löb Solarenergie GmbH & Co. KG |
| PV-Anlage ullmer NES | 0.71 MW | Gebäudesolaranlage | in operation | 2024-01-29 | ullmer GmbH & Co. KG |
| Jopp Werk 3, 707,72 kWp | 0.71 MW | Gebäudesolaranlage | in operation | 2022-10-07 | Jopp Automotive GmbH |
| AGRI-PV II Ostheim | 0.67 MW | Freiflächensolaranlage | in operation | 2026-07-30 | Bauer & Schöpplein GbR |
| Mittelstreu Erweiterung, 662 kWp | 0.66 MW | Freiflächensolaranlage | in operation | 2022-03-17 | Bioenergie Roter Berg I |
| Gemarkung Unsleben Fl. 2084, 645,39 kWp | 0.65 MW | Freiflächensolaranlage | in operation | 2020-09-11 | Bioenergie Roter Berg I |
| PV-Anlage Hohenroth Alban Schmitt; Grundstück 1250 | 0.60 MW | Gebäudesolaranlage | in operation | 2019-02-28 | Adites Park |
| Wollbacher Weg, 537,87 kWp | 0.54 MW | Gebäudesolaranlage | in operation | 2022-07-14 | Hertzsch-Werner Maschinen KG |
| Anlage 9 | SSW Recycling-Halle, SSW Kommissionier-Halle | 0.51 MW | Gebäudesolaranlage | in operation | 2025-08-01 | Adolf Steinbach Steinindustrie-Schotterwerke GmbH & Co. KG |
| PV Hollstadt Südfeld 2 | 0.50 MW | Freiflächensolaranlage | in operation | 2020-06-02 | TB Agrar GbR |
| PV Unsleben Fl. 714-718, 453,335 kWp | 0.45 MW | Freiflächensolaranlage | in operation | 2020-05-29 | Zwierlein Energie GbR |
| PV-Anlage | 0.45 MW | Gebäudesolaranlage | in operation | 2020-01-31 | Schmitts Backstube KG |
| Gemarkung Mittelstreu Fl. 649, 651, 652, 413,22 kWp | 0.41 MW | Freiflächensolaranlage | in operation | 2020-09-11 | Bioenergie Roter Berg I |
| unit operated by a private individual | 0.41 MW | Gebäudesolaranlage | in operation | 2013-07-31 | private individual |
| MET 2013 399 KWp Kiefernweg | 0.40 MW | Gebäudesolaranlage | in operation | 2013-12-30 | Edinger-Braun PV GmbH |
| unit operated by a private individual | 0.39 MW | Gebäudesolaranlage | in operation | 2019-02-28 | private individual |
| unit operated by a private individual | 0.37 MW | Gebäudesolaranlage | in operation | 2011-11-11 | private individual |
| PV Freiland Stockheim 2.3 | 0.37 MW | Freiflächensolaranlage | temporarily shut down | 2025-02-04 | Bauer & Schöpplein GbR |
| unit operated by a private individual | 0.35 MW | Gebäudesolaranlage | in operation | 2026-09-01 | private individual |
| AG11/2 | 0.35 MW | Freiflächensolaranlage | in operation | 2007-03-12 | Bauer & Schöpplein GbR |
| Betriebsdächer Werk 1 u. 2 | 0.33 MW | Gebäudesolaranlage | in operation | 2024-01-30 | Steinhardt GmbH & Co. KG |
| MSB PV-Anlage Lindenstrasse | 0.32 MW | Gebäudesolaranlage | in operation | 2024-05-03 | MSB GmbH & Co. KG |
| PV-Anlage - Sebald Maschinenbau GmbH / Werk 1 | 0.31 MW | Gebäudesolaranlage | in operation | 2023-09-27 | Sebald Maschinenbau GmbH |
| PV-Anlage 2019 | 0.31 MW | Gebäudesolaranlage | in operation | 2019-01-29 | Hermann Benkert Werkzeug- und Formenbau GmbH |
| Anlage 7.1 | FGB Fertigung | 0.31 MW | Gebäudesolaranlage | in operation | 2023-04-01 | Fertigungsgerätebau Adolf Steinbach GmbH & Co. KG |
| Gemarkung Unsleben Fl.2113, 296,07 kWp | 0.30 MW | Freiflächensolaranlage | in operation | 2020-06-30 | Bioenergie Roter Berg I |
| unit operated by a private individual | 0.29 MW | Gebäudesolaranlage | in operation | 2018-05-15 | private individual |
| Photovoltaikanlage Haus 2 | 0.29 MW | Gebäudesolaranlage | in operation | 2023-05-03 | Franz Pecht Vermögensverwaltungs GmbH & Co. KG |
| Biostrom 279,65 kWp | 0.28 MW | Gebäudesolaranlage | in operation | 2025-01-03 | BioRest GmbH |
| Anlage 8.1 | FGB Montage | 0.28 MW | Gebäudesolaranlage | in operation | 2024-07-18 | Fertigungsgerätebau Adolf Steinbach GmbH & Co. KG |
| unit operated by a private individual | 0.27 MW | Gebäudesolaranlage | in operation | 2026-04-22 | private individual |
| GANSHORN NES | 0.27 MW | Gebäudesolaranlage | in operation | 2026-01-14 | GANSHORN Medizin Electronic GmbH |
| PV Freiland Stockheim II | 0.25 MW | Freiflächensolaranlage | in operation | 2023-01-09 | Bauer & Schöpplein GbR |
| PV Freiland Stockheim 2.2 | 0.25 MW | Freiflächensolaranlage | temporarily shut down | 2025-02-03 | Bauer & Schöpplein GbR |
| AG11/3 | 0.25 MW | Freiflächensolaranlage | in operation | 2008-07-18 | Bauer & Schöpplein GbR |
| unit operated by a private individual | 0.25 MW | Gebäudesolaranlage | in operation | 2023-08-01 | private individual |
| unit operated by a private individual | 0.24 MW | Gebäudesolaranlage | in operation | 2012-10-30 | private individual |
| PVA- Am Kurzentrum - 235,62 kWp | 0.24 MW | Gebäudesolaranlage | in operation | 2023-04-14 | Kur-Betriebsgesellschaft mbH Werner Angermüller |
| Dachfläche Verwaltung, Produktion und Lager Friedenstraße 9 | 0.23 MW | Gebäudesolaranlage | in operation | 2019-07-31 | Druckerei Mack |
| unit operated by a private individual | 0.23 MW | Gebäudesolaranlage | in operation | 2021-03-29 | private individual |
| unit operated by a private individual | 0.23 MW | Gebäudesolaranlage | in operation | 2017-09-11 | private individual |
| PV-Anlage Bad Neustadt (2015) | 0.22 MW | Gebäudesolaranlage | in operation | 2015-06-30 | Wehner Lebensmittel |
| Lebenhan | 0.22 MW | Gebäudesolaranlage | in operation | 2015-07-31 | Krenig & Erlich & Esau |
| P022 BW Unterweißenbrunn | 0.22 MW | Gebäudesolaranlage | in operation | 2012-03-07 | Friedrich-Wilhelm Raiffeisen Energie eG |
| PVA Bad Neustadt | 0.21 MW | Gebäudesolaranlage | in operation | 2008-04-11 | Edeka Grundstücksgesellschaft Nordbayern-Sachsen-Thüringen mbH |
| P004 1. BSA Sondheim | 0.21 MW | Gebäudesolaranlage | in operation | 2009-07-31 | Friedrich-Wilhelm Raiffeisen Energie eG |
| PV-Anlage 210KW | 0.21 MW | Gebäudesolaranlage | in operation | 2026-09-10 | Kleinhenz & Fries Metallbearbeitung GmbH |
| unit operated by a private individual | 0.21 MW | Gebäudesolaranlage | in operation | 2012-11-30 | private individual |
| PVNST-Salz | 0.21 MW | Gebäudesolaranlage | in operation | 2023-06-17 | Bötz Matthias |
| PV-Anlage Bad Neustadt (2025) | 0.20 MW | Gebäudesolaranlage | in operation | 2025-01-21 | Wehner Lebensmittel |
| unit operated by a private individual | 0.20 MW | Gebäudesolaranlage | in operation | 2012-03-29 | private individual |
| BEG_Stockheim_Willmarser Str. 32 | 0.20 MW | Gebäudesolaranlage | in operation | 2012-06-30 | Bürger-Energie Grabfeld eG |
| Anlage 2 | 0.19 MW | Gebäudesolaranlage | in operation | 2010-06-30 | Gustav Deblich OHG |
| PV-Anlage 2011 | 0.19 MW | Gebäudesolaranlage | in operation | 2011-12-19 | Landhaus Kienbacher |
| 185,72 kW - H17 | 0.19 MW | Gebäudesolaranlage | in operation | 2013-08-30 | Erhard |
| PV-Anlage 1 | 0.19 MW | Gebäudesolaranlage | in operation | 2011-12-19 | Schindler Handhabetechnik GmbH |
| ABR941557994537 | 0.18 MW | Gebäudesolaranlage | in operation | 2024-04-11 | Preh |
| unit operated by a private individual | 0.18 MW | Gebäudesolaranlage | in operation | 2025-10-01 | private individual |
| unit operated by a private individual | 0.18 MW | Gebäudesolaranlage | in operation | 2012-03-08 | private individual |
| unit operated by a private individual | 0.18 MW | Gebäudesolaranlage | in operation | 2017-07-31 | private individual |
| Jopp Werk 2, 176,4 kWp | 0.18 MW | Gebäudesolaranlage | in operation | 2023-01-04 | Jopp Holding GmbH |
| PV Anlage Meininger Straße Neu | 0.18 MW | Gebäudesolaranlage | in operation | 2022-09-15 | Bayerisches Rotes Kreuz - Kreisverband Rhön-Grabfeld |
| Anlage 5 | 0.17 MW | Gebäudesolaranlage | in operation | 2024-10-22 | Joachim Schrotthandel GmbH |
| Hausdach | 0.17 MW | Gebäudesolaranlage | in operation | 2017-04-28 | ADITES Bau GmbH |
| PV-Anlage 2014 | 0.17 MW | Gebäudesolaranlage | in operation | 2014-03-19 | Hermann Benkert Werkzeug- und Formenbau GmbH |
| PV-Anlage Dach Schule Hohenroth | 0.16 MW | Gebäudesolaranlage | in operation | 2022-01-27 | Gemeinde Hohenroth |
| Niederlauer | 0.16 MW | Gebäudesolaranlage | in operation | 2012-03-27 | SSMH |
| ABR936193152298 | 0.16 MW | Gebäudesolaranlage | in operation | 2024-01-10 | Holzfräserei |
| unit operated by a private individual | 0.16 MW | Gebäudesolaranlage | in operation | 2010-09-29 | private individual |
| Norma | 0.16 MW | Gebäudesolaranlage | in operation | 2024-03-14 | NORMA Lebensmittelfilialbetrieb Stiftung & Co. KG |
| Versandlager | 0.16 MW | Gebäudesolaranlage | in operation | 2014-07-31 | Remy & Geiser GmbH |
| unit operated by a private individual | 0.16 MW | Gebäudesolaranlage | in operation | 2018-04-30 | private individual |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2023-01-09 | private individual |
| PV-Anlage Hohenroth Alban Schmitt Plus | 0.15 MW | Gebäudesolaranlage | in operation | 2019-02-28 | Adites Park |
| Lagerhalle HW | 0.15 MW | Gebäudesolaranlage | in operation | 2012-06-29 | Georg und Joachim Schmitt GbR |
| unit operated by a private individual | 0.15 MW | Gebäudesolaranlage | in operation | 2013-01-11 | private individual |
| Anlage 1 | 0.15 MW | Gebäudesolaranlage | in operation | 2018-02-06 | WEG Paul-Forbach-Str. 2, Bad Neustadt |
| Sulzdorf GS24 Anl. 2 | 0.15 MW | Gebäudesolaranlage | in operation | 2010-06-24 | ME 64 GmbH & Co. KG |
| Sulzdorf AHB Anl. 2 | 0.15 MW | Gebäudesolaranlage | in operation | 2010-06-24 | Bauer GmbH |
| Rhön-Saale | 0.14 MW | Gebäudesolaranlage | in operation | 2025-02-13 | Autohaus Heermann und Rhein GmbH |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2023-06-26 | private individual |
| TSV Hollstadt Sportheim | 0.13 MW | Gebäudesolaranlage | in operation | 2020-06-23 | TSV Hollstadt e. V. |
| P001 Bauhof NES Anl1 | 0.13 MW | Gebäudesolaranlage | in operation | 2008-11-14 | Friedrich-Wilhelm Raiffeisen Energie eG |
| Anlage 3 | SSW Lagerhalle | 0.13 MW | Gebäudesolaranlage | in operation | 2015-12-23 | Adolf Steinbach Steinindustrie-Schotterwerke GmbH & Co. KG |
| Filiale, 97616, Bad Neustadt, Borsigstr. 13 | 0.13 MW | Gebäudesolaranlage | in operation | 2015-12-09 | ALDI SE & Co. KG Helmstadt |
| unit operated by a private individual | 0.13 MW | Gebäudesolaranlage | in operation | 2011-09-06 | private individual |
| PV-Anlage | 0.13 MW | Gebäudesolaranlage | in operation | 2012-03-08 | Trost |
| ME64 Ottelmannshsn. | 0.12 MW | Gebäudesolaranlage | in operation | 2012-06-29 | ME 64 GmbH & Co. KG |
| Candor Ottelmannshsn. | 0.12 MW | Gebäudesolaranlage | in operation | 2012-06-29 | Bauer GmbH |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2012-03-28 | private individual |
| unit operated by a private individual | 0.12 MW | Gebäudesolaranlage | in operation | 2012-03-30 | private individual |
| PV Anlage 1 und 2 | 0.12 MW | Gebäudesolaranlage | in operation | 2018-11-14 | PIA Automation Bad Neustadt GmbH |
| PV-Anlage 1 Bauhof Ostheim | 0.12 MW | Gebäudesolaranlage | in operation | 2011-11-22 | Überlandwerk Rhön GmbH |
| PV Anlage Halle 2 Bad Königshofen | 0.12 MW | Gebäudesolaranlage | in operation | 2012-03-30 | Rainer und Michaela Bötsch GbR |
| Werkstatt HW | 0.11 MW | Gebäudesolaranlage | in operation | 2011-12-19 | Georg und Joachim Schmitt GbR |
| unit operated by a private individual | 0.11 MW | Gebäudesolaranlage | in operation | 2011-05-06 | private individual |
| P005 Maschinenhalle MK | 0.11 MW | Gebäudesolaranlage | in operation | 2009-05-28 | Friedrich-Wilhelm Raiffeisen Energie eG |
| Hallendach | 0.11 MW | Gebäudesolaranlage | in operation | 2013-04-23 | Stadtwerke Bad Neustadt a. d. Saale |
| unit operated by a private individual | 0.11 MW | Gebäudesolaranlage | in operation | 2009-12-30 | private individual |
| 3. BSA Gbd IFSYS | 0.11 MW | Gebäudesolaranlage | in operation | 2012-03-06 | Friedrich-Wilhelm Raiffeisen Energie eG Großbardorf |
| 2318 Bad Neustadt PV | 0.11 MW | Gebäudesolaranlage | in operation | 2015-07-01 | tegut... gute Lebensmittel GmbH & Co. KG |
Which organisations operate the most solar PV capacity in Rhön-Grabfeld?
| Operator | Units | Capacity |
|---|---|---|
| Bürgersolarpark Herbstadt-Ottelmannshausen GmbH & Co. KG | 3 | 39.9 MW |
| Solarkraftwerk Großbardorf GmbH & Co. KG | 1 | 30.3 MW |
| ÜWR Solarpark Stetten GmbH & Co. KG | 4 | 27.1 MW |
| Bürgersolarpark Sulzfeld Kleinbardorf GmbH & Co. KG | 3 | 21.0 MW |
| Bürgersolar Lerchenleite | 1 | 20.6 MW |
| Bürgersolarpark Alsleben West GmbH & Co. KG | 2 | 20.0 MW |
| Könergie GmbH & Co. KG | 2 | 20.0 MW |
| Bürgersonnenenergie Saaletal GmbH & Co. KG | 3 | 20.0 MW |
| Bürgersolarpark Aubstadt Nord GmbH & Co. KG | 2 | 20.0 MW |
| Solarkraftwerk Großbardorf II GmbH & Co. KG | 2 | 18.8 MW |
Which installation type accounts for the most solar PV capacity in Rhön-Grabfeld?
| Installation type | Units | Capacity |
|---|---|---|
| Freiflächensolaranlage | 74 | 364.8 MW |
| Gebäudesolaranlage | 94 | 24.9 MW |
Solar PV in Bayern · Solar PV in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many solar installations are registered in Rhön-Grabfeld (Bayern), and how large are t can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.